This local environmental plan sets the rules that govern land use and development across the Moree Plains area: zoning, what uses are permitted or prohibited, when development consent is required, and which works are exempt or complying. It affects landowners, developers, the Council (as consent authority) and relevant State or Commonwealth bodies because it changes what can be built, subdivision entitlements, heritage and environmental controls, and procedural requirements for approvals.
Mechanically, the instrument consolidates local planning controls for the Moree Plains local government area into a single Local Environmental Plan (the Plan). It does so by specifying the land to which it applies (the Land Application Map) and the Land Zoning Map, setting out the zones that apply, and replacing earlier local environmental plans that previously applied to that land (cl 1.3; cl 2.2; cl 1.8). The Plan establishes the Council as the consent authority, subject to the Environmental Planning and Assessment Act 1979 (the Act) (cl 1.6). It prescribes, by way of a Land Use Table and schedules, which uses are permitted without development consent, permitted with development consent, and prohibited in each zone (cl 2.3 and the Land Use Table). The Plan also specifies exempt and complying development rules (Part 3, cl 3.1-3.3; cl 3.2; Schedules 2 and 3) and principal development standards such as minimum lot sizes and rules for certain rural subdivisions (Part 4, cl 4.1 et seq.; cl 4.2).
The Plan links to maps and schedules that are part of the instrument and that may be amended from time to time; those maps are the operative source for zoning, lot sizes and certain overlays (cl 1.7; cl 2.2; references to Lot Size Map, Land Zoning Map, Heritage Map, Meteorological Station Height Limit Map and others). It repeals the Moree Plains Local Environmental Plan 1995 in respect of the land to which this Plan applies (cl 1.8(1)), and provides transitional treatment for development applications made before commencement (savings provision cl 1.8A). It also identifies State environmental planning policies that prevail over the Plan and lists a SEPP provision that does not apply to the land (cl 1.9).
At the activity control level the Plan does the following, among other things:
Defines zones and their objectives, and prescribes detailed use lists for each zone (cl 2.1; cl 2.3; Land Use Table). Each zone has specific permitted-without-consent, permitted-with-consent and prohibited entries.
Current sections
Direct links to the current provisions in Moree Plains Local Environmental Plan 2011.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agriculture; Air transport facilities; Airstrips; Animal boarding or training establishments; Aquaculture; Boat building and repair facilities; Boat launching ramps; Boat sheds; Camping grounds; Car parks; Caravan parks; Cellar door premises; Cemeteries; Charter and tourism boating facilities; Community facilities; Correctional centres; Crematoria; Depots; Dual occupancies; Dwelling houses; Eco-tourist facilities; Educational establishments; Environmental facilities; Extractive industries; Flood mitigation works; Freight transport facilities; Funeral homes; Heavy industrial storage establishments; Heavy industries; Helipads; Home occupations (sex services); Industrial retail outlets; Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Jetties; Kiosks; Landscaping material supplies; Marinas; Markets; Mooring pens; Moorings; Mortuaries; Neighbourhood shops; Open cut mining; Passenger transport facilities; Places of public worship; Plant nurseries; Public administration buildings; Recreation areas; Recreation facilities (indoor); Recreation facilities (major); Recreation facilities (outdoor); Respite day care centres; Restaurants or cafes; Roadside stalls; Rural industries; Rural supplies; Rural workers’ dwellings; Secondary dwellings; Service stations; Sewerage systems; Sex services premises; Signage; Tourist and visitor accommodation; Transport depots; Truck depots; Turf farming; Veterinary hospitals; Warehouse or distribution centres; Water recreation structures; Water supply systems; Any other development not specified in item 2 or 4
4
Prohibited
4 Prohibited
4 Prohibited
Amusement centres; Centre-based child care facilities; Commercial premises; Entertainment facilities; Exhibition homes; Exhibition villages; Function centres; Health services facilities; Highway service centres; Industries; Local distribution premises; Registered clubs; Residential accommodation; Restricted premises; Storage premises; Vehicle body repair workshops; Vehicle repair stations; Wholesale supplies
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Part 6
Urban release areas
Part 6 Urban release areas
Part 6 Urban release areas
6
Arrangements for designated State public infrastructure
6 Arrangements for designated State public infrastructure
6.1 Arrangements for designated State public infrastructure
(1) The objective of this clause is to require satisfactory arrangements to be made for the provision of designated State public infrastructure before the subdivision of land in an urban release area to satisfy needs that arise from development on the land, but only if the land is developed intensively for urban purposes.
(2) Development consent must not be granted for the subdivision of land in an urban release area if the subdivision would create a lot smaller than the minimum lot size permitted on the land immediately before the land became, or became part of, an urban release area, unless the Director-General has certified in writing to the consent authority that satisfactory arrangements have been made to contribute to the provision of designated State public infrastructure in relation to that lot.
(3) Subclause (2) does not apply to—
(a) any lot identified in the certificate as a residue lot, or
(b) any lot to be created by a subdivision on land that was the subject of a previous development consent granted in accordance with this clause, or
(c) any lot that is proposed in the development application to be reserved or dedicated for public open space, public roads, public utility undertakings, educational facilities or any other public purpose, or
(d) a subdivision for the purpose only of rectifying an encroachment on any existing lot.
(4) This clause does not apply to land in an urban release area if all or any part of the land is in a region within the meaning of the Act, Division 7.1, Subdivision 4.
(a) to ensure that earthworks for which development consent is required will not have a detrimental impact on environmental functions and processes, neighbouring uses, cultural or heritage items or features of the surrounding land,
(b) to allow earthworks of a minor nature without requiring separate development consent.
(2) Development consent is required for earthworks unless—
(a) the work is exempt development under this Plan or another applicable environmental planning instrument, or
(b) the work is ancillary to other development for which development consent has been given.
(3) Before granting development consent for earthworks, the consent authority must consider the following matters—
(a) the likely disruption of, or any detrimental effect on, existing drainage patterns and soil stability in the locality,
(b) the effect of the proposed development on the likely future use or redevelopment of the land,
(c) the quality of the fill or the soil to be excavated, or both,
(d) the effect of the proposed development on the existing and likely amenity of adjoining properties,
(e) the source of any fill material and the destination of any excavated material,
(f) the likelihood of disturbing relics,
(g) the proximity to and potential for adverse impacts on any watercourse, drinking water catchment or environmentally sensitive area.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
(a) cover mechanical ventilation inlet or outlet vents, or
(b) be situated on an item listed in Schedule 5.
(c) (Repealed)
(2) Business identification signs or building identification signs must comply with the following—
(a) Maximum area—1m2.
(b) Only 1 per property.
(c) Must be secure and stable.
(3) A-frame signs on private land must comply with the following—
(a) Only 1 per property.
(b) Must be on land within an employment zone.
(c) Must be related to the existing lawful use of the land.
(d) Must not involve any live or recorded entertainment, including music, broadcast programs, flashing lights and the like.
(e) Must not obstruct access to the land or to any adjacent land.
(f) Maximum display area (on each side)—0.5m2.
(g) Must be secure and stable.
(h) Must not involve construction work.
(i) Must be temporary and must be removed at the close of business each day.
(4) Change of message on existing sign must comply with the following—
(a) Development consent for the sign must have been previously granted by the consent authority or the sign must have been erected as exempt development.
(b) Must not change signage illumination.
(c) New message must comply with any content requirements of any existing development consent.
(d) Must not change sign dimensions.
(5) Fascia signs must comply with the following—
(a) Must be attached to an existing fascia and fixed flush with the fascia.
(b) Must not extend above or below the fascia or return end of the awning.
(c) Must not be illuminated.
(d) Only 1 per property.
(6) Flush wall signs must comply with the following—
(a) Maximum area—2.5m2.
