This local environmental plan sets the planning rules for land in the Lockhart area: it defines zones, what development is allowed or prohibited, when council consent is required, minimum lot sizes, and local environmental controls (heritage, biodiversity, waterways, flood risk and special buffers). It affects landowners, developers, and the Council as consent authority by allocating decision‑making power to Council and placing compliance, design and infrastructure costs on applicants and landowners.
This instrument is the Lockhart Local Environmental Plan 2012 (the Plan). It sets the local statutory land-use framework for the Lockhart local government area by:
Declaring the Plan’s aims and scope (cl 1.2; cl 1.3), nominating the land to which it applies by reference to published maps (cl 1.3; cl 1.7) and stating the consent authority (the Council) for development under the Plan (cl 1.6).
Repealing prior local environmental plans that applied only to the same land (cl 1.8) and preserving existing development applications made before the Plan’s commencement so that they are to be determined as if the Plan had not commenced (savings provision, cl 1.8A).
Establishing the zoning schema for the area (cl 2.1-2.2) and prescribing permitted, permitted‑with‑consent and prohibited land uses through the Land Use Table (cl 2.3 and the Land Use Table).
Setting principal development controls that govern subdivision, demolition, temporary uses, and minimum lot sizes (cl 2.6; Part 4, in particular cl 4.1 and related clauses), while providing for a limited exceptions mechanism to development standards (cl 4.6).
Enabling exempt and complying development where identified in Schedule 2 and Schedule 3, and being subject to the requirements of Part 3 (cl 3.1-3.3).
Imposing local overlay provisions and assessment triggers for heritage (cl 5.10; Schedule 5), terrestrial biodiversity and riparian areas (cl 6.2-6.4), flood planning (cl 5.21), aquaculture (cl 5.19 and Schedule 6), and other local matters such as defence communications buffers (cl 5.15) and standards for certain small business uses (cl 5.4).
Providing operational rules about public land classification and acquisition (cl 5.1-5.2 and Schedule 4) and specifying that certain State environmental planning policies prevail where they do (cl 1.9).
Current sections
Direct links to the current provisions in Lockhart Local Environmental Plan 2012.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Land Use tbl: Am 2014 (823), Sch 1 [2]; 2017 (493), Sch 1.1 [1]; 2022 (314), Sch 1; 2022 (832), Sch 1.16[2]; 2023 (458), Sch 2.56.
Zone RU1 Primary Production
Zone RU3 Forestry
Zone RU5 Village
Zone R5 Large Lot Residential
Zone E4 General Industrial
Zone SP2 Infrastructure
Zone RE2 Private Recreation
Zone C1 National Parks and Nature Reserves
Zone W1 Natural Waterways
3
Permitted with consent
3 Permitted with consent
3 Permitted with consent
Agritourism; Airstrips; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Boat launching ramps; Boat sheds; Building identification signs; Business identification signs; Camping grounds; Cemeteries; Community facilities; Correctional centres; Crematoria; Depots; Dual occupancies (attached); Dwelling houses; Eco-tourist facilities; Educational establishments; Environmental facilities; Environmental protection works; Extractive industries; Farm buildings; Farm stay accommodation; Freight transport facilities; Heavy industrial storage establishments; Heavy industries; Helipads; Home-based child care; Home businesses; Home industries; Home occupations (sex services); Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Intensive plant agriculture; Landscaping material supplies; Open cut mining; Plant nurseries; Recreation areas; Recreation facilities (major); Recreation facilities (outdoor); Roads; Roadside stalls; Rural industries; Rural supplies; Rural workers’ dwellings; Secondary dwellings; Storage premises; Timber yards; Truck depots; Veterinary hospitals
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
Note.
When this Plan was made it did not include Zone RE1 Public Recreation.
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Lockhart Local Environmental Plan 2012.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Lockhart in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to encourage the proper management, development and conservation of natural and man-made resources in Lockhart,
(b) to facilitate growth and development while minimising the cost of such growth and development to the community,
(c) to assist in the delivery of amenities and services, as well as residential and employment opportunities, to meet demand,
(d) to provide for a range of development opportunities that contribute to the social, economic and environmental resources of the area,
(e) to conserve the environmental heritage of Lockhart.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
Mechanically, the Plan works by: (a) mapping land into zones and overlays; (b) listing what is permitted without consent, permitted with consent, and prohibited for each zone; and (c) prescribing local assessment matters, standards and mandatory constraints that the consent authority (the Council) must consider before granting development consent (for example, heritage conservation cl 5.10; terrestrial biodiversity cl 6.2; riparian land cl 6.3; flood planning cl 5.21; aquaculture cl 5.19). The Plan also contains some expressly non‑adopted local standards (for example cl 4.3, cl 4.4, cl 4.5 note “[Not adopted]”), meaning those particular model provisions are not used in this Plan.
