This Plan sets Kiama’s zoning, permitted/prohibited uses, development pathways (exempt, complying, consent), numeric standards (lot sizes, heights, FSR) and map-linked overlays that determine what development can occur and when council consent is required. It aims to protect environmental and heritage values, concentrate growth, and provide housing choice.
Developers and landowners bear compliance costs; Council is the consent authority and has discretion on many exceptions (eg cl 4.6), creating approval risk and behavioural incentives to seek mapped exceptions or alternative pathways; maps and technical thresholds materially shape private investment decisions.
This instrument is a local environmental plan (Kiama Local Environmental Plan 2011) that sets the statutory land use framework for the local government area of Kiama. Mechanically it does the following:
Establishes the Plan as the operative environmental planning instrument for the land identified on the Land Application Map and confirms commencement on publication (cls 1.1, 1.1AA, 1.3). It expressly repeals prior local environmental plans and deemed environmental planning instruments that applied solely to the land (cl 1.8), while preserving application of earlier plans over land identified as “Deferred matter” (cl 1.8 note).
Identifies the consent authority, being the Council, subject to the Environmental Planning and Assessment Act 1979 (the Act) (cl 1.6).
Creates a map-driven zoning and standards regime: land is zoned by the Land Zoning Map, and a suite of maps (Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Terrestrial Biodiversity Map, Riparian Land and Watercourses Map, Acid Sulfate Soils Map, Heritage Map, Active Street Frontages Map, Urban Release Area Map and others) supply parcel- and area-specific controls (cll 1.7, 1.3, 2.2; many provisions refer to maps).
Sets out zone objectives and a Land Use Table that prescribes for each zone which uses are permitted with consent, which are permitted without consent and which are prohibited (cl 2.3, Land Use Table). The Land Use Table is the operative list for day-to-day decision‑making.
Requires development consent for a wide range of activities (subdivision, demolition, many building works), while identifying exempt development (Schedule 2) and complying development (Schedule 3 and cross-references to the State SEPP for complying development) (cll 2.6-2.8, 3.1-3.2; Schedules 2-3).
Current sections
Direct links to the current provisions in Kiama Local Environmental Plan 2011.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agricultural produce industries; Agritourism; Air transport facilities; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Building identification signs; Business identification signs; Cellar door premises; Dwelling houses; Environmental facilities; Extractive industries; Farm buildings; Farm stay accommodation; Flood mitigation works; Forestry; Highway service centres; Home-based child care; Home businesses; Home industries; Home occupations (sex services); Industrial retail outlets; Intensive livestock agriculture; Intensive plant agriculture; Open cut mining; Recreation areas; Roads; Roadside stalls; Secondary dwellings; Stock and sale yards; Water supply systems
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Note.
If land, other than land specified in the Table to subclause (2), is required to be acquired under the owner-initiated acquisition provisions, the Minister for Planning and Infrastructure is required to take action to enable the designation of the acquiring authority under this clause. Pending the designation of the acquiring authority for that land, the acquiring authority is to be the authority determined by order of the Minister for Planning and Infrastructure (see section 21 of the Land Acquisition (Just Terms Compensation) Act 1991).
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Acid sulfate soils
6 Acid sulfate soils
6.1 Acid sulfate soils
(1) The objective of this clause is to ensure that development does not disturb, expose or drain acid sulfate soils and cause environmental damage.
(2) Development consent is required for the carrying out of works described in the Table to this subclause on land shown on the Acid Sulfate Soils Map as being of the class specified for those works.
| Class of land | Works |
| 1 | Any works. |
| 2 | Works below the natural ground surface.Works by which the watertable is likely to be lowered. |
| 3 | Works more than 1 metre below the natural ground surface.Works by which the watertable is likely to be lowered more than 1 metre below the natural ground surface. |
| 4 | Works more than 2 metres below the natural ground surface.Works by which the watertable is likely to be lowered more than 2 metres below the natural ground surface. |
| 5 | Works within 500 metres of adjacent Class 1, 2, 3 or 4 land that is below 5 metres Australian Height Datum and by which the watertable is likely to be lowered below 1 metre Australian Height Datum on adjacent Class 1, 2, 3 or 4 land. |
(3) Development consent must not be granted under this clause for the carrying out of works unless an acid sulfate soils management plan has been prepared for the proposed works in accordance with the Acid Sulfate Soils Manual and has been provided to the consent authority.
