Lake Macquarie Local Environmental Plan 2004
15General controls for land within zones
Start here
Get a plain-English read of 15
Turn the raw legal text into a practical explanation grounded in Lake Macquarie Local Environmental Plan 2004.
15 General controls for land within zones
15 General controls for land within zones
Except as provided otherwise by this plan, the following Table shows for land within each zone—
(a) the development that may be carried out in the zone without development consent under the heading “Without development consent”, and
(b) the development that may be carried out in the zone only with development consent under the heading “Only with development consent”, and
(c) the development that is prohibited in the zone under the heading “Prohibited”.
Land use table
Zone 1 (1) Rural (Production) Zone
Zone 1 (2) Rural (Living) Zone
Zone 2 (1) Residential Zone
Zone 2 (2) Residential (Urban Living) Zone
Zone 3 (1) Urban Centre (Core) Zone
Zone 3 (2) Urban Centre (Support) Zone
Zone B4 Mixed Use Zone
Zone 4 (1) Industrial (Core) Zone
Zone 4 (2) Industrial (General) Zone
Zone 4 (3) Industrial (Urban Services) Zone
Zone 5 Infrastructure Zone
Zone 6 (1) Open Space Zone
Zone 6 (2) Tourism and Recreation Zone
Zone 7 (1) Conservation (Primary) Zone
Zone 7 (2) Conservation (Secondary) Zone
Zone 7 (3) Environmental (General) Zone
Zone 7 (4) Environmental (Coastline) Zone
Zone 7 (5) Environmental (Living) Zone
Zone 8 National Park Zone
Zone 9 Natural Resources Zone
Zone 10 Investigation Zone
Zone 11 Lakes and Waterways Zone
cl 15, table: Am 2006 No 58, Sch 2.26 [1]; 2007 (53), Sch 1 [2]–[16]; 2010 (218), Sch 1 [4]–[14]; 2010 (288), Sch 1 [2]; 2013 (537), Sch 1 [1]; 2014 No 88, Sch 2.31 [1].