Local Government (Building and Miscellaneous Provisions) Act 1993
80Interpretation of Part 3
Start here
Get a plain-English read of 80
Turn the raw legal text into a practical explanation grounded in Local Government (Building and Miscellaneous Provisions) Act 1993.
80 Interpretation of Part 3
(1) In this Part –
[Section 80 Subsection (1) amended by No. 24 of 2014, s. 50, Applied:01 Jan 2015] acceptable solution means a matter specified in a planning scheme to be an acceptable solution;
alley means a road or path less than 10 metres wide and bounded on one or both sides by land –
(a) on which the buildings are contiguous or continuous; or
(b) which is laid out to be built upon;
[Section 80 Subsection (1) amended by No. 19 of 1997, s. 4, Applied:28 Jun 1997] block means a piece of land all in one piece of the same owner;
[Section 80 Subsection (1) amended by No. 24 of 2014, s. 50, Applied:01 Jan 2015] discretionary permit has the same meaning as it has in the Land Use Planning and Approvals Act 1993 ;
final plan means a final plan referred to in section 87 ;
highway authority means a council or authority responsible for the management of a highway or part of a highway;
improvement includes landscaping, fencing and the provision of playground equipment, walking paths, car parking areas and toilet facilities;
lot means a block of land created by subdivision of a larger block of which it was part;
minimum lot means the minimum lot for an area as provided by section 109 ;
[Section 80 Subsection (1) amended by No. 26 of 2022, s. 30, Applied:01 Dec 2022]