This local environmental plan sets the zoning, permitted/prohibited uses, and development consent rules for the land shown on its maps. Mechanically it replaces earlier Murrumbidgee LEPs, makes the Council the consent authority, and establishes exempt, complying and consent pathways (cls 1.3, 1.8, 1.6, 3.1–3.2). It states aims such as protecting agriculture, biodiversity and heritage (cl 1.2) and therefore affects landowners and developers who must obtain consent or meet technical/exempt standards while the Council decides and enforces compliance.
This instrument is a local environmental plan (LEP) that sets land use zones, development permissions, development standards and locally tailored environmental controls for land in the Murrumbidgee area. The Plan commences on publication (cl 1.1AA) and applies to the land shown on the Land Application and Land Zoning maps (cls 1.3; 2.2). The Council is the consent authority subject to the Environmental Planning and Assessment Act 1979 (the Act) (cl 1.6). State environmental planning policies continue to apply where they prevail over the Plan (cl 1.9(1)).
Mechanically the Plan does the following.
Establishes zones and a Land Use Table that specifies, for each zone, permitted without consent uses, permitted with consent uses, and prohibited uses (cl 2.1; cl 2.3; Land Use Table). The zoning categories include rural, residential, employment, special purpose, recreation, conservation and waterways (cl 2.1).
Repeals prior local plans for the area and removes their operation on the land to which this Plan applies (cl 1.8). A savings rule requires development applications lodged but not finally determined before commencement to be decided as if the Plan had not commenced (cl 1.8A).
Specifies when development consent is required, including for subdivision (cl 2.6) and demolition (cl 2.7); creates an express temporary use mechanism capped at 52 days in any 12 month period, with an exception for sales offices (cl 2.8); and expressly prohibits canal estate development (cl 2.9).
Provides for exempt and complying development via Schedules 2 and 3 and sets the tests that must be met for such works to be exempt or complying (cls 3.1-3.3).
Sets local development standards and controls, for example minimum lot sizes on the Lot Size Map (cl 4.1), rural subdivision flexibility and special rules for intensive plant agriculture in the Coleambally Irrigation Area (cls 4.2; 4.2A), and a local exceptions-to-standards regime modelled on the state clause (cl 4.6).
Current sections
Direct links to the current provisions in Murrumbidgee Local Environmental Plan 2013.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agritourism; Air transport facilities; Airstrips; Animal boarding or training establishments; Aquaculture; Backpackers’ accommodation; Bed and breakfast accommodation; Boat launching ramps; Boat sheds; Building identification signs; Business identification signs; Camping grounds; Caravan parks; Cellar door premises; Cemeteries; Community facilities; Correctional centres; Depots; Dual occupancies (attached); Dwelling houses; Eco-tourist facilities; Environmental facilities; Extractive industries; Farm buildings; Farm stay accommodation; Flood mitigation works; Forestry; Freight transport facilities; Helipads; Home-based child care; Home businesses; Home industries; Home occupations (sex services); Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Jetties; Landscaping material supplies; Open cut mining; Plant nurseries; Recreation areas; Recreation facilities (major); Recreation facilities (outdoor); Roadside stalls; Rural industries; Rural workers’ dwellings; Secondary dwellings; Veterinary hospitals; Water recreation structures; Water supply systems
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Note.
When this Plan was made, no land in the zones listed in the Table to subclause (2) was included on the Land Reservation Acquisition Map as the land was owned by a State authority, a public company or a subsidiary of a public company.
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Earthworks
6 Earthworks
6.1 Earthworks
(1) The objective of this clause is to ensure that earthworks for which development consent is required will not have a detrimental impact on environmental functions and processes, neighbouring uses, cultural or heritage items or features of the surrounding land.
(2) Development consent is required for earthworks unless—
(a) the earthworks are exempt development under this Plan or another applicable environmental planning instrument, or
(b) the earthworks are ancillary to development that is permitted without consent under this Plan or to development for which development consent has been given.
(3) Before granting development consent for earthworks (or for development involving ancillary earthworks), the consent authority must consider the following matters—
(a) the likely disruption of, or any detrimental effect on, drainage patterns and soil stability in the locality of the development,
(b) the effect of the development on the likely future use or redevelopment of the land,
(c) the quality of the fill or the soil to be excavated, or both,
(d) the effect of the development on the existing and likely amenity of adjoining properties,
(e) the source of any fill material and the destination of any excavated material,
(f) the likelihood of disturbing relics,
(g) the proximity to, and potential for adverse impacts on, any waterway, drinking water catchment or environmentally sensitive area,
(h) any appropriate measures proposed to avoid, minimise or mitigate the impacts of the development.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
(Clause 5.2)
Schedule 5
Environmental heritage
Schedule 5 Environmental heritage
Schedule 5 Environmental heritage
(Clause 5.10)
sch 5: Am 2019 (249), cl 5.
Maps: Am 2019 (249), cl 4. Entries discontinued from July 2021 when responsibility for map updates moved to Department of Planning, Industry and Environment.
