This local environmental plan sets the legal planning rules for land in Maitland: zoning and maps, what uses are permitted, prohibited or need consent, and key development standards (lot sizes, heights, floor space ratios), plus exemptions, heritage and environmental controls. It tells landowners, developers, Council and state agencies what development may proceed and under what conditions.
The Plan matters because it changes who pays compliance costs, who decides approvals (the Council as consent authority) and what development behaviour is allowed or restricted, thereby shaping timing, costs and feasible uses of land.
This instrument is a local environmental plan for Maitland that prescribes zoning, permitted uses, development standards and a set of site‑specific and local rules that govern land use, subdivision and development within the Maitland local government area. Mechanically it:
Commences on publication to the NSW legislation website (cl 1.1AA).
Repeals earlier local environmental plans applying only to this land and displaces other instruments as described (cl 1.8).
Identifies the Council as the consent authority for the Plan (cl 1.6) and relies on a set of named maps , Land Zoning Map, Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Heritage Map, Watercourse Map, Land Reservation Acquisition Map and others , to fix spatial rules (cl 1.7; cl 2.2; cl 4.1(2) and elsewhere).
Establishes the land use zones (cl 2.1) and a Land Use Table (cl 2.3 and the Land Use Table at the end of Part 2) that categorises, by zone, development that is permitted without consent, permitted with consent and prohibited. The Land Use Table and schedules have been amended repeatedly (see amendment notes).
Requires development consent for many core activities: subdivision (cl 2.6), demolition (cl 2.7), development on unzoned land (cl 2.4(1)), work below mean high water mark (cl 5.7) and specified works in acid sulfate soils areas (cl 7.1).
Creates an exempt and complying development regime in Part 3 (cl 3.1-3.3) but limits those forms of development where land is environmentally sensitive (cl 3.3).
Fixes principal development standards , minimum lot sizes (cl 4.1; cl 4.1AA), exceptions for specific zones (cl 4.1A; cl 4.2C), building height (cl 4.3), floor space ratio (cl 4.4) and the rules for calculating site area and floor space (cl 4.5). It also provides a route for contravention of development standards where the consent authority is satisfied pursuant to cl 4.6.
Current sections
Direct links to the current provisions in Maitland Local Environmental Plan 2011.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agritourism; Airstrips; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Boat launching ramps; Boat sheds; Cellar door premises; Dual occupancies; Dwelling houses; Environmental facilities; Environmental protection works; Extractive industries; Farm buildings; Farm stay accommodation; Flood mitigation works; Forestry; Helipads; Home-based child care; Home businesses; Home industries; Intensive livestock agriculture; Jetties; Landscaping material supplies; Markets; Open cut mining; Plant nurseries; Recreation areas; Roads; Roadside stalls; Rural industries; Rural supplies; Signage; Turf farming; Water supply systems
4
Prohibited
4 Prohibited
4 Prohibited
Any other development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Note.
If land, other than land specified in the Table to subclause (2), is required to be acquired under the owner-initiated acquisition provisions, the Minister for Planning and Infrastructure is required to take action to enable the designation of the acquiring authority under this clause. Pending the designation of the acquiring authority for that land, the acquiring authority is to be the authority determined by order of the Minister for Planning and Infrastructure (see section 21 of the Land Acquisition (Just Terms Compensation) Act 1991).
cl 5.1: Am 2022 (828), Sch 1.12[9].
Part 6
Urban release areas
Part 6 Urban release areas
Part 6 Urban release areas
6
6
6.1 (Repealed)
Part 7
Additional local provisions
Part 7 Additional local provisions
Part 7 Additional local provisions
7
Acid sulfate soils
7 Acid sulfate soils
7.1 Acid sulfate soils
(1) The objective of this clause is to ensure that development does not disturb, expose or drain acid sulfate soils and cause environmental damage.
(2) Development consent is required for the carrying out of works described in the Table to this subclause on land shown on the Acid Sulfate Soils Map as being of the class specified for those works.
| Class of land | Works |
| 1 | Any works. |
| 2 | Works below the natural ground surface.Works by which the watertable is likely to be lowered. |
| 3 | Works more than 1 metre below the natural ground surface.Works by which the watertable is likely to be lowered more than 1 metre below the natural ground surface. |
| 4 | Works more than 2 metres below the natural ground surface.Works by which the watertable is likely to be lowered more than 2 metres below the natural ground surface. |
| 5 | Works within 500 metres of adjacent Class 1, 2, 3 or 4 land that is below 5 metres Australian Height Datum and by which the watertable is likely to be lowered below 1 metre Australian Height Datum on adjacent Class 1, 2, 3 or 4 land. |
(3) Development consent must not be granted under this clause for the carrying out of works unless an acid sulfate soils management plan has been prepared for the proposed works in accordance with the Acid Sulfate Soils Manual and has been provided to the consent authority.
(4) Despite subclause (2), development consent is not required under this clause for the carrying out of works if—
(a) a preliminary assessment of the proposed works prepared in accordance with the Acid Sulfate Soils Manual indicates that an acid sulfate soils management plan is not required for the works, and
(b) the preliminary assessment has been provided to the consent authority and the consent authority has confirmed the assessment by notice in writing to the person proposing to carry out the works.
(5) Despite subclause (2), development consent is not required under this clause for the carrying out of any of the following works by a public authority (including ancillary work such as excavation, construction of access ways or the supply of power)—
(a) emergency work, being the repair or replacement of the works of the public authority required to be carried out urgently because the works have been damaged, have ceased to function or pose a risk to the environment or to public health and safety,
(b) routine maintenance work, being the periodic inspection, cleaning, repair or replacement of the works of the public authority (other than work that involves the disturbance of more than 1 tonne of soil),
(c) minor work, being work that costs less than $20,000 (other than drainage work).
(6) Despite subclause (2), development consent is not required under this clause to carry out any works if—
(a) the works involve the disturbance of less than 1 tonne of soil, such as occurs in carrying out agriculture, the construction or maintenance of drains, extractive industries, dredging, the construction of artificial water bodies (including canals, dams and detention basins), foundations or flood mitigation works, or
(b) the works are not likely to lower the watertable.