(4) Despite subclause (2), development consent is not required under this clause for the carrying out of works if—
(a) a preliminary assessment of the proposed works prepared in accordance with the Acid Sulfate Soils Manual indicates that an acid sulfate soils management plan is not required for the works, and
(b) the preliminary assessment has been provided to the consent authority and the consent authority has confirmed the assessment by notice in writing to the person proposing to carry out the works.
(5) Despite subclause (2), development consent is not required under this clause for the carrying out of any of the following works by a public authority (including ancillary work such as excavation, construction of access ways or the supply of power)—
(a) emergency work, being the repair or replacement of the works of the public authority required to be carried out urgently because the works have been damaged, have ceased to function or pose a risk to the environment or to public health and safety,
(b) routine maintenance work, being the periodic inspection, cleaning, repair or replacement of the works of the public authority (other than work that involves the disturbance of more than 1 tonne of soil),
(c) minor work, being work that costs less than $20,000 (other than drainage work).
(6) Despite subclause (2), development consent is not required under this clause to carry out any works if—
(a) the works involve the disturbance of less than 1 tonne of soil, such as occurs in carrying out agriculture, the construction or maintenance of drains, extractive industries, dredging, the construction of artificial water bodies (including canals, dams and detention basins), foundations or flood mitigation works, or
(b) the works are not likely to lower the watertable.
Part 7
Urban release areas
Part 7 Urban release areas
Part 7 Urban release areas
pt 7: Ins 2021 (783), Sch 1[1].
7
Development to which Part applies
7 Development to which Part applies
7.1 Development to which Part applies
This Part applies to development on land shown hatched and marked “Urban Release Area” on the Urban Release Area Map.
(1) This clause applies to land at 105 Shoalhaven Street, Kiama, being part of Lot 102, DP 775450, identified as “8” on the Additional Permitted Uses Map.
(2) Development for the purposes of a community facility is permitted with development consent.
9
Use of certain land at Eddy Street, Kiama
9 Use of certain land at Eddy Street, Kiama
9 Use of certain land at Eddy Street, Kiama
(1) This clause applies to Lot 1, DP 883525, 20 Eddy Street, Kiama, identified as “9” on the Additional Permitted Uses Map.
(2) Development for the purposes of community facilities is permitted without development consent.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
sch 2: Am 2019 (655), Sch 1[3].
sch.2-sec
Markets
sch.2-sec Markets
Markets
(1) Must take place on the following—
(a) public land owned by, or under the control of, the Council,
(b) a public road for which the Council is the roads authority under the Roads Act 1993.
(2) Must have access and egress for pedestrians and emergency vehicles.
(3) Must not include the erection of a permanent structure.
sch.2-sec-oc.2
Recreation areas
sch.2-sec-oc.2 Recreation areas
Recreation areas
(1) Must only be used for the purposes of swimming or surf schools, personal or group fitness training, concerts, festivals, functions or exhibitions.
(2) Must take place on the following—
(a) public land owned by, or under the control of, the Council,
(b) a public road for which the Council is the roads authority under the Roads Act 1993.
(3) Must have access and egress for pedestrians and emergency vehicles.
(4) Must not include the erection of a permanent structure on the land or road.
(5) Must not include camping on the land or road.
(6) Must not permanently occupy the land or road.
(7) Must not involve any permanent physical change to the land or road.
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Kiama Local Environmental Plan 2011.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Kiama in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to provide planning controls for the Kiama area to achieve ecologically sustainable development principles while recognising the economic, environmental and social impacts and risks associated with climate change,
(b) to maintain, protect and improve the natural environment including native vegetation, endangered ecological communities, natural habitat corridors, riparian land, groundwater dependent ecosystems and wetlands for their biodiversity values,
(c) to conserve and protect the area’s water resources, groundwater, waterways, and water quality for their biodiversity, ecological, health and recreational values,
(d) to protect agricultural land and restrict its fragmentation for purposes other than primary production,
(e) to protect and enhance the coastal and rural character of Kiama’s rural towns, neighbourhoods and villages, and the characteristic scenic landscapes that contribute to its liveability and identity,
(f) to consolidate future population growth and medium density housing primarily in locations near shops and public transport,
(g) to cater for housing choice including affordable rental housing, affordable housing for first home buyers and housing for the aged and disabled and independent seniors,
Imposes principal development standards, notably minimum subdivision lot sizes (cl 4.1 and numerous exceptions and qualifications at cll 4.1A-4.1E), maximum heights (cl 4.3), and maximum floor space ratios (cl 4.4) as shown on the respective maps.
