Mechanically, this Plan replaces prior local environmental plans for the land it covers (cl 1.8) and fixes zoning, permitted/prohibited uses, development standards (lot sizes, height, floor‑space), exempt/complying categories and local overlays (heritage, flood, acid sulfate soils). It also creates site‑specific additional uses and schedules. It matters because the Council is the consent authority (cl 1.6), applicants must obtain consent or meet exempt/compliant rules, and landowners and developers bear assessment and compliance costs while adapting proposals to zoning and overlay constraints (see cl 5.21 on flood planning).
This instrument is a local environmental plan that sets the legal planning framework for land identified as being within the Lismore area. Mechanically, it:
Commences on publication to the NSW legislation website (cl 1.1AA).
Applies to the land shown on the Land Application Map, subject to any areas shown as “Deferred matter” (cl 1.3(1)-(1A)).
Establishes the consent authority for the Plan as the Council (cl 1.6).
Establishes the zoning system (cl 2.1; cl 2.2), the Land Use Table and objectives for each zone (cl 2.3), and the map-based controls that determine height, floor space ratio, minimum lot sizes and other spatially-varying standards (see cl 4.3-4.5 and references throughout to the Lot Size Map, Height of Buildings Map and Floor Space Ratio Map).
Repeals predecessor local environmental plans that applied only to the Plan area and removes their effect on the mapped land (cl 1.8).
Creates the usual three-tiered regime for development: development that is exempt (Schedule 2, cl 3.1), complying (Schedule 3, cl 3.2) or requires development consent (Land Use Table, cl 2.3).
Sets principal development standards (Part 4), including minimum lot sizes (cl 4.1 and related clauses 4.1AA, 4.2A-4.2E), height limits (cl 4.3), and floor space ratio (cl 4.4-4.5), and provides the mechanism to permit departures from standards (exceptions clause, cl 4.6).
Includes a suite of localised, substantive controls (Part 5 and Part 6) that attach additional requirements to particular land uses or constraints: heritage (cl 5.10 and Schedule 5), flood planning and special flood considerations (cl 5.21-5.22), acid sulfate soils (cl 6.1), earthworks (cl 6.2), aquaculture (cl 5.19 and Schedule 6), airspace and aircraft noise controls (cl 6.5-6.6), music/noise protections for licensed premises (cl 5.20), and various rural and tourism-specific rules (multiple clauses in Part 6).
Current sections
Direct links to the current provisions in Lismore Local Environmental Plan 2012.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agritourism; Airstrips; Animal boarding or training establishments; Aquaculture; Artisan food and drink industries; Boat launching ramps; Boat sheds; Building identification signs; Business identification signs; Camping grounds; Caravan parks; Cellar door premises; Cemeteries; Community facilities; Creative industries; Dual occupancies; Dwelling houses; Eco-tourist facilities; Environmental facilities; Extractive industries; Farm buildings; Flood mitigation works; Garden centres; Helipads; Home-based child care; Home businesses; Home industries; Information and education facilities; Intensive livestock agriculture; Jetties; Kiosks; Landscaping material supplies; Mooring pens; Open cut mining; Plant nurseries; Recreation areas; Recreation facilities (outdoor); Restaurants or cafes; Roads; Roadside stalls; Rural industries; Rural supplies; Tourist and visitor accommodation; Turf farming; Water recreation structures
4
Prohibited
4 Prohibited
4 Prohibited
Backpackers’ accommodation; Hotel or motel accommodation; Local distribution premises; Serviced apartments; Any other development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
| Zone RU1 Primary Production and marked “Arterial road” | Council |
| Zone RU1 Primary Production and marked “Proposed Dunoon Dam Inundation Area” | Rous County Council |
| Zone W1 Natural Waterways and marked “Proposed Dunoon Dam Inundation Area” | Rous County Council |
| Zone R1 General Residential and marked “Arterial road” | Council |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
cl 5.1: Am 2018 (660), Sch 1 [4].
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Acid sulfate soils
6 Acid sulfate soils
6.1 Acid sulfate soils
(1) The objective of this clause is to ensure that development does not disturb, expose or drain acid sulfate soils and cause environmental damage.
(2) Development consent is required for the carrying out of works described in the Table to this subclause on land shown on the Acid Sulfate Soils Map as being of the class specified for those works.
| Class of land | Works |
| 1 | Any works. |
| 2 | Works below the natural ground surface.Works by which the watertable is likely to be lowered. |
| 3 | Works more than 1 metre below the natural ground surface.Works by which the watertable is likely to be lowered more than 1 metre below the natural ground surface. |
| 4 | Works more than 2 metres below the natural ground surface.Works by which the watertable is likely to be lowered more than 2 metres below the natural ground surface. |
| 5 | Works within 500 metres of adjacent Class 1, 2, 3 or 4 land that is below 5 metres Australian Height Datum and by which the watertable is likely to be lowered below 1 metre Australian Height Datum on adjacent Class 1, 2, 3 or 4 land. |
(3) Development consent must not be granted under this clause for the carrying out of works unless an acid sulfate soils management plan has been prepared for the proposed works in accordance with the Acid Sulfate Soils Manual and has been provided to the consent authority.
(4) Despite subclause (2), development consent is not required under this clause for the carrying out of works if—
(a) a preliminary assessment of the proposed works prepared in accordance with the Acid Sulfate Soils Manual indicates that an acid sulfate soils management plan is not required for the works, and
(b) the preliminary assessment has been provided to the consent authority and the consent authority has confirmed the assessment by notice in writing to the person proposing to carry out the works.
(5) Despite subclause (2), development consent is not required under this clause for the carrying out of any of the following works by a public authority (including ancillary work such as excavation, construction of access ways or the supply of power)—
(a) emergency work, being the repair or replacement of the works of the public authority, required to be carried out urgently because the works have been damaged, have ceased to function or pose a risk to the environment or to public health and safety,
(b) routine maintenance work, being the periodic inspection, cleaning, repair or replacement of the works of the public authority (other than work that involves the disturbance of more than 1 tonne of soil),
(c) minor work, being work that costs less than $20,000 (other than drainage work).