Use of certain land at 37 and 45 Alnwick Street, Millers Forest
4A Use of certain land at 37 and 45 Alnwick Street, Millers Forest
4A Use of certain land at 37 and 45 Alnwick Street, Millers Forest
(1) This clause applies to Lots 20 and 21, DP 836869, being 37 and 45 Alnwick Street, Millers Forest.
(2) Development for the purpose of a hazardous storage establishment (being for the storage of fireworks) is permitted with development consent.
8
Use of certain land at 46 and 48 Banks Street, East Maitland
8 Use of certain land at 46 and 48 Banks Street, East Maitland
8 Use of certain land at 46 and 48 Banks Street, East Maitland
(1) This clause applies to Lot 1, DP 199405 and Lot 1, DP 716770, being 46 and 48 Banks Street, East Maitland.
(2) Development for the purpose of a mortuary is permitted with development consent.
9
Use of certain land at 56 Kyle Street, Rutherford
9 Use of certain land at 56 Kyle Street, Rutherford
9 Use of certain land at 56 Kyle Street, Rutherford
(1) This clause applies to Lot 3, DP 790460, being 56 Kyle Street, Rutherford.
(2) Development for the purpose of a recreation facility (outdoor) for the purpose of motorcycle activities is permitted with development consent.
10
Use of certain land at 11 Metford Road, East Maitland
10 Use of certain land at 11 Metford Road, East Maitland
10 Use of certain land at 11 Metford Road, East Maitland
(1) This clause applies to Lot 1, DP 1274406, 11 Metford Road, East Maitland.
(2) Development for the purposes of animal boarding or training establishments is permitted with development consent.
11
Use of certain land at 5–13 Louth Park Road, South Maitland
11 Use of certain land at 5–13 Louth Park Road, South Maitland
11 Use of certain land at 5–13 Louth Park Road, South Maitland
(1) This clause applies to the following land at South Maitland—
(a) Lot 6, DP 199882 and Lots 17 and 18, DP 1044795, 5 Louth Park Road,
(b) Lot 1, DP 794525, 7 Louth Park Road,
(c) Lot 4, DP 1109043, 9 Louth Park Road,
(d) Lots 1–3, DP 1109043, 11 Louth Park Road,
(e) Lot 1, DP 782596, 13 Louth Park Road.
(2) Development for the purposes of service stations and takeaway food and drink premises is permitted with development consent.
12
Use of certain land in Zone E3 for shop top housing
12 Use of certain land in Zone E3 for shop top housing
12 Use of certain land in Zone E3 for shop top housing
Development for the purposes of shop top housing is permitted with development consent on land in Zone E3 and identified as “Area A” on the Land Zoning Map.
13
Use of certain land at 19 Scotch Creek Road, Millers Forest
13 Use of certain land at 19 Scotch Creek Road, Millers Forest
13 Use of certain land at 19 Scotch Creek Road, Millers Forest
(1) This clause applies to Lot 1, DP 721804, 19 Scotch Creek Road, Millers Forest.
(2) Development for the purposes of light industries that involve sand and gravel processing are permitted with development consent.
14
Use of certain land at 24 Hunter Street, Horseshoe Bend
14 Use of certain land at 24 Hunter Street, Horseshoe Bend
14 Use of certain land at 24 Hunter Street, Horseshoe Bend
(1) This clause applies to part of Lot 1, DP 1261532, 24 Hunter Street, Horseshoe Bend, identified as “Horseshoe Bend Area 1” on the Additional Permitted Uses Map.
(2) Development for the purposes of educational establishments is permitted with development consent.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
This Plan is Maitland Local Environmental Plan 2011.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Maitland in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to facilitate ecologically sustainable development of land and natural assets,
(b) to protect and maintain the extent, condition, connectivity and resilience of natural ecosystems, native vegetation, wetlands and landscapes, including those aspects of the environment that are matters of national environmental significance within Maitland in the long term,
(c) to properly plan and protect human-made resources of Maitland including buildings, structures and sites of recognised significance which are part of the heritage of Maitland,
(d) to protect, enhance or conserve the natural resources of Maitland including the following—
(i) areas of high scenic rural quality,
(ii) productive agricultural land,
(iii) habitat for listed threatened species and endangered ecological communities,
(iv) minerals of regional significance,
(e) to create liveable communities which are well connected, accessible and sustainable,
(f) to provide a diversity of affordable housing with a range of housing choices throughout Maitland,
Contains numerous local provisions (Part 5 and Part 7) covering heritage (cl 5.10 and Schedule 5), flood planning (cl 5.21), music and licensed premises (cl 5.20), intensive livestock thresholds (cl 5.18), aquaculture rules (cl 5.19 and Schedule 6), suspension of private covenants in limited circumstances (cl 1.9A), classification/reclassification of public land (cl 5.2 and Schedule 4) and urban release area rules (Part 6).
Adds bespoke land‑by‑land permissions in Schedule 1 and identifies exempt or complying development categories in Schedules 2 and 3 (the latter largely defers to the State SEPP machinery).
The Plan states its aims in cl 1.2, including ecologically sustainable development, protecting biodiversity and heritage, concentrating intensive uses near centres and transport, facilitating housing diversity and managing natural hazards. Those aims are expressed as purpose statements and then implemented by the zoning, the Land Use Table, development standards, site‑specific schedules and map layers.
The Plan sets legal mechanics for how decisions are to be made (Council as consent authority, the need for consent unless otherwise stated) and the spatial limits to permissible activity. It repeatedly cross‑references the Environmental Planning and Assessment Act (the Act) and State environmental planning policies, and foresees interactions where State policy prevails (cl 1.9(1)).
Main concepts
The Plan rests on a small toolkit of land use instruments and mapped controls. Understanding those is the key to reading how the Plan operates.
Zoning and the Land Use Table (cl 2.1; cl 2.3). Zones are defined by name (RU1, R1, E2, MU1, SP2, C2, W2, etc.) and the Land Use Table allocates for each zone: objectives, development permitted without consent, development permitted only with consent, and prohibited development. The consent authority must have regard to zone objectives when deciding consents (cl 2.3(2)).