Schedule 6
Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
(Clause 5.19)
Division 1
Site location requirements
Division 1 Site location requirements
Division 1 Site location requirements
Division 2
Operational requirements
Division 2 Operational requirements
Division 2 Operational requirements
7
Conservation exclusion zones
7 Conservation exclusion zones
7 Conservation exclusion zones
(1) Must not be carried out on the following land, except to the extent necessary to gain access to water—
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Murrumbidgee Local Environmental Plan 2013.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Murrumbidgee in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to protect, enhance and conserve agricultural and horticultural land through the proper management, development and conservation of natural and man-made resources,
(b) to encourage a range of housing, employment, recreation and community facilities to meet the needs of existing and future residents of Murrumbidgee,
(c) to promote the efficient and equitable provision of public services, infrastructure and amenities,
(d) to conserve the environmental heritage of the land to which this Plan applies.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
Imposes locally specific environmental and heritage assessment obligations: terrestrial biodiversity (cl 6.3), groundwater vulnerability (cl 6.4), riparian land and watercourses (cl 6.5), wetlands (cl 6.6), river front areas and river beds and banks with river-specific controls linked to the Murrumbidgee River (cls 6.7-6.8), and a heritage consent regime that requires consent for demolition, alteration and excavation affecting listed items or places (cl 5.10; Schedule 5).
Applies targeted industry and activity rules, for example for pond, tank and oyster aquaculture (cl 5.19; Schedule 6), intensive livestock agriculture thresholds and locational constraints (cl 5.18), and a provision preventing consent refusals on grounds related to music and performance at licensed premises, subject to acceptable noise control (cl 5.20).
Provides administrative and procedural items such as mapping rules and public access to maps (cl 1.7), classification and reclassification of public land (cl 5.2; Schedule 4), and the identification of the relevant State acquisition authority where owner-initiated acquisition may occur (cl 5.1).
The Plan expressly cross-references and relies on the Act and a range of State statutes and SEPPs for matters outside local scope, and it leaves enforcement, penalties and many procedural mechanisms to the Act and the relevant regulations (see cl 1.6; cl 1.9; numerous cross-references).
Main concepts
This Plan organises local planning by a combination of spatial zoning, regulatory permissions, mapped development controls and topic-specific clauses that overlay the zoning regime.
Zones and land use controls
Zones are the primary spatial unit; the Land Use Table maps uses to zones and identifies whether a use is permitted without consent, permitted with consent or prohibited (cl 2.1; cl 2.3). The Plan lists multiple rural zones (for example RU1 Primary Production, RU3 Forestry, RU5 Village), residential, industrial, recreation, conservation and waterway zones (cl 2.1).
Maps and schedules control granular outcomes
The Plan refers repeatedly to maps that determine zone boundaries, lot sizes, biodiversity overlays, riparian land, wetlands, groundwater vulnerability and heritage areas (cls 1.3; 1.7; cl 6.3; cl 6.4; cl 6.5; cl 6.6; Schedule 5; Schedule 6). The Plan treats maps as authoritative and requires them to be available on the Planning Portal (cl 1.7).
Consent paradigms and alternative pathways
Development may be: exempt development (no development consent required subject to conditions in Schedule 2 and the Building Code of Australia criteria, cl 3.1); complying development (certificate pathway where the proposal meets Part 1 of Schedule 3 and complying standards, cl 3.2); or development requiring development consent under the Act and this Plan (cl 2.3; cl 2.6). Designations such as environmental assessment and Part 5 matters of the Act remain relevant for some categories (cl 3.1(3)(c)).
Localised standards and exceptions
Minimum lot sizes and subdivision controls are mapped and enforced by cl 4.1 and cl 4.1AA (community title schemes). Clauses provide targeted flexibility: clause 4.2 allows limited rural subdivision for primary production, subject to constraints on creating lots with dwellings; clause 4.2A allows subdivisions for intensive plant agriculture in the Coleambally Irrigation Area but with stringent criteria for dwellings and irrigation entitlements.
Environmental overlay clauses
Part 6 contains topic-specific controls and tests that the consent authority must consider and satisfy before granting consent: biodiversity (cl 6.3), groundwater vulnerability (cl 6.4), riparian land and watercourses (cl 6.5), wetlands (cl 6.6), river front areas and river beds and banks (cls 6.7-6.8). Each clause requires assessment of specific impacts and typically prohibits consent unless the authority is satisfied impacts are avoided, minimised or mitigated (for example cl 6.3(4); cl 6.4(4); cl 6.5(4); cl 6.6(4)).
Industry-specific regimes
Aquaculture is addressed in cl 5.19 and Schedule 6 with site, operational and design requirements; intensive livestock agriculture has thresholds that allow small operations to proceed without consent but restrict location relative to watercourses, dwellings and other farms (cl 5.18). For aquaculture and intensive livestock the Plan sets minimum information requirements and locational restrictions the consent authority must consider.
Heritage and cultural protections
The Plan lists local and state heritage items and archaeological sites in Schedule 5 and requires development consent for demolition, moving, altering externally and some internal changes, and excavation where relics or Aboriginal places are likely to be disturbed (cl 5.10). Notification and consultation obligations with the Heritage Council and local Aboriginal communities are attached in certain circumstances (cl 5.10(7)-(9)).
Cross-cutting procedural and statutory interactions
The Plan repeatedly defers to State law and SEPPs where they prevail, and it includes a clause that suspends covenants and private agreements to the extent necessary to give effect to permissive provisions of the Plan, with enumerated exceptions (cl 1.9A). It also preserves State powers on acquisition and classification of public land, and it identifies relevant State authorities for owner-initiated acquisition (cl 5.1; cl 5.2).