The Plan repeatedly cross‑references the Environmental Planning and Assessment Act and State environmental planning policies (for example, cl 1.9 and the notes to cl 2.3). It therefore operates as the local layer in the hierarchical statutory planning system, with the Council exercising decision rights within the limits and duties the Plan imposes.
Main concepts
This Plan uses standard local environmental plan concepts: zones, Land Use Table, maps, schedules, development consent, exempt and complying development, and overlay provisions. Key structural features and concepts in the Plan are as follows:
Zones and Land Use Table (cl 2.1-2.3)
The Plan defines a set of zones (RU1, RU3, RU5, R5, E4, SP2, RE2, C1, W1) and places land into those zones via the Land Zoning Map (cl 2.1-2.2). The Land Use Table at the end of Part 2 specifies objectives for each zone and the uses that are permitted without consent, permitted with consent, and prohibited (cl 2.3 and Land Use Table entries).
The consent authority must have regard to zone objectives when deciding development applications (cl 2.3(2)).
Development permissions and processes
Certain works are expressly required to have development consent: subdivision (cl 2.6(1)), demolition of a building or work (cl 2.7), and most forms of development unless specifically listed as exempt (Part 3).
Exempt development is identified in Schedule 2 and must meet the Schedule’s standards and other requirements in Part 3 to be exempt (cl 3.1). Complying development is identified in Schedule 3 and must meet the relevant deemed‑to‑satisfy provisions and schedule conditions (cl 3.2).
The Plan preserves transitional arrangements for applications made before commencement (cl 1.8A).
Development standards and exceptions
Clause 4.1 sets minimum subdivision lot sizes to be read with the Lot Size Map. There are special rules for community title schemes, average lot sizes in R5 (cl 4.1AA, 4.1A), rural subdivision flexibility (cl 4.2), and controls on erection of dual occupancies and rural workers’ dwellings in RU1 (cl 4.2B-4.2C).
Clause 4.6 is the local exceptions to development standards mechanism; it allows consent authorities to grant consent for development that would contravene a development standard in this or another instrument, but only where the applicant demonstrates compliance with the tests in cl 4.6(3) and subject to specified prohibitions (cl 4.6(6), (8)). The clause requires the consent authority to keep a record of its assessment (cl 4.6(4)).
Local overlays and assessment matters
Heritage (cl 5.10; Schedule 5) with specific procedural steps (notification to Heritage Council for archaeological sites, consultation with local Aboriginal communities for Aboriginal places when assessing applications) and scope for conservation incentives (cl 5.10(7)-(10)).
Terrestrial biodiversity, riparian land and wetlands provisions in Part 6 require the consent authority to assess impacts and not grant consent unless avoidance/minimisation/mitigation outcomes are achievable (cl 6.2-6.4).
Flood planning (cl 5.21) includes measurable policy aims and lists specific matters the consent authority must be satisfied of before granting consent, such as compatibility with flood function and safe evacuation measures (cl 5.21(2)-(3)).
Aquaculture (cl 5.19 and Schedule 6) prescribes site location and operational requirements, with separate rules for intensive and extensive pond/tank aquaculture and for oyster aquaculture (cl 5.19(2)-(6) and Schedule 6).
Specific local rules and protections
Suspension of private covenants and similar instruments to the extent necessary to allow development consistent with the Plan (cl 1.9A), subject to specified exclusions (cl 1.9A(2)-(3)).
Defence communications facility buffer land has mandatory constraints and consultation duties with Commonwealth Defence before consenting to certain types of development (cl 5.15). Clause 5.15 is a compulsory provision, and cl 4.6 cannot be used to override it (cl 5.15(6) and (4)).
A provision limiting the grounds on which consent may be refused for licensed premises where music, performance and related features are involved (cl 5.20). Consent authorities cannot refuse consent on enumerated aesthetic or entertainment‑related grounds, and must not refuse on noise grounds if the noise can be managed to an acceptable level (cl 5.20(1)-(2)).
Essential services test requires the consent authority to be satisfied that services such as water, electricity and sewage disposal are available or can be arranged (cl 6.5).
Maps and schedules as operative instruments
The Plan references several maps,Land Zoning Map, Lot Size Map, Land Application Map, Heritage Map, Watercourse Map, Terrestrial Biodiversity Map, Defence Communications Facility Buffer Map and Land Reservation Acquisition Map,and requires these to be published on the NSW Planning Portal (cl 1.3; cl 1.7; various schedule notes).
Schedules are used to record local exempt/comlying development, public land classification, heritage items, and technical aquaculture requirements (Schedules 1-6).