Spatial maps. The Plan relies on multiple maps adopted under cl 1.7 and specifically referenced throughout: Land Zoning Map (cl 2.2), Lot Size Map (cl 4.1(2)), Height of Buildings Map (cl 4.3(2)), Floor Space Ratio Map (cl 4.4(2)), Watercourse Map (cl 7.4(2)), Land Reservation Acquisition Map (cl 5.1(2)), Acid Sulfate Soils Map (cl 7.1(2)), Heritage Map (cl 5.10 note). These maps are incorporated by reference and updated as permitted by cl 1.7.
Development consent as the default regulatory mechanism. Many activities are permitted only with development consent (for example subdivision cl 2.6, demolition cl 2.7, erection of dwellings in certain rural zones cl 4.2A). Exempt and complying development are identified in Part 3 but are expressly excluded in many sensitive locations (cl 3.3).
Principal development standards. The Plan fixes minimum lot sizes (cl 4.1), exceptions for community title schemes (cl 4.1AA), special exceptions in R1 for higher density housing (cl 4.1A), rural subdivision flexibilities (cl 4.2), bans on strata plan subdivision in certain rural and conservation zones (cl 4.2B), building heights (cl 4.3) and floor space ratios (cl 4.4). Detailed rules for calculating site area and floor area to avoid double counting are in cl 4.5.
Flexibility through exceptions. Clause 4.6 allows contravention of a development standard where compliance is demonstrated to be unreasonable or unnecessary and sufficient environmental planning grounds exist; the consent authority must keep a record of its assessment (cl 4.6(3)-(4)). However cl 4.6(6) precludes using that flexibility for particular rural and conservation subdivisions that would create multiple undersized lots.
Localised rules and site‑by‑site carve‑outs. Schedule 1 grants additional permitted uses to identified parcels (for example Lot 1504 Racecourse Road,cl 6 of Sch 1; other lots for educational uses, mortuary, restaurant, hazardous storage). Schedule 5 lists heritage items and conservation areas and imposes heritage consent requirements (cl 5.10).
Environmental and hazard overlays. Acid sulfate soils require management plans (cl 7.1), riparian buffers and considerations are in cl 7.4, flood planning obligations are in cl 5.21 and bushfire hazard reduction work is permitted without consent under the Rural Fires Act (cl 5.11).
Public land and acquisition. Clause 5.1 identifies the relevant State acquisition authorities applied to land on the Land Reservation Acquisition Map and cl 5.2 enables classification/reclassification of public land (Schedule 4).
Special protections and policy choices. Clause 5.20 prohibits refusal of development for licensed premises on the basis of music characteristics where noise can be managed, reflecting a policy choice to protect live music and performance activities from being excluded by planning decisions.
Mechanically the Plan deploys zoning + maps + schedules + standards + discretionary exceptions. The incentives are set by the permitted/prohibited matrix and by the availability of exemptions or complying development; maps and lot size ceilings channel where density and intensification happen (cl 4.3-4.5). The Plan also shifts some bargaining power: e.g. cl 1.9A suspends private covenants that would limit development consistent with the Plan (subject to a set of exceptions), which makes Council/Plan rules decisive where there is tension with many private instruments.
Readers should treat the Plan as a layered spatial rulebook: to determine a proposal’s regulatory outcome you must identify the parcel on the maps, check the zone and Land Use Table, check overlays (heritage, watercourse, acid sulfate soils, flood planning area), confirm whether exempt/complying development applies, and then apply the standards (lot size, height, FSR) plus any relevant local clauses or Schedule entries. The Plan repeatedly cross‑references the Act and State policies where State policy prevails (cl 1.9(1)), so readers must also consider those instruments.
Who it affects
The Plan affects multiple groups through concrete legal mechanisms in the text.
Landowners and developers within Maitland. The Plan applies to the land identified on the Land Application Map (cl 1.3) and fixes what may be done on each parcel by zoning and schedules (cl 2.2; cl 2.3). Owners proposing subdivision, demolition, erection of dwellings, industrial or commercial uses will be affected by consent requirements (cl 2.6; cl 2.7; cl 4.2A). Owners in heritage items or conservation areas are subject to additional consent duties (cl 5.10; Schedule 5).
The Council. The Council is the designated consent authority for decisions under the Plan (cl 1.6). The Plan imposes duties on the consent authority , for example to have regard to zone objectives in cl 2.3(2), to keep a record of assessments under cl 4.6(4), and to consider specified matters for intensive livestock (cl 5.18(3)), riparian land (cl 7.4(3)), flood planning (cl 5.21(3)) and heritage (cl 5.10(4), (5), (6), (7), (8), (9)). The Council is also empowered to classify/reclassify public land per cl 5.2 and to grant (or not) development consent under local provisions such as Part 6 urban release rules.
State agencies and acquiring authorities. Clause 5.1 identifies State authorities as the relevant acquisition authority for certain reserved land shown on the Land Reservation Acquisition Map (for example Transport for NSW for classified roads, the corporation constituted under s 2.5 of the Act for regional open space). Where owner‑initiated acquisition is pursued under the Land Acquisition (Just Terms Compensation) Act 1991 the named authorities are the parties required to act.
Public authorities carrying out infrastructure and emergency works. The Plan expressly does not restrict or prohibit development that public authorities may carry out under State SEPPs (cl 5.12). It also exempts public authority emergency and routine works from some acid sulfate soils consent requirements (cl 7.1(5)).
Businesses that operate licensed premises, live music venues and hospitality. Clause 5.20 prevents consent authorities from refusing development for licensed premises purely because of characteristics of the music or performance (genre, live vs amplified, number of performers, whether dancing occurs) and also prevents refusal on noise grounds where noise can be managed and minimised to an acceptable level (cl 5.20(1)-(2)). That gives venue operators regulatory protection from exclusionary planning decisions based solely on music.
Primary producers, aquaculture and livestock operators. The Plan creates thresholds and site/location rules for intensive livestock (cl 5.18) and pond/tank/oyster aquaculture (cl 5.19 and Schedule 6). Small‑scale intensive livestock operations below defined capacities can proceed without development consent if not located in environmentally sensitive or proximate locations (cl 5.18(4)-(5)). Aquaculture operators must meet site and operational requirements and freshwater discharge controls (cl 5.19, Schedule 6).