(6) Despite subclause (2), development consent is not required under this clause to carry out any works if—
(a) the works involve the disturbance of less than 1 tonne of soil, and
(b) the works are not likely to lower the watertable.
(7) Despite subclause (2), development consent is not required under this clause for the carrying out of works for the purpose of agriculture if—
(a) a production area entitlement is in force in respect of the land when the works are carried out, and
(b) the works are carried out in accordance with a drainage management plan, and
(c) the works are not carried out in respect of a major drain identified on the Acid Sulfate Soils Map, and
drainage management plan means an irrigation and drainage management plan that—
(a) is prepared in accordance with the NSW Sugar Industry Best Practice Guidelines for Acid Sulfate Soils (2005), and
(b) is endorsed by the Sugar Milling Co-operative as being appropriate for the land.
NSW Sugar Industry Best Practice Guidelines for Acid Sulfate Soils (2005) means the guidelines approved by the Director-General of the Department of Infrastructure, Planning and Natural Resources on 25 May 2005.
production area entitlement means a contractual arrangement between the Sugar Milling Co-operative and a grower member of that co-operative for the production of sugar cane for milling.
Sugar Milling Co-operative means the New South Wales Sugar Milling Co-operative Limited or its successor.
Note.
The NSW Sugar Industry Best Practice Guidelines for Acid Sulfate Soils (2005) is available on the Department of Planning and Infrastructure’s website.
Use of certain land at 1112 Bruxner Highway, McKees Hill
8 Use of certain land at 1112 Bruxner Highway, McKees Hill
8 Use of certain land at 1112 Bruxner Highway, McKees Hill
(1) This clause applies to part of the northern end of the land at 1112 Bruxner Highway, McKees Hill, being part of Lot 4, DP 614912 and identified as “Item 8” on the Additional Permitted Uses Map.
(2) Development for the purpose of a transport depot is permitted with development consent.
9
Use of certain land surrounding rail corridor in South Lismore
9 Use of certain land surrounding rail corridor in South Lismore
9 Use of certain land surrounding rail corridor in South Lismore
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
Signage—portable weighted, A-frame and retractable business identification signs in employment and mixed use zones and Zone RU5 Village
sch.2-sec Signage—portable weighted, A-frame and retractable business identification signs in employment and mixed use zones and Zone RU5 Village
Signage—portable weighted, A-frame and retractable business identification signs in employment and mixed use zones and Zone RU5 Village
Must comply with all of the following—
(a) must not be located on public land, a road reserve or a public footpath,
(b) must not be illuminated,
(c) only 1 sign per occupancy,
(d) maximum advertising area on each side—0.6m2,
(e) if erected on land in Zone E4, maximum advertising area on each side—4m2,
(f) must have the written consent of the owner of the land on which the sign is located,
(g) if the sign or part of the sign projects over adjoining land, must have the written consent of the owner of that land,
(h) must not relate to a building being used as restricted premises,
(i) must not result in more than 3 business identification signs being constructed or installed in relation to a building if the building houses only one commercial tenant,
(j) must not result in more than 6 business identification signs being constructed or installed in relation to any building.
Special events and temporary use of land owned or managed by Council
sch.2-sec-oc.2 Special events and temporary use of land owned or managed by Council
Special events and temporary use of land owned or managed by Council
(1) Must not involve the use of a loudspeaker or sound amplifying device after midnight, unless it is used within a building or place that is an entertainment facility, pub or registered club.
(2) Must not involve the provision of overnight camping or accommodation.
Raising of dwelling houses above flood planning level
sch.3-sec Raising of dwelling houses above flood planning level
Raising of dwelling houses above flood planning level
(1) This clause applies to the following development—
(a) the alteration or rebuilding of a lawfully erected dwelling house for the purpose of raising the finished floor level of the dwelling house to a level above the flood planning level,
(b) the construction or installation of the following in connection with that development—
(i) footings, foundations or other structural elements,
(ii) structures associated with the provision of utility services,
(iii) access ramps, stairways, landings, balustrades, pathways, paving, light fittings, privacy screens, gutters, pipes or cooling or heating appliances,
(4) The development must not involve the enlargement or extension of the dwelling house.
(5) The dwelling house must be certified as suitable for the development in a certificate issued by—
(a) the Northern Rivers Reconstruction Corporation, or
(b) the NSW Reconstruction Authority.
(6) Each part of the dwelling house erected as part of the development must—
(a) if erected at or below the flood planning level—be constructed of flood compatible material, and
(b) be able to withstand the forces exerted by water, debris and buoyancy during a flood, up to the flood planning level.
(7) The development must not restrict the flow of floodwater on the land.
(8) The development standards specified in subclauses (6)(b) and (7) are satisfied if a registered professional engineer issues a certificate certifying the standards are satisfied.
(9) The finished floor level must be no more than 3.5m above ground level (existing).
(10) The height of the dwelling house may exceed the maximum height shown for the land on the Height of Buildings Map.
(11) The setback of the dwelling house from each property boundary must not be altered.
(12) A landing for a stairway constructed or installed as part of the development must have an area of no more than 3m2.
(13) The total area of all landings for stairways constructed or installed as part of the development must not exceed 9m2.
(14) The following must be located above the flood planning level—
(a) the connection point for the dwelling house,
(b) electrical installations,
(c) switchboards,
(d) meters.
(15) A privacy screen must be installed for each part of a window that is less than 1.5m above the finished floor level if—
(a) the window—
(i) is in a habitable room with a finished floor level of more than 1m above ground level (existing), and
(ii) faces a side or rear boundary and is less than 3m from the boundary, or
(b) the window—
(i) is in a habitable room with a finished floor level of more than 3m above ground level (existing), and
(ii) faces a side or rear boundary and is at least 3m, but no more than 6m, from the boundary.
(16) Subclause (15) does not apply to a bedroom window with an area of no more than 2m2.
(17) A privacy screen must be installed for a balcony, deck, patio, terrace or verandah with an area of at least 3m2 if the structure is—
(a) less than 3m from a side or rear boundary and has a finished floor level of more than 1m above ground level (existing), or
(b) at least 3m, but no more than 6m, from a side or rear boundary and has a finished floor level of more than 2m above ground level (existing).