Who it affects
The Plan distributes regulatory rights and duties across a defined set of actors. The principal affected parties and how they are affected, with sources in the Plan, are:
Landowners and prospective developers: The Plan determines what they may lawfully do on their land (Land Use Table and zone rules, cl 2.3; cl 2.2; subdivision and development consent requirements, cl 2.6; Part 4). Landowners proposing development must obtain development consent where required (cl 2.6; cl 2.7) or ensure works qualify as exempt or complying development under Part 3 and the relevant schedules (cl 3.1-3.2; Schedules 2-3). They must also meet overlay constraints such as heritage (cl 5.10), biodiversity (cl 6.2), riparian buffers (cl 6.3), flood planning (cl 5.21) and aquaculture rules (cl 5.19; Schedule 6) where relevant.
Lockhart Council (the consent authority): The Plan nominates the Council as the consent authority subject to the Act (cl 1.6). The Council is the decision maker for development applications, must consider zone objectives (cl 2.3(2)), mandated assessment matters (heritage cl 5.10(4), biodiversity cl 6.2(3), riparian cl 6.3(3), flood planning cl 5.21(3)) and must not grant consent where certain local tests are not satisfied (for example, cl 4.1 minimum lot sizes, cl 5.21 flood planning tests). The Council is also involved in classification and reclassification of public land (cl 5.2) and in giving notices to local Aboriginal communities under the heritage provisions (cl 5.10(8)).
State agencies and relevant acquisition authorities: The Plan specifies which State authorities are the relevant authority for owner‑initiated acquisition for particular land types (cl 5.1(2) and table), and preserves rights of public authorities under registered instruments (cl 1.9A(3)). Transport for NSW, the National Parks Minister and the corporation constituted under the Act are named in cl 5.1 for particular land types.
Developers and operators in specific industries: Aquaculture operators are directly affected by cl 5.19 and Schedule 6, which set minimum site location, species and operational requirements. Intensive livestock agriculture is subject to cl 5.18 with thresholds where consent is not required provided criteria are met. Industrial uses in buffer land near the Defence communications facility trigger mandatory consultation with Defence (cl 5.15).
Heritage stakeholders, including the Heritage Council and local Aboriginal communities: The Plan requires notification to and consideration of responses from the Heritage Council for archaeological sites (cl 5.10(7)) and requires consultation with local Aboriginal communities for development in Aboriginal places of heritage significance (cl 5.10(8)). These stakeholders therefore are participants in the assessment process where such items or places are involved.
Licensed premises and hospitality operators: Clause 5.20 limits the grounds on which a consent authority may refuse development for licensed premises on entertainment‑related grounds (genre, live versus amplified, dancing, stage orientation, decorations) and constrains refusal on noise grounds where noise can be managed to an acceptable level.
Owners and beneficiaries of private instruments (covenants, agreements): Clause 1.9A operates to suspend private covenants and similar instruments to the extent necessary to enable development consistent with the Plan, subject to express exclusions (for example, covenants imposed by Council, conservation agreements).
The wider community and adjoining owners: The Plan requires the consent authority to consider impacts on adjoining land uses (cl 2.4 unzoned land, cl 5.3 development near zone boundaries), amenity (temporary use cl 2.8(3)(b)), and environment (flood planning, riparian, biodiversity provisions). Decisions by the consent authority therefore affect neighbours, service providers and community stakeholders.
Who pays and who decides: in practice developers and landowners bear the direct costs of preparing applications, technical assessments, heritage management documents, and infrastructure connections required by the Plan (see cl 5.10 heritage assessment requirements, cl 6.5 essential services). The Council decides development applications and exercises discretions under the Plan, obliged to act within the Plan’s mandatory tests and recordkeeping requirements (cl 2.3(2); cl 4.6(4)).
Key duties and rights
The Plan allocates specific duties to the consent authority and obligations on applicants, and creates rights to carry out certain kinds of development in specified circumstances. Key duties and rights follow from textual requirements.
Duties of the consent authority (Council)
Apply zone objectives: The consent authority must have regard to the zone objectives when determining applications in that zone (cl 2.3(2)). This is a recurring duty across the scheme.
Mandatory assessment tests for overlays: The consent authority must be satisfied of particular matters before granting consent in overlay areas. Examples include heritage (cl 5.10(4)-(9)), terrestrial biodiversity (cl 6.2(3)-(4)), riparian land (cl 6.3(3)-(4)), wetlands (cl 6.4(3)-(4)) and flood planning (cl 5.21(2)-(3)). Those tests are framed as preconditions to consent.
Recordkeeping and reasons: Clause 4.6(4) requires the consent authority to keep a record of its assessment under the exceptions to development standards clause. Other duties to notify affected statutory bodies are also imposed, for example notifying the Heritage Council for archaeological sites (cl 5.10(7)) and notifying local Aboriginal communities for Aboriginal places (cl 5.10(8)).
Consultation duties: For certain matters the consent authority must consult or obtain input from State/Commonwealth bodies before consenting; for example, for development on defence communications facility buffer land the consent authority must be satisfied Defence has been consulted and has indicated no adverse effect (cl 5.15(3)).