Heritage owners and Aboriginal communities. Land identified in Schedule 5 as heritage items or conservation areas is subject to consent requirements for demolition, alteration and excavation (cl 5.10(2)). The consent authority must consult the Heritage Council or local Aboriginal communities and consider responses in certain circumstances (cl 5.10(7)-(9)).
Parties to private instruments and covenant holders. Clause 1.9A suspends agreements, covenants and similar instruments that restrict development carried out in accordance with the Plan, to the extent necessary to enable development in a zone, but excludes covenants imposed or required by Council and certain statutory instruments (cl 1.9A(1)-(2)). The clause preserves public authority rights under registered instruments (cl 1.9A(3)) and was subject to Governor approval (cl 1.9A(4)).
The practical consequence is that anyone with an interest in a parcel of land in Maitland , title holders, prospective buyers, lenders, developers, heritage custodians, operators of licensed venues and local community groups , must consult the Plan, the relevant maps and schedules as their rights and duties are materially altered by zoning, overlays and the Plan’s site‑specific rules. For existing development applications the savings provision requires different treatment: development applications made before the Plan’s commencement must be determined as if the Plan had not commenced (cl 1.8A(1)), and a specified amendment’s changes do not apply to applications made but not finally determined before that amendment commenced (cl 1.8A(2)).
Key duties and rights
The Plan allocates clear duties and confers rights by reference to consent mechanisms, mapped standards, and local rules.
Duties placed on the consent authority (Council)
To consider and have regard to zone objectives when determining applications (cl 2.3(2)).
To refuse or not grant consent in specified circumstances (for example cl 4.2A prohibits consent for new dwellings in certain rural and conservation zones unless minimum lot size criteria are met, and cl 4.6(6) prohibits granting consent under cl 4.6 for subdivisions that create multiple undersized rural or conservation lots).
To consider and be satisfied as to particular matters before granting consent: adequacy of infrastructure in urban release areas (cl 6.2); conservation and heritage effects (cl 5.10(4)-(6)); flood compatibility (cl 5.21(2)); riparian and water quality impacts (cl 7.4(3)-(4)); intensive livestock environmental impacts (cl 5.18(3)); and aquaculture site/operational compliance with Schedule 6 (cl 5.19(2)-(3)).
To keep a record of its assessment where a development standard is contravened under cl 4.6(4).
Duties placed on applicants/landowners
To seek development consent for activities that the Plan requires consent for: subdivision (cl 2.6(1)), demolition (cl 2.7), development on unzoned land (cl 2.4(1)), works in mapped acid sulfate soils classes (cl 7.1(2)), and others listed across Parts 3-7.
To supply site‑specific technical documentation where required: acid sulfate soils management plan for works in specified classes (cl 7.1(3)); heritage management documents or conservation management plans if the consent authority requires them (cl 5.10(5)-(6)); flood and evacuation measures for flood planning areas (cl 5.21(2)(d) and (3)(c)); environmental impact statements for designated development as required by the Act (cl 3.1(3)(c) references designated development).
To demonstrate that they meet exempt or complying development tests and Building Code of Australia requirements where those regimes apply (cl 3.1(3)(a); cl 3.2(3)(b)).
Where an applicant seeks to contravene a development standard, to demonstrate the matters in cl 4.6(3)(a)-(b) and comply with the regulation requirement for an accompanying document (cl 4.6 note referencing the Environmental Planning and Assessment Regulation 2021).
Rights conferred
Rights to carry out particular development without consent where the Plan explicitly permits it (items in the Land Use Table and Schedules 2 and 3, see cl 2.3; cl 3.1; cl 3.2). For example certain small intensive livestock operations may proceed without development consent subject to location buffers (cl 5.18(4)-(5)); extensive pond‑based aquaculture in certain rural zones may be carried out without consent if it meets Part 2 of Schedule 6 (cl 5.19(4)).
A right for licensed premises owners that a consent authority must not refuse development on the basis of the playing/performing of music characteristics (cl 5.20(1)), and must not refuse on noise grounds if the noise may be managed and minimised to an acceptable level (cl 5.20(2)).
A limited right to have private instruments (agreements/covenants) set aside to the extent necessary to enable development consistent with the Plan (cl 1.9A(1)), except where excluded by cl 1.9A(2) (e.g. covenants required by Council, biobanking agreements and conservation agreements listed).
Rights under Schedule 1 where the Plan grants additional permitted uses for specific lots.
Mechanisms that change behaviour
Spatial concentration of intensive uses and trip‑generating activities in accessible centres is implemented by the Land Use Table and zone objectives (cl 1.2(h); cl 2.3).
Minimum lot sizes, strata subdivision limits and special subdivision rules (cl 4.1, cl 4.1AA, cl 4.2B, cl 4.2C, cl 7.8) channel where density can increase and where urban infill is possible. Exceptions such as cl 4.1A allow higher density outcomes in R1 where multi‑lot subdivisions with dwellings result in lots not less than 300m2.
The Plan uses permit and consent triggers to create administrative friction and information requirements (heritage assessments, ASS plans, flood investigations) that raise the cost of development in sensitive areas.
The suspension of covenants in cl 1.9A shifts power from private restriction to the Plan where consistent with it, altering negotiation dynamics between developers and covenant‑holders.
Rights and duties under the Plan are exercised within the Act’s development consent framework. The Plan itself prescribes where consents are required, what matters must be addressed, and where development may proceed without consent, with the Council as the primary decision‑maker for most matters (cl 1.6).
Penalties and enforcement
The Plan sets out procedural and substantive constraints but does not itself specify monetary penalties or detailed enforcement mechanisms in its text. Enforcement and penalties for unauthorised development or breaches of conditions are to be imposed under the Act and associated regulations, which the Plan repeatedly references as the operative framework (see cl 1.9 and other cross‑references to the Act). From the Plan text we can extract the following enforcement‑relevant mechanisms and practical implications:
Consent requirements and the illegality of unauthorised works. The Plan repeatedly makes development consent the gateway for particular works (e.g. subdivision cl 2.6, demolition cl 2.7, works in acid sulfate soils cl 7.1(2), heritage alterations cl 5.10(2), development within flood planning areas cl 5.21(2)). Works done without required consent will be unauthorised development, enabling enforcement action under the Act (the Plan explicitly operates within the Act , cl 1.9 references the Act). The Plan does not itself specify the Act’s enforcement provisions; users must look to the Act/regulations for penalties such as fines, orders to remedy or injunctions.
