This local environmental plan sets planning rules for land in Lithgow: it maps zones, lists permitted development, requires council consent for subdivision and demolition, and identifies exempt and complying development (see cl.1.3, 1.6, 2.6, Part 3). The Plan states aims such as protecting primary production, heritage and biodiversity and imposes controls on lot sizes, aquaculture, flood risk, temporary uses and music at licensed venues; applicants bear compliance costs, the council decides consents, and some flexibility exists through exceptions and schedules (see cl.1.2, 4.1, 5.19, 5.21, 5.20, 4.6).
This instrument is a local environmental plan for Lithgow, the Lithgow Local Environmental Plan 2014. It establishes the local planning framework that applies to the land shown on the Land Application Map and Land Zoning Map (see cl 1.3; cl 2.2). It commenced on publication on the NSW legislation website (cl 1.1AA). The Plan performs these core mechanical functions:
Sets statutory aims and zone objectives (cl 1.2; cl 2.3). The stated aims emphasise ecologically sustainable development, protection of heritage and environmental assets, employment and tourism opportunities, infrastructure efficiency and resilience to natural hazards (cl 1.2(1)-(2), items (a)-(x)).
Divides the area into zones and prescribes what development is permitted without consent, permitted with consent, or prohibited in each zone (cl 2.1; cl 2.3; the Land Use Table at Part 2). The Plan lists standard rural, residential, employment, mixed use, recreation and conservation zones (cl 2.1).
Specifies development standards and controls, including minimum lot sizes for subdivisions and for specific housing forms, exemptions for certain development, complying development criteria, and the process for exceptions to development standards (Part 3; Part 4, cl 4.1-4.6; cl 3.1-3.3).
Prescribes local controls on a range of matters: subdivision consent rules (cl 2.6), demolition (cl 2.7), temporary uses (cl 2.8), prohibition of canal estate development (cl 2.9), heritage controls (cl 5.10 and Schedule 5), flood planning (cl 5.21), biodiversity, groundwater, riparian and sensitive lands overlays (cl 7.4-7.7 and overlay maps), stormwater (cl 7.3) and other local provisions (Part 7).
Implements local exceptions and bespoke permissions: additional permitted uses for particular parcels (Schedule 1), classification/reclassification of public land (Schedule 4), lists of heritage items and conservation areas (Schedule 5), and aquaculture technical requirements (Schedule 6).
Current sections
Direct links to the current provisions in Lithgow Local Environmental Plan 2014.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agritourism; Air transport facilities; Airstrips; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Boat building and repair facilities; Boat launching ramps; Boat sheds; Building identification signs; Business identification signs; Camping grounds; Cellar door premises; Cemeteries; Charter and tourism boating facilities; Community facilities; Crematoria; Dual occupancies; Dwelling houses; Eco-tourist facilities; Educational establishments; Environmental facilities; Environmental protection works; Extractive industries; Farm buildings; Farm stay accommodation; Flood mitigation works; Forestry; Freight transport facilities; Heavy industrial storage establishments; Helipads; Highway service centres; Home-based child care; Home businesses; Home industries; Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Intensive plant agriculture; Jetties; Landscaping material supplies; Markets; Open cut mining; Plant nurseries; Recreation areas; Recreation facilities (major); Recreation facilities (outdoor); Roadside stalls; Rural industries; Rural supplies; Secondary dwellings; Service stations; Transport depots; Truck depots; Veterinary hospitals; Water recreation structures; Water supply systems
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Part 6
Urban release areas
Part 6 Urban release areas
Part 6 Urban release areas
6
Arrangements for designated State public infrastructure
6 Arrangements for designated State public infrastructure
6.1 Arrangements for designated State public infrastructure
(1) The objective of this clause is to require satisfactory arrangements to be made for the provision of designated State public infrastructure before the subdivision of land in an urban release area to satisfy needs that arise from development on the land, but only if the land is developed intensively for urban purposes.
(2) Development consent must not be granted for the subdivision of land in an urban release area if the subdivision would create a lot smaller than the minimum lot size permitted on the land immediately before the land became, or became part of, an urban release area, unless the Director-General has certified in writing to the consent authority that satisfactory arrangements have been made to contribute to the provision of designated State public infrastructure in relation to that lot.
(3) Subclause (2) does not apply to—
(a) any lot identified in the certificate as a residue lot, or
(b) any lot to be created by a subdivision of land that was the subject of a previous development consent granted in accordance with this clause, or
(c) any lot that is proposed in the development application to be reserved or dedicated for public open space, public roads, public utility undertakings, educational facilities or any other public purpose, or
(d) a subdivision for the purpose only of rectifying an encroachment on any existing lot.
(4) This clause does not apply to land in an urban release area if all or any part of the land is in a region within the meaning of the Act, Division 7.1, Subdivision 4.
(1) The objective of this clause is to ensure that earthworks for which development consent is required will not have a detrimental impact on environmental functions and processes, neighbouring uses, cultural or heritage items or features of the surrounding land.