(b) Must be securely fixed to an existing wall.
(c) Maximum height—3.5m above ground level (existing).
(d) Must not be illuminated.
(e) Only 1 per property in Zone R1 General Residential and Zone RU5 Village.
(f) Maximum of 2 per property in all other zones.
(g) Must only identify the subject premises or describe the subject premises, activities or professional affiliations of the occupation conducted in the building to which the sign is attached.
(7) Pole or pylon advertising signs must comply with the following—
(a) Maximum height—6m.
(b) Maximum area of advertising panel (per side)—2.5m2.
(c) Only 1 per property.
(d) Must only be installed on land in Zone E4 or E5.
(e) Must be built in accordance with engineer’s certification for the structure and footings.
(f) Must be located clear of any sewer main or stormwater main by a minimum distance of 1m from the main centreline or the equivalent invert depth of the main, whichever is the greater.
(g) Must not encroach on any registered easement.
(8) Real estate signs must comply with the following—
(a) Maximum area (per side)—
(i) single dwelling house—2.5m2, or
(ii) multi dwelling housing of less than 10 dwelling houses—5m2, or
(iii) multi dwelling housing of 10 or more dwelling houses—10m2, or
(iv) commercial premises—5m2, or
(v) rural property—10m2, or
(vi) subdivision of less than 20 lots—10m2, or
(vii) subdivision of 20 lots or more—15m2.
(b) If the sign relates to a proposed building or subdivision, must not be erected until development consent for the building or subdivision has been granted.
(c) Maximum width—0.2m.
(d) Must contain only a notice that the building or site to which it is fixed is for sale or for lease.
(e) Maximum of 1 sign for each property or lot.
(f) Must not be illuminated.
(g) Must be removed within 14 days of the property being sold or leased, or in the case of subdivisions, when 90% of lots are sold, or within 5 years, whichever occurs first.
(h) Maximum height—8m.
(i) Only 1 directional sign with a maximum area of 1m2 in Zone RU1 Primary Production to direct people to the site or for auction or inspection purposes.
(j) Must not interfere with sight distances for vehicles approaching intersections.
(9) Temporary signs (including signs announcing a local event for religious, educational, cultural, political, social or recreational purposes) other than signs referred to in subclause (3) must comply with the following—
(a) Maximum height—3m.
(b) Sign must not be higher than any building it is mounted on.
(c) Maximum area—3m2.
(d) Must not be illuminated.
(e) Any sponsors’ names or logos must be less prominent than the message.
(f) Must not be displayed earlier than 28 days before an event.
(g) Must not be displayed later than 14 days after an event.
(10) Top hamper signs (including signs attached to the transom of a doorway or display window of a building) must comply with the following—
(a) Must be fixed flush to the wall.
(b) Must be securely affixed.
(c) Must not extend below the head of the doorway or window to which they are attached.
(d) Must not extend more than 0.2m beyond any building alignment.
(e) Must not be illuminated.
(11) Under awning signs must comply with the following—
(a) Must be located on land within an employment zone.
(b) Must not be less than 2.6m from the ground or footpath to the underside of the sign.
(c) Maximum length—2.5m.
(d) Only 1 per property.
(e) Must be securely fixed to awning.
(f) Must not project beyond the awning.
(g) Must be erected horizontal to the ground.
(h) Must be located more than 3m from another under awning sign.
(12) Shop window signs must comply with the following—
(a) Must be located on land within employment zones.
(b) Must not cover more than 75% of shop window.
(c) Must not be illuminated.
(d) Must be located on ground level facade.
(e) Only 1 per shop window.
sch.2-sec-oc.2
Community use of educational establishments and centre-based child care facilities
sch.2-sec-oc.2 Community use of educational establishments and centre-based child care facilities
Community use of educational establishments and centre-based child care facilities
An educational establishment or centre-based child care facility (including the site and facilities) may also be used for the physical, social, cultural or intellectual development of the community, whether or not any such use is a commercial use of the land.
sch.3-sec Farm buildings—Zone R5 Large Lot Residential
Farm buildings—Zone R5 Large Lot Residential
(1) Maximum floor area—250m2.
(2) Must not be used for habitable purposes, commercial premises or industries.
(3) Use must be related to rural land use.
(4) Existing ground levels must not be altered by more than 1.5m.
(5) Must not be located within 50m of any road other than an internal road within the subject lot.
(6) Must comply with any restrictions placed on the title of the land.
(7) Must not be relocated from another site.
(8) Roof line must not protrude above natural ridge lines when viewed from public areas and public roads.
(9) Maximum building height—8.5m.
(10) Materials used in construction must have low reflectivity properties and must be characteristic of the locality. Factory pre-coloured and new materials must be used.
(11) Sanitary facilities must not be within the building.
(12) Roof water must be disposed of to a rainwater tank that has an overflow that is piped at least 5m from the building foundations in a manner that will ensure no nuisance is caused to nearby buildings or properties.
(13) Must not involve any new vehicular access.
sch.3-sec-oc.2
Industrial buildings—minor additions and ancillary structures
sch.3-sec-oc.2 Industrial buildings—minor additions and ancillary structures
Industrial buildings—minor additions and ancillary structures
(1) Additional floor area created must not exceed 50m2 and must not be used for manufacturing, industrial or like activity.
(2) Additional external areas must not be occupied for the purpose of storage or manufacturing or any like activity.
(3) The total floor area of all buildings on the site must not be more than 2,000m2.
(4) Must not involve a change of building use.
(5) Must comply with any existing development consent conditions.
(6) Setbacks must comply with the following—
(a) each part of the structure must have a front setback of not less than 10m,
(b) each part of the structure must have side and rear setbacks of not less than 3m.
(7) Building height and materials must comply with the following—
(a) the height of any walls must not be more than 8.5m, not including a parapet,
(b) parapets may extend a maximum of 1.2m above the intersection of the wall and the roof,
(c) roof pitch must not be more than 10 degrees,
(d) the site must not be cut or filled greater than 500mm,
(e) cladding and materials used in construction must be new, must have low reflective properties and must be factory pre-coloured,
(f) security fencing must not be greater than 1.8m in height.
(8) Drainage must comply with the following—
(a) all roof and surface water must be drained to the street and discharged to the consent authority’s nearest stormwater drainage system in accordance with an engineer’s design,
(b) the drainage system must be designed for a 10-year return period, with excess flows designed to flow overland to the street.
(9) Garbage and storage areas must be on site and behind the building line of the property.
(10) A landscaping strip of at least 3m (if reticulated sewer is provided) or 6m (if there is no sewer) to each street frontage must be planted and maintained with canopy trees and shrubs with a maximum width of 7m for the driveway.
(11) Must not change existing arrangements for access, parking spaces, loading and waste disposal.
(12) Stormwater must be disposed of by way of—
(a) a registered stormwater easement, or
(b) an inter-lot stormwater pit located within the property boundaries, or
(c) a pipe that connects to the kerb and gutter, or
(d) an existing approved stormwater drain on site.
sch.3-sec-oc.3
Retaining walls
sch.3-sec-oc.3 Retaining walls
Retaining walls
(1) Minimum height—900mm from ground level (existing).
(2) Maximum height—2,500mm from ground level (existing).
(3) Adequate moisture barriers and drainage lines must be connected via a silt trap to an existing stormwater system.
(4) Must comply with—
(a) AS 3500:2003, Plumbing and drainage set, and
(b) AS 2870:1996, Residential slabs and footings—Construction.
(5) Must comply with—
(a) AS 3700:2001, Masonry structures, or
(b) AS 3600:2009, Concrete structures, or
(c) AS 1170.0:2002, Structural design actions—General principles, or
(d) AS 1720.1:2010, Timber structures—Design methods.