(18) The privacy screen required under subclause (17) must—
(a) have a height of at least 1.7m, but no more than 2.2m, above the finished floor level of the balcony, deck, patio, terrace or verandah, and
(b) be installed along the edge of the part of the structure that is parallel to, or faces, the relevant side or rear boundary.
Conditions for raising of dwelling houses above flood planning level
sch.3-sec-oc.3 Conditions for raising of dwelling houses above flood planning level
Conditions for raising of dwelling houses above flood planning level
Before building work commences, a restriction must be registered in accordance with the Conveyancing Act 1919, section 88E against the title of the property to which the development relates that ensures—
(a) the space under the dwelling house cannot be enclosed, and
(b) a habitable room cannot be constructed below the level to which the dwelling house is raised.
Schedule 4
Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Lismore Local Environmental Plan 2012.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Lismore in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to give effect to the desired outcomes, strategic principles, policies and actions contained in the Council’s adopted strategic planning documents,
(b) to stimulate and strengthen the role of Lismore as a regional centre for agriculture, business, education, health, recreation, tourism and the arts,
(c) to encourage a diverse range of housing, and the equitable and appropriate provision of services,
(d) to conserve the heritage of Lismore through the integration of heritage conservation into the planning and development control process,
(e) to protect, sustain and enhance Lismore’s natural environment, particularly native fauna and flora,
(f) to minimise the adverse effects of natural hazards, particularly flooding, bush fire and land instability,
(g) to ensure that development is consistent with the principles of ecologically sustainable development.
1 Land to which Plan applies
1 Land to which Plan applies
1.3 Land to which Plan applies
Provides for site‑specific and map‑identified exceptions and additional permitted uses via Schedules (Schedule 1 additional permitted uses; Schedule 4 classification of public land; Schedule 5 heritage items).
Introduces an Urban Release Area regime (Part 7, inserted 2025) that requires Planning Secretary concurrence for subdivision in release areas (cl 7.2), mandatory development control plans before subdivision (cl 7.4), and public utility infrastructure tests (cl 7.3).
The instrument states policy aims in cl 1.2, including protection and promotion of arts and cultural activity, support for Lismore as a regional centre, diverse housing, heritage conservation, natural environment protection and managing natural hazards. Those stated aims are the Plan’s declared rationale (cl 1.2(1)-(2)), but the Plan’s legal effect is exercised through the zoning, maps, schedules and procedural requirements summarised above.
Key operational interactions are explicit: the Plan is subject to State environmental planning policies (SEPPs) that prevail as provided by the Act (cl 1.9(1)); some SEPPs or their provisions are listed as not applying (cl 1.9(2)); the Plan also cross‑references and defers to other legislation for matters such as Crown land (cl 1.9A(2)), building standards and codes (cl 3.1(3)(a)), and the Land Acquisition (Just Terms Compensation) Act (cl 5.1).
Read together, the Plan sets the default permission structure and spatial standards for land use and development across the mapped Lismore area, while creating specific bespoke rules (Schedules and Part 6 controls) and procedural checkpoints (e.g. heritage notifications, Planning Secretary concurrence for urban release subdivisions) that modify the practical pathway to development in particular circumstances.
Main concepts
This Plan uses a conventional map‑and‑table structure to couple spatial zoning with activity‑based permissions and technical standards. The central concepts and instruments are:
Zoning and the Land Use Table. Clause 2.1 lists the zones (RU, R, E, MU, SP, RE, C, W), clause 2.2 fixes land to zones via the Land Zoning Map, and clause 2.3 supplies the Land Use Table that sets permitted without consent, permitted with consent and prohibited uses for each zone. The consent authority must have regard to zone objectives when deciding applications (cl 2.3(2)).
Map‑based standards. The Plan operates via a set of maps that carry the operative controls: Land Application Map (cl 1.3), Land Zoning Map (cl 2.2), Lot Size Map (cl 4.1(3)), Height of Buildings Map (cl 4.3(2)), Floor Space Ratio Map (cl 4.4(2)), Heritage Map (cl 5.10 note), Acid Sulfate Soils Map (cl 6.1(2)), Drinking Water Catchment Map (cl 6.4(2)), and others. Clause 1.7 governs named maps and their public availability.
Permission tiers. Part 3 establishes exempt development (Schedule 2) and complying development (Schedule 3) regimes. Exempt development must meet Schedule 2 standards and is still subject to other approvals where required (cl 3.1(2)-(5)). Complying development must meet the specified development standards and conditions and be permissible in the relevant zone (cl 3.2).
Development standards and exceptions. Part 4 sets principal standards (lot size, height, FSR) and rules for calculating site area and FSR (cl 4.5). Clause 4.6 creates a process for departures from development standards, requiring the applicant to show compliance with the “unreasonable or unnecessary”/“environmental planning grounds” test and for the consent authority to keep a record of its assessment (cl 4.6(3)-(4)). The clause also lists explicit prohibitions on use for certain contraventions (cl 4.6(6) and (8)).
Localised operational controls. Part 5 and Part 6 add targeted requirements for: heritage conservation (cl 5.10 and Schedule 5), flood planning and special flood considerations (cl 5.21-5.22), acid sulfate soils (cl 6.1), earthworks (cl 6.2), aquaculture (cl 5.19 and Schedule 6), music/noise for licensed premises (cl 5.20), airspace and aircraft noise around Lismore Airport (cl 6.5-6.6), rural landsharing development (cl 6.8), and various tourism, farm gate, farm stay and intensive livestock rules (multiple clauses in Part 5/6).
Interaction with other legal instruments. The Plan repeatedly cross‑references the Act, SEPPs, Building Code of Australia, Heritage Act, Local Government Act and numerous other State Acts and regulations (see cl 1.9, cl 3.1(3)(a), cl 5.10 and throughout Schedule 6). The Plan does not operate in isolation; SEPPs may prevail (cl 1.9(1)).