(2) Development consent is required for earthworks unless—
(a) the earthworks are exempt development under this Plan or another applicable environmental planning instrument, or
(b) the earthworks are ancillary to development that is permitted without consent under this Plan or to development for which development consent has been given.
(3) In deciding whether to grant development consent for earthworks (or for development involving ancillary earthworks), the consent authority must consider the following matters—
(a) the likely disruption of, or any detrimental effect on, drainage patterns and soil stability in the locality of the development,
(b) the effect of the development on the likely future use or redevelopment of the land,
(c) the quality of the fill or the soil to be excavated, or both,
(d) the effect of the development on the existing and likely amenity of adjoining properties,
(e) the source of any fill material and the destination of any excavated material,
(f) the likelihood of disturbing relics,
(g) the proximity to, and potential for adverse impacts on, any waterway, drinking water catchment or environmentally sensitive area,
(h) any appropriate measures proposed to avoid, minimise or mitigate the impacts of the development,
(i) the proximity to, and potential for adverse impacts on, any heritage item, archaeological site or heritage conservation area.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
(Clause 5.2)
Schedule 5
Environmental heritage
Schedule 5 Environmental heritage
Schedule 5 Environmental heritage
(Clause 5.10)
sch 5: Am 2015 No 15, Sch 2.31; 2015 (691), cl 5 (2)–(4).
Schedule 6
Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
(Clause 5.19)
Division 1
Site location requirements
Division 1 Site location requirements
Division 1 Site location requirements
Division 2
Operational requirements
Division 2 Operational requirements
Division 2 Operational requirements
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Lithgow Local Environmental Plan 2014.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Lithgow in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to encourage sustainable and planned development that complements the unique character and amenity of Lithgow and enhances its towns, villages and rural areas,
(b) to provide for a range of development opportunities that contribute to the social, economic and environmental resources of Lithgow in a way that allows the needs of present and future generations to be met by implementing the principles of ecologically sustainable development,
(c) to manage, facilitate and encourage sustainable growth and development that—
(i) promotes the efficient and effective delivery of utilities, infrastructure and service and minimises long-term costs to government, authorities and the community, and
(ii) protects, enhances and conserves mineral and extractive resources lands, forests and agricultural lands and the contributions they make to the local, regional and State economy, and
(iii) allows for the orderly growth of land uses while minimising conflict between land uses in a zone and land uses in adjoining zones, and
(iv) encourages a range of housing choices in planned urban and rural locations to meet population growth and the diverse needs of the community, and
Decision-makers and allocation of responsibilities are articulated: the Council (the local consent authority subject to the Act) is the consent authority (cl 1.6), but some provisions require or defer to State agencies (for example Director‑General certification before subdivision in urban release areas, cl 6.1(2)-(3), and specified State authorities for acquisition, cl 5.1(2)). The Plan also creates procedural rules that affect timing and transitional treatment of existing development applications (savings clause cl 1.8A). It contains a suspension mechanism which, to the extent necessary, renders private covenants that would prevent compliant development inoperative, subject to explicit exceptions (cl 1.9A).
Mechanically, the Plan operates through three linked instruments: zoning maps, overlay maps (environmentally sensitive areas, lot size map, heritage map, active street frontages map, etc.) and the textual clauses and Schedules. It further provides that maps are authoritative when approved by the local plan‑making authority and may be amended (cl 1.7). The Plan frequently cross‑references State environmental planning policies, and is expressly subject to SEPPs that prevail under section 3.28 of the Environmental Planning and Assessment Act (cl 1.9(1)).
Main concepts
The Plan organises land use regulatory choices through a small number of key concepts and instruments that govern how land may be used, developed, subdivided and conserved. Key concepts and where they appear are:
Zones and Land Use Table (cl 2.1-2.3). The Land Use Table pairs each zone with objectives and a three‑tiered permission model: development permitted without consent (often limited to roads, home occupations, extensive agriculture in rural zones), development permitted only with consent (a long list of uses per zone), and prohibited development (residual category). The consent authority must have regard to zone objectives when determining applications (cl 2.3(2)).
Maps and overlays (cl 1.7; cl 2.2). The Plan relies on a set of maps (Land Application Map, Land Zoning Map, Lot Size Map, Heritage Map, Environmentally Sensitive Areas overlays and more). The maps are part of the Plan and may be amended (cl 1.7(1)-(2)).
Development classification: exempt, complying, designated and development requiring consent (Part 3). Schedule 2 (exempt) and Schedule 3 (complying) are used alongside State SEPPs. Exempt development is limited to low‑impact works meeting the Building Code and other requirements (cl 3.1). Complying development requires meeting technical standards in Schedule 3 (cl 3.2).
Minimum lot sizes and subdivision standards (cl 4.1; cl 4.1AA; cl 4.1A; cl 4.1B; cl 4.2; cl 4.2C). These rules prevent fragmentation in rural and conservation zones and set thresholds for dual occupancies, multi dwelling housing and residential flat buildings. The Plan also provides exceptions and special rules for split zones (cl 4.1B) and rural subdivision for primary production (cl 4.2).