Obligations on applicants/developers
Demonstrate compliance with local overlay tests: Applicants must provide information (heritage management documents, heritage conservation management plans, environmental impact statements where development is designated, measures to avoid/minimise/mitigate biodiversity impacts) as required by the applicable clause (cl 5.10(5)-(6); cl 6.2(3); cl 6.3(3); cl 6.4(3); cl 5.19(2)).
Meet essential services test: The consent authority must be satisfied that essential services are available or arrangements are in place (cl 6.5). This places the evidentiary burden on an applicant to show services can be provided.
Demonstrate grounds for contravening development standards: If an applicant seeks consent under clause 4.6 (exceptions), the applicant must demonstrate compliance with the tests in cl 4.6(3) and supply the document required by the Environmental Planning and Assessment Regulation 2021 (cl 4.6 note).
Provide heritage and Aboriginal engagement where applicable: Applicants proposing works affecting heritage items, heritage conservation areas, Aboriginal places or archaeological sites must notify or consult (cl 5.10(3), (5)-(9)) and may need to prepare heritage management documents or obtain Heritage Council input.
Rights created or preserved by the Plan
Exempt and complying development rights where development meets the criteria in Schedule 2 or Schedule 3 and Part 3 (cl 3.1-3.2).
Additional permitted uses may be recorded in Schedule 1 (cl 2.5). Although Schedule 1 is blank when the Plan was made, the mechanism exists to authorise extra uses for particular land (cl 2.5(1)-(2)).
Privileges for public authorities: The Plan notes it does not restrict development by or on behalf of a public authority where that development is permitted by State SEPP Transport and Infrastructure (cl 5.12(1)) and does not restrict use of existing Crown buildings by the Crown (cl 5.12(2)).
Suspension of private instruments: Clause 1.9A gives, as a right, the ability for development to proceed notwithstanding private covenants, agreements or similar instruments to the extent necessary to allow development authorised by the Plan, with specific exclusions preserving some protections (cl 1.9A(1)-(3)).
Other notable duties and prohibitions
Subdivision constraints: Subdivision generally requires consent (cl 2.6(1)) and cl 4.6(6) prevents the exceptions clause being used to create multiple lots smaller than minimum sizes in specified zones. Clause 2.6(2) also prohibits subdivision that would separate a secondary dwelling from its principal dwelling unless resulting lots meet the Lot Size Map minima.
Temporal limit on temporary uses: Temporary use consent may be granted for a maximum 52 days in any 12‑month period (cl 2.8(2)) except in a specified sales office case (cl 2.8(4)).
Prohibition on canal estates: The Plan prohibits canal estate development (cl 2.9).
Defence buffer as a non‑negotiable constraint: Clause 4.6 cannot be used to contravene cl 5.15 regarding defence communications buffer land (cl 5.15(4)); cl 5.15 is a compulsory provision (cl 5.15(6)).
Penalties and enforcement
The Plan itself mostly prescribes statutory permissions, assessment tests and procedural duties; it does not contain express penalty or offence schedules setting fines or criminal offences within its text. The operative enforcement and penalty machinery for non‑compliance with planning controls sits in the Environmental Planning and Assessment Act 1979 and related regulations rather than in this Plan. Several aspects of the Plan specify mandatory preconditions and prohibitions which will inform decisions and enforcement under the Act:
Mandatory “must not” constraints and preconditions: The Plan uses “must not” in places where consent is forbidden unless particular criteria are satisfied (for example, cl 4.6(3)-(4) sets mandatory constraints on when an exception to development standards may be used; cl 5.21(2) forbids granting consent in the flood planning area unless the consent authority is satisfied of various flood risk matters; cl 2.6 requires consent for subdivision).
Decision‑making and recordkeeping duties for the consent authority: The Plan requires the consent authority to keep a record of assessments under cl 4.6(4) and to follow required notification steps (heritage cl 5.10). These duties create an administrative trail which is available for review if a challenge arises under the Act.
Practical enforcement implications
Where a party carries out development without required consent the Act provides the compliance tools (orders, penalties, injunctions, remediation directions) rather than the Plan. The Plan’s role is to define when consent is required, the content of consents, and the assessment framework the consent authority must follow.
The Plan’s requirements for consultation and notification (e.g. to Heritage Council and local Aboriginal communities, cl 5.10(7)-(9)) create process rights that affected parties can rely upon in review or merits challenges.
In summary, the Plan sets mandatory assessment criteria and prohibitions; it does not itself create a separate penalty regime within its text. Enforcement and penalties derive from the Act and regulations that give effect to the Plan’s permissions and prohibitions. Any enforcement step would therefore be taken under the Act, using the Plan as the substantive standard against which development has or has not complied.