Consent conditions and covenants. The Plan contemplates the imposition of conditions on consent. For floor space management it allows conditions requiring registration of covenants that prevent “double dipping” in floor area (cl 4.5(9)-(10)). Failure to observe conditions can give rise to enforcement action under the Act and potential restriction on future development rights.
Recordkeeping and transparency obligations on the consent authority. Clause 4.6(4) requires the consent authority to keep a record of assessments where a development standard is contravened. Such administrative records support review and audit and are relevant in any enforcement or merits review context.
Statutory consultation and notification duties. Heritage and Aboriginal heritage provisions create procedural steps the consent authority must take (cl 5.10(7)-(9)) and the Plan makes clear consents may be refused or delayed pending those processes; failure to consult as prescribed could attract challenge in judicial review or merits review channels under the Act.
Suspension of covenants (cl 1.9A) alters enforcement dynamics: private covenant enforcement is partially displaced where the covenant restricts development consistent with the Plan, but the clause preserves certain categories of instruments and public authority rights, so disputes about whether a covenant has been lawfully suspended may arise and be litigated under the Act and property law.
Specific exemptions and permitted activities. The Plan defines threshold‑based allowances (e.g. small intensive livestock in cl 5.18(5) may proceed without consent if location criteria are satisfied). Non‑compliance with those buffer/location tests may render such development unauthorised and amenable to enforcement.
Local provisions that directly affect enforcement risk. For example, heritage items require consent for demolition or significant change (cl 5.10(2)); carrying out such works without consent exposes owners to action under the Act and the Heritage Act processes referenced in cl 5.10 and its notes.
In short, the Plan establishes the rules and thresholds that determine whether development is lawful; the scope of penalties and the procedural enforcement tools (infringement notices, orders to remedy, prosecution, fines, injunctions) are contained in the Act and relevant regulations rather than in the Plan text. Practitioners should therefore use the Plan to identify what requires consent and which conditions and assessments are mandatory, and then consult the Environmental Planning and Assessment Act and local government enforcement practice for the likely enforcement outcomes if those rules are breached.
How it interacts with other laws
The Plan is repeatedly framed as an environmental planning instrument operating within the Environmental Planning and Assessment Act (the Act) and interacts with a range of State statutes and State environmental planning policies (SEPPs). The Plan itself references and defers to those instruments, and also cross‑references other sectoral Acts for particular policy areas.
Key interactions spelled out in the Plan
State environmental planning policies (SEPPs). Clause 1.9(1) states the Plan is subject to any SEPP that prevails under s 3.28 of the Act. The Plan’s Land Use Table and notes list relevant SEPPs that may apply to development on the land, e.g. Housing 2021, Transport and Infrastructure 2021, Resources and Energy 2021, Resilience and Hazards 2021, Industry and Employment 2021, Primary Production 2021 (see Land Use Table notes). The Plan therefore operates alongside, and where required by the Act, yields to State policy.
Heritage legislation. The Plan requires consent for changes to State heritage items and provides for notification to the Heritage Council (cl 5.10(7), (9)). It cross‑references the Heritage Act 1977 in relation to the State Heritage Register and interim heritage orders and requires consultation where archaeological sites are affected (cl 5.10). The Plan’s heritage protections must be read in conjunction with the Heritage Act and any State listing.
Crown and public land regimes. Clause 1.9A(2) excludes certain Crown instruments from suspension, referencing the Crown Land Management Act 2016. Clause 5.1 and its table and notes cross‑reference the Land Acquisition (Just Terms Compensation) Act 1991 and set the relevant acquiring State authorities for the Land Reservation Acquisition Map. Clause 5.2 cross‑references the Local Government Act 1993 for classification and reclassification of public land.
Native vegetation, biodiversity and fisheries law. Clauses around exempt development (cl 3.1(5)) and aquaculture (cl 5.19 and Schedule 6) reference the Biodiversity Conservation Act 2016, Fisheries Management Act 1994 and State aquaculture industry plans. Exempt/conforming development must also observe approvals and licences required under these other Acts.
Building Code and BASIX. Exempt and complying development require compliance with the Building Code of Australia (cl 3.1(3)(a); cl 3.2(3)(b)). Clause 4.6(8) disallows use of the exceptions clause to contravene certain development standards that arise in connection with BASIX commitments (cl 4.6(8)(b)).
Flood, bushfire and emergency management. The Plan cross‑references the Rural Fires Act 1997 allowing prescribed bushfire hazard reduction works without consent (cl 5.11). The flood planning clause (cl 5.21) imports the Considering Flooding in Land Use Planning Guideline and Flood Risk Management Manual for definitions and guidance.
Local government powers and statutory instruments. Clauses on essential services (cl 7.9), development control plans and urban release areas (Part 6, cl 6.2-6.4), and public land classification (cl 5.2) interact closely with the Local Government Act 1993 and the Council’s DCPs. The Plan requires certain development to await a development control plan (cl 6.3).
Orders and exemptions under other Acts. Several Plan clauses preserve or recognise exemptions and requirements under other Acts: e.g. cl 5.12 preserves the operation of State SEPP Chapter 2 in the Transport and Infrastructure SEPP; cl 7.1(5) exempts particular public authority emergency and routine works from ASS consent; cl 3.3 excludes environmentally sensitive areas listed under other Acts from exempt/compliant development.
Practical consequences
The Plan cannot be read in isolation. For most proposals the Plan defines the local “what” and “where” but State SEPPs and other Acts define additional “how” and “when” obligations, and may prevail in case of inconsistency (cl 1.9(1)).
Consultation and licensing regimes under sectoral Acts (Heritage Act, Fisheries Management Act, Biodiversity Conservation Act, Crown land law) remain operative even where the Plan permits development , the Plan often requires or anticipates additional approvals or licences (see cl 5.19(3) note, cl 3.1(5) note, cl 1.9A(3)).