Exceptions to standards (cl 4.6). The Plan allows departures from development standards where compliance is “unreasonable or unnecessary” and there are sufficient environmental planning grounds, subject to record‑keeping and explicit prohibitions (cl 4.6(2)-(4), (6), (8)).
Heritage protection (cl 5.10; Schedule 5). Consent is required for demolition, alterations or subdivision affecting heritage items, Aboriginal objects or archaeological sites, except in limited circumstances; the consent authority may require heritage management documents and must consult the Heritage Council and local Aboriginal communities in particular cases (cl 5.10(2)-(9)).
Environmental overlays and locational controls (Part 7). The Plan imposes additional site‑specific tests for earthworks (cl 7.1), stormwater (cl 7.3), terrestrial biodiversity (cl 7.4), groundwater vulnerability (cl 7.5), riparian land and watercourses (cl 7.6), sensitive lands (cl 7.7), and buffers protecting utility facilities (cl 7.8). These clauses operate in tandem with mapped overlays.
Local exceptions and bespoke rules: temporary use (cl 2.8; 52‑day cap), prohibition of canal estates (cl 2.9), active street frontages in the E1 zone to encourage ground‑floor retail (cl 7.9), and protection of playing and performing music in licensed premises (cl 5.20).
Public land classification and acquisition rules (cl 5.1, cl 5.2; Schedule 4). Schedule 4 lists parcels to be reclassified as operational or community land and specifies which trusts continue to apply (cl 5.2(2)-(5)).
These concepts structure decision rights and constraints. The local consent authority, the Council, is given primary decision‑making responsibility (cl 1.6), but clauses require the Council to take specified matters into account, to consult and to seek State certification or notices in particular procedural situations (for example cl 6.1(2) and cl 5.10(7)-(9)). Many controls are framed as matters the consent authority “must consider” or “must be satisfied”, creating both mandatory assessment steps and areas of discretion.
Who it affects
The Plan affects a range of actors with materially different interests and duties:
Landowners and prospective developers. The Plan sets the circumstances in which owners can subdivide, erect dwellings, carry out commercial or industrial uses, or convert buildings (see cl 2.3, cl 2.6, cl 4.2A, cl 4.2B). Minimum lot sizes (cl 4.1, 4.1A, 4.1B, 4.2C) and the zoning matrix determine what uses are allowed or require consent, changing the economic value of lots and the feasibility of development proposals.
The Council, as the local consent authority (cl 1.6). The Council decides development applications, enforces the Plan’s controls, classifies public land (cl 5.2), prepares or approves development control plans for urban release areas (cl 6.3), and gives technical advice under heritage, biodiversity and flood provisions (cl 5.10, cl 7.4, cl 5.21).
State agencies and the Director‑General. Certain State-level roles are prescribed: e.g., the Director‑General must certify arrangements for designated State public infrastructure before some subdivisions in urban release areas proceed (cl 6.1(2)). The Plan also defers to State SEPPs when they prevail (cl 1.9(1)) and identifies State authorities to acquire reserved land (cl 5.1(2)).
Heritage and Aboriginal groups. The Plan requires notification and consultation with the Heritage Council and local Aboriginal communities on archaeological sites and Aboriginal places of heritage significance prior to consent (cl 5.10(7)-(8)). Owners and applicants seeking to alter heritage items must supply heritage impact documents and conservation management plans when requested (cl 5.10(4)-(6)).
Neighbouring landholders and the community. Many assessment matters require the consent authority to consider amenity, environmental impacts, and compatibility with surrounding uses (e.g., cl 2.3(2); cl 5.24(4); cl 7.1(3); cl 7.3(3); cl 7.6(3)). Temporary uses are capped at 52 days per year unless specified otherwise (cl 2.8(2)-(4)), affecting event organisers and communities.
Utilities and infrastructure providers. The Plan conditions development on availability or arrangements for essential services (cl 7.10) and requires satisfactory arrangements for designated State public infrastructure in urban release areas (cl 6.1, cl 6.2).
Owners subject to private covenants. Clause 1.9A suspends private agreements, covenants or similar instruments to the extent necessary to allow development under the Plan, subject to listed exceptions (cl 1.9A(1)-(3)). This changes the legal regime of restrictive covenants when they are inconsistent with the Plan.
Who pays: developers and landowners carry direct costs of compliance (design changes, heritage conservation measures, environmental assessments, infrastructure contributions where required by other legislation), while the Council and State agencies incur administrative and compliance enforcement costs. The Plan explicitly contemplates Council involvement in development control plans for urban release areas and certification processes (cl 6.3; cl 6.1(2)). Granting permissions where the Plan allows,such as additional permitted uses (Schedule 1) or exemptions (Schedule 2),delivers concentrated benefits to particular landowners; by contrast the majority of residents face diffuse costs in the form of restrictions, assessment requirements and potential impacts on land values.