How it interacts with other laws
The Plan is explicitly framed as part of the statutory hierarchy: it sits under the Environmental Planning and Assessment Act 1979 (the Act) and interacts with a range of State and Commonwealth instruments and other legislation. The Plan’s text identifies these interactions and sets rules about conflicts and precedence.
Hierarchy and precedence
State environmental planning policies (SEPPs): Clause 1.9(1) makes the Plan subject to any SEPP that prevails over it under s 3.28 of the Act. The Plan also lists particular SEPPs that may be relevant (Land Use Table notes) and cross‑refers to SEPP (Exempt and Complying Development Codes) for exempt and complying development (cl 3.1 note).
The Plan relies on the Act for many procedural and substantive matters, referencing specific Act provisions such as s 3.20 (standards for local environmental planning instruments), s 3.16 (Governor approval for certain clauses), and Division 3.5 of the Act (note to cl 1.8A). This confirms that the Plan operates within the Act’s framework.
Cross‑legislation cross‑references and protections
Covenants and other instruments: Clause 1.9A suspends private covenants and similar instruments to the extent necessary to enable development consistent with the Plan, but explicitly preserves the rights of public authorities under registered instruments and excludes certain conservation instruments (cl 1.9A(2)-(3)). The clause lists specific Acts defining excluded instruments, for example the Crown Land Management Act 2016, National Parks and Wildlife Act 1974, and threatend species/biobanking or planning agreement instruments.
Heritage and Aboriginal law: The Plan cross‑references the Heritage Act 1977 and imposes procedural duties that require the consent authority to notify and consider the Heritage Council and to consult local Aboriginal communities under certain circumstances (cl 5.10(7)-(9)). That creates a statutory interface with heritage law and cultural heritage processes.
Local Government Act interactions: Clause 5.2 adopts and enables classification and reclassification of public land under Part 2 of Chapter 6 of the Local Government Act 1993 and notes the requirement for Governor’s approval when a public reserve is discharged from trusts (cl 5.2(5) and Note). The Plan therefore interacts with council land management and trust law.
Fisheries, biodiversity and primary production law: Aquaculture provisions (cl 5.19; Schedule 6) and intensive livestock agriculture provisions (cl 5.18) expressly reference the Fisheries Management Act 1994, Fisheries Management (Aquaculture) Regulation 2017, Biodiversity Conservation Act 2016 and relevant Department of Primary Industries guidelines. The Plan requires consistency with those regimes and limits exempt development where State or Commonwealth laws apply.
Transport and infrastructure: Clause 5.12 confirms the Plan does not restrict development by a public authority that is permitted under State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2, nor the Crown’s use of existing Crown buildings. The Plan also nominates Transport for NSW as the acquisition authority for certain classified roads (cl 5.1(2) table).
Defence and Commonwealth: Clause 5.15 requires the consent authority to consider Australian/New Zealand standards for radiocommunications siting and to consult the Secretary of Commonwealth Department of Defence about potential impacts on the Defence communications facility. It is a compulsory provision and cl 4.6 cannot be used to contradict it (cl 5.15(4) and (6)).
Regulatory process interactions
The Plan frequently refers to regulations and other statutory instruments that determine procedures and information requirements. For example, the note to cl 4.6 references the Environmental Planning and Assessment Regulation 2021 as requiring a document to accompany any application that proposes to contravene a development standard.
Maps, technical requirements and GIS data must comply with Standard technical requirements for LEP maps and Standard requirements for LEP GIS data (cl 1.7 note), which are State administrative requirements.
In short, the Plan is not a standalone code. It operates within and defers to higher‑order SEPPs and the Act where those prevail, references and relies on procedural obligations in the Regulations, and integrates with other specific regimes including heritage law, fisheries/aquaculture law, biodiversity law, local government land management and Commonwealth Defence consultation obligations.
Amendment history
The Plan text includes amendment notes and insertions that identify specific amendments and the years and instruments that effected them. The instrument as provided contains multiple amendment annotations; the key recorded amendments and insertions in the Plan text are as follows (references are those shown in the Plan):
2014 amendments: Clause 2.1 was amended in 2014 (2014 (823), Sch 1 [1]) and Schedule entries were amended (Land Use Table notes reference Am 2014 (823), Sch 1 [2]; cl 4.1A was inserted in 2014 (cl 4.1A: Ins 2014 (823), Sch 1 [3]). These 2014 annotations indicate a suite of changes to zones and subdivision rules (including the introduction of average lot size subdivision rules in R5).
2016 insertion: Clause 5.15 (Defence communications facility) was inserted in 2016 (cl 5.15: Ins 2016 (310), Sch 3.4).
2017 amendments: Land Use Table notes show an amendment in 2017 (2017 (493), Sch 1.1 [1]).