Provides targeted local provisions: heritage controls (cl 5.10 and Schedule 5), acid sulfate soils (cl 6.1), riparian land and watercourses (cl 6.5), terrestrial biodiversity (cl 6.4), foreshore access and building line controls (cll 6.6-6.7), controls for aquaculture (cl 5.19 and Schedule 6), flood‑planning matters (cl 5.21), and more.
Establishes special rules for urban release areas, including requirements for development control plans and public utility infrastructure to be available (Part 7, cll 7.1-7.4), and states that Part 7 prevails where inconsistent with the remainder of the Plan (cl 7.6).
Contains an exceptions mechanism allowing development consent to be granted even where a development standard would otherwise be contravened, provided the applicant demonstrates that compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds (cl 4.6). This clause is subject to specific prohibitions (cl 4.6(8)).
The Plan also spells out practical and procedural mechanics that affect compliance and transaction costs: maps are approved and may be amended (cl 1.7), the Plan is subject to State environmental planning policies that prevail where applicable (cl 1.9), and some private law instruments (agreements, covenants) may be suspended to the extent necessary to enable development under the Plan, with specified exceptions (cl 1.9A). The Plan requires certain technical documents as preconditions to consent in particular circumstances (for example an acid sulfate soils management plan under cl 6.1(3), heritage management documents under cl 5.10(5), and compliance with site-specific operational requirements for aquaculture under cl 5.19 and Schedule 6).
Officially, the Plan’s stated aims (cl 1.2) include ecologically sustainable development, biodiversity protection, consolidation of population growth near shops and public transport, housing choice and affordable housing, protection of agricultural land, and conservation of cultural heritage. Those purpose claims are stated within the Plan; the Plan delivers those aims by imposing the zoning, mapping and consent‑triggering mechanisms described above.
Main concepts
The Plan is built around a small set of repeatable legal and planning concepts that structure the local regulatory regime.
Zoning and maps: The zoning system is the primary allocative device. The Land Zoning Map places each parcel in a named zone (RU1, RU2, R2, R3, R5, E1, E3, E4, SP2, RE1, RE2, C1, C2, C3, W4 etc) and the Land Use Table allocates permissible uses and prohibitions to those zones (cll 2.1-2.3; Land Use Table). Other maps provide quantitative standards (Lot Size Map, Height of Buildings Map, Floor Space Ratio Map) and environmental overlays (Terrestrial Biodiversity Map, Riparian Land and Watercourses Map, Acid Sulfate Soils Map, Heritage Map, Active Street Frontages Map, Urban Release Area Map) (cll 1.7, 2.2; multiple clauses).
Development consent vs exempt/complying development: The Plan segregates development into (a) development requiring consent (default for many activities, e.g. subdivisions, demolition) (cll 2.6-2.7), (b) exempt development that may proceed without consent where it meets Schedule 2 and Plan conditions (cl 3.1; Sch 2), and (c) complying development that may proceed via a complying development certificate if it meets the standards in Schedule 3 and State SEPPs (cl 3.2; Sch 3). Environmentally sensitive areas are excluded from exempt or complying development (cl 3.3).
Site-specific standards: Minimum lot sizes (cl 4.1 and numerous exceptions, cll 4.1A-4.2C, 4.1E-4.1F), height limits (cl 4.3), floor space ratios and rules for calculating site area and gross floor area (cl 4.4-4.5) are applied by reference to maps or tables. The Plan contains numerous specific quantitative maxima and minima for particular uses (for example, bed and breakfast bedroom caps, kiosk area caps, neighbourhood shop floor area caps, secondary dwelling floor area maximums) (cl 5.4).
Local overlay controls for environmental protection: The Plan designates “Biodiversity land”, riparian categories and acid sulfate soils classes and requires the consent authority to consider and be satisfied about impacts on ecological values, water quality, bank stability and habitat connectivity before granting consent (cll 6.4, 6.5, 6.1).
Heritage controls and management planning: Heritage items and conservation areas are listed in Schedule 5. Demolition, exterior alteration or works affecting heritage items, Aboriginal objects/places or archaeological sites require consent, and the consent authority may require heritage management documents and conservation management plans (cl 5.10; Sch 5).
Exceptions mechanism and discretion: The Plan contains a development standard exceptions clause (cl 4.6) that permits contravention of development standards where applicants satisfy the consent authority that compliance is unreasonable or unnecessary and sufficient environmental planning grounds justify the contravention, subject to specific prohibitions and record‑keeping requirements. This explicitly allocates discretion to the consent authority and creates an administrative pathway for bespoke outcomes.