Key duties and rights
The Plan creates a set of statutory duties, discretionary powers and rights that restructure planning decision‑making:
Consent authority duties. The Council is the consent authority (cl 1.6). It must have regard to zone objectives in assessing development (cl 2.3(2)) and satisfy specific statutory tests before granting consent across a range of matters (heritage cl 5.10(4)-(9), flood planning cl 5.21(2)-(3), biodiversity cl 7.4(3)-(4), riparian cl 7.6(3)-(4)). Many clauses use “must be satisfied” or “must consider”,this creates enforceable procedural duties on the consent authority to record and take into account particular matters.
Applicants’ duties. Applicants must align proposals with the Land Use Table, maps and applicable development standards. For departures from development standards, applicants must demonstrate compliance with the tests in cl 4.6(3) and, under the regulations, provide supporting documents (cl 4.6(3) note). For heritage impacts the consent authority may require a heritage management document or conservation management plan (cl 5.10(5)-(6)). For intensive livestock, applicants must provide adequate environmental information in the statement of environmental effects and consider odour, water, soils and codes of practice (cl 5.18(3)(a)-(h)).
Rights to carry out exempt and complying development. Schedule 2 and Schedule 3 and the relevant clauses (cl 3.1-3.3) set out when applicants may proceed without development consent or with a complying development certificate. Exempt development must meet Building Code requirements and must not be on land containing State heritage items or certain sensitive areas (cl 3.1(2)-(5)).
Rights to challenge decisions. The Plan obliges consent authorities to keep records of assessments under cl 4.6(4) and specifies consultation obligations in heritage and Aboriginal matters (cl 5.10(7)-(9)), which create reviewable administrative processes; the text of the Plan does not itself spell out appeal rights, but the Act and regulations provide judicial and administrative review mechanisms referenced throughout (for example, the Act’s Division 3.5 is invoked in the savings note at cl 1.8A).
Suspension of private restrictions. Clause 1.9A operates to suspend covenants and agreements that would restrict development carried out in accordance with this Plan, except for specified classes of instruments and public authority interests (cl 1.9A(1)-(3)). That reduces private enforcement options where a covenant would otherwise prevent Plan‑compliant development, although it does not affect public authority rights under registered instruments (cl 1.9A(3)).
Developer obligations for services/infrastructure. Development in urban release areas cannot proceed unless arrangements for designated State public infrastructure are certified (cl 6.1(2)); and development consent must not be granted unless essential services are available or arrangements made (cl 6.2; cl 7.10). This allocates responsibility for upfront infrastructure planning and guarantees to applicants or their proponents.
Rights and duties are layered: many permissions require the consent authority’s satisfaction about multiple environmental, amenity or heritage matters (see cl 5.10, cl 7.4-7.6, cl 5.21). These create procedural and substantive hurdles that applicants must clear, while giving the Council discretionary capacity to impose conditions or require further documentation.
Penalties and enforcement
The Plan itself sets planning permissions and processes; it does not contain a standalone penalty regime within its text. Enforcement and penalty mechanisms for breaches of planning controls are governed by the Environmental Planning and Assessment Act and associated regulations rather than by the Plan’s clauses. That said, the Plan creates enforceable requirements and points that will trigger statutory enforcement under the Act, including:
Requirement for development consent. Carrying out development that requires consent (for example demolition cl 2.7, subdivision cl 2.6, erection of dwellings in particular zones cl 4.2A-4.2C) without consent exposes the landowner or developer to compliance action under the Act (see the Plan’s repeated use of “may be carried out only with development consent”).
Conditions and compliance. The consent authority can impose conditions of consent (e.g., heritage conservation work under cl 5.10(10) and complying development certificate conditions under Schedule 3 Part 2). Non‑compliance with conditions is enforceable under the Act.
Recording and consultation duties. The Plan requires the consent authority to keep assessment records (cl 4.6(4)) and to notify heritage/Aboriginal bodies in certain cases (cl 5.10(7)-(9)). Failures in procedural duties may expose the authority and decisions to judicial review, and may affect the validity of consents.
Suspension and limitations. Clause 1.9A’s suspension of private covenants may reduce the private remedial remedies (e.g., injunctions) that covenanted parties might otherwise seek where the development is permitted by the Plan, but it expressly preserves public authority rights under registered instruments (cl 1.9A(3)). Practically, this changes the enforcement landscape for private restrictions.
State and local enforcement links. Specific technical obligations, such as compliance with Building Code requirements for exempt works (cl 3.1(3)(a)), and with BASIX commitments (cl 4.6(8)(b)), remain enforceable under separate regimes; the Plan disallows using cl 4.6 to override certain standards (cl 4.6(8)).
The Plan does not list monetary penalties or infringement regimes itself; enforcement and sanctions for unlawful development therefore arise from the Act and regulations referenced in the Plan, and the Plan’s requirements feed into that enforcement machinery. Practitioners should therefore consult the Environmental Planning and Assessment Act and the Regulations for the specific sanctions that attend non‑compliance with Plan requirements.