(6) Must not adversely impact on surface water or rain water run off onto adjoining properties.
(7) Must not affect existing fencing.
(8) Must not affect the structural integrity of any adjacent structure.
(9) Must be located at least 1,500mm from any manhole, riser, inspection shaft or the like.
(10) If the proposed works involve structural alterations to an existing building, the consent authority must be satisfied of the structural adequacy of the existing structures and their ability to withstand the proposed additional or altered structural loads.
Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
(Clause 5.2)
sch 4: Am 2016 (224), Sch 1 [1]–[4].
Maps: Am 2012 (559), cl 4; 2015 (53), cl 4; 2018 (456), cl 4. Entries discontinued from July 2021 when responsibility for map updates moved to Department of Planning, Industry and Environment.
Schedule 5
Environmental heritage
Schedule 5 Environmental heritage
Schedule 5 Environmental heritage
(Clause 5.10)
Schedule 6
Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
(Clause 5.19)
Division 1
Site location requirements
Division 1 Site location requirements
Division 1 Site location requirements
Division 2
Operational requirements
Division 2 Operational requirements
Division 2 Operational requirements
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Moree Plains Local Environmental Plan 2011.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Moree Plains in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to encourage the management, development and conservation of environmental, economic and social resources,
(b) to facilitate economic growth and development that is consistent with the aim specified in paragraph (a) and that—
(i) embraces the principles of environmentally sustainable development, and
(ii) minimises the cost to the community of fragmented and isolated development, and
(iii) facilitates the efficient and effective delivery of amenities and services, and
(iv) facilitates stimulation of demand for a range of residential, enterprise and employment opportunities and promotes agricultural diversity, and
(v) facilitates farm adjustments, and
(vi) utilises, where feasible, existing infrastructure and roads for new development and future potential development,
(c) to facilitate development in accordance with flood management planning,
(d) to facilitate development that is compatible with adjoining and nearby uses,
Requires development consent for subdivision and demolition except where exempted or classified as complying development (cl 2.6; cl 2.7; cl 3.1-3.2).
Sets minimum lot sizes and sectoral exceptions, including special rules for community title schemes, dual occupancies, rural subdivision, and dwelling erection in rural, residential and conservation zones (cl 4.1; cl 4.1AA; cl 4.1A; cl 4.2; cl 4.2B; cl 4.2C; cl 4.2D).
Provides for exempt and complying development with performance standards and links to State SEPPs and the Building Code of Australia (cl 3.1-3.2; Sch 2; Sch 3).
Creates a mechanism to suspend private covenants and similar instruments to the extent necessary to enable development consistent with the Plan, with specified exceptions and a safeguard that registered public authority rights are preserved (cl 1.9A).
Sets out heritage protections, notification and heritage management documentation requirements for work affecting heritage items, Aboriginal objects and archaeological sites (cl 5.10).
Imposes specific controls for intensive livestock agriculture and aquaculture, setting thresholds and site requirements including extensive pond-based aquaculture rules (cl 5.18; cl 5.19; Sch 6).
Introduces several operational requirements linked to airports, meteorological facilities and aircraft noise, requiring consultation with relevant Commonwealth bodies and compliance with Australian Standard AS 2021,2000 where applicable (cl 7.3; cl 7.4; cl 7.5).
Establishes urban release area requirements that pre-condition certain subdivisions on certification that designated State infrastructure arrangements are in place and requires development control plans for intensive urban releases (Part 6, cl 6.1-6.3).
Protects the ability of licensed premises to host and play music by limiting grounds on which consent may be refused in relation to musical performance, subject to noise being manageable (cl 5.20).
Reclassifies specified parcels of public land as operational or community land and records exceptions to trust discharge for particular parcels (cl 5.2; Schedule 4).
The Plan states its aims but those are framed as stated policy objectives rather than operative duties; for example the Plan’s declared aims include facilitating sustainable primary production, promoting economic growth consistent with environmentally sustainable development, recognising European and Aboriginal heritage, encouraging arts and cultural activity and facilitating flood-aware development (cl 1.2). Those stated aims coexist with the mechanically prescriptive elements listed above.
In short, the instrument replaces prior local instruments for the area, fixes zones and maps as the primary legal reference for permissible uses, establishes the Council as consent authority and sets detailed development standards, exemptions and local procedural requirements that apply across agricultural, residential, industrial, environmental and heritage contexts.
Main concepts
The Plan organises decision-making and private action around a set of core, source-defined concepts. Those concepts determine what development is allowed, when consent is needed, and what evidence or procedural steps consent authorities must take.
Zoning and Land Use Table. The Plan is zone-driven. It specifies zones (cl 2.1) and for each zone sets out objectives and a Land Use Table that lists permitted without consent, permitted with consent and prohibited uses (cl 2.3; Land Use Table). The consent authority must have regard to zone objectives when determining applications (cl 2.3(2)). The Land Use Table is supplemented by Schedule 1 (additional permitted uses for particular land) and by maps (Land Zoning Map) that identify the zone for each parcel (cl 2.2; Schedule 1).
Maps as legal instruments. The Plan treats named maps as operative parts of the instrument and permits their amendment and consolidation (cl 1.7). The maps are public and to be kept on the NSW Planning Portal and may be in electronic form (cl 1.7(3)-(4)). Several defined maps are cross-referenced throughout the Plan: Land Zoning Map, Lot Size Map, Land Reservation Acquisition Map, Heritage Map, Meteorological Station Height Limit Map and others.
Development consent, exempt and complying development. The Act remains the overarching process; the Plan identifies development that is exempt or complying development (Part 3, cl 3.1-3.2). Exempt development must meet the specific standards in Schedule 2 and comply with Building Code of Australia requirements where relevant (cl 3.1). Complying development must meet the standards in Schedule 3 and the Building Code and be permissible with consent in the zone (cl 3.2). Environmentally sensitive areas are excluded from exempt or complying development (cl 3.3).
Principal development standards and exceptions. The Plan sets principal development standards,most prominently minimum lot sizes (cl 4.1), minimum lot sizes for community title schemes (cl 4.1AA), lot size requirements for residential intensified forms (cl 4.1A), rural subdivision flexibility (cl 4.2), and specific operational constraints for types of dwellings and worker accommodation (cl 4.2B, cl 4.2D, cl 4.2E). There is also a clause permitting exceptions to development standards where the consent authority is satisfied the applicant demonstrates compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds (cl 4.6). That exceptions clause is constrained by express exclusions and thresholds, for example preventing its use to create multiple undersized lots in certain zones (cl 4.6(6)) and excluding some standards from its operation (cl 4.6(8)).
Heritage and Aboriginal cultural heritage. The Plan lists heritage items, conservation areas and archaeological sites and requires consent for demolition, structural change to interior fabric specified in Schedule 5 and works affecting Aboriginal objects and places (cl 5.10). For archaeological sites not on the State Heritage Register the consent authority must notify the Heritage Council and consider any response (cl 5.10(7)). For Aboriginal places, the Plan requires consideration of cultural impact and consultation with local Aboriginal people (cl 5.10(8); cl 7.7).
Environment, biosecurity and primary production measures. The Plan contains bespoke controls for intensive livestock agriculture (cl 5.18) with thresholds under which development consent is not required but subject to siting constraints, and comprehensive pond- and tank-based aquaculture rules in Schedule 6 and cl 5.19 including conservation exclusion zones and operational requirements.
Interactions with State and Commonwealth law. The Plan is expressly subject to State environmental planning policies that prevail under section 3.28 of the Act (cl 1.9(1)). It also provides for required consultation with Commonwealth bodies on matters that affect airports and meteorological facilities (cl 7.3; cl 7.5).