Site‑specific schedules and maps. Schedule 1 allows additional permitted uses on particular mapped land (cl 2.5); Schedule 4 classifies certain public land as operational or community land for Local Government Act purposes (cl 5.2); Schedule 5 lists heritage items and conservation areas (cl 5.10).
Procedural guardrails. The Plan creates specific procedural steps: heritage notifications to the Heritage Council or local Aboriginal communities where relevant (cl 5.10(7)-(9)), Planning Secretary concurrence for subdivision in urban release areas (cl 7.2), mandatory development control plans for urban release areas (cl 7.4), requirements for acid sulfate soils management plans (cl 6.1(3)) and certificates/registrations for certain complying development (sch 3 Part 2 conditions, including s88E restriction for raised dwelling work).
Taken together, the main concepts are mapping + zoning + use table + standards + exceptions + targeted local rules + procedures. These elements determine who can do what where, under what conditions, and with what procedural checks.
Who it affects
The Plan assigns roles and imposes constraints that touch a range of actors. Principal affected parties are:
Landowners and prospective developers within the mapped Plan area. The Plan applies to the land identified on the Land Application Map (cl 1.3) and to all parcels zoned under the Land Zoning Map (cl 2.2). Whether a proposed activity requires consent, is exempt, or is complying depends on the zone and the Schedules (cl 2.3; cl 3.1-3.2; Schedules 2-3).
Lismore City Council. The Plan names the Council as the consent authority (cl 1.6), gives the Council powers to classify and reclassify public land (cl 5.2 and Schedule 4), and requires the Council to keep and make maps available in accordance with Ministerial arrangements (cl 1.7). The Council must assess applications having regard to zone objectives (cl 2.3(2)) and must carry out procedural notifications and impose conditions (for example, heritage assessments cl 5.10(4)-(6)).
State agencies and the Planning Secretary. SEPPs may prevail over the Plan (cl 1.9(1)). The Planning Secretary must be consulted and provide concurrence for subdivision in urban release areas (cl 7.2), and the Planning Secretary may consult other public authorities in deciding concurrence (cl 7.2(3)). The Plan also designates relevant State acquisition authorities for certain mapped land (cl 5.1(2)).
Owners and users of heritage items and land in heritage conservation areas. Schedule 5 lists individual heritage items and conservation areas (cl 5.10 note and Schedule 5). Development affecting heritage items, Aboriginal places and archaeological sites triggers consent requirements and notification obligations (cl 5.10(2), (4), (7)-(9)).
Agricultural and aquaculture operators. The Plan includes specific rules for primary production zones (zones RU1-RU5 in cl 2.1 and Land Use Table) and niche controls for intensive livestock agriculture (cl 5.18) and pond/tank/oyster aquaculture (cl 5.19 and Schedule 6). Those operators must meet the site and operational requirements in Schedule 6 and consider distance and environmental constraints in cl 5.18.
Owners of land in flood‑prone or acid sulfate soils areas. The Plan places explicit gates on development in flood planning areas (cl 5.21-5.22), requires an acid sulfate soils management plan for works on mapped classes of land (cl 6.1(2)-(3)) and restricts certain earthworks without consent (cl 6.2).
Operators of licensed premises and venues. Clause 5.20 prevents consent being refused on the basis of the genre of music, live or amplified music, dancing or certain stage/lighting choices for licensed premises, so long as noise can be managed to an acceptable level (cl 5.20(1)-(2)). This directly affects how venues and operators plan events.
Infrastructure owners/operators and airport users. The Plan contains an airspace operations clause for Lismore Airport that requires consultation with the relevant Commonwealth body if a proposed development would penetrate prescribed operational surfaces (cl 6.5). Clause 6.6 applies noise and siting tests for development in aircraft noise contours.
Public authorities and Crown entities. The Plan contains special provisions for development by or on behalf of a public authority under SEPP Transport and Infrastructure (cl 5.12) and protects public authority rights under registered instruments where the Plan suspends covenants (cl 1.9A(3)).
Community interest groups and neighbouring residents. While not a named party, the Plan creates notification obligations (heritage and Aboriginal place notifications cl 5.10(7)-(8)) and neighbourhood protection tests (flooding cl 5.21, intensive livestock proximity limits cl 5.18(4)(b)) which enable neighbourhood interests to be considered by the consent authority.
Finally, there are a number of site‑specific actors identified in the Schedules: owners of land subject to Additional Permitted Uses (Schedule 1 Items 1-9), proprietors of properties listed in Schedule 4 (public land classification), and owners of the Schedule 5 heritage items. Those individuals or entities face bespoke permissions, constraints and, in a few cases, time‑limited consents (e.g. Item 4 in Schedule 1 requires a 5‑year cessation condition).
Key duties and rights
The Plan allocates duties and confers rights through permissions, procedural rules and conditional requirements. The operative duties and rights that practitioners will most commonly rely upon are:
Consent authority duties. The consent authority (the Council, cl 1.6) must assess development applications having regard to the objectives for the relevant zone (cl 2.3(2)), must consider heritage impacts before granting consent (cl 5.10(4)), and must keep records of assessments under clause 4.6 when considering departures from development standards (cl 4.6(4)). For heritage and Aboriginal matters, the consent authority must give notices and consider responses (cl 5.10(7)-(9)).
Applicant duties. Applicants must use the Plan’s maps to identify applicable controls (cl 1.7; cl 2.2). For certain classes of work, applicants must supply technical plans or management plans before consent can be granted: acid sulfate soils management plan required for works on mapped classes (cl 6.1(3)); heritage management documents or heritage conservation management plans where required (cl 5.10(5)-(6)); compliance material for complying development certificates in line with Schedule 3 and State policy (cl 3.2(4)); and the document required to demonstrate grounds for contravening a development standard per cl 4.6(3) (and the Regulation requires accompanying documentation).
Rights to carry out exempt or complying development. If a proposal meets the tests in Schedule 2 and the Building Code (cl 3.1(2)-(4)), it is exempt development and can proceed without development consent, subject to other approvals as required by other Acts. Likewise, acceptable applications under Schedule 3 may obtain a complying development certificate if they meet the specified conditions and standards (cl 3.2(2)-(4)).