How it interacts with other laws
The Plan is embedded in a hierarchy of State law and cross‑references multiple statutes and State environmental planning policies (SEPPs). Interaction points include:
Precedence of SEPPs (cl 1.9(1)). The Plan is subject to any State environmental planning policy that prevails over it under section 3.28 of the Act. Practically, where a SEPP explicitly modifies or overrides a local environmental plan, the SEPP controls.
Environmental Planning and Assessment Act (the Act). The Plan repeatedly references rules and processes under the Act, for example savings treatment of pending development applications (cl 1.8A), the need for development consent under the Act (numerous clauses), and the role of the consent authority (cl 1.6). The Plan operates as an environmental planning instrument within the Act’s framework.
Other Commonwealth and State Acts and statutory regimes. The Plan cross‑references and interacts with sectoral laws affecting land and environment, for example:
Heritage Act 1977: State Heritage Register and interim heritage orders trigger exemptions and consent requirements (cl 3.1(3)(d); cl 5.10).
Crown Land Management Act 2016 and National Parks and Wildlife Act 1974: cl 1.9A(2) lists relevant instruments that cannot be suspended by cl 1.9A.
Fisheries Management Act 1994 and Marine Estate Management Act 2014 in the aquaculture provisions and conservation exclusion zones (cl 5.19; Schedule 6).
Land Acquisition (Just Terms Compensation) Act 1991: cl 5.1 identifies relevant acquisition authorities and the owner‑initiated acquisition process (cl 5.1(1)-(3)). The Plan also references the obligations if a landholder will suffer hardship (note under cl 5.1(1)).
Local Government Act 1993: cl 5.2 authorises classification/reclassification of public land in accordance with that Act and identifies the consequences for reserves and trusts (cl 5.2(2)-(5)).
Building Code of Australia and relevant NSW SEPPs: exempt and complying development rules require compliance with the Building Code (cl 3.1(3)(a); cl 3.2(3)(b)) and BASIX commitments are protected from being overridden by a clause 4.6 variation (cl 4.6(8)(b)).
SEPPs and statewide instruments. The Plan notes several SEPPs that may be relevant (Land Use Table notes): e.g., SEPP (Housing) 2021, SEPP (Transport and Infrastructure) 2021, SEPP (Resilience and Hazards) 2021, among others. These SEPPs can add, restrict or displace local rules in their subject matter areas.
Regulations under other Acts. The Plan invokes other regulatory materials for procedural detail, such as the Environmental Planning and Assessment Regulation 2021 requiring applicants to provide documents supporting a proposed contravention of a development standard (cl 4.6 note).
Local and State planning documents. The Plan requires development control plans for urban release areas (cl 6.3) and implements policy guidance such as the Considering Flooding in Land Use Planning Guideline referenced in the flood planning clause (cl 5.21(4)-(5)).
Mechanically, the Plan sits inside a nested legal architecture: State SEPPs and the Act govern the outer rules and precedence; the Plan provides local standards and bespoke permissions; sectoral Acts (heritage, fisheries, Crown land) impose permitted or prohibited activities and consultation obligations that the Plan acknowledges and, in some instances, cannot override (for example cl 1.9A(2)’s carve outs). Where conflicts arise, the Plan defers to higher‑order law as provided in cl 1.9 and the Act.
Amendment history
The Plan’s text contains inline amendment annotations. The following is a summary of amendment signals visible within the instrument text (as recorded in the margins and footnotes of the version provided):
2014: Original making (the Plan is Lithgow Local Environmental Plan 2014; cl 1.1).
2015: Amendments recorded,Schedule 1 amendments and Schedule 5 amendments are annotated as Am 2015 No 15, Sch 2.31; Am 2015 (691), cl 5 (1-4) in the Schedule notes for Schedules 1 and 5.
2017: Multiple insertions and amendments; for example, Land Use Table amendments Am 2017 (493), Sch 1.1 and clause 4.1B inserted (cl 4.1B inserted 2017 (573), Sch 1). Clause 7.13 amended in 2017 (cl 7.13: Am 2017 (493), Sch 1.2[1]).
2018: Amendments to Land Use Table and cl 5.4 (industrial retail outlet / artisan controls) noted Am 2018 (406), Sch 1.84 and 2018 (488). Also 2018 No 68, Sch 2.19 indicated to land use table.
2019: Amendments noted in 2019 (137), Sch 6[1] and 2019 (621), Sch 3 and Sch 5[1-4]. Importantly, cl 1.8A (savings provision) and cl 1.9A (suspension of covenants) are recorded as Am 2019 (621), Sch 5[1-4].
2021: Insertions such as cl 5.9 (dwelling affected by natural disaster) introduced in 2021 (302), Sch 1.18; Schedule 1 amended 2021 (541), cl 5(1).
