Mid-Western Regional Local Environmental Plan 2012
sch.2-secDepot
Start here
Get a plain-English read of sch.2-sec
Turn the raw legal text into a practical explanation grounded in Mid-Western Regional Local Environmental Plan 2012.
sch.2-sec Depot
Depot
(1) Must only be constructed on land in Zone RU1 Primary Production, Zone RU4 Primary Production Small Lots or Zone R5 Large Lot Residential.
(2) Must be a small scale operation with a maximum of 2 vehicles.
(3) Maximum height—7m above ground level (existing).
(4) Maximum area—200m2.
(5) Must be located at least 20m from the primary road frontage of the lot and at least 10m from the other lot boundaries.
(6) Must be constructed or installed at least 50m from a dwelling on an adjoining property.
(7) Must be located at least 50m from a waterbody (natural).
(8) To the extent it is comprised of a metal components, must be designed by, and constructed in accordance with the specifications of, a professional engineer.