Short title
1 Short title
These regulations may be cited as the Land Use Planning and Approvals (Application of Act) Regulations 2024 .
© 2026 Zoe. All rights reserved.
Zoe is a legal information platform. Always consult the Federal Register of Legislation for authoritative text.
Tasmania regulation
These regulations add two specific kinds of pipeline- and telecommunications-related works to the Land Use Planning and Approvals Act 1993’s definition of “development” (reg 4). They make installing telecommunications infrastructure alongside a permitted pipeline, and constructing a gas supply pipeline within 10 metres of a permitted transmission pipeline, classes of development. That change brings those works within the Act’s planning/approval framework and therefore affects pipeline and telecommunications operators’ compliance and approval exposure.
Want the full deep dive?
Zoe can write the in-depth analysis on top of the summary above: how it works, who it affects and what each part actually does.
Direct links to the current provisions in Land Use Planning and Approvals (Application of Act) Regulations 2024.
These regulations may be cited as the Land Use Planning and Approvals (Application of Act) Regulations 2024 .
These regulations take effect on the day on which their making is notified in the Gazette.
In these regulations –
Act means the Land Use Planning and Approvals Act 1993 ;
pipeline has the same meaning as in the Gas Safety Act 2019 ;
supply has the same meaning as in the Gas Safety Act 2019 ;
telecommunications infrastructure means –
(a) any underground conduit or cable; and
(b) any inspection pits or similar facilities installed in conjunction with the conduit or cable; and
(c) any equipment installed in conjunction with the conduit or cable; and
(d) any cable or conduit location-marking post or sign installed in conjunction with the conduit or cable;
transmission pipeline has the same meaning as in the Gas Safety Act 2019 .
The following kinds of development are prescribed as classes of development for the purposes of the definition of development in section 3(1) of the Act:
(a) the installation of telecommunications infrastructure in conjunction with the construction of a pipeline constructed in accordance with a permit;
(b) the construction of a pipeline for the supply of gas in conjunction with the construction of a transmission pipeline constructed in accordance with a permit where no part of the construction of the pipeline is more than 10 metres from the transmission pipeline.
Displayed and numbered in accordance with the Rules Publication Act 1953.
Notified in the Gazette on 24 December 2024
These regulations are administered in the Department of State Growth.
Sourced from Tasmanian Legislation Online (legislation.tas.gov.au), CC BY 4.0.
These regulations may be cited as the Land Use Planning and Approvals (Application of Act) Regulations 2024 .
These regulations take effect on the day on which their making is notified in the Gazette.
In these regulations –
Act means the Land Use Planning and Approvals Act 1993 ;
pipeline has the same meaning as in the Gas Safety Act 2019 ;
supply has the same meaning as in the Gas Safety Act 2019 ;
telecommunications infrastructure means –
(a) any underground conduit or cable; and
(b) any inspection pits or similar facilities installed in conjunction with the conduit or cable; and
(c) any equipment installed in conjunction with the conduit or cable; and
(d) any cable or conduit location-marking post or sign installed in conjunction with the conduit or cable;
transmission pipeline has the same meaning as in the Gas Safety Act 2019 .
The following kinds of development are prescribed as classes of development for the purposes of the definition of development in section 3(1) of the Act:
(a) the installation of telecommunications infrastructure in conjunction with the construction of a pipeline constructed in accordance with a permit;
(b) the construction of a pipeline for the supply of gas in conjunction with the construction of a transmission pipeline constructed in accordance with a permit where no part of the construction of the pipeline is more than 10 metres from the transmission pipeline.