2022: Multiple rounds of amendments: numbering shows Am 2022 (156), Sch 1[1-3]; Am 2022 (314), Sch 1; Am 2022 (829), Sch 1.13[1-13] with multiple clauses and zone lists updated (e.g., cl 2.1 amended Am 2022 (829), Sch 1.13[1]). Several map‑related and lot size changes are referenced as Am 2022.
2023: Amendments include the insertion of cl 5.24 and cl 5.25 (farm stay accommodation and farm gate premises) Subst 2023 (458), Sch 1[4]; and cl 6.1 amended 2023 (554), Sch 1.
The footnotes indicate a stream of targeted amendments over time: adding specialised local provisions (farm‑stay, farm gate), disaster relief measures, procedural savings and covenant suspension, and updates to zoning and lot size arrangements. The Plan’s amendment history, as recorded in the provided text, therefore shows iterative local updates addressing heritage, rural land management, and response to State policy changes (for instance multiple SEPPs referenced) across 2015-2023.
Practitioners must check the consolidated LEP on the NSW Planning Portal for the authoritative up‑to‑date text and the chronology of amendments, as the printed annotations in the instrument reference the amending legislation but do not summarise the policy reasons for each amendment. The Plan itself records the Minister and Governor approvals required for certain provisions (e.g., cl 1.9A approval under s 3.16 of the Act).
Litigation history
The provided Plan text does not include any cases, decisions, or litigation history. There are no judicial or tribunal determinations cited within the instrument. Where the Plan requires the consent authority to keep records or notify heritage or Aboriginal bodies (for example cl 4.6(4); cl 5.10(7)-(9)), those procedural duties create grounds for potential judicial review of administrative decisions under the Act, but no specific litigation examples are recorded in the Plan.
For practice researchers, that means to find litigation engaging the Plan you must search administrative and judicial records (Land and Environment Court, NSW Court of Appeal, etc.) for decisions referencing “Lithgow Local Environmental Plan 2014”, the specific clauses (for example heritage items in Schedule 5, or Minimum Lot Size clauses cl 4.1/4.1A/4.1B), or for appeals that turned on SEPP interactions (cl 1.9). The Plan itself neither summarises nor cites any judicial interpretations.
Gotchas
This section highlights traps, procedural wrinkles and legally significant nuances that arise directly from the Plan’s text.
Savings clause for pending DAs (cl 1.8A). Development applications lodged before the Plan’s commencement but not finally determined must be decided as if the Plan had not commenced (cl 1.8A). Practitioners should watch transitional timing: a DA pending at commencement may escape new constraints, but Division 3.5 of the Act allows particular public notice and simultaneous exhibition if a draft instrument is required. That creates timing arbitrage for applicants but also procedural complexity for consent authorities.
Suspension of private covenants (cl 1.9A). Private covenants, agreements and instruments that would restrict Plan‑consistent development are suspended to the extent necessary (cl 1.9A(1)), but important exceptions apply: covenants imposed or required by the Council, instruments under the Crown Land Management Act or National Parks Act, conservation agreements, biobanking agreements, and planning agreements (cl 1.9A(2)(a)-(g)). Practitioners must check whether a covenant falls within the exemption list before advising clients to rely on covenants being inoperative.
52‑day cap on temporary uses (cl 2.8). Temporary use consent is limited to a maximum 52 days in any 12‑month period unless the use is a sales office for a new release area (cl 2.8(2)-(4)). Applicants should plan events/markets/short‑term activities within that cap or seek alternative approvals.
Canal estate prohibition (cl 2.9). Canal estates are expressly prohibited (cl 2.9(1)). The definition is technical and ties to specific engineering works and flood planning interactions (cl 2.9(2)). Developers contemplating waterbody excavation or fill to create waterfront lots must note this absolute prohibition except for limited drainage or water supply works (cl 2.9(3)).
Multiple minimum lot size regimes and overlapping rules (cl 4.1; cl 4.1AA; cl 4.1A; cl 4.1B; cl 4.2C). Different clauses apply to general subdivisions, community title schemes, dual occupancies and strata in rural/conservation zones. In particular, cl 4.1AA applies to Community Land Development Act subdivisions and overrides cl 4.1; cl 4.1B addresses split‑zone lots; cl 4.2A restricts erection of dwellings in certain rural/conservation zones. Practitioners must cross‑check the Lot Size Map in each case and confirm which clause governs.
Exceptions to development standards limited (cl 4.6). The Plan permits departures from development standards where properly justified (cl 4.6(2)-(3)), but explicitly disallows using cl 4.6 to contravene standards for complying development, BASIX commitments, clause 5.4, cl 5.5 (not adopted) and specified clauses including 4.2A(6), 6.1 or 6.2 (cl 4.6(8)). That narrows the scope for “planning grounds” to justify non‑compliance in sensitive contexts (for example, sewered minimum lot size threshold in cl 4.2A(6)).
Heritage consultation timeframes (cl 5.10(7)-(9)). The consent authority must notify the Heritage Council or local Aboriginal communities and wait 28 days for responses in specified situations. Failure to observe these steps may render a decision vulnerable to review.