Design choices to note
Some model clauses are expressly not adopted, for example height of buildings and floor space ratio are marked not adopted (cls 4.3-4.5). The Plan thus relies more heavily on zoning, lot size and overlay controls than on quantitative height or FSR limits within the instrument itself.
Who it affects
The Plan creates legal entitlements, obligations and practical effects for a range of actors. The primary affected groups are as follows.
Landowners and developers within the Murrumbidgee mapping area
Owners and prospective buyers must comply with zoning, lot-size maps and overlay controls. Subdivision, demolition, erection of dwellings, intensive livestock facilities and aquaculture developments are all activities that attract consent or compliance obligations (cls 2.6; 2.7; cl 4.1; cl 5.18; cl 5.19). Owners with land in mapped biodiversity, riparian or wetland overlays face additional assessment requirements and, for some categories, prohibitions on consent unless environmental outcomes are met (cls 6.3-6.6).
Council as consent authority
The Council is the consent authority for this Plan, subject to the Act (cl 1.6). The Council decides development applications, enforces development consent conditions, and must consider the objectives of zones and the specific assessment criteria in the Plan when making decisions (cl 2.3(2); cl 6.3(3); cl 6.5(3), among many other clauses).
Developers and operators in specific industries
Farmers, intensive livestock operators and aquaculture operators are directly affected. Intensive livestock agriculture is permitted without consent below specified capacity thresholds but only if locational constraints are satisfied; otherwise consent is required and the Council must consider odour, water pollution, soil degradation and industry codes (cl 5.18). Pond and tank aquaculture require compliance with site and operational standards in Schedule 6 and in some cases require consent and environmental statements (cl 5.19; Sch 6).
Heritage stakeholders and Aboriginal communities
Owners of listed heritage items or land within heritage conservation areas must obtain consent for demolition, structural change and excavations, and the consent authority must notify and consider submissions from the Heritage Council or local Aboriginal communities in prescribed circumstances (cl 5.10(2), (7) and (8); Schedule 5 lists items).
Public authorities and the State
The Plan identifies certain State authorities as the relevant acquisition authority for owner-initiated acquisition (cl 5.1). It also preserves the operation of State policies that prevail over local provisions (cl 1.9), and clauses exclude certain Crown instruments from suspension under the covenant-suspension clause (cl 1.9A(2)).
Licensed premises and entertainment operators
Clause 5.20 prevents the consent authority from refusing development consent for licensed premises on specified aesthetic and programmatic grounds connected to music, performance, dancing and related fixtures; it also precludes refusal solely on noise grounds if the consent authority is satisfied noise can be managed to an acceptable level (cl 5.20).
Neighbouring landowners and communities
Local residents and adjoining landowners are affected by environmental overlays, earthworks, intensive livestock thresholds, flood planning and riverbank protections, all of which are designed to protect amenity, environmental function and safety (cls 6.1; 5.18; 5.21; 6.7-6.8).
Who pays and who decides
Developers and landowners bear the direct costs of compliance: preparing statements of environmental effects, heritage impact statements, infrastructure servicing arrangements, compliance with lot-size and aquaculture requirements, and any construction or remediation works required as conditions of consent (see cl 6.9 on essential services; cl 5.19 and Sch 6 on aquaculture requirements). The Council, acting as consent authority subject to the Act, decides whether development proceeds and what conditions apply (cl 1.6; cl 2.3(2)). Where State policies prevail, State agencies may effectively set higher level constraints and influence outcomes through SEPPs or approvals required under other statutes (cl 1.9).
Behavioural effects on private choice
Owners are nudged towards compliance with mapped overlays and lot size minima if they wish to subdivide or erect dwellings (cl 4.1; cl 4.2C). Aquaculture and intensive livestock operators are incentivised to design operations within threshold capacities and locational buffers to avoid a consent pathway, or to prepare more substantial environmental documentation if they exceed thresholds (cl 5.18; cl 5.19). The clause preventing refusal on certain music-related grounds reduces the ability of Council to condition out particular forms of live entertainment where noise can be managed, thereby affecting venue programming decisions (cl 5.20).
Concentrated and diffuse effects
Benefits from relaxed permissions or special provisions will concentrate on specific owner groups: holders of irrigated land in the Coleambally Irrigation Area seeking smaller lots for intensive plant agriculture (cl 4.2A); small-scale aquaculture operators within priority oyster areas (cl 5.19(6)); and licensed premises operators seeking certainty about entertainment-related consent grounds (cl 5.20). Costs and constraints from environmental overlays are distributed across owners of mapped areas where restrictions, additional assessment and possible refusals can limit private development choices (cls 6.3-6.6).
Key duties and rights
This Plan creates a network of duties and entitlements for applicants, consent authorities and other stakeholders. The key legal duties and rights under the text are as follows.
Duties to obtain development consent, or to comply with exemptions or complying pathways
Subdivision, demolition and many classes of development require development consent unless the Plan or a SEPP identifies the development as exempt or complying (cl 2.6; cl 2.7; cl 3.1; cl 3.2). Exempt development must meet Schedule 2 standards and Building Code of Australia requirements (cl 3.1(2)-(5)). Complying development must be specified in Part 1 of Schedule 3 and meet the development standards specified there and in the Building Code of Australia (cl 3.2(2)-(4)).