The Plan’s text explicitly flags that maps and technical standards are to be maintained on the NSW Planning Portal and guided by standard technical requirements for LEP maps (cl 1.7 note). That creates an ongoing administrative interface between the Plan’s spatial controls and the State mapping standards and data infrastructure.
Where the Plan and other laws overlap, the Plan allocates decision roles (Council as consent authority, certain State authorities as acquiring authorities) but defers to State law where it prevails.
Read together, the Plan is one piece of a statutory mosaic: it fixes local directions and mapped limits while recognising State legislation and policies as the contextual and sometimes prevailing legal framework.
Amendment history
The Plan text contains in‑line amendment annotations at multiple clauses and schedules. Those annotations identify the principal legislative updates recorded in the Plan and indicate an evolving instrument. The following is a synthesis of amendment signals present in the text, listing notable insertions and amendments recorded in clause footnotes and schedule notes (this is a synthesis only of the amendments shown in the Plan text itself , not a complete legislative history beyond those annotations).
Early and ongoing consolidation. The Plan records amendments across many years, with annotations showing insertions and substitutions in 2013, 2014, 2016 and later years. The Land Use Table and multiple schedules show cumulative amendments (see Land Use Table amendment note referencing 2014, 2016, 2017, 2018, 2019, 2022, 2023, 2025).
Clause insertions and amendments:
Clause 1.8A (Savings provision for development applications) carries amendment notes: Am 2019 (621), Sch 5[1]; 2025 (131), Sch 1[1]. It was inserted and later amended to address transitional issues for pending applications.
Clause 1.9A (Suspension of covenants, agreements and instruments) is annotated as amended in 2019 (Am 2019 (621), Sch 5[2]-[4]) to set out the scope of covenants it does and does not suspend.
Clause 2.1 (Land use zones) shows amendments in 2022 (828) and 2025 (131) (Sch 1.12[1] etc), indicating periodic zone list changes.
Clauses addressing community title and subdivision: cl 4.1AA (minimum subdivision lot size for community title schemes) was inserted or amended in 2022 (828), Sch 1.12[3]-[4].
Clause 4.1A (Exceptions to minimum lot sizes in Zone R1) was added in 2025 (131), Sch 1[7].
Clauses dealing with erection of dwellings in rural/conservation zones (cl 4.2A) show amendments in 2013 and 2022 (cl 4.2A: Am 2013 (652), Sch 1[1]-[3]; 2022 (828), Sch 1.12[3]-[6]).
Clause 4.2B (No strata plan subdivision in certain zones) amended 2022 (828).
Clause 4.6 (Exceptions to development standards) was amended in 2023 (554), Sch 2.19[1], and contains multiple subclauses repealed and replaced over time.
Part 6 (urban release area provisions) shows clause 6.1 repealed in 2023 (Rep 2023 (554), Sch 2.19[2]) and other insertions in 2019 and 2023.
Clause 5.9 (Dwelling house or secondary dwelling affected by natural disaster) was inserted in 2021 (Ins 2021 (302), Sch 1.21) and amended in 2022 (828).
Clauses in Part 7 such as 7.8 (Subdivision in Zone R1 in Anambah Urban Release Area) were inserted 2020 (708) and amended subsequently (2023, 2026).
Schedule amendments and listings: Schedule 1 (additional permitted uses) carries multiple amendment notes up to 2024, 2025. Schedule 4 (public land classification) amended across 2013, 2019, 2024, 2026. Schedule 5 (heritage) has amendments including 2012, 2014, 2017 and 2022.
Repeals and repealed provisions. The Plan shows express repeal of prior local environmental plans (cl 1.8 includes repeal of Maitland Local Environmental Plan 1993). Specific clauses have been repealed over time by amending instruments (e.g. cl 6.1 is shown as repealed).
New policy inclusions. Clauses reflecting newer State priorities were added: cl 5.21 on flood planning references the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual (2023 publication cited in the clause). Clause 5.20 protects music/performing arts in licensed premises , a policy inclusion affecting cultural/entertainment venues.
Amendments that change procedural rules. For example, the 2019 and 2025 amendments touching cl 1.8A show how transitional treatment for applications has been handled legislatively, indicating attention to fairness between pre‑existing applications and the rule changes.
These in‑text amendment notes document a Plan that has been incrementally updated to reflect State policy, new sites and local projects, and to fine‑tune local controls (e.g. subdivision, community title, heritage lists and urban release rules). For a complete, authoritative list of amending instruments, dates and statutory citations, practitioners must consult the consolidated Plan as published on the NSW legislation website and the list of amending instruments attached to it; the Plan text itself contains many of the amendment stamps but not an exhaustive legislative history beyond the insert notes.
Litigation history
The Plan text supplied does not contain any recorded case law or judicial decisions that interpret this Plan, its clauses, or its maps. There are no statutory notes identifying reported judgments or litigation outcomes in the text provided. Where the Plan references the Act, SEPPs and other statutes it assumes those statutes’ judicial histories exist outside the Plan, but none are cited or summarised here.
Practical implications of the absence of litigation material in the Plan text
No precedent signals contained in the instrument. The Plan does not reference decisions that clarify how courts or tribunals have interpreted particular clauses such as cl 4.6 exceptions to development standards, cl 1.9A suspension of covenants, or cl 5.20 protections for live music. Where ambiguity exists, practitioners must look to case law under the Act and related SEPPs rather than to the Plan for interpretive guidance.
Points likely to attract litigation or merits review. While not evidence of litigation, the Plan contains areas that typically generate disputes under the Act in practice: contraventions of development standards under cl 4.6 where the consent authority must be satisfied that compliance is unreasonable or unnecessary; the suspension of covenants under cl 1.9A and its exceptions; heritage consents (cl 5.10) where there are competing claims about significance or impacts; flood planning (cl 5.21) where risk, modelling and evacuation safety are contested; and the classification/reclassification of public land (cl 5.2) where discharge of trusts or reclassification may be litigated. Absent a Plan‑specific litigation record, these are categories where one should expect factual and legal contestation.
Need to consult the Act and Tribunal decisions. Because enforcement, penalties, merits review and judicial review mechanisms lie in the Act and the Land and Environment Court (and other tribunals), practitioners must pair reading of the Plan with targeted searches for reported decisions on similar clauses and State policy provisions.