Rights and restrictions on subdivision. Subdivision is allowed only with development consent (cl 2.6(1)), subject to minimum lot sizes (cl 4.1), but the Plan permits a range of exceptions and flexibility (clauses 4.1AA, 4.2-4.2E) where specific criteria are met (e.g. rural subdivision for primary production cl 4.2(3)). Part 7 adds a further gate: Planning Secretary concurrence is required for subdivision in urban release areas (cl 7.2).
Heritage and archaeological duties. Development affecting heritage items, heritage conservation areas, Aboriginal places of heritage significance or archaeological sites requires development consent (cl 5.10(2)). The consent authority may require heritage management documents (cl 5.10(5)) and must notify prescribed bodies (cl 5.10(7)-(9)). The consent authority may also allow development that otherwise would be prohibited if it facilitates conservation and meets the heritage management criteria (cl 5.10(10)).
Flood and hazard obligations. Development consent in flood planning areas must not be granted unless the consent authority is satisfied the development is compatible with flood function/behaviour and evacuation and environmental protections are provided (cl 5.21(2)-(3)). Special flood considerations add further requirements for sensitive or hazardous development (cl 5.22).
Technical compliance and registration conditions. Where complying development is used (for example the raising of dwellings above flood planning level in Schedule 3), the Plan inserts specific certification requirements (e.g. certification by the Northern Rivers Reconstruction Corporation or NSW Reconstruction Authority sch.3, clause governing raising of dwellings), building materials and structural standards (sch.3 Part 1), and requires a section 88E restriction on title before work commences (sch.3 Part 2 condition).
Suspension of private covenants for Plan‑consistency with exceptions. Clause 1.9A suspends covenants and similar private instruments to the extent necessary to enable development consistent with the Plan or a consent granted under the Act, but it expressly preserves covenants imposed by the Council, certain Crown instruments and planning agreements and does not affect rights of public authorities under registered instruments (cl 1.9A(1)-(3)).
Rights under State policies and other Acts. The Plan makes explicit that SEPPs may prevail over its provisions (cl 1.9(1)); it also cross‑references the Building Code and other Acts as material or operative obligations (cl 3.1(2)-(4), cl 5.12).
These duties and rights create a working regime: applicants have rights to pursue exempt, complying or consent pathways but must satisfy the Plan’s maps, standards and the consent authority’s tests; the Council has duties to assess and notify on targeted matters and to ensure compliance with both local and State requirements.
Penalties and enforcement
The Plan itself is primarily a regulatory instrument setting permissions and procedural obligations; it does not create a general schedule of monetary fines or criminal penalties within the text provided. The enforcement regime and sanctions arise through interaction with the Environmental Planning and Assessment Act and other statutes. From the Plan text the immediate enforcement and compliance mechanisms are:
Development consent conditions and covenants. The consent authority can impose conditions on development consents (see heritage incentives and conditions cl 5.10(10)(c) and cl 4.5(9) on registering covenants to prevent floor space “double dipping”). Those conditions can be registered against title (e.g. sch.3‑oc.3 requires an s 88E restriction be registered before building work for raised dwellings).
Record keeping and administrative oversight. Clause 4.6(4) requires the consent authority to keep a record of its assessment when considering contraventions of development standards. This administrative obligation supports accountability and provides documentary footing for subsequent enforcement or review.
Role of other statutory regimes. The Plan repeatedly cross‑refers to other acts that contain enforcement mechanisms. For example, exempt development remains subject to approvals, licences or permits required under other Acts (sch 2 Note 2; cl 3.1(5) reminder). Heritage matters point to the Heritage Act 1977 and notifications to the Heritage Council (cl 5.10(7), (9)), with those Acts containing their own compliance regimes.
Title restrictions and legal encumbrances. The Plan imposes or contemplates registered restrictions (section 88E in Conveyancing Act) that limit future development (e.g. sch.3 conditions for raised dwellings). Registered restrictions are enforceable at law and can be relied upon in subsequent planning, conveyancing and enforcement contexts.
Administrative refusal or modification of proposals. The consent authority may refuse to grant development consent where statutory criteria are not satisfied (for example, flood planning tests cl 5.21(2), heritage impacts cl 5.10(4)-(6), airspace clearance objections cl 6.5(4)). Those refusals are effective enforcement tools.
Interaction with the Act for remedies and offences. The Plan is made under the Environmental Planning and Assessment Act; enforcement of unauthorised development, breaches of consent conditions or offences under the Act are matters for that Act and the relevant regulations. While the Plan does not restate those sanctions, it explicitly situates its operation under the Act (see numerous references to “development consent” and the Act generally).
Public authority safeguards. Clause 1.9A(3) preserves the rights of public authorities under any registered instrument, meaning public authority instruments and easements remain enforceable notwithstanding some suspension of private covenants for Plan consistency.
In short, the Plan establishes the permissions, conditions, and registrable restrictions that feed into the statutory enforcement architecture of the Environmental Planning and Assessment Act, the Conveyancing Act and related statutes. The Plan itself does not list fines or criminal penalties in the text provided; enforcement will therefore rely on consent refusals, conditions, registered restrictions, notifications and the enforcement tools available under the Act and other referenced legislation.
How it interacts with other laws
The Plan contains numerous explicit cross‑references and carve‑outs that govern how it sits within the broader statutory environment. The key legal interaction points are:
State environmental planning policies (SEPPs). Clause 1.9(1) states that the Plan is subject to SEPPs that prevail over the Plan as provided by section 3.28 of the Act. Clause 1.9(2) lists certain SEPPs or provisions that do not apply to the Plan area, with an amendment note indicating changes over time. Practically, SEPPs can supersede local provisions where inconsistency arises.
The Environmental Planning and Assessment Act. The Plan is an environmental planning instrument under the Act and repeatedly uses the Act’s consent machinery: development consent, exempt/compliant development certificates, and s 3.16 approval references (cl 1.9A(4) references the Governor’s approval in accordance with s 3.16 of the Act). Many procedural requirements (fees, appeal rights, enforcement) fall back to the Act and its Regulations.