Assessment duties imposed on the consent authority
The consent authority must have regard to the objectives for development in a zone when determining an application (cl 2.3(2)). For many environmental overlays the consent authority must consider specific matters and must be satisfied that development will avoid, minimise or mitigate significant adverse environmental impacts before granting consent (for example cl 6.3(3)-(4) biodiversity; cl 6.4(3)-(4) groundwater; cl 6.5(3)-(4) riparian; cl 6.6(3)-(4) wetlands). For eco-tourist facilities the Plan lays out a long list of matters the consent authority must be satisfied about before granting consent (cl 5.13).
Duties on applicants to provide information
Several clauses require particular information or assessments to accompany an application or be available for consideration. For example, clause 5.17 requires a statement of environmental effects and details of licences or exemptions for certain artificial waterbodies. Clause 5.18 directs the consent authority to consider the adequacy of the statement of environmental effects for intensive livestock agriculture. The Environmental Planning and Assessment Regulation 2021 requires a document setting out grounds when an applicant seeks to contravene a development standard under cl 4.6 (cl 4.6 note).
Rights to challenge or seek variations
Clause 4.6 allows development consent to be granted notwithstanding contravention of a development standard where the applicant demonstrates that compliance is unreasonable or unnecessary and there are sufficient planning grounds to justify the contravention; the consent authority must record its assessment (cl 4.6(2)-(4)). There are limits, for example the clause cannot be used to permit multiple undersized rural lots or certain complying development standards (cl 4.6(6); cl 4.6(8)).
Specific rights and limits for certain land uses
Owners in the Coleambally Irrigation Area may seek subdivisions for intensive plant agriculture under clause 4.2A, but where an existing dwelling would be situated on a created lot the consent authority must be satisfied of a long list of criteria including minimum lot area of at least 40 hectares, existing or intended intensive plant agriculture and appropriate water entitlements (cl 4.2A(3)-(4)).
Rural workers’ dwellings in Zone RU1 require the consent authority to be satisfied of economic necessity, siting with an existing dwelling and that the dwelling will not impair agricultural use (cl 4.2D).
Temporary use and time-limited permissions
Development consent may be granted for temporary use of land for up to 52 days in any 12 month period, subject to satisfaction of several site restoration and amenity tests; a sales office for a new housing estate may exceed that limit (cl 2.8).
Suspension of private instruments and limits
Clause 1.9A temporarily suspends the operation of agreements, covenants or similar instruments to the extent necessary to enable development in accordance with the Plan, but excludes covenants imposed by the Council, certain Crown instruments, conservation agreements and planning agreements, and does not affect public authorities’ rights under registered instruments (cl 1.9A(1)-(3)).
Heritage procedural duties
Consent is required to demolish, move or alter heritage items, archaeological sites and Aboriginal places; the consent authority may require heritage management documents and must notify the Heritage Council or local Aboriginal communities in specified circumstances (cl 5.10(2)-(9)).
Industry standards and operational controls
Aquaculture and intensive livestock clauses require operators to comply with industry development plans, operational requirements in Schedule 6, and to satisfy locational and design requirements or face refusal of consent (cl 5.19; Sch 6; cl 5.18).
Essential services test
The consent authority must not grant consent unless essential services are available or arrangements have been made for water, electricity, sewage disposal, stormwater and suitable vehicular access (cl 6.9).
Rights that are not in the LEP
The Plan does not itself set out penalties or enforcement procedures; those functions are allocated to the Act and related regulations. The Plan repeatedly references the Act and other legislation as the source of enforcement and procedural mechanisms (cl 1.6; cl 1.9; various notes).
Penalties and enforcement
The Plan sets statutory permissions, prohibitions and procedural prerequisites but it does not itself specify a standalone schedule of criminal or civil penalties. Instead the Plan operates inside the enforcement and compliance framework of the Environmental Planning and Assessment Act 1979 and other relevant statutes that it cross-references. The instrument therefore relies on external enforcement mechanisms and administrative remedies.
What the Plan provides on enforcement and compliance
The Plan makes many activities subject to development consent and makes others exempt or complying, thereby creating the legal preconditions for enforcement action under the Act where unauthorised development occurs (for example cl 2.6 subdivision; cl 2.7 demolition; cl 3.1 exempt development requirements; cl 3.2 complying development). The Act contains the powers to issue orders, require remediation, impose penalties and seek injunctions for breaches of planning controls. The Plan repeatedly flags that development consent and other approvals are required under the Act or another applicable instrument (see cl 3.1(3), citing designated development and references to the Act throughout).
Where the Plan places duties on consent authorities to record or notify
Clause 4.6 requires the consent authority to keep a record of its assessment when considering a contravention of a development standard under that clause (cl 4.6(4)). Clause 5.10 mandates notification of the Heritage Council prior to granting consent for development on archaeological sites and nominated State heritage items, and notification of local Aboriginal communities for Aboriginal places of heritage significance (cl 5.10(7)-(9)). Those procedural duties create administrative records and consultation steps that can be material to later compliance and judicial review.
Enforcement instruments are external to the Plan
The Act and the regulations prescribe infringements, penalties, compliance notices and prosecution mechanisms; those are not restated in the Plan. The Plan’s role is to set planning permissions and constraints which the Act enforces. For example, the Plan’s notes reference Division 3.5 of the Act in relation to public notice of DAs for development that require an environmental planning instrument amendment (cl 1.8A note). The reader should consult the Act for the precise range of penalties, the power to issue stop work orders, enforcement notices and the civil and criminal penalties attached to breaches.