In sum, the Plan provides the regulatory architecture but the provided text contains no litigation history. For case law that tests the Plan’s provisions a practitioner must consult court databases, Tribunal records and decisions under the Act and relevant SEPPs.
Gotchas
The Plan contains numerous traps for the unwary which arise from map reliance, transitional rules, localized carve‑outs and cross‑instrument interactions. Key “gotchas” identifiable in the text:
Maps determine outcomes; check every map layer. Many definitive limits and permissions are map‑based (Land Zoning Map cl 2.2; Lot Size Map cl 4.1(2); Height of Buildings Map cl 4.3(2); FSR Map cl 4.4(2); Watercourse Map cl 7.4(2); Heritage Map cl 5.10 note; Land Reservation Acquisition Map cl 5.1(2); Acid Sulfate Soils Map cl 7.1(2)). A parcel may appear to be in a zoning that permits a use, but overlays such as heritage or flood planning areas may reimpose consent requirements or prohibitions.
Transitional savings carveouts. Clause 1.8A(1) requires applications made before the Plan’s commencement and not finally determined to be decided as if the Plan had not commenced. Clause 1.8A(2) clarifies that certain later amendments do not apply to applications not finally determined before their commencement. Practitioners must determine the relevant commencement dates and the date an application was finally determined to know which instrument applies to an application.
Suspension of covenants is partial and subject to important exceptions. Clause 1.9A suspends private covenants to the extent necessary to enable development under the Plan, but it excludes covenants imposed by Council and specified statutory instruments (cl 1.9A(2)(a)-(g)). It also preserves public authority rights under registered instruments (cl 1.9A(3)). The practical risk is title surprises: owners and developers should verify whether their covenants are of a kind excluded from suspension.
Exempt and complying development exclusions. Part 3 establishes exempt and complying development categories (cl 3.1-3.2) but prohibits exempt/compliant development on “environmentally sensitive areas” that include coastal waters, Ramsar wetlands, land of high Aboriginal cultural or biodiversity significance and land within 100 metres of many of these features (cl 3.3). That can undo an apparent fast‑track if the parcel sits near or within a mapped sensitive area.
Floor space, site area and double‑counting. Clause 4.5 contains detailed rules on what counts for site area and gross floor area and allows covenants to be imposed to prevent “double dipping” (cl 4.5(9)-(10)). For multi‑lot or consolidated sites, an apparently permissible FSR may be limited once covenants or prior floor areas are accounted for.
Contravening development standards is discretionary and recordable. Clause 4.6 allows flexibility but requires the applicant to demonstrate compliance is unreasonable or unnecessary and requires the consent authority to keep a record of the assessment (cl 4.6(3)-(4)). For some rural and conservation subdivisions cl 4.6(6) prohibits using this route to create multiple undersized lots.
Heritage triggers are broad and procedural. For items listed in Schedule 5 the consent authority requires development consent for demolition, works that alter external appearance, interior structural changes to listed buildings, excavation likely to expose relics and subdivision (cl 5.10(2)). The Plan permits certain minor works without consent only where the consent authority expressly advises they are of minor nature (cl 5.10(3)(a)). Applicants must factor potential heritage management plans, heritage impact statements, and consultation time with the Heritage Council or local Aboriginal communities (cl 5.10(5)-(9)).
Flood and climate change considerations can block development. Clause 5.21 requires the consent authority to be satisfied that development in the flood planning area is compatible with flood function and evacuation safety and to consider projected changes from climate change (cl 5.21(2)-(3)). That imposes qualitative and technical requirements that can materially affect feasibility.
Music protection is limited to planning grounds. Clause 5.20 prevents refusal based purely on music characteristics and prevents refusal on noise grounds where noise can be managed (cl 5.20(1)-(2)), but it does not remove environmental noise regulation or licensing obligations under other statutes. It is a narrow planning protection, not a licence to ignore acoustic controls.
Intensive livestock thresholds and buffers: location matters. Clause 5.18 allows certain small‑scale intensive livestock developments to proceed without consent only if they meet location restrictions (not in environmentally sensitive areas, not within buffer distances to dwellings/residential zones and poultry/pig farm separation distances) (cl 5.18(4)-(5)). A small change in parcel location relative to a sensitive receptor may change the regulatory path.
Site‑specific permissions and limits. Schedule 1 contains parcel‑specific permissions (restaurants, mortuaries, hazardous storage, etc.) and limits such as a cap on the number of dwellings in a community title scheme (cl 6 of Sch 1 permits up to 450 dwellings). Relying on general zone permissions without checking Schedule 1 can miss site‑specific authorisations or constraints.
Public land classification/reclassification consequences. Clause 5.2 and Schedule 4 classify or reclassify public land and specify which trusts or interests are discharged or remain in force (cl 5.2(4)-(5) and Schedule 4 Part 2 column 3). Reclassification can extinguish or preserve legal trusts and restrictions and may require Governor approval before taking effect (cl 5.2(5) note).
Mitigation: Always check the parcel on every map layer referenced by the Plan, review Schedule 1 and Schedule 5 for site‑specific rules, verify whether pre‑existing applications are saved by cl 1.8A, and identify any statutory licences required under other Acts (Heritage Act, Fisheries Act, Local Government Act, Crown land law). When relying on cl 4.6 exceptions, prepare the required demonstration documented by the Environmental Planning and Assessment Regulation and expect the consent authority to record its assessment. For titles, check the specific covenant instruments listed and whether they fall within the exceptions to cl 1.9A.
How to comply
A practical compliance checklist, grounded in the Plan provisions, for proponents, solicitors, planners and councils.
Identify the parcel precisely and consult the Plan maps.
Locate the site on the Land Zoning Map (cl 2.2) and the Lot Size Map, Height of Buildings Map, Floor Space Ratio Map and Watercourse Map as relevant. The Plan makes maps the primary spatial controls (cl 1.7; cl 2.2; cl 4.1(2); cl 4.3(2); cl 4.4(2); cl 7.4(2)).
Check Schedule 1 for any additional permitted uses applying to that lot (cl 2.5; Schedule 1). Check Schedule 5 for heritage listings and the Heritage Map for conservation area boundaries (cl 5.10; Schedule 5).