2018 amendment: Clause 5.4 (Controls relating to miscellaneous permissible uses) was amended in 2018 (cl 5.4: Am 2018 (406), Sch 1.87 [1] [2]) to add or change floor area limits for several uses (for example, neighbourhood supermarkets and industrial retail outlets references).
2019 amendment: Clause 1.8A (Savings provision relating to development applications) was amended in 2019 (cl 1.8A: Am 2019 (621), Sch 5[1]) and clause 1.9A had amendments in 2019 (cl 1.9A: Am 2019 (621), Sch 5[2]-[4]).
2021 repeal/administrative change: Clause 6.1 was repealed in 2021 (cl 6.1: Rep 2021 (225), Sch 1). The maps note that entries were discontinued from July 2021 when map update responsibility moved to the Department of Planning, Industry and Environment.
2022 amendments: Clause 2.1 shows an amendment in 2022 (2022 (832), Sch 1.16[1]); cl 4.6 was amended in 2022 (cl 4.6: Am 2022 (832), Sch 1.16[3]); cl 5.3 (development near zone boundaries) was amended in 2022 (cl 5.3: Am 2022 (832), Sch 1.16[3]). The Land Use Table and other parts were amended in 2022 (2022 (314), Sch 1; 2022 (832), Sch 1.16[2]).
2023 amendment: Land Use Table amendments noted for 2023 (2023 (458), Sch 2.56).
Each amendment note in the Plan identifies the amending instrument by year and schedule reference. The Plan also notes that maps and GIS data must meet Standard technical requirements and that those map responsibilities transferred to the Department in 2021 (maps note under Part 6). Where the Plan text says a clause was “Not adopted” or “[Not applicable]” that reflects a conscious local decision not to include model provisions, rather than an omission.
Users should consult the consolidated version on the NSW legislation and Planning Portal to confirm the current operative text and any further amendments after the dates recorded in the Plan text. The Plan itself cross‑refers to maps and schedules that may be amended from time to time and to SEPP instruments that have been updated in the intervening period.
Litigation history
The Plan as provided does not include any internal references to litigation or named cases. It contains procedural references to consultation and notification obligations (for example, informing the Heritage Council and local Aboriginal communities, cl 5.10(7)-(9)) that create administrative steps used in judicial review or merits review proceedings under the Act, but the instrument does not record or summarise any judicial decisions.
Practical implications for litigation risk and review
Administrative review and merits appeals: Many of the Plan’s provisions (for example, mandatory preconditions to consent in cl 5.21 flood planning; cl 6.2 terrestrial biodiversity; cl 5.15 defence buffer constraints) will form the substantive basis for decision‑making under the Act. Where a consent authority fails to address these obligations, affected parties may seek merits or judicial review remedies under the Act and relevant review pathways.
Recordkeeping under exceptions clause: Clause 4.6(4) requires the consent authority to keep a record of its assessment when granting consent under the exceptions clause. Those records will be material in any challenge to a decision permitting a contravention of a development standard.
Consultation and notification steps: Failure to follow the Plan’s statutory notification or consultation steps (for example, cl 5.10(7)-(9) regarding the Heritage Council and local Aboriginal communities) may be a ground for review where those steps were mandatory in the circumstances.
Because the Plan text does not list precedent decisions or case law, researchers or practitioners seeking litigation history must search case law databases and administrative tribunal decisions for matters involving the Lockhart LEP 2012 or for legal issues arising under the Plan’s specific clauses (for example, cases concerned with cl 4.6 exceptions, heritage notices under cl 5.10, or flood planning assessments under cl 5.21). The Plan itself gives procedural hooks but does not catalogue outcomes of disputes.
Gotchas
The Plan contains several provisions and drafting features that produce practical compliance traps and decision risks for applicants, consent authorities and neighbours. The “gotchas” below identify specific textual points to watch and their operational consequences, with clause citations.
Maps and the location of triggers
Many controls are map‑triggered (Lot Size Map, Land Zoning Map, Watercourse Map, Terrestrial Biodiversity Map, Heritage Map, Defence Buffer Map). An incorrect assumption about which map applies to a parcel can change whether a use is permitted, whether consent is required, or what overlays apply (see cl 1.3; cl 1.7 and the use of maps throughout the Plan). The Plan emphasises maps are to be published and may be amended (cl 1.7 note); practitioners must check the current maps on the Planning Portal.
Savings provision for pending applications
Clause 1.8A preserves the entitlement of a development application made before the Plan’s commencement to be determined as if the Plan had not commenced. This produces potential timing arbitrage: an application made before commencement may escape new constraints. Practitioners should check application lodgement and determination dates carefully.
Suspension of covenants with exceptions
Clause 1.9A suspends private covenants to the extent necessary to enable Plan‑consistent development but expressly excludes council‑imposed covenants and several conservation instruments (cl 1.9A(2)). There is a risk of assuming a private covenant is suspended when it is one of the listed exclusions. Further, cl 1.9A does not affect rights of public authorities under registered instruments (cl 1.9A(3)), so statutory rights may prevail.