Implementation and enforceability friction points
Enforcement will depend on accurate mapping and identification of overlays. The Plan requires maps to be maintained and available, but the instrument also records that updates and map maintenance arrangements moved to the Department of Planning, Industry and Environment in 2021 (cl 1.7 note; Schedule 5 notes). Implementation risk exists where there is map lag, ambiguous boundaries or where the Plan defers particular technical standards to other documents or industry development plans. For activities regulated by other Acts such as fisheries, water or Crown land management, enforcement may require coordination between agencies because the Plan refers to those instruments for licencing and approvals (for example cl 5.17; cl 5.12).
Practical enforcement consequences for developers and owners
Breach of Plan-derived planning controls will ordinarily trigger Act-based enforcement such as orders to obtain retrospective consent, remediate unauthorised works, or prosecution for contraventions. The Plan tightens the nexus between mapped overlays and consent outcomes; where a proposed development falls within a biodiversity, riparian, wetland or river overlay the Plan imposes substantive tests the consent authority must apply before approving development (see cls 6.3-6.8). Failure to satisfy these tests creates a tangible legal barrier to obtaining consent, which is enforced administratively or judicially through the Act’s mechanisms.
In short, the Plan creates duties and prohibitions but relies on the Act and other statutes for the mechanisms, sanctions and remedies that implement compliance. The Plan itself contains procedural duties that create administrative steps that can be enforced through the Act’s framework.
How it interacts with other laws
The Plan is expressly embedded within the wider NSW planning, environment and resource law architecture. It cross-references and defers to numerous State instruments and statutes, and it creates interaction points that affect both decision-making and the shape of approvals.
Priority of SEPPs and the Act
Clause 1.9(1) states that the Plan is subject to any State environmental planning policy that prevails over the Plan as provided by section 3.28 of the Act. This establishes the standard rule that SEPPs can override local LEP provisions where they are inconsistent. The Plan also identifies particular SEPPs and state instruments likely to be relevant, for example the Housing SEPP, Transport and Infrastructure SEPP, and several SEPPs dealing with primary production, resilience and hazards, resources and energy, and industry and employment (Land Use Table notes).
Cross-references to other Acts for particular matters
Heritage: cl 5.10 cross-references the Heritage Act 1977 for the State Heritage Register and interim heritage orders, and requires notification to the Heritage Council in relevant circumstances.
Crown land and Crown instruments: cl 1.9A excludes certain Crown instruments from the suspension mechanism and refers to the Crown Land Management Act 2016; cl 5.12 preserves the Crown’s ability to carry out infrastructure development that is permitted under the Transport and Infrastructure SEPP.
Water and fisheries: aquaculture rules and artificial waterbody controls link to the Fisheries Management Act 1994, the Water Management Act 2000, the Local Land Services Act 2013 and the Protection of the Environment Operations Act 1997 (cl 5.17; cl 5.19; Sch 6). The Plan requires consideration of licences and approvals under those Acts when assessing certain developments (cl 5.17(4)(b)).
Local government and land classification: cl 5.2 implements classification and reclassification powers under the Local Government Act 1993 and notes that reclassification may discharge trusts only with Governor approval where required (cl 5.2(1)-(5)).
Overlap and delegation effects
The Plan frequently defers technical standards and assessment procedures to State policies, industry development plans and external guidelines. Examples include: the Considering Flooding in Land Use Planning Guideline and Flood Risk Management Manual referred to in cl 5.21 on flood planning; the EPA Regulation 2021 requirement that a DA proposing to contravene a development standard must be accompanied by a document addressing the clause 4.6 tests; and references to industry guidelines and codes of practice for intensive livestock agriculture in cl 5.18. These deferrals mean that a DA assessment commonly requires applicants to satisfy both Plan clauses and external policy or regulatory instruments.
Suspension of private covenants and planning agreements
Clause 1.9A allows, to the extent necessary, suspension of covenants, agreements or similar instruments that restrict carrying out development consistent with the Plan, but it explicitly excludes covenants imposed by the Council, certain Crown instruments, conservation agreements, vegetation and biobanking agreements, and planning agreements under the Act (cl 1.9A(1)-(2)). The Governor approved this clause under s 3.16 of the Act prior to its making (cl 1.9A(4)). The clause therefore creates interaction between private property instruments and statutory planning rights, while insulating specific public and conservation instruments.
Procedural links that affect approval sequencing
The Plan’s savings clause for pre-existing development applications means applications made before the Plan commenced are determined as if the Plan had not commenced (cl 1.8A). A separate note draws attention to Division 3.5 of the Act, which allows a DA to be made for development that can only occur if the relevant instrument is amended and requires public notice of the DA and the draft instrument concurrently. This affects timing and sequencing for projects that straddle plan changes.
Multi-agency enforcement and approvals
Several Plan provisions require approvals or licences under other Acts before consent is granted or considered. For example, cl 5.17 requires the consent authority to consider the need for licences under the Water Management Act or Local Land Services Act for artificial waterbodies. These multi-agency touchpoints increase the need for coordination and for applicants to engage with multiple regulatory regimes.
Implication for users
Applicants must map their proposals not only against the LEP but also identify which SEPPs, Acts and industry plans apply, and prepare material to satisfy both LEP clauses and external statutory or policy requirements. Consent authorities must manage interactions, for example by notifying the Heritage Council or local Aboriginal communities when required by cl 5.10, by checking required licences under cl 5.17, and by applying SEPPs where they prevail.