Transitional and miscellaneous mechanisms. The Plan contains a savings provision that requires pre-commencement development applications to be determined as if the Plan had not commenced (cl 1.8A). It contains a suspension-of-covenants provision that makes private covenants and similar instruments inapplicable to the extent necessary to permit development consistent with the Plan, with listed exceptions and preservation of public authority rights (cl 1.9A). It identifies the relevant State authority for owner-initiated acquisition of certain reserved land (cl 5.1) and provides for classification/reclassification of public land (cl 5.2; Schedule 4).
Operational planning for urban releases. Part 6 imposes a gating function for urban release subdivisions, requiring certification that arrangements for designated State public infrastructure exist before smaller lots are created (cl 6.1). It also requires a DCP prepared to specified content before many developments in urban release areas will be approved (cl 6.3).
Standards protecting cultural and social uses. The Plan includes a specific standard that limits the grounds on which consent can be refused to licensed premises for playing or performing music and related matters, provided noise can be managed to acceptable levels (cl 5.20). This is a locally operative protection for live music and performing arts claims stated as an objective in cl 1.2(aa).
Those concepts are the structural building blocks of how the Plan allocates rights, specifies duties for applicants and consent authorities, and channels economic and social activities through the development consent process, exempt/compliant categories and prescribed standards.
Who it affects
Property owners and applicants
Owners and prospective purchasers must check the Land Zoning Map, Lot Size Map and other maps referenced in the Plan to determine permitted uses and minimum lot sizes (cl 2.2; cl 4.1). The Plan directly affects owners by defining what can be carried out without consent, what requires Council consent, and what is prohibited in each zone (cl 2.3; Land Use Table). Owners of land listed in Schedule 5 (heritage items) or in Schedule 5 Part 3 (archaeological sites) face additional consent conditions and may be required to prepare heritage management documents or conservation management plans before consent is granted (cl 5.10(2), (5)-(6)).
Applicants for subdivision are affected by minimum lot size rules and exceptions, including the requirement not to create principal and secondary dwellings on separate lots unless minimum sizes are met (cl 2.6; cl 4.1; cl 4.1AA; cl 4.2B). Applicants proposing to contravene development standards must prepare supporting material addressing the tests in cl 4.6 and should expect the consent authority to keep a record of its assessment (cl 4.6(3)-(4)).
Developers and builders
Developers who rely on exempt or complying development pathways must satisfy Schedule 2 or Schedule 3 requirements and the Building Code of Australia provisions referenced in cl 3.1 and cl 3.2. They must also be mindful that environmentally sensitive areas are excluded from being able to use those pathways (cl 3.3).
Those planning urban releases must secure certifications about designated State public infrastructure where subdivisions would create smaller lots than the pre-release minimum (cl 6.1). They must also work with the Council on the DCP content required for urban release areas (cl 6.3).
Council and consent authorities
The Council is identified as the consent authority for the purposes of the Plan, subject to the Act (cl 1.6). It must consider zone objectives when determining applications (cl 2.3(2)), assess heritage impacts and may require heritage management documents (cl 5.10(4)-(6)), and ensure that flood risk, bush fire hazard reduction, airport/meteorological compatibility and other overlay matters are addressed in determinations (cl 5.21; cl 7.3; cl 7.4; cl 7.5; cl 5.11). The Council must also keep maps on public access arrangements approved by the Minister (cl 1.7(3)).
State and Commonwealth agencies
The Plan identifies particular State policies and instruments that prevail and excludes one SEPP provision in relation to this land (cl 1.9). It designates particular State authorities as the relevant acquiring authority for owner-initiated acquisition of reserved land (cl 5.1). It requires consultation with relevant Commonwealth bodies where works would penetrate airport obstacle limitation or operations surfaces or affect meteorological radar vectors (cl 7.3(2)-(4); cl 7.5(4)). The Plan also preserves the use of State SEPP Chapter 2 infrastructure rights (cl 5.12(1)).
Aboriginal communities and heritage stakeholders
Local Aboriginal communities have a consultative role where development will affect Aboriginal places of heritage significance; the Plan requires notification and consideration of any response (cl 5.10(8)). Local Aboriginal communities are specifically part of the consultative test for land identified on the Aboriginal Cultural Significance Map (cl 7.7(2)).
Agricultural and aquaculture operators
Operators of intensive livestock enterprises and aquaculture must work within the Plan’s operational thresholds and siting constraints (cl 5.18; cl 5.19; Sch 6). The Plan sets capacity thresholds under which certain intensive livestock operations may proceed without consent if siting constraints are satisfied (cl 5.18(4)-(5)). Pond-based and tank-based aquaculture must comply with site-location and operational requirements in Schedule 6 (cl 5.19).
Holders and beneficiaries of private covenants and agreements
The Plan makes private agreements, covenants and similar instruments inapplicable to the extent necessary to allow development consistent with the Plan, subject to express exemptions (cl 1.9A(1)-(2)). This alters the enforceability landscape for covenant beneficiaries and requires them to monitor development decisions under this Plan; rights and interests of public authorities are preserved (cl 1.9A(3)).
Commercial hospitality operators and musicians
Licensed premises are protected from refusal on certain aesthetic and entertainment-related grounds, including genre, whether music is live or amplified, presence of a dance floor and stage orientation (cl 5.20(1)). A refusal on the basis of noise from music is prevented if the consent authority is satisfied noise can be managed and minimised to an acceptable level (cl 5.20(2)). That shifts some of the burden onto applicants to demonstrate manageability of noise and onsite measures.
Infrastructure providers and transport planners
Developers proposing truck depots or warehouse/distribution centres in RU1 must demonstrate adequate road access and that the development supports primary industry freight movement or rail freight usage and will not increase rural land use conflict (cl 7.8; cl 7.9). Urban release area developers must arrange public utility infrastructure and staging plans before proposals proceed (cl 6.1-6.3).
Who pays and who decides
Applicants and owners bear the compliance, application and documentation costs required by the Plan and by the Act and regulations. The consent authority (primarily the Council) decides on approvals, subject to consultation and notification obligations to State and Commonwealth bodies in some circumstances (cl 1.6; cl 7.3; cl 7.5). For owner-initiated acquisitions, identified State authorities bear the acquisition obligation as specified in cl 5.1, with statutory acquisition processes under the Land Acquisition (Just Terms Compensation) Act 1991 being triggered where applicable.
In short, the Plan primarily affects landowners, developers, the Council as consent authority, specified State and Commonwealth bodies, Aboriginal communities, agribusiness and aquaculture operators, and those with interests under private covenants. The degree of impact depends on zoning, whether the land is heritage-listed or in an environmentally sensitive area, and whether the development relies on exempt or complying pathways or requires bespoke consent.
Key duties and rights
Duties of the consent authority
Consider zone objectives: The consent authority must have regard to the objectives for development in the relevant zone when assessing development applications (cl 2.3(2)). This imposes an evaluative duty to align grant or refusal with those objectives.
Keep records for exceptions: If an application seeks to contravene a development standard, the consent authority must be satisfied of the matters in cl 4.6(3) and must keep a record of the assessment conducted under that clause (cl 4.6(3)-(4)). This creates an evidentiary and record-keeping duty for decisions relying on the exceptions pathway.
Heritage procedural duties: For development on archaeological sites (other than land on the State Heritage Register), the consent authority must notify the Heritage Council and take into account any response within 28 days (cl 5.10(7)). For demolition of nominated State heritage items, similar notification is required (cl 5.10(9)). For Aboriginal heritage the consent authority must consider the effect on cultural significance and notify local Aboriginal communities and consider their responses (cl 5.10(8)).
Flood and hazard assessment: When development is within the flood planning area, the consent authority must be satisfied the development is compatible with flood function and behaviour, will not adversely affect flood behaviour, incorporates life-safety measures and considers climate change impacts and evacuation capacity (cl 5.21(2)-(3)).
