Local Government (Manufactured Home Estates, Caravan Parks, Camping Grounds and Moveable Dwellings) Regulation 2021
72Matters to be specified in approval
Start here
Get a plain-English read of 72
Turn the raw legal text into a practical explanation grounded in Local Government (Manufactured Home Estates, Caravan Parks, Camping Grounds and Moveable Dwellings) Regulation 2021.
72 Matters to be specified in approval
72 Matters to be specified in approval
(1) An approval must specify the following—
(a) whether the approval allows—
(i) the operation of a caravan park only, or
(ii) the operation of a camping ground only, or
(iii) the operation of both a caravan park and a camping ground,
(b) for an approval allowing the operation of a caravan park—
(i) the number, size and location of long-term sites allowed by the approval, and
(ii) the number, size and location of short-term sites allowed by the approval, and
(iii) the number, size and location of dwelling sites, whether long-term or short-term, to be reserved for self-contained moveable dwellings, and
(iv) the location of off-site parking spaces, if any, for dwelling sites,
(c) for an approval allowing the operation of a camping ground—
(i) whether the camping ground is a primitive camping ground, and
(ii) for an approval for the operation of a primitive camping ground that designates camp sites—the number, size and location of the camp sites allowed by the approval, and
(iii) for an approval for the operation of a primitive camping ground that does not designate camp sites—the maximum number of caravans, campervans and tents permitted to use the camping ground at the same time, and
(iv) the location of off-site parking spaces, if any, for camp sites,
(d) the location of flood liable land, if any, in the caravan park or camping ground.
(2) The numbers, sizes and locations must be specified by reference to a community map.
(3) In calculating the number of tents permitted to use a camping ground, 2 or more tents occupied by a group of no more than 12 persons camping together must be counted as 1 tent.