Amendment history
The Plan carries a number of amendment notations in the text. Below is a synthesis of the material amendments recorded in the instrument and the clauses they affected, as shown in the Plan’s annotations.
Noted amendments with citation lines in the LEP text
2016 amendment: Land Use Table annotated Am 2016 (168), Sch 1[2]. The Land Use Table has multiple subsequent amendments that reshape permitted uses.
2017 amendment: Land Use Table annotated Am 2017 (493), Sch 1.1[1].
2018 amendment: Clause 5.4 was amended in 2018 (cl 5.4: Am 2018 (406), Sch 1.95[1][2]) to adjust floor area limits and other local controls for uses such as industrial retail outlets.
2019 amendments: Clause 1.8A (savings provision for development applications) and clause 1.9A (suspension of covenants) were added or amended in 2019 (1.8A: Am 2019 (621), Sch 5[1]; 1.9A: Am 2019 (621), Sch 5[2]-[4]). Schedule 5 amendments relating to heritage are recorded as sch 5 Am 2019 (249), cl 5; map update responsibility note also amended in 2019.
2021 amendments and repeals: Clause 6.2 was repealed in 2021 (cl 6.2: Rep 2021 (225), Sch 1). Clause 5.5 (controls relating to secondary dwellings on land in a rural zone) was substituted in 2021 (cl 5.5: Subst 2021 (714), Sch 11.26).
2022 amendments: Several clauses were amended in 2022, including zone list updates (cl 2.1: Am 2022 (831), Sch 1.20[1]), multiple land use table amendments (Am 2022 (314) and Am 2022 (831) annotations in Land Use Table), minimum subdivision lot size and community title provisions added or amended (clauses 4.1AA, 4.2B, 4.2C: Am 2022 (831), Sch 1.20[3] and Sch 1.20[3][4]; and cl 6.7 amended Am 2022 (831), Sch 1.20[3][5]).
2023 amendment: Land Use Table annotated Am 2023 (458), Sch 2.60.
Material effects and traceable changes
Introduction of clause 1.8A and 1.9A in 2019 added transitional and covenant-suspension mechanics that alter how pre-commencement DAs and private instruments operate post-adoption. The Governor’s approval for cl 1.9A under s 3.16 was noted.
The 2022 amendments added several community-title and strata-specific subdivision provisions, and updated the zone listing, reflecting changes to planning policy emphasis on community title and lot size controls.
The 2018 amendment to cl 5.4 refined floor-area caps for uses such as industrial retail outlets and introduced terminology and thresholds for neighbourhood supermarkets (cl 5.4(7AA) added).
Repeal of cl 6.2 in 2021 and other textual edits reflect iterative adjustments to LEP content as State policy evolved.
Limitations of the amendment trace
The Plan text carries amendment annotations with shorthand citations. To reconstruct the full legislative history and effects on the LEP text it is necessary to consult the consolidated instrument on the NSW legislation website and the schedules of the amending instruments identified by their year and schedule references listed in the Plan. The Plan itself notes that map updates moved to the Department in July 2021; this is material for boundary and overlay changes.
Litigation history
The text provided contains no case law or litigated decisions. The Plan itself does not list any litigation in its schedules or notes. The instrument names no cases and cites no judicial decisions, consistent with the developer instruction to rely only on cases the source names. Therefore the Plan’s publicly available litigation history is not recorded in the LEP text supplied.
What to do if litigation is relevant
Where a practitioner needs to assess the litigated interpretation of a clause in this LEP (for example cl 4.6 exceptions to standards, cl 1.9A covenant suspension, or heritage clauses), the next step is to search the NSW courts and tribunals databases and planning case law databases for decisions referencing the Murrumbidgee LEP, the specific clause, or equivalent clauses in other LEPs. Because the Plan cross-references the Act and State policies, jurisprudence on those higher level instruments and on equivalent model clauses may be persuasive or binding.
Administrative review and merits review routes
The Plan establishes development consent decisions to be made by the Council subject to the Act. Aggrieved applicants or third parties may have avenues for review under the Act, including merits review by the Land and Environment Court in relation to merits or judicial review for jurisdictional error. The Plan itself is silent on procedural appeal routes, which are governed by the Act and the Land and Environment Court rules.
Absence of listed disputes
The absence of litigation history in the instrument does not mean the Plan has not been the subject of disputes. Practitioners should check planning appeals listed by the Land and Environment Court, available decisions databases and council records for contested DAs and judicial reviews involving the LEP.
Gotchas
The Plan contains several features that can produce unexpected legal or practical consequences. The following issues are concrete mechanics a practitioner should check in early project assessment.
Savings rule that preserves pre-commencement DAs
If a development application was lodged before the LEP commenced and not finally determined, cl 1.8A requires the DA to be determined as if the LEP had not commenced. This can create temporal arbitrage for applicants and affect neighbouring owners who may find a DA proceeds under the previous regime. The note to cl 1.8A points to Division 3.5 of the Act for applications where an amendment or new instrument is required, and prescribes concurrent public notice requirements for the DA and the draft instrument.
Suspension of covenants and private restrictions, but with specific exclusions
Clause 1.9A suspends private covenants and similar instruments to the extent necessary to permit development consistent with the LEP, but it excludes covenants imposed by Council, certain Crown instruments and planning agreements (cl 1.9A(2)). The Governor approved the clause under s 3.16 (cl 1.9A(4)). Practitioners should not assume covenants are always inoperative; check whether the covenant is one of the excluded categories and whether public authority interests are registered and protected.