Music protections but subject to noise management (cl 5.20). Clause 5.20 prevents refusal of consent for licensed premises based on a list of musical factors (genre, live vs amplified, instruments, dancing, etc.) and bars refusal on the grounds of noise if noise can be managed to an acceptable level (cl 5.20(1)-(2)). This is a statutory protection for live music but does not remove obligations to manage noise; applicants and councils must still demonstrate noise management measures.
Flood planning and climate change (cl 5.21). The consent authority must assess flood compatibility and take into account projected changes from climate change and evacuation/safety measures. Practitioners need to provide climate‑aware flood modelling and evacuation analysis, and must consult the Considering Flooding guideline referenced in cl 5.21(4).
Essential services and urban release preconditions (cl 6.1-6.3; cl 7.10). In urban release areas, subdivision creating smaller lots than historic minimums requires Director‑General certification of satisfactory arrangements for designated State infrastructure (cl 6.1(2)), and development consent cannot be granted unless essential services are available or arrangements made (cl 6.2; cl 7.10). These preconditions impose coordination with State agencies and infrastructure funding arrangements.
Map reliance and amendment (cl 1.7). Maps are authoritative once approved by the local plan‑making authority but may be amended. The Plan contemplates maps in electronic or paper form and publication on the Planning Portal (cl 1.7(1), (3)-(4)). Discrepancies between map versions can create uncertainty; practitioners should obtain the current approved map set from the NSW Planning Portal.
Localised additional permitted uses (Schedule 1). Schedule 1 contains parcel‑specific permissions (for example Lot 1 Hoskins Ave for offices, cl Sch 1.2; Lot 20 Main Street Wallerawang for hotel/motel, Sch 1.3). These create concentrated benefits to particular landowners and require careful checking of parcel identity in conveyancing and development due diligence.
These “gotchas” are practical issues where the Plan’s text imposes procedural or substantive hurdles, carving out exceptions or creating opportunities that depend on correct identification of parcels, overlay status, and the interplay with State SEPPs and other statutes.
How to comply
Compliance requires matching the proposal to the Plan’s layered requirements: zone, overlays, maps, development standards, and local clauses. Practical steps and compliance checkpoints are:
Identify applicable maps and zones. Confirm the land is within the Plan’s area (cl 1.3) and identify its zone on the Land Zoning Map (cl 2.2). Check overlay maps (Lot Size Map, Heritage Map, Environmentally Sensitive Areas maps, Facilities Buffer Zone Map, Active Street Frontages Map and Pottery Estate map where relevant). The Plan makes maps an authoritative part of the instrument (cl 1.7).
Use the Land Use Table. For the identified zone, consult the Land Use Table to determine whether the proposed use is permitted without consent, permitted with consent or prohibited (cl 2.3(1)). If the use is not listed it is prohibited (residual “Any development not specified…” entries).
Check exempt and complying development regimes. If the proposal is low‑impact, check Schedule 2 exempt items and Schedule 3 complying development items and conditions (cl 3.1-3.2). Confirm Building Code compliance and that the land is not excluded (heritage or environmentally sensitive areas cl 3.1(3)-(5); cl 3.3).
Confirm subdivision rules and minimum lot sizes. If subdividing, verify applicable minimum lot sizes on the Lot Size Map and the controlling clause: general minimums cl 4.1; community title cl 4.1AA; dual occupancy/multi dwelling minimums cl 4.1A; special split zone rules cl 4.1B and strata rules cl 4.2C. Consider cl 4.2 rural subdivision flexibility if applicable and cl 4.2A restrictions on dwellings in certain rural/conservation zones.
Assess site constraints and overlay tests. If the land lies in overlays (biodiversity, groundwater vulnerability, watercourse, sensitive lands, facilities buffer), prepare targeted technical studies:
Terrestrial biodiversity: species/habitat assessment and mitigation sequencing (cl 7.4(3)-(4)).
Riparian/watercourse: water quality, bank stability, aquatic habitat protection and fish passage (cl 7.6(3)-(4)).
Sensitive lands: slope, erosion, salinity, karst and inundation risks and site engineering responses (cl 7.7(3)-(4)).
Facilities buffer: assess noise/odour impacts and potential relocation if feasible (cl 7.8(3)(a)-(d)).
Address heritage and Aboriginal matters early. If the site contains a heritage item, archaeological site or Aboriginal place in Schedule 5 or mapped heritage area, prepare a heritage assessment, and be prepared to submit a heritage management document or conservation management plan if requested (cl 5.10(4)-(6)). Notify Heritage Council or local Aboriginal communities where required and allow for 28‑day response windows (cl 5.10(7)-(9)).
Prepare flood and climate‑aware assessments. If the land is in a flood planning area, provide flood risk analysis, design for safe occupation and evacuation and consider projected climate change impacts as required by cl 5.21(2)-(3) and the Considering Flooding guideline (cl 5.21(4)-(5)).