Airport and meteorological consultation: The consent authority must consult the relevant Commonwealth body where proposed development would penetrate obstacle limitation or operations surfaces or affect meteorological radar vectors, and must refuse consent if the Commonwealth body advises construction should not occur (cl 7.3(2)-(4); cl 7.5(4)).
Rights and obligations of applicants and owners
Right to rely on exempt or complying development pathways where the work meets Schedule 2 or Schedule 3 standards and is not in an environmentally sensitive area (cl 3.1-3.3; Sch 2; Sch 3).
Obligation to meet building safety and sustainability standards: Exempt and complying development must meet the Building Code of Australia deemed-to-satisfy provisions where relevant, and complying development must meet any BASIX commitments and other regulatory approvals (cl 3.1(3)(a); cl 3.2(3)(b)-(c); cl 4.6(8)(b)).
Duty when seeking exceptions to standards: Applicants who rely on cl 4.6 must demonstrate compliance with cl 4.6(3)(a)-(b) and prepare the material required by the Environmental Planning and Assessment Regulation to justify the departure.
Duties for intensive livestock and aquaculture: Applicants must address operational and siting matters listed in cl 5.18 and cl 5.19 and the Schedule 6 requirements for pond and tank aquaculture. For intensive livestock agriculture, the consent authority must have regard to odour, water pollution, soil degradation, mitigation measures, site suitability and industry codes (cl 5.18(3)). For certain types and sizes, development may proceed without consent but only outside environmentally sensitive areas and subject to prescribed setbacks (cl 5.18(4)-(5)).
Duty to restore land after temporary use: Temporary uses permitted for up to 31 days per 12 months must not prejudice future development and must be restored to previous condition at the end of the temporary use period unless a longer sales office exemption applies (cl 2.8(2)-(5)).
Rights arising from the Plan
Right to have a pre-commencement development application determined under the earlier instrument: If an application was lodged before commencement and not finally determined, the application must be determined as if this Plan had not commenced (cl 1.8A). That preserves the applicant’s rights under the previous instrument’s rules.
Limited right to live music at licensed premises: Applicants for licensed premises have a statutory protection against refusal based on a range of music- and performance-related factors, including genre or whether music is amplified, provided the consent authority is satisfied the noise can be managed and minimised to an acceptable level (cl 5.20(1)-(2)). This is a substantive right affecting consent grounds.
Right to public land classification decisions under local government law: The Plan authorises classification and reclassification of certain public land as operational or community land in accordance with the Local Government Act 1993 and records specific parcels and any trusts that remain (cl 5.2; Schedule 4).
Constraints and procedural rights preserved
Suspension of covenants does not apply to covenants imposed by the Council or to a set of specified instruments (cl 1.9A(2)). It also does not affect rights or interests of public authorities under registered instruments (cl 1.9A(3)). Those are preserved constraints and rights.
State SEPPs prevail: The Plan is subject to State environmental planning policies that have precedence under the Act (cl 1.9(1)). Where a SEPP applies and prevails, it will modify the rights and duties that flow from the Plan.
Administrative roles and appointed authorities
The Plan identifies particular authorities as the relevant State acquisition authority for lands reserved for public purposes on the Land Reservation Acquisition Map (cl 5.1(2); table in cl 5.1(2)). That identification determines which State body handles owner-initiated acquisition requests under the Land Acquisition (Just Terms Compensation) Act 1991.
Overall, the Plan prescribes a mix of duties for consent authorities, procedural and evidentiary obligations for applicants, specific entitlements for certain land uses and protections that preserve State, Commonwealth and public authority rights. Duties are often expressed as preconditions to consent and are backed by detailed standards and documentation requirements in the schedules.
Penalties and enforcement
This Plan is an environmental planning instrument that operates within the enforcement framework of the Environmental Planning and Assessment Act 1979 and associated regulations. The Plan itself does not set out specific monetary penalties or prosecutions; instead, enforcement is effected through the consent regime, compliance with conditions and the Act's compliance and enforcement mechanisms.
How enforcement is effected under the Plan
Development consent requirement and prohibition compliance. Many provisions specify that certain work may be carried out only with development consent (for example, subdivision cl 2.6, demolition cl 2.7, heritage-related work cl 5.10). Where development occurs without required consent, the relevant enforcement mechanisms are those in the Act and regulations, including orders to remedy or to cease work, compliance notices, penalty notices and court proceedings under the Act. The Plan conditions the need for consent but enforcement action for breaches will be through the Act rather than through unique penalty provisions contained in the Plan text itself.
Conditions and approvals. Complying development certificates and development consents issued under this Plan are subject to conditions (see cl 3.2(4) for complying development certificates and many schedule entries). Failure to observe conditions is an enforceable breach under the Act and may attract actions such as orders and penalties available to regulators under the Act and the regulations.
Heritage and Aboriginal heritage offences and protections. The Plan requires consent for works affecting heritage items, Aboriginal objects and archaeological sites (cl 5.10). Offences for unauthorised disturbance of Aboriginal objects or places are also regulated under the National Parks and Wildlife Act 1974; the Plan notes the overlap and references the relevant statutory protections (cl 7.1 note referencing National Parks and Wildlife Act 1974 s 86). Enforcement in these contexts can include criminal and civil remedies under the heritage and Aboriginal heritage statutes as well as under the Act.
Regulatory links to other Acts. The Plan repeatedly cross-references other regulatory regimes that carry their own enforcement regimes. For example, aquaculture developments are subject to Fisheries Management Act and relevant regulations; farming and native vegetation issues reference Local Land Services and Native Vegetation law (cl 3.1(5) note; cl 5.19; Sch 6). Noncompliance with licences, permits or conditions in those regimes is independently enforceable.
Procedural enforcement and review paths
Administrative decision-making. Decisions of the consent authority under the Act are subject to merits review and judicial review pathways established by the Act and administrative law. The Plan prescribes duties and procedural steps (such as consultation with the Heritage Council and Commonwealth bodies) which their omission could expose a decision to legal challenge on procedural grounds.
Record-keeping and evidentiary duties. The Plan requires record-keeping for certain discretionary departures from standards (cl 4.6(4)). Failure to document decision-making could undermine the legal defensibility of a consent decision and increase legal risk for the consent authority.
Practical enforcement considerations drawn from the Plan
Many obligations are normative rather than punitive in the Plan text; the Plan relies on the Act and related statutes to supply sanctions. This splits responsibilities between the local instrument for specifying obligations and the Act for enforcement tools.
Where the Plan permits development without consent (subject to Schedule conditions), noncompliance with those conditions will typically be enforced as a breach of the Act rather than by an enforcement clause within the Plan.
The Plan authorises the Council to impose conditions and require management documents such as heritage management documents and conservation management plans (cl 5.10(5)-(6)). Those documents will usually form part of the consent conditions and thus their enforcement is via the general compliance machinery of the Act.
In short, the Plan sets substantive and procedural rules. Enforcement of the Plan’s requirements is exercised under the Environmental Planning and Assessment Act 1979 and other directly relevant statutory regimes such as the Heritage Act 1977, the Land Acquisition (Just Terms Compensation) Act 1991 where acquisition is involved, the National Parks and Wildlife Act 1974 for Aboriginal objects, and fisheries or agriculture statutes for aquaculture and intensive livestock. The Plan itself does not prescribe unique penalty rates; it creates obligations whose breach is actionable under the statutory enforcement architecture.
How it interacts with other laws
The Plan is embedded in a web of State and Commonwealth statutes and policy instruments. The Plan itself references and defers to other laws in multiple ways; these interactions are procedural and substantive.