Canal estates are prohibited, and the definition is technical
Clause 2.9 prohibits canal estate development. Its definition includes elements such as constructed canals inundated by surface or groundwater, associated dwellings and the use of fill or excavation to create waterways or to achieve flood planning heights (cl 2.9(2)). Projects that involve earthworks, excavation or fill to create waterways or to manage flood heights must be examined against this definition; a proposed development that looks superficially like a waterfront lot may be captured and prohibited.
Music and performance protections limit refusal grounds but do not guarantee outcomes
Clause 5.20 prevents the consent authority from refusing licensed-premises development on enumerated grounds relating to music, dance and performance, and prohibits refusal on noise grounds if the consent authority is satisfied noise may be managed to an acceptable level. This provides rights for venue operators, but it does not eliminate noise regulation. If noise cannot be managed to an “acceptable level” the consent authority retains refusal power. Practitioners should prepare noise management strategies to satisfy the consent authority.
Exceptions to development standards have built-in limits and procedural requirements
Clause 4.6 allows flexibility to contravene development standards where the applicant shows compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds. However the clause cannot be used to permit multiple undersized rural lots or lots below 90 per cent of the minimum area in many zones (cl 4.6(6)), and it does not apply to certain complying development standards or BASIX commitments (cl 4.6(8)). The EP&A Regulation 2021 requires applicants to prepare a supporting document for such contraventions; the consent authority must keep a record (cl 4.6 note; cl 4.6(4)). Practitioners must follow the regulation and provide the required material.
A site may be simultaneously within biodiversity, groundwater vulnerability, riparian, wetland and river front overlays. Each overlay triggers its own “must not grant consent unless satisfied” test and a corresponding list of matters to be considered (for example cls 6.3-6.6). These are cumulative constraints; mitigation for one overlay does not automatically discharge obligations under another. Early map checks and multi-disciplinary assessments are necessary.
Essential services test can stop consent where servicing is inadequate
Clause 6.9 requires the consent authority to be satisfied that essential services are available or that adequate arrangements exist to make them available. This can be decisive for rural subdivisions or community title proposals that rely on reticulated water, sewage and electricity.
Aquaculture and artificial waterbody approvals require external licences
Clause 5.17 and cl 5.19 require consent authorities to consider whether licences or other authorities are required under the Water Management Act, Local Land Services Act or Protection of the Environment Operations Act, and to consider aquaculture industry development plans (cl 5.17(4); cl 5.19(2) and (5)). Applicants cannot assume planning consent alone suffices; separate licencing and compliance under other Acts is often required.
Not adopted clauses and absent quantitative controls
The LEP records that height of buildings and floor space ratio clauses were not adopted (cls 4.3-4.5). Where quantitative controls are absent in the LEP, developers should check other instruments such as Development Control Plans, SEPPs or Council policies that may supply numeric limits or design criteria.
Heritage and archaeological consultation obligations can impose delay
The consent authority must notify the Heritage Council when granting consent on archaeological sites and must consider any response within 28 days (cl 5.10(7)-(9)). For Aboriginal places, the consent authority must notify local Aboriginal communities and consider any response received within 28 days (cl 5.10(8)). These timing points should be factored into project programmes.
Subdivision minimum sizes and exceptions
Minimum lot sizes are mapped (cl 4.1). Community title and strata subdivisions attract additional minimum size rules (cl 4.1AA; cl 4.2B). Clause 4.2 on rural subdivision permits smaller lots for primary production in specified rural zones, but forbids creation of a lot on which an existing dwelling would be situated and forbids dwellings on such lots (cl 4.2(3)-(5)). Practitioners must not assume simple conversion of holdings to smaller lots without carefully checking the relevant clause.
How to comply
This section sets out practical compliance steps and the documentary and procedural workstreams that developers, owners and advisers should use to manage projects within the Murrumbidgee area.
Start with the maps and the basics
Identify the property on the Land Zoning Map and the Lot Size Map (cls 1.3; 2.2; cl 4.1). Check all overlay maps published for the LEP: Terrestrial Biodiversity Map, Groundwater Vulnerability Map, Riparian Lands and Watercourses Map, Wetlands Map, River Front Areas, Heritage Map and any other relevant overlays (cls 6.3; 6.4; 6.5; 6.6; cl 5.10; Schedule 6). Mapping determines permitted uses, minimum lot sizes and overlay tests.
Determine the applicable permission pathway
Using the Land Use Table (cl 2.3 and the Land Use Table), determine whether the proposed use is permitted without consent, permitted with development consent, or prohibited. If permitted without consent, verify whether it falls within Schedule 2 exempt categories and meets the Building Code of Australia and Schedule 2 conditions (cl 3.1). If complying development is being considered, check Part 1 of Schedule 3 and the required standards (cl 3.2). If permitted with consent, prepare to lodge a DA and identify the specific LEP clauses that will shape assessment.
Assess overlay-specific tests early
If the site intersects biodiversity, groundwater, riparian or wetland overlays, prepare ecological and hydrological assessments that address the specific matters listed in cls 6.3-6.6, and demonstrate avoidance, minimisation or mitigation of significant adverse impacts. For riparian and river front areas, show how water quality, bank stability, public access and riverine habitat will be protected (cls 6.5; 6.7; 6.8). For flood-prone sites, prepare flood impact assessments aligned to the Considering Flooding guideline and Flood Risk Management Manual referenced in cl 5.21.