For urban release and infrastructure‑dependent proposals: secure certification/agreements. If subdivision in an urban release area would create smaller lots than historically permitted, obtain Director‑General certification that satisfactory arrangements for designated State public infrastructure have been made (cl 6.1(2)). Ensure essential services are available or arrangements are in place (cl 6.2; cl 7.10).
Comply with ancillary technical controls. Observe specific quantitative caps: bed and breakfast up to 4 guest rooms (cl 5.4(1)); home business ≤30 m2 (cl 5.4(2)); home industries ≤50 m2 (cl 5.4(3)); industrial retail/ artisan retail caps (cl 5.4(4) & (10)); neighbourhood shop ≤120 m2 (cl 5.4(7)); secondary dwelling size limits (cl 5.4(9)). These are strict maximums; clauses note Building Code implications (cl 5.4 note).
Consider covenant suspension implications. If a private covenant would prevent a Plan‑consistent development, cl 1.9A may operate to suspend it (cl 1.9A(1)), but check whether the covenant is one of the exceptions listed in cl 1.9A(2). If seeking to rely on covenant suspension, document the analysis and provide the consent authority with evidence that the covenant is not of the excluded type.
Use the Plan’s exception provisions cautiously. If development would contravene a development standard, prepare a written justification addressing cl 4.6(3) tests: show that compliance is unreasonable or unnecessary and provide environmental planning grounds. Remember the clause cannot be used to override complying development standards, BASIX commitments or certain other listed clauses (cl 4.6(8)).
Prepare for consultation and timing impacts. Heritage notifications (cl 5.10), Aboriginal community notification (cl 5.10(8)), and the Plan’s record‑keeping obligations (cl 4.6(4)) impose timing. Temporary use approvals (cl 2.8) and complying development certificates with time‑of‑work conditions (cl 5.8(4)) impose operational constraints. Build these timelines into project schedules.
Check Schedule 1 and Schedule 4/5 for parcel‑specific entries. Schedule 1 adds permitted uses for particular lots; Schedule 4 lists land to be reclassified as operational or community land and identifies any trusts that remain (cl 5.2). Schedule 5 lists heritage items and conservation areas. Ensure you identify the correct lot/DP references when advising clients because these entries create rights and obligations unique to the parcel.
Confirm interactions with SEPPs and State law. Before finalising a strategy, check for any relevant SEPP that may prevail (cl 1.9(1)), and confirm that the proposal meets obligations under sectoral Acts (Heritage Act, Fisheries Act, Crown Land Act and others) where the Plan defers to these regimes.
Who decides, and how to manage risk: The Council is the primary decision‑maker (cl 1.6), but some permissions will require consultation with, or certification by, State agencies (cl 6.1(2), cl 5.10(7)-(9)). To manage implementation risk, applicants should front‑load technical studies, address overlay tests, engage early with Council, Heritage/Aboriginal stakeholders and State infrastructure planners, and prepare robust planning grounds where a standards exception is sought (cl 4.6).
Record keeping and evidence: Given the Plan’s repeated “must be satisfied” wording and the specific requirement that consent authorities keep records of assessments under cl 4.6(4), practitioners should prepare decision‑quality materials: clear statements of environmental effects, heritage and biodiversity reports, flood risk and evacuation modelling, and regulation‑compliant documents supporting any proposed contravention.
In short, compliance is a mapping and sequencing exercise: map zone and overlays; check specific clause triggers; prepare technical evidence targeted to the Plan’s mandatory assessment matters; engage stakeholders early; and ensure alignment with SEPPs and other statutes referenced in the Plan.
(v) preserves and protects land that has been identified for future long term urban development from inappropriate fragmentation and development, and
(vi) protects and enhances environmentally sensitive areas, ecological systems, areas of high scenic, recreational, landscape or conservation value and areas that have the potential to contribute to improved environmental outcomes, and
(vii) protects and enhances places and items of environmental, archaeological, cultural or heritage significance, including Aboriginal relics and places, and
(viii) avoids or minimises the impact of development on drinking and environmental water catchments to protect and enhance water availability and safety for human consumption and the maintenance of environmental and recreational values, and
(ix) strengthens and promotes employment land opportunities and appropriate tourism development and growth, and
(x) creates resilience to natural hazards through local land use planning.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plan is repealed under this provision—
Rylstone Local Environmental Plan 1996
Lithgow City Local Environmental Plan 1994
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
cl 1.8: Am 2022 (156), Sch 1[2] [3].
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU2 Rural Landscape
RU3 Forestry
RU5 Village
Residential Zones
R1 General Residential
R2 Low Density Residential
R5 Large Lot Residential
Employment Zones
E1 Local Centre
E3 Productivity Support
E4 General Industrial
E5 Heavy Industrial
Mixed Use Zones
MU1 Mixed Use
Special Purpose Zones
SP2 Infrastructure
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
C3 Environmental Management
C4 Environmental Living
cl 2.1: Am 2022 (829), Sch 1.13[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The object
This is an opening excerpt, not the complete document.