Primacy of State environmental planning policies. The Plan is expressly subject to any State environmental planning policy (SEPP) that prevails over it under section 3.28 of the Act (cl 1.9(1)). That means where SEPPs contain provisions that override local LEP provisions, the SEPP applies. The Plan also lists a particular SEPP provision that does not apply to the land (State Environmental Planning Policy (Rural Lands) 2008 clause 9) as excluded in cl 1.9(2).
Cross-references to the Act and regulations. The Plan operates under the framework of the Environmental Planning and Assessment Act 1979. It repeatedly relies on the Act for procedural context (for example, the consent authority is "subject to the Act" cl 1.6). When an exempt or complying development pathway requires an accompanying document under the Environmental Planning and Assessment Regulation 2021,for instance, where an applicant seeks to contravene a development standard,the Plan expects the regulation-driven documentation (cl 4.6 note and cl 4.6(3)).
Heritage and Aboriginal heritage statutes. The Plan cross-refers to the Heritage Act 1977 and the National Parks and Wildlife Act 1974 for heritage and Aboriginal heritage matters (cl 5.10; cl 7.1 note). It mandates notification of the Heritage Council and consultation with Aboriginal communities in appropriate circumstances, thereby layering local consent obligations on top of state heritage protections.
Local Government Act 1993 and public land. The Plan enables classification and reclassification of public land as operational land or community land in accordance with the Local Government Act 1993 and records specific parcels to be reclassified (cl 5.2; Schedule 4). That operation interacts with local government land management and trust discharge provisions under the Local Government Act.
Land acquisition law. For owner-initiated acquisition of land reserved for public purposes, the Plan specifies the relevant State authority to acquire the land for particular reservations on the Land Reservation Acquisition Map and references the Land Acquisition (Just Terms Compensation) Act 1991 (cl 5.1). This interface defines which State authority handles acquisition and triggers the statutory acquisition machinery when required.
Crown land and Crown instruments. The Plan’s suspension of covenants provision excludes "relevant instruments" within the meaning of section 13.4 of the Crown Land Management Act 2016 (cl 1.9A(2)(b)). The provision was approved by the Governor under section 3.16 before its making (cl 1.9A(4)), which signals an administrative interaction with Crown property law and the Governor’s approval requirements.
BASIX and building sustainability standards. The Plan excludes the operation of the exceptions clause for development standards that arise in connection with BASIX commitments and for complying development standards (cl 4.6(8)(a)-(b)). That means a BASIX commitment embedded in a building approval cannot be overridden by the Plan’s exceptions route.
Fisheries, marine and aquaculture law. The Plan’s aquaculture rules cross-reference the Fisheries Management Act 1994 and Fisheries Management (Aquaculture) Regulation 2017, and the Plan expects adherence to aquaculture industry development plans and specific strategy documents (cl 5.19; Sch 6). Where marine parks, aquatic reserves or other fisheries instruments apply, the Plan restricts aquaculture activity in those areas (Sch 6 Division 1, cl 1).
Rural land and primary production regimes. The Plan contains specific references to agricultural industry codes, Local Land Services responsibilities and the Native Vegetation and other Acts in notes, particularly in relation to exempt works and environmentally sensitive areas (cl 3.1(5) note; cl 5.18). Intensive livestock and pond/tank aquaculture controls are designed to dovetail with the Department of Primary Industries guidance and approved industry standards (cl 5.18(3)(h); cl 5.19(2)(a)).
Commonwealth aviation and meteorological responsibilities. Where development would penetrate the Limitation or Operations Surface for Moree Airport, or be in radar vectors of the Moree Meteorological Station, the consent authority must consult relevant Commonwealth bodies and must not grant consent if the relevant Commonwealth body advises against it (cl 7.3(2)-(4); cl 7.5(4)-(5)). That creates a direct interface with Commonwealth aviation and meteorological legislation and decision-making functions.
Other State policies and instruments. The Plan references State SEPPs covering housing, transport and infrastructure, industry and employment, resilience and hazards, and resources and energy (Land Use Table notes), signalling that subject-matter governance in those SEPPs will intersect with local decisions under this Plan.
Practical implications of these interactions
Where State or Commonwealth instruments prevail or carry separate licensing or approval regimes, applicants must satisfy both the Plan's local rules and the broader statutory or policy requirements. For example, a proposed wastewater discharge from aquaculture may require approvals under fisheries and water law as well as compliance with the Plan’s Schedule 6 operational standards (cl 5.19; Sch 6).
The Plan’s exceptions mechanism (cl 4.6) is limited by other statutory commitments, especially BASIX. Applicants should not rely on local exceptions to override State-imposed environmental performance commitments.
Consultation and notification duties to external bodies can be determinative: Commonwealth aviation or meteorological objections can negate a local approval regardless of the Plan’s zoning permissibility (cl 7.3(4); cl 7.5(4)).
Overall, the Plan is not self-contained; it operates as a layer in a multi-level governance system and depends on compliance with, consultation under, and the primacy of other State and Commonwealth laws and policies.
Amendment history
The Plan text contains inline amendment notes specifying the statutory instruments, years and schedule items that altered particular clauses or schedules. The history as recorded in the Plan includes the following source-attributed amendments and insertions:
Repeal and replacement mechanics: The Plan, when made, repealed the Moree Plains Local Environmental Plan 1995 for land to which it applies (cl 1.8(1); note).
2015 changes: Clauses 4.2D and 4.2E (dual occupancies and temporary workers’ accommodation on RU1) were inserted by the 2015 instrument (2015 (53), Sch 1 [4]) and clause 7.2 (rural workers’ dwellings) was amended in 2015 (2015 (53), Sch 1 [5]).
2016 amendments: Schedule 4 was amended in 2016 (2016 (224), Sch 1 [1]-[4]); the Land Use Table shows multiple amendment entries including 2016 (168), Sch 1 [2] cited in the Land Use Table marginal note.
2017 amendments: Schedule 2 was amended in 2017 (2017 (726), Sch 2.5); Land Use Table amendments include 2017 (493), Sch 1.1 [1] [2].
2018 amendments: Several changes in 2018 are recorded: cl 5.13 (eco-tourist facilities) was substituted in 2018 (2018 (455), Sch 1 [5]); clauses 7.8 and 7.9 (truck depots and warehouse/distribution centres in RU1) were inserted in 2018 (2018 (455), Sch 1 [6]); Land Use Table amendments include 2018 (455), Sch 1 [1]-[4] and 2018 (488), Sch 1.1 [1]. Schedule 2 amendments also listed 2018 (456), cl 4 changes to maps.
2019 amendments: Clause 1.8A (savings for development applications) was amended in 2019 (621), Sch 5[1]; clause 1.9A (suspension of covenants) was amended in 2019 (621), Sch 5[2]-[4]; Part 6 cl 6.1 was amended in 2019 (621), Sch 5[5]; Schedule 1 was amended in 2019 (228), cl 4 to add additional permitted uses; Land Use Table includes 2019 (137), Sch 6 [1].
2021 changes: Clause 7.6 was repealed by 2021 (225), Sch 1.
2022 amendments: Multiple provisions were amended or inserted in 2022 (830), including updates to clause 2.1 (zones) (Sch 1.16[1]), insertion of clause 4.1AA (minimum subdivision lot size for community title schemes) and amendments to cl 4.2B, 4.2C and clause 4.6 adjustments (Sch 1.16[3]-[5]) and multiple Schedule amendments including Schedule 2 (Sch 1.16[6]-[9]). The Land Use Table records amendments in 2022 (314), Sch 1 and 2022 (830), Sch 1.16[2].
2023 amendments: Part 6 cl 6.1 shows an amendment in 2023 (554), Sch 1; Schedule 2 was further amended in 2023 (609), Sch 1.16.