Building Code and building classification. Exempt development rules require compliance with the Building Code of Australia (cl 3.1(3)(a)-(b)). Complying development must meet deemed‑to‑satisfy provisions of the Building Code (cl 3.2(3)(b)). Where exemptions reference State policies, the Plan instructs how those State provisions are read into local complying rules (sch.3, raising dwellings clause 3(3)).
Heritage and Aboriginal heritage regimes. Clause 5.10 cross‑references the Heritage Act 1977 in relation to State heritage register items and interim heritage orders. For Aboriginal objects and places, cl 5.10(8) requires local Aboriginal community notification and consideration of responses. Archaeological and Aboriginal heritage processes thus involve both the Plan and the Heritage Act/Aboriginal heritage processes.
Local Government Act. Clause 5.2 is explicitly about classifying public land as operational or community land for the purposes of the Local Government Act 1993, and it references the need for Governor’s approval for discharging trusts where applicable (note to cl 5.2). Schedule 4 then implements those classifications.
Crown land instruments and Crown land management. Clause 1.9A(2) excludes certain Crown land instruments from the clause suspending private covenants, and cl 5.12 preserves the Crown’s rights to use existing Crown buildings and to perform development permitted under SEPP Transport and Infrastructure (cl 5.12(1)-(2)).
Fisheries, biodiversity and environment statutes. The aquaculture rules (cl 5.19 and Schedule 6) cross‑reference the Fisheries Management Act 1994, aquaculture industry development plans and the NSW Oyster Industry Sustainable Aquaculture Strategy. The Plan excludes environmentally sensitive areas as defined in State policies (cl 3.3) which pulls in coastal, Ramsar and World Heritage considerations under other Acts and international conventions.
Land acquisition and State acquisition authorities. Clause 5.1 identifies which State authority is the relevant acquisition authority for land reservation acquisition purposes under the Land Acquisition (Just Terms Compensation) Act 1991, linking local land reservation to State acquisition processes.
Conveyancing and title restrictions. Sch.3 Part 2 imposes a condition that an s 88E restriction (Conveyancing Act 1919) be registered before specified development work commences. Clause 4.5(9) contemplates covenants being registered as conditions to prevent “double dipping” on FSR and floor area.
Other statutory approvals. The Plan repeatedly notes that exempt or complying development is not exempt from approvals under other Acts (Schedule 2 Note 2; cl 3.1(5)), explicitly signalling that water, sewer, road or Crown land approvals may still be required.
Practitioners must therefore read the Plan alongside the Act, relevant SEPPs, the Building Code, the Heritage Act, the Local Government Act, the Conveyancing Act, fisheries and biodiversity instruments, and any Crown land management regimes. The Plan makes clear that it is part of a web of regulatory instruments; where there is inconsistency, SEPPs or other statutory primacy rules apply as stated in cl 1.9(1) and in the relevant enabling legislation.
Amendment history
The Plan includes inline amendment annotations for many clauses and Schedules. The Plan as presented reflects iterations across multiple years; the text itself records the dates and instruments that amended particular clauses. Notable, non‑exhaustive amendment markers from the instrument include:
Clause 1.8 (Repeal of planning instruments applying to land) shows an amendment note: Am 2021 (784), cl 5(1).
Clause 1.8A (Savings provisions relating to development applications) has amendment history: Am 2019 (621), Sch 5[1]; 2023 (657), Sch 1[1]-[3].
Clause 1.9 was amended in 2016 (Am 2016 (310), Sch 4.14) as shown in the note.
Clause 1.9A (suspension of covenants) was amended in 2019 (Am 2019 (621), Sch 5[2]-[4]).
Zoning list (cl 2.1) carries a series of amendment notes showing alterations in 2016, 2017 and 2022: cl 2.1: Am 2016 (193), Sch 1[1]; 2017 (25), Sch 1[1]; 2022 (832), Sch 1.15[1].
The Land Use Table and its amendments are extensively annotated, with amendments recorded in many years: e.g. 2013, 2014, 2016, 2017, 2018, 2019, 2020, 2021, 2022, 2023 and 2025 (see Land Use tbl notes).
Minimum subdivision lot size, and related rural lot clauses, show amendments and insertions over the years: cl 4.1AA was added/amended in 2016 and 2022 (cl 4.1AA: Am 2016 (193), Sch 1[3]; 2022 (514), Sch 1[3]). Clauses 4.2A, 4.2B, 4.2C, 4.2D, 4.2E show amendment or insertion notes across 2013-2023.
Part 3 and schedules show multiple amendments: Schedule 3 has amendments noted in 2014 and 2022.
Clause 5.9 (Dwelling house or secondary dwelling affected by natural disaster) is a 2021 insertion (Ins 2021 (302), Sch 1.17) and was amended again in 2022 (Am 2022 (514), Sch 1[3]).
Clause 5.22 (Special flood considerations) was substituted in 2023 (Subst 2023 (657), Sch 1[4]).
Part 7 (Urban release areas) was inserted in 2025 (Ins 2025 (347), Sch 1[1]) and includes multiple new clauses (7.1-7.4) with amendment notes (cl 7.1: Ins 2025 (347), Sch 1[1]).
Schedule and clause-level amendment notes appear throughout Schedule 6, Schedule 1, Schedule 4 and Schedule 5 with dates ranging from 2013 to 2026 (see the specific schedule headers, e.g. Sch 1: Am 2017 (89) ... 2026 (102), Sch 1).
These inline annotations give a traceable indicator of the Plan’s iterative evolution. They also show that the Plan has been actively maintained, with specific responses to events (for example, the 2021 insertion concerning natural disaster‑affected dwellings) and the 2025 addition of an Urban Release Area regime. For practitioners, the amendment notes provide a contemporaneous record of change and should be used to identify when particular operative tests or exceptions came into force.
This instrument does not provide its own consolidated amendment table beyond the inline notes. Users should rely on the official consolidated version on the NSW legislation website for the operative text and the full legislative history, including commencement dates for each amendment.