If within an urban release area, check Urban Release Area Map requirements and DCP requirements (Part 6 cl 6.2-6.3).
Determine permissibility under the Land Use Table.
Using the zone identified, consult the Land Use Table for that zone to see whether the proposed use is permitted without consent, permitted with consent, or prohibited (cl 2.3). The consent authority must have regard to the zone objectives when assessing (cl 2.3(2)).
Confirm whether the proposal is exempt or complying development.
Check Part 3, Schedule 2 and Schedule 3 and the State SEPP for exempt and complying development lists and standards (cl 3.1-3.2). Ensure the development is not on an “environmentally sensitive area” as defined in cl 3.3, which would exclude exempt/compliant pathways.
If development consent is required, assemble the necessary technical material.
Heritage items: if the land contains a heritage item or is in a conservation area, be prepared to prepare heritage management documents or conservation management plans and anticipate consultation with the Heritage Council and local Aboriginal communities where required (cl 5.10(4)-(9)).
Acid sulfate soils: for works in mapped ASS classes, prepare an acid sulfate soils management plan in accordance with the Acid Sulfate Soils Manual and submit it with the application (cl 7.1(2)-(3)). A preliminary assessment may avoid the need for a full management plan if confirmed in writing by the consent authority (cl 7.1(4)).
Flood planning: if within the flood planning area, prepare flood impact and evacuation assessments showing compatibility with flood function and consideration of climate change impacts, and specify measures for life safety (cl 5.21(2)-(3)).
Riparian/watercourse impacts: if within 40m of a mapped watercourse, prepare water quality, bank stability and ecological impact assessments and demonstrate avoidance/minimisation/mitigation consistent with cl 7.4.
Intensive livestock and aquaculture: check cl 5.18 and cl 5.19 and Schedule 6 for threshold tests, location buffers, discharge controls and species selection; prepare any required operational plans.
Floor space and site area calculations: follow cl 4.5 rules to calculate site area, include any vertical projections and note obligations about covenants preventing double counting (cl 4.5(2)-(11)).
If proposing to contravene a development standard, prepare the required justification.
Clause 4.6 requires a demonstration that compliance is unreasonable or unnecessary and that there are sufficient environmental planning grounds. The EP&A Regulation requires an accompanying document for such an application; the consent authority must keep a record of its assessment (cl 4.6(3)-(4)).
Check covenants and the operation of cl 1.9A.
Identify registered covenants affecting the title. Where a covenant restricts development that the Plan permits, cl 1.9A may cause the covenant to not apply to the extent necessary. However, confirm whether the covenant is one of the exceptions listed in cl 1.9A(2) (e.g. Council‑imposed covenants, biobanking agreements, conservation agreements). Where doubt exists, seek a legal opinion or approach the consent authority.
For licensed premises and live music, document noise management.
Use cl 5.20 to ensure the application addresses noise management and minimisation measures, as consent authorities must not refuse planning consent based solely on music characteristics (cl 5.20(1)-(2)). Acoustic mitigation plans will strengthen the case.
For subdivision and strata/community title proposals, apply the specific lot size and strata rules.
Minimum lot sizes apply per Lot Size Map (cl 4.1(3)); community title scheme provisions in cl 4.1AA apply; cl 4.2B prohibits strata subdivisions creating lots below minimum sizes in certain zones. Check cl 4.2C where lots cross zones. For particular urban release areas (e.g. Anambah), special subdivision relaxations apply (cl 7.8).
Engage early with the Council and relevant State agencies.
The Plan frequently makes consent contingent on the consent authority being “satisfied” about specific matters (infrastructure availability cl 6.2; heritage cl 5.10; flood cl 5.21; riparian cl 7.4). Early pre‑lodgement meetings reduce risk of refusal for procedural or evidentiary gaps.
If public acquisition or classification issues may affect the site, consult the Land Reservation Acquisition Map and cl 5.1 and 5.2 to identify acquiring authorities and any trust reclassifications (Schedule 4).
Build compliance into conditions and construction.
Expect conditions on consents addressing the matters in Part 5 and Part 7 (heritage conservation work, heritage management plans, ASS plan implementation cl 7.1(3), stormwater management cl 6.3(3)(e), environmental monitoring for eco‑tourist facilities cl 5.13). Ensure construction contracts and budgets include costs for monitoring, remediation, heritage conservation and covenant registrations where consent conditions require them (cl 4.5(9)).
Keep records and be ready for audits or reviews.
Where the Plan requires records (cl 4.6(4)), or where a consent condition requires covenant registration or floor area tracking (cl 4.5(9)-(10)), ensure those records are maintained and accessible.
If in doubt, assume consent is required.
The Plan makes many categories consent‑based. If a proposal might intersect with heritage, flood, acid sulfate soils or watercourse overlays, or if the development exceeds thresholds in cl 5.18 or cl 5.19, plan on lodging a development application rather than proceeding under an exempt/compliant pathway.
This compliance pathway follows the Plan’s text: identify map‑based constraints, read zone permissions in the Land Use Table, check Part 3 exempt/compliant rules and Part 4 standards, apply Part 5 and Part 7 overlay tests, and prepare the application materials the Plan requires (heritage assessments, ASS plans, flood assessments, aquaculture operational plans, species selection documents). Where the Plan allows flexibility (cl 4.6), prepare the statutory demonstration materials and anticipate the consent authority recording its decision rationale.
(g) to allow for future urban development on land within urban release areas and ensure that development on such land occurs in a co-ordinated and cost-effective manner,
(h) to concentrate intensive urban land uses and trip-generating activities in locations most accessible to transport and centres, strengthening activity centre and precinct hierarchies and employment opportunities,
(i) to ensure that land uses are organised to minimise risks from hazards including flooding, bushfire, subsidence, acid sulfate soils and climate change,
(j) to encourage orderly, feasible and equitable development whilst safeguarding the community’s interests, environmentally sensitive areas and residential amenity.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Maitland Local Environmental Plan 1993
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
(1) If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
(2) The amendments made to this plan by Maitland Local Environmental Plan 2011 (Amendment No 38) do not apply to development applications made but not finally determined before the commencement of those amendments.
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Note.
If a subdivision is identified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the t
This is an opening excerpt, not the complete document.