The marginal notes within the instrument provide the authoritative amendment citations attached to specific clauses and schedules. Where a clause is annotated as "Not adopted" or "Not applicable" the marginal note may reflect that a model clause available under the standard instrument was not taken up when this Plan was finalised. The Plan’s maps have also been subject to amendment entries noted in Schedule 4 and the Land Use Table notes, and map entries were discontinued from July 2021 when responsibility for map updates moved to the Department of Planning, Industry and Environment.
Readers should use the Plan’s marginal amendment annotations and the NSW legislation database to confirm the precise form of each clause at a given date. The amendment notes in the Plan text are the source record in this instrument for the listed changes.
Litigation history
The Plan text itself does not record judicial decisions, appeals, or litigation history. There are no cases or decisions cited in the instrument. As a planning instrument, outcomes under the Plan which give rise to litigation are handled through the Environmental Planning and Assessment Act 1979 appeal and review mechanisms, and through judicial review, merits review and other administrative law processes where applicable. However, within the Plan text there are no references to litigation, no reported cases and no formal adjudicative history recorded.
Practical implications for practitioners
Because the instrument contains no internal litigation history, practitioners seeking precedent or judicial interpretation must look to decisions under the Act and to any published cases that have considered particular clauses of this Plan. That material is not embedded in the Plan text and requires external legal research in planning and environmental law databases.
Absent Plan-specific case law being recorded in the text, the Plan’s interpretation will initially rely on standard principles of statutory construction and the Act’s framework. For example, disputes about whether an applicant has satisfied cl 4.6 for an exception to a development standard, or whether the Council complied with cl 5.10 heritage consultation steps, would be litigated under the Act; the Plan provides the substantive points of reference but not the adjudicative answers.
Practitioners should also bear in mind that the Plan cross-references other instruments and laws where litigation or administrative decisions may better illuminate practical application: SEPPs, the Heritage Act 1977, fisheries and aquaculture regulations, the Local Government Act 1993 and Commonwealth decisions in aviation or meteorological matters may generate relevant case law that shapes how the Plan’s provisions are applied in practice.
Because there are no cases named in this instrument, any consideration of litigation must proceed by researching external case law that addresses development controls of the type contained in the Plan, under the Act and its regulations, or case law that discusses the same statutory constructs at a State or local level.
Gotchas
This Plan contains several provisions that commonly produce practical traps for applicants, consent authorities and third parties. The following are specific points to watch, with clause references to the Plan.
Suspension of private covenants is limited, not universal (cl 1.9A)
The Plan makes private agreements, covenants and similar instruments inapplicable to the extent necessary to permit development consistent with the Plan (cl 1.9A(1)). However, it expressly excludes covenants imposed by the Council and a specified list of instruments such as Crown instruments, conservation agreements, property vegetation plans and biobanking agreements (cl 1.9A(2)(a)-(f)). It also preserves registered public authority rights (cl 1.9A(3)). Practitioners and owners must not assume all restrictive covenants vanish; check cl 1.9A(2) for the exceptions.
Transitional applications remain on prior rules (cl 1.8A)
If an application was lodged before the Plan's commencement and not finally determined, it must be determined as if the Plan had not commenced (cl 1.8A). That can create parallel tracks where older applications are assessed under prior rules while new applications are judged under the Plan. Developers should check whether their application is "finalised" before the Plan's commencement date to determine which rules apply.
Exceptions to development standards are constrained (cl 4.6)
While cl 4.6 permits departures from development standards where an applicant satisfies tests, it expressly prohibits using the clause to grant subdivision consents that would produce two or more lots below minimum areas in certain zones or create lots less than 90% of the minimum in those zones (cl 4.6(6)). It also excludes development standards for complying development, BASIX commitments, and some other clause standards (cl 4.6(8)(a)-(b)). Applications relying on cl 4.6 must prepare the evidence the regulations require and should expect the consent authority to record its reasons (cl 4.6(3)-(4)).
Exempt and complying development excluded in environmentally sensitive areas (cl 3.3)
Schedule 2 or Schedule 3 pathways are not available in a wide range of environmentally sensitive areas defined in cl 3.3(2), including coastal waters, wetlands of international significance, land of high Aboriginal cultural significance, listed conservation reserves and declared critical habitat. Applicants who assume an exempt/compliant pathway must first confirm the land is not an environmentally sensitive area as defined.
Music protections have limits (cl 5.20)
Clause 5.20 prevents refusal on a range of entertainment-related grounds and bars refusal solely because of music genre, amplification, dance floors and similar matters (cl 5.20(1)). However the protection applies only where the consent authority is satisfied the noise "may be managed and minimised to an acceptable level" (cl 5.20(2)). The practical issue is that applicants still need to show appropriate noise management measures and mitigation; the clause does not eliminate acoustic assessment requirements.
Heritage procedural requirements can prolong assessment (cl 5.10)
For many works affecting heritage items, the Plan authorises the consent authority to request a heritage management document or a conservation management plan (cl 5.10(5)-(6)). For archaeological sites and some State heritage items, the consent authority must notify the Heritage Council and consider any response (cl 5.10(7), (9)). These requirements add time and cost and may change project scope.
Maps and online updates are authoritative (cl 1.7)
The Plan treats maps as operative and allows them to be amended over time (cl 1.7(1)-(2)). The maps are to be kept on the NSW Planning Portal and amendments made by environmental planning instruments will update them. Users must check the live maps rather than rely on printed or historic information.
Urban release area gating for infrastructure (cl 6.1-6.3)
Subdivision that creates lots smaller than the pre-release minimum requires a written certificate from the Director-General stating satisfactory arrangements for designated State public infrastructure have been made (cl 6.1(2)). Developers can be delayed if infrastructure arrangements are not agreed or certified; the clause also exempts certain lots from the requirement (cl 6.1(3)).
Minimum lot size nuance for secondary dwellings and community titles (cl 4.1, 4.1AA, 4.1A)
Minimum lot sizes apply generally but are subject to exceptions for strata and community title schemes in certain zones (cl 4.1AA), and special minimums apply to dual occupancies, multi-dwelling housing and residential flat buildings in specified zones (cl 4.1A). Misreading which rules apply can lead to incorrect subdivision proposals.
Pond/tank aquaculture and discharge limitations (cl 5.19; Sch 6)
Pond-based and tank-based aquaculture has specific operational requirements and limits, particularly for intensive systems (no discharge to natural waterbodies except open flow-through systems per Sch 6 cl 4). There are also conservation exclusion zones where aquaculture cannot be carried out except for water access. Applicants should confirm both Plan constraints and fisheries licensing requirements.
Airport and meteorological constraints are externally determined (cl 7.3; cl 7.5)
Even if a proposal is permissible under zone controls, the relevant Commonwealth body can object to development that penetrates airport limitation surfaces or radar vectors and that objection can be determinative (cl 7.3(4); cl 7.5(4)). Applicants must factor in potential Commonwealth-level refusal.
Specific local additional permitted uses are parcel-specific (Schedule 1)
Schedule 1 grants additional permitted uses for particular lots (e.g., Longpoint at Bingara Road, concrete works at 74 Drive In Road) (Sch 1). Applying those permissions elsewhere or to parts of a lot not specified risks incorrect assumptions about entitlement.
Non-adopted or not applicable clauses
Several clauses are marked as "Not adopted", for example height of buildings (cl 4.3) and floor space ratio (cl 4.4) and others. Practitioners should not assume the presence of those model clauses and must instead look to other instruments such as DCPs or State controls for height or FSR guidance.