Prepare required supporting statements
For intensive livestock or aquaculture proposals, prepare statements of environmental effects that cover odour, surface and groundwater pollution, soil degradation, species selection and compliance with industry development plans, as required by cl 5.18 and cl 5.19 and Schedule 6. For artificial waterbodies of 15 to 100 megalitres in environmentally sensitive areas, provide the statement of environmental effects and identify any licences or exemptions under other Acts (cl 5.17(4)).
Check servicing and essential services
Demonstrate that essential services are available or that adequate arrangements are in place for water, electricity, sewage, stormwater and vehicular access in conformity with cl 6.9. For subdivisions in R5 where smaller lots are sought via sewered and reticulated services, verify reticulation availability as cl 4.1(4A) allows smaller lots when serviced.
Follow heritage and Aboriginal engagement procedures
If the proposal affects a heritage item, archaeological site or Aboriginal place of heritage significance, the DA must meet the heritage consent tests in cl 5.10. Prepare heritage management documents or conservation management plans if required, and be prepared to notify the Heritage Council or local Aboriginal communities where the clause mandates consultation and to allow 28 days for response (cl 5.10(5), (6), (7), (8)).
If seeking a standards variation, follow the EP&A Regulation requirements
If relying on cl 4.6 to justify a contravention of a development standard, prepare the required written justification demonstrating that strict compliance is unreasonable or unnecessary and setting out environmental planning grounds. The EP&A Regulation 2021 requires a supporting document to accompany the DA; the LEP requires the consent authority to keep a record of the assessment (cl 4.6(3)-(4)).
Use the temporary use pathway where appropriate
For short-term uses up to 52 days within a 12 month period, consider applying for temporary development consent under cl 2.8; ensure the consent authority is satisfied the temporary use will not prejudice future development and that the land can be restored.
For community title, strata or Coleambally intensive plant agriculture matters, apply the special clauses
If proposing community title subdivisions in RU1, R5 or C3, or strata in certain rural/residential zones, follow cl 4.1AA and cl 4.2B as applicable. For intensive plant agriculture in the Coleambally Irrigation Area, cl 4.2A sets out the criteria for subdivisions with dwellings, including minimum 40 hectare lots and evidence of irrigation entitlements.
Engage early with Council and relevant State agencies
Book pre-lodgement meetings with Council, identify any SEPPs that may prevail (cl 1.9), and consult agencies that issue licences required under other Acts (water, fisheries, Local Land Services, Crown land managers). Early engagement reduces the risk of refusal and clarifies the multi-agency approvals that may be needed.
Prepare construction and management strategies
For eco-tourist facilities and other uses with detailed management expectations, prepare management strategies addressing waste, energy, water efficiency and monitoring as required by cl 5.13. For aquaculture, design ponds to prevent escape of stock, provide screened outlets and comply with Schedule 6 operational requirements.
Factor in timing and notice requirements
For heritage and archaeological matters, allow the 28 day notice periods mandated in cl 5.10. For contraventions of standards, allow time for the EP&A Regulation documentation and for the consent authority to keep records. For DAs affected by the savings provision cl 1.8A, confirm whether the DA is to be assessed under the previous instrument or the new LEP.
Documentation checklist (practitioner minimum)
Current cadastral plan and land title details.
Map-based zoning, lot size and overlay extracts from the LEP maps.
Statement of environmental effects addressing applicable LEP overlays and clauses.
Heritage impact statement or heritage management document where required (cl 5.10).
Flood, hydrology or geotechnical reports where flood planning or riverfront rules apply (cl 5.21; cl 6.7).
Noise management plan for licensed premises or live performance where cl 5.20 is relevant.
Evidence of water licences, irrigation entitlements or approvals under other Acts where cl 5.17 or cl 4.2A applies.
BASIX compliance and evidence, if BASIX applies; note cl 4.6 excludes contraventions to BASIX-derived standards.
For any proposed contravention of a development standard, prepare the cl 4.6 justification document in line with the EP&A Regulation.
In summary, compliance requires an integrated mapping and documentary approach, early multi-agency engagement, and careful attention to the Plan’s specific overlay tests, heritage consultation and the Act’s procedural and enforcement framework.
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Murrumbidgee Local Environmental Plan 1994
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU3 Forestry
RU5 Village
Residential Zones
R5 Large Lot Residential
Employment Zones
E4 General Industrial
Special Purpose Zones
SP2 Infrastructure
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
C3 Environmental Management
Waterway Zones
W1 Natural Waterways
W2 Recreational Waterways
cl 2.1: Am 2022 (831), Sch 1.20[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.
(5) Subclause (3) (d) does not apply to the temporary use of a dwelling as a sales office mentioned in subclause (4).
2 Canal estate development prohibited
2 Canal estate development prohibited
2.9 Canal estate development prohibited
(1) Canal estate development is prohibited on land to which this Plan applies.
(2) In this Plan, canal estate development means development that involves—
(a) a constructed canal, or other waterway or waterbody, that—
(i) is inundated by surface water or groundwater movement, or
(ii) drains to a waterway or waterbody by surface water or groundwater movement, and
This is an opening excerpt, not the complete document.