The limited scope of the exceptions clause (cl 4.6)
Clause 4.6 permits contravention of development standards only when the applicant demonstrates compliance with a two‑part test (unreasonable/unnecessary and sufficient environmental planning grounds) and the consent authority keeps a record (cl 4.6(3)-(4)). Importantly, cl 4.6(6) forbids its use to authorise certain subdivisions that create multiple undersized lots in sensitive zones. Also cl 4.6(8) lists development standards that cannot be contravened, including standards for complying development and some BASIX‑related standards. Failure to follow the procedural requirements under the Environmental Planning and Assessment Regulation 2021 (documentary requirement) will make an exceptions argument vulnerable.
Defence buffer and compulsory provision
Clause 5.15 is a compulsory provision and includes restrictions that cannot be overridden by cl 4.6 (cl 5.15(4), (6)). Where land is in the Defence communications facility buffer, certain development (e.g., transmitters, high voltage lines, some industries) requires Defence consultation and may be refused regardless of an exceptions argument. This is a hard constraint.
Music and licensed premises protection (cl 5.20)
Clause 5.20 prevents refusal of consent for licensed premises on prescribed entertainment grounds (genre, live vs amplified, dancing, decorations) and disallows refusal on noise grounds if the consent authority is satisfied the noise can be managed to an acceptable level. This limits some amenity‑based objections but does not remove noise management obligations: applicants should prepare robust noise management strategies to demonstrate acceptability.
Non‑adopted model provisions
The Plan leaves some common local standards “Not adopted” (cl 4.3 height, cl 4.4 floor space ratio, cl 4.5 calculation of FSR and site area, cl 5.5 secondary dwelling controls for rural zones, and others). Practitioners must not assume default model controls apply locally; absence of a local control may produce uncertainty or reliance on State SEPPs or the Act.
Aquaculture technical constraints and exclusions
Aquaculture has detailed site and operational requirements in cl 5.19 and Schedule 6 (e.g., conservation exclusion zones, no freshwater discharge to natural waterbodies for intensive aquaculture except open flow systems; screening to avoid escape of fish, cl 5 and Schedule 6). Oyster aquaculture has additional references to Industry Development Plans and the NSW Oyster Industry Strategy (cl 5.19(5)-(6)). These specific technical constraints can be prescriptive and may require specialised supporting documentation.
Subdivision and secondary dwelling separation
Clause 2.6(2) prohibits subdivision that would separate a secondary dwelling from the principal dwelling if separation would produce lots smaller than Lot Size Map minima. This can frustrate attempts to convert secondary dwellings into separate lots.
Essential services as a veto
Clause 6.5 requires the consent authority to be satisfied that essential services are available or can be arranged. If the applicant cannot evidence services (water, electricity, sewage, stormwater, access), consent can be refused. Applicants must budget for infrastructure studies and connections.
Heritage process timing
Heritage provisions allow the consent authority to require heritage management documents or conservation management plans before consent (cl 5.10(5)-(6)). That can add time and cost. For archaeological sites and Aboriginal places, the consent authority must notify the Heritage Council or local Aboriginal communities and consider responses within prescribed 28‑day periods (cl 5.10(7)-(9)). Delays can follow from these statutory notice periods.
Interactions with State policy and SEPPs
Because the Plan is subject to SEPPs that prevail where applicable (cl 1.9), practitioners cannot assume the Plan alone governs a matter; SEPPs and their accompanying regulations and standards may add or override local controls.
How to comply
A practical compliance checklist for applicants, advisers and local decision‑makers follows. Each step indicates the relevant Plan provisions to consult and the typical documentation or process required.
Confirm applicable mapping and zoning
Check the Land Application Map, Land Zoning Map, Lot Size Map, Heritage Map, Watercourse Map, Terrestrial Biodiversity Map, Defence Communications Facility Buffer Map and Land Reservation Acquisition Map on the NSW Planning Portal (cl 1.3; cl 1.7). The zone determines the Land Use Table entries (cl 2.3), and overlays determine additional assessment triggers (cl 5.10; cl 6.2-6.4; cl 5.15; schedule triggers).
Establish whether the proposal is exempt, complying or requires development consent
Compare the proposal to Schedule 2 (exempt development) and Schedule 3 (complying development) and to the State SEPP (Exempt and Complying Development Codes) (cl 3.1-3.2). If the development is not exempt or complying, prepare a development application for consent (cl 2.6; cl 2.7).
Prepare the application documentation to address Plan triggers
Heritage: If the site contains a heritage item, is in a heritage conservation area, or affects Aboriginal places or archaeological sites, prepare a heritage management document or conservation management plan as necessary and be ready to notify and consult as required (cl 5.10(4)-(6),(7)-(9)).