In summary, the gotchas mainly arise from assuming universal application of seemingly permissive clauses, not checking the specific exceptions and excluded areas, failing to verify the latest maps and schedules, misunderstanding the limits of the exceptions clause, and underestimating cross-jurisdictional consultation and approval requirements. Each of these is grounded in the textual provisions cited above.
How to comply
Compliance under this Plan requires a stepwise, source-focused approach. The following practical checklist sets out the principal compliance actions tied to the Plan’s provisions.
Confirm the applicable maps and zoning
Check the Land Zoning Map and Lot Size Map for the subject parcel on the NSW Planning Portal and verify whether any overlay maps apply (Heritage Map, Meteorological Station Height Limit Map, Aboriginal Cultural Significance Map, Land Reservation Acquisition Map) as the Plan treats maps as operative parts of the instrument and they can be amended (cl 1.7; cl 2.2; cl 4.1 reference to Lot Size Map; cl 7.5(3) for meteorological height limits).
Do not rely on printed copies; the Plan requires maps be kept and made available with Minister-approved arrangements (cl 1.7(3)-(4)).
Determine use permissibility under the Land Use Table and Schedule 1
Identify whether the proposal is listed as permitted without consent, permitted with consent or prohibited in the relevant zone (cl 2.3 and Land Use Table). If the use is expressly prohibited, a standard consent pathway under this Plan will not permit it.
Check Schedule 1 for any site-specific additional permitted uses that may alter what is permitted on the parcel (Schedule 1).
Check exempt and complying development options
If the proposal might be exempt or complying development, confirm it meets the precise standards in Schedule 2 or Schedule 3 and the Building Code of Australia requirements referenced in cl 3.1 and cl 3.2. Verify that the land is not in an "environmentally sensitive area" as defined at cl 3.3, which would exclude exempt/compliant pathways.
Subdivision and lot size compliance
For subdivisions, confirm the Lot Size Map minimum lot sizes apply and whether exceptions in cl 4.2 (rural subdivision) or cl 4.2A (exceptions) are relevant. For community title schemes, check cl 4.1AA.
Note the prohibition in cl 4.6(6) on using the exceptions clause to create multiple undersized lots in specified zones. If a proposal would create lots smaller than the Lot Size Map minimums, carefully check whether any specific exception applies and whether it can survive cl 4.6 constraints.
If proposing a variation from a development standard
Where compliance with a development standard cannot be met and cl 4.6 is to be relied upon, prepare a written statement that demonstrates that compliance with the standard is unreasonable or unnecessary in the circumstances and that there are sufficient environmental planning grounds to justify the contravention (cl 4.6(3)). The Environmental Planning and Assessment Regulation requires additional supporting material for such applications; ensure that material is prepared and that the consent authority record requirement is anticipated (cl 4.6(3)-(4)).
Heritage and Aboriginal heritage processes
If the site is a heritage item, within a heritage conservation area, or contains Aboriginal objects or archaeological sites (Schedule 5 and cl 5.10; cl 7.7), notify and consult as required. Be prepared to prepare a heritage management document or heritage conservation management plan if the consent authority requires it (cl 5.10(5)-(6)). For archaeological sites the consent authority must notify the Heritage Council and consider any response (cl 5.10(7)). For Aboriginal places, notify local Aboriginal communities and consider any responses (cl 5.10(8)).
Environmental, agricultural and aquaculture controls
Intensive livestock agriculture: confirm whether the activity falls below the thresholds set out in cl 5.18(5). If so and the location is appropriate (not in environmentally sensitive areas and not within the specified setbacks), the development may be possible without consent; if not, prepare an environmental assessment addressing odour, water pollution, soil degradation, mitigating measures and consistency with DPI guidelines (cl 5.18(3)-(5)).
Aquaculture: for pond- and tank-based aquaculture follow the site location and operational requirements in Schedule 6 and cl 5.19. For intensive aquaculture, ensure pond design enables draining and drying and that there is no prohibited freshwater discharge to natural waterbodies except as allowed (Sch 6 cl 3-4).
Airport, meteorological, and noise constraints
If the site is near Moree Airport or in ANEF contours, check cl 7.3 and cl 7.4 requirements and consult the relevant Commonwealth aviation body where the proposed development will penetrate limitation or operations surfaces (cl 7.3(2)-(4)). For development in the Moree Airport ANEF zone, demonstrate that the development will meet AS 2021,2000 indoor design sound levels and that it will not increase persons affected by aircraft noise (cl 7.4(3)).
For meteorological radar considerations check the Meteorological Station Height Limit Map and give notice to the relevant Commonwealth body for development in radar vectors (cl 7.5(2)-(4)).
Temporary uses, sales offices and events
If the proposal is a temporary use, ensure the period does not exceed 31 days in any 12-month period unless the exception for sales offices in new release areas applies (cl 2.8). Provide evidence that the temporary use will not prejudice future development, will not cause amenity impacts, and that the land will be restored after the use ends (cl 2.8(2)-(3)).
Prepare required documentation and engage early with the consent authority
Be ready to supply heritage management documents, environmental impact statements for designated development, BASIX certificates where required, and the statements necessary to justify departures from standards under cl 4.6. The Plan references particular guidelines (for example the Considering Flooding in Land Use Planning Guideline in cl 5.21(4)), so use those to support applications.
For potential disputes about covenant suspension under cl 1.9A, confirm whether the covenant you rely on is excluded from suspension (cl 1.9A(2)). If you are a covenant beneficiary, engage with the Council early when development proposals are lodged.
Urban release and infrastructure obligations
For urban release subdivisions that create lots smaller than the previously permitted minimum, secure a written certificate from the Director-General that satisfactory arrangements have been made for designated State public infrastructure (cl 6.1(2)). Prepare the DCP content required under cl 6.3 in cooperation with Council where necessary.
Check ancillary State or Commonwealth approvals
Because the Plan operates alongside other statutory regimes, confirm whether separate licences, permits or approvals are required (for example fisheries licences for aquaculture, heritage consents under the Heritage Act, Crown land approvals and aviation/meteorological clearances). The Plan’s notes repeatedly remind applicants that exempt development is not a substitute for approvals under other Acts (cl 3.1 note; Sch 6 notes).
Post-approval compliance and conditions
Ensure consent conditions are integrated into project delivery schedules and contractual arrangements. If preparing a complying development certificate, adhere to the conditions in Schedule 6 of the State SEPP on Exempt and Complying Development Codes as referenced in Schedule 3 (sch.3-sec-oc.4).
Professional advice and record-keeping
Where the Plan triggers consultation with Commonwealth bodies, heritage authorities or requires technical submissions (noise, flood, heritage, environmental), engage appropriately qualified consultants and document decisions and correspondence thoroughly. The consent authority is obliged to keep records for certain discretionary decisions (cl 4.6(4)); applicants benefit from keeping detailed records to support claims and to expedite responses to queries or challenges.
Following that sequence and aligning application materials to the Plan’s clauses and schedules will substantially reduce legal and procedural risk. When in doubt, check the operative maps and the latest version of the Plan as made available by the NSW legislation website and the NSW Planning Portal, and consider early pre-lodgement discussions with the consent authority to clarify expectations under the Plan.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Moree Plains Local Environmental Plan 1995
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
State Environmental Planning Policy (Rural Lands) 2008 (clause 9)
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU4 Primary Production Small Lots
RU5 Village
Residential Zones
R1 General Residential
R2 Low Density Residential
R5 Large Lot Residential
Employment Zones
E1 Local Centre
E2 Commercial Centre
E3 Productivity Support
E4 General Industrial
E5 Heavy Industrial
Special Purpose Zones
SP1 Special Activities
SP2 Infrastructure
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
C3 Environmental Management
C4 Environmental Living
cl 2.1: Am 2022 (830), Sch 1.16[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 31 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards th
This is an opening excerpt, not the complete document.