Liverpool Local Environmental Plan 2008
sch.3-secAdditions to industrial and warehouse buildings in Zone E4 or E5
Start here
Get a plain-English read of sch.3-sec
Turn the raw legal text into a practical explanation grounded in Liverpool Local Environmental Plan 2008.
sch.3-sec Additions to industrial and warehouse buildings in Zone E4 or E5
Additions to industrial and warehouse buildings in Zone E4 or E5
(1) Must not be on lots that are adjacent to land in residential or recreation zones.
(2) Must not involve change to the use of the premises.
(3) Maximum additional floor area—1,000m2 or 25% of existing floor area (whichever is the lesser).
(4) Maximum floor space ratio—1:1.
(5) Maximum height of any structure—8.5m.
(6) Minimum setback for any structure—
(a) from an arterial road (or arterial road widening)—20m, or
(b) from a local road (or local road widening)—10m, or
(c) from other boundaries—5m.
(7) Minimum setback for any paved area wider than 1.5m—
(a) from an arterial road (or arterial road widening)—5m, or
(b) from a local road (or local road widening)—5m, or
(c) from other boundaries—3.5m.
(8) Must have at least one window opening, door opening or other wall variation of more than 50mm for every 20m of wall length facing the front boundary.
(9) Earthworks must not extend more than—
(a) 900mm above ground level (existing), or
(b) 600mm below ground level (existing).
(10) Any roof or surface drainage area must have a drainage system that—
(a) captures the roof or surface water, and
(b) discharges that water into the inter-allotment or street stormwater drainage system, and
(c) limits the rate of discharge into Council’s kerb and gutter to less than 20 litres per second without using on-site detention systems, and
(d) caters for a 1 in 20 year storm event and directs excess water over land to the street.
(11) Must provide and maintain, adjacent to any street, a landscaped area with a minimum width of 5m that is designed by a suitably qualified landscape architect and that has mounding to a height of at least 600mm along the majority of any frontage to an arterial road.