Litigation history
The text supplied contains no judicial authorities, case law references or descriptions of litigation concerning the Plan. It names no decided cases and includes no summary of any decisions interpreting its provisions. Consequently, from this source alone:
There are no recorded cases cited within the Plan that interpret the Plan’s provisions or that the Plan itself relies upon.
There is no litigation history, challenges or judicial commentary provided in the instrument text.
For practitioners seeking authoritative judicial interpretation, merits review outcomes or precedents on how courts or tribunals have applied particular clauses of this Plan (for example, how cl 4.6 is tested in practice, or how cl 5.21 flood planning tests have been assessed), the Plan does not supply that material. Users will need to consult the judgments database, Land and Environment Court decisions, merits review determinations and any tribunal records external to this instrument.
The Plan does, however, build in administrative recordkeeping and notification processes that produce the documentary trail often relied on in litigation or merits review: cl 4.6(4) requires the consent authority to keep a record when granting consent that contravenes a development standard; cl 5.10(7)-(9) requires notice to the Heritage Council or local Aboriginal communities with 28‑day response windows; sch.3 Part 2 requires s 88E restrictions to be registered before certain works commence. Those administrative steps are relevant evidence points in any subsequent dispute but are not judicial determinations themselves.
In short, there is no litigation history contained in the Plan text; to obtain that history practitioners must search case law and tribunal repositories for decisions engaging the Plan’s clauses.
Gotchas
The Plan contains a number of specific provisions and interactions that commonly create risk or traps for practitioners and applicants. These are practical points to watch closely, with the controlling clauses cited:
Savings and transitional applications. Clause 1.8A requires that development applications made before the Plan (or certain amendments) commenced and not finally determined must be determined as if the Plan (or the amendment) had not commenced. This can produce counterintuitive outcomes: an application lodged pre‑Plan may proceed under previous rules even though the Plan is now operative. Check cl 1.8A carefully for which applications are saved and which amendment dates apply.
Map focus and deferred matters. The Plan applies only to land shown on the Land Application Map (cl 1.3(1)), and it excludes “Deferred matter” areas (cl 1.3(1A)). Practitioners must always confirm the correct map version, because the Plan’s operative rules are map‑driven (cl 1.7 emphasises maps and their amendments).
Suspension of private covenants,not absolute. Clause 1.9A suspends private agreements to the extent necessary to enable development consistent with the Plan, but expressly excludes covenants imposed by Council and a list of Crown and conservation instruments (cl 1.9A(2)), and it does not affect the rights of public authorities under registered instruments (cl 1.9A(3)). Do not assume covenants are automatically overridden; check the exceptions and registered instruments.
Exempt and complying development exclusions for environmentally sensitive areas. Clause 3.3 excludes environmentally sensitive areas from exempt/compliant development. That list pulls in coastal waters, Ramsar wetlands, land identified as high Aboriginal cultural significance or high biodiversity significance, reserved national parks and other mapped areas. Proposals that might otherwise be “minor” can be non‑exempt if in a sensitive area (cl 3.3(1)-(2)).
Floor space ratio calculation and “double dipping.” Clause 4.5 sets detailed rules for determining site area and gross floor area, including the exclusion of land where development is prohibited (cl 4.5(4)(a)), and allows conditions requiring covenants to prevent creation of floor area on one lot because the site included another lot (cl 4.5(9)-(10)). When sites comprise multiple lots, floor area calculations and registered covenants can materially affect development yield.
Exceptions to standards are procedural and recordable. Clause 4.6 permits departures from development standards but requires the applicant to demonstrate that compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds (cl 4.6(3)). The consent authority must keep a record (cl 4.6(4)). Departures are not routine; paperwork and justification are necessary.
Heritage and archaeological notification timelines. For archaeological sites and nominated State heritage items, the consent authority must notify the Heritage Council and consider any responses within 28 days (cl 5.10(7), (9)). For Aboriginal places of heritage significance the consent authority must notify local Aboriginal communities and consider responses within 28 days (cl 5.10(8)). Failure to follow these notice rules can lead to procedural challenge.
Flooding and raising of dwellings. Flood planning and special flood considerations (cl 5.21-5.22) impose substantive safety and evacuation tests; sch.3 sets out complying development for raising dwellings but requires certification by the Northern Rivers Reconstruction Corporation or NSW Reconstruction Authority and an s 88E restriction (sch.3 Part 1(5) and sch.3 Part 2 conditions). Complying development height and privacy constraints also apply (sch.3 Parts 1-2).
Airspace and airport noise gates. For developments that would penetrate the Limitation or Operations Surface for Lismore Airport, the consent authority must consult the relevant Commonwealth body and decline consent if that body objects (cl 6.5(2)-(4)). Development in ANEF contours of 20 or greater triggers siting and indoor sound level obligations (cl 6.6(2)-(3)). Don’t overlook Commonwealth consultation obligations.
Intensive livestock and proximity limits. Clause 5.18 permits some intensive livestock development without consent up to specified capacity thresholds but only outside environmentally sensitive areas, within minimum separation distances from dwellings, and with poultry/pig farm proximity constraints (cl 5.18(4)-(5)). Operators may incorrectly assume small scale operations are free of planning constraints.
Urban release area hurdles. The Part 7 regime introduced in 2025 places a new gate on subdivisions in release areas: concurrence of the Planning Secretary is mandatory (cl 7.2). In addition a development control plan that sets staging, transport hierarchies, landscaping and infrastructure sequencing is required before consent for most development (cl 7.4). This will delay or condition subdivision in mapped release areas.
Site‑specific, time‑limited permissions. Schedule 1 Item 4 permits manufacture of concrete fence posts on a targeted 2‑hectare area but requires a condition to cease operation no later than five years after first consent (Schedule 1 Item 4(3)). Watch Schedule 1 for bespoke, temporally‑limited rights.
“Not adopted” or repealed clauses. Several provisions are marked as “Not adopted” (e.g. 5.5; 5.14; 5.15; 5.23) or repealed (cl 6.3). Do not rely on those headings as operative controls.
Careful map checks, confirmation of which amendments apply to a given parcel, attention to notification timelines, and recognising where State policy and Commonwealth consultation trumps local rules are critical risk‑mitigation steps.