Biodiversity and riparian matters: For land shown as “Biodiversity” (cl 6.2), “Watercourse” and 40m riparian buffer (cl 6.3), or wetlands (cl 6.4), include an assessment of impacts, and measures to avoid, minimise or mitigate impacts. The consent authority must be satisfied of avoidance/mitigation (cl 6.2(4); cl 6.3(4); cl 6.4(4)).
Flood planning: For land in a flood planning area, provide flood risk assessments and demonstrate compatibility with flood function, evacuation measures and design measures for life safety (cl 5.21(2)-(3)). Use the Considering Flooding in Land Use Planning Guideline and Flood Risk Management Manual where applicable (cl 5.21(4)-(5)).
Aquaculture and intensive livestock: For aquaculture, comply with cl 5.19 and Schedule 6 site location and operational requirements; for intensive livestock agriculture, ensure the development either meets threshold criteria for consent‑free operations (cl 5.18(4)-(5)) or supply an appropriate environmental assessment addressing odour, water, soil and site suitability (cl 5.18(3)).
Defense buffer: If the land is in the defence buffer, early consultation with Defence is required and consent cannot be granted without Defence indicating no adverse effect for specified development types (cl 5.15(2)-(3)).
Address essential services and infrastructure
Provide evidence of water, electricity, sewerage (or effluent systems approval), stormwater management and vehicular access as required by cl 6.5. If the proposal relies on Council‑managed services, coordinate early with the Council regarding timing and costs.
If seeking to contravene a development standard, follow the exceptions pathway
If a development standard needs to be contravened, prepare the document required by the Environmental Planning and Assessment Regulation 2021 that addresses cl 4.6(3) tests: why compliance is unreasonable or unnecessary and environmental planning grounds to justify contravention. Keep in mind cl 4.6(6) and (8) bars the exceptions path in some subdivision and complying development contexts and that the consent authority must record its assessment (cl 4.6(4)).
Heritage and Aboriginal engagement
For works affecting heritage items, provide heritage impact statements or management documents as requested by the consent authority (cl 5.10(4)-(6)). For Aboriginal places, carry out adequate investigation and notify local Aboriginal communities, allowing the 28‑day consideration period (cl 5.10(8)).
Noise and entertainment strategies for licensed premises
For licensed premises propose robust noise mitigation and management plans so the consent authority can be satisfied noise may be managed to an acceptable level (cl 5.20(2)). Clause 5.20 prevents refusal on enumerated entertainment grounds, but noise impact remains a matter for demonstration and mitigation.
Plan for timing and costs of additional assessments
Expect possible requirements for environmental impact statements where development is designated, heritage conservation management plans, biodiversity studies, hydrology/flood risk reports, and specialist aquaculture or agricultural industry assessments. These requirements are explicitly called out across Part 5 and Part 6 (for example cl 5.10(5)-(6), cl 5.19(2), cl 6.2(3)).
Check for private instruments and exclusions
Identify any private covenants or registered instruments; understand cl 1.9A suspends private covenants only to the extent necessary to permit Plan‑consistent development and excludes council‑imposed covenants and several conservation instruments (cl 1.9A(1)-(2)). Confirm whether public authority rights under registered instruments are implicated (cl 1.9A(3)).
Engage Council early
Given numerous discretionary tests (zone objectives; overlay tests; cl 5.3 development near zone boundaries) and recordkeeping obligations for exceptions, practitioners should engage Council early to identify required documentation and note any compulsory consultations (for example with Heritage Council or Defence) and likely consent conditions.
Post‑consent compliance
Where consent is granted with conditions (for example, conservation works per cl 5.10(10) or management strategies for eco‑tourist facilities cl 5.13), ensure conditions are incorporated into construction and operation phases and that ongoing management, monitoring and reporting obligations are achievable and budgeted.
This checklist applies to the Plan as consolidated in its published form. Because the Plan is integrated with State SEPPs and the Act, always confirm the current operative version of the Plan, check relevant SEPPs and the Environmental Planning and Assessment Regulation 2021, and seek targeted technical reports for heritage, biodiversity, flood, aquaculture or engineering matters where the Plan makes those tests mandatory.
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Lockhart Local Environmental Plan 2004
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.
(5) Subclause (3) (d) does not apply to the temporary use of a dwelling as a sales office mentioned in subclause (4).
2 Canal estate development prohibited
2 Canal estate development prohibited
2.9 Canal estate development prohibited
(1) Canal estate development is prohibited on land to which this Plan applies.
(2) In this Plan, canal estate development means development that involves—
(a) a constructed canal, or other waterway or waterbody, that—
(i) is inundated by surface water or groundwater movement, or
(ii) drains to a waterway or waterbody by surface water or groundwater movement, and
(b) the erection of a dwelling, and
This is an opening excerpt, not the complete document.