How to comply
The Plan sets out a practical sequence and a set of specific documentary and procedural requirements for complying with its controls. The following step‑by‑step check list is grounded in the instrument text and is intended for practitioners preparing or advising on proposals:
Identify the land and applicable maps. Confirm the land is within the Plan by reference to the Land Application Map and Land Zoning Map (cl 1.3(1); cl 2.2). Check whether the parcel is shown as “Deferred matter” (cl 1.3(1A)). Consult the Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Heritage Map, Acid Sulfate Soils Map, Drinking Water Catchment Map and any specific Additional Permitted Uses Map noted in Schedules (cl 1.7; cl 4.1(3); cl 4.3(2); cl 4.4(2); cl 5.10 notes; cl 6.1(2)).
Determine the permitted status. Use the Land Use Table (cl 2.3) to classify the proposed use as permitted without consent, permitted with consent, or prohibited in the relevant zone. If the use is listed in Schedule 1 as an Additional Permitted Use, apply the Schedule’s conditions (cl 2.5).
Consider exempt or complying pathways. Check Schedule 2 for exempt development standards and Schedule 3 for complying development provisions (cl 3.1-3.2). Ensure the proposal is not in an “environmentally sensitive area” excluded from exempt/compliant development (cl 3.3). For complying development, confirm the proposal meets the relevant Building Code deemed‑to‑satisfy provisions and any state policy cross‑references (cl 3.2(2)-(3)).
Check technical standards. Confirm minimum lot size (cl 4.1), height (cl 4.3) and FSR (cl 4.4) controls using the Lot Size, Height and FSR maps and apply the floor space ratio calculation rules in cl 4.5 where site area includes multiple lots or public land. If a proposed development contravenes a development standard, prepare the necessary cl 4.6 justification material and be ready for the consent authority’s record keeping requirement (cl 4.6(3)-(4)); the Regulation requires a supporting document with the development application.
Address site‑specific technical obligations. Where relevant, prepare and submit:
An acid sulfate soils management plan in accordance with the Acid Sulfate Soils Manual when works are on mapped classes (cl 6.1(2)-(3)), or obtain and have a confirmed preliminary assessment (cl 6.1(4)).
Heritage management documentation or a heritage conservation management plan if the site is a heritage item or in a conservation area (cl 5.10(5)-(6)).
Flood risk and evacuation measures per cl 5.21 and special flood considerations per cl 5.22 for sensitive/hazardous development.
For aquaculture, ensure the operation meets site location and operational requirements in Schedule 6 and consult the relevant aquaculture industry development plan and oyster strategy where relevant (cl 5.19 and Schedule 6).
Prepare notifications and consultations. If the proposal affects archaeological sites or nominated State heritage items, notify the Heritage Council and allow 28 days for response (cl 5.10(7), (9)); for Aboriginal heritage places, notify local Aboriginal communities and allow 28 days (cl 5.10(8)). For development that may penetrate airport operational surfaces, consult the relevant Commonwealth body and follow its advice (cl 6.5(2)-(4)). For urban release area subdivisions, obtain Planning Secretary concurrence (cl 7.2(1)) and prepare the DCP content required by cl 7.4(3) if not already prepared.
Demonstrate essential services and infrastructure availability. For any development, ensure essential services will be available (cl 6.9). For land in urban release areas, show public utility infrastructure is available or that adequate arrangements are in place (cl 7.3).
Address title encumbrances and register conditions. Expect conditions that require registration of restrictions or covenants (e.g. sch.3 oc.3 requires an s 88E restriction for raised dwellings; cl 4.5(9) contemplates covenants to prevent FSR “double dipping”). Plan for Conveyancing Act processes and timing to register required instruments before work commences.
Use the correct application pathway and documentation. For departures from standards under cl 4.6 provide the required demonstration materials described in cl 4.6(3) and the Regulation. For complying development, ensure the certificate application attaches the compliance conditions in Schedule 3 and the relevant State conditions (cl 3.2(4)). For exempt development follow Schedule 2 standards and ensure other statutory approvals are obtained as required (sch 2 Note 2).
Anticipate procedural timing and possible refusals. Heritage, Aboriginal and Commonwealth airport consultations each have review/response windows. The consent authority must be satisfied on substantive matters (flood safety cl 5.21(2), heritage effects cl 5.10(4)) before granting consent. Urban release areas add an extra concurrency step (cl 7.2), and the DCP requirement (cl 7.4) may delay subdivision until staging, infrastructure sequencing and design controls are in place.
Post‑consent compliance. Comply with consent conditions, monitor and maintain any required management strategies (e.g. eco‑tourist facility management strategy cl 5.13(3)(k)), and ensure ongoing compliance with registered restrictions and covenants. Keep records of assessments where the Plan requires them (e.g. cl 4.6(4)).
Practically, compliance requires early map checking, pre‑application engagement with Council and where necessary the relevant State bodies (Heritage Council, Planning Secretary, Commonwealth aviation body), procurement of technical management plans (acid sulfate soils, heritage, flood risk), and readiness to register title restrictions. The Plan points to a multi‑agency decision process for many developments: local assessment by Council under the Plan, concurrent State policy controls (SEPPs) and, in some cases, Commonwealth involvement for airspace considerations.
(1A) Despite subclause (1), this Plan does not apply to the land identified as “Deferred matter” on the Land Application Map.
1 Definitions
1 Definitions
1.4 Definitions
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
Note—
While Lismore Local Environmental Plan 2000 no longer applies to the land to which this Plan applies, it will continue to apply to the land identified as “Deferred matter” under clause 1.3(1A).
cl 1.8: Am 2021 (784), cl 5(1).
1 Savings provisions relating to development applications
1 Savings provisions relating to development applications
1.8A Savings provisions relating to development applications
(1) If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
(2) A development application made, but not finally determined, before the commencement of Lismore Local Environmental Plan 2012 (Amendment No 55) must be determined as if that plan had not commenced.
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
cl 1.9: Am 2016 (310), Sch 4.14.
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 30 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sal
This is an opening excerpt, not the complete document.