Parcel‑specific permitted uses: Schedule 1 identifies additional permitted uses for specifically identified parcels of land, authorising particular developments on those parcels (Sch 1). Those are concentrated, site‑level permissions that depart from the generic Land Use Table.
Urban release area regime: Part 7 creates a specific, staged control regime for land identified as “Urban Release Area”, requiring development control plans with staging, transport hierarchies, landscape strategies and utility availability and giving Part 7 precedence where inconsistent (cll 7.1-7.6).
These concepts define where private actors may (or must) apply to the consent authority, what technical inputs will be required for consent, and the degree of discretion the council exercises.
Who it affects
The Plan affects a broad set of actors by creating rights, obligations and administrative pathways tied to land, structures and activities in Kiama.
Landowners and prospective purchasers: Zoning and mapped controls determine what uses landholders may lawfully pursue, whether they must obtain development consent, and the quantitative limits that apply to development (cls 2.2-2.3, 4.1, 4.3-4.5). Owners of parcels listed in Schedule 1 have bespoke additional permitted uses (Sch 1), which are direct, concentrated benefits for specific landowners.
Developers, builders and design professionals: Those proposing development must navigate the Land Use Table, maps, exempt/compliant pathways (Sch 2-3) and site‑specific technical requirements (acid sulfate soils management plan, heritage reports, aquaculture operational requirements, flood planning evidence, essential services availability). The Plan sets the documentary and technical inputs required to secure consent (for example cl 6.1(3), cl 5.10(5)-(6), cl 5.19(2)).
Council (the consent authority): The Council is the designated consent authority (cl 1.6) and is responsible for assessing applications against zone objectives (cl 2.3(2)), the Plan’s provisions and relevant State policies (cl 1.9). The Council decides whether applicants have satisfied statutory tests, whether conditions or covenants should be imposed (cl 4.5(9)-(10) contemplates covenants) and whether to require management plans or conservation plans (cl 5.10(5)-(6)).
Neighbouring landholders and community groups: The Plan requires the consent authority to consider impacts on adjoining properties, amenity, natural hazards and heritage values in many clauses (for example cl 2.4 on unzoned land, cl 2.8(3) for temporary uses, cl 6.5 on riparian land, cl 5.21 on flood planning). These provisions function as procedural protections for neighbours and communities.
Public authorities and utility providers: Part 5 (cl 5.1) identifies authorities with relevant acquisition roles for reserved land and Part 7 requires public utility infrastructure to be available for urban release areas (cl 7.3). The Plan also preserves the Crown’s existing uses under SEPP Transport & Infrastructure (cl 5.12).
Aboriginal communities: The Plan requires consultation and consideration before granting consent where Aboriginal objects or places of heritage significance may be affected (cl 5.10(8)).
Industry sectors with sectoral rules: Aquaculture operators are affected by cl 5.19 and Schedule 6 operational and siting requirements; intensive livestock agriculture uses have threshold rules and locational restrictions at cl 5.18; licensed premises and live music performers are affected by the protections at cl 5.20 limiting application of certain discretionary noise/music grounds.
Who pays and who decides, mechanically: applicants pay for the studies, applications, management plans and any required works; the Council decides on consent and conditions; State agencies may dictate infrastructure or acquisition roles set out in cl 5.1 and cl 5.12. Concentrated benefits accrue where Schedule 1 creates special permitted uses for particular land parcels; diffuse costs fall on neighbouring residents, utility providers and future owners who must comply with mapped constraints.
Key duties and rights
The Plan defines a mix of duties on applicants and rights (or permissions) tied to zones and schedules.
Rights and permissions:
The Land Use Table grants rights to carry out particular developments with and without development consent in each zone (cl 2.3; Land Use Table). Where a use is “permitted without consent” it may proceed subject to the Plan’s other requirements (for instance exempt development conditions, cl 3.1).
Schedule 1 grants additional permitted uses for specified parcels (Sch 1), effectively enlarging rights for those landowners.
Exempt development (Sch 2) and complying development (Sch 3 and State policy cross-references) provide statutory pathways to proceed without the full development consent process where the specified standards and conditions are met (cll 3.1-3.2).
Duties and prerequisites:
Development consent is required for subdivision, demolition and many other activities (cll 2.6-2.7). The consent authority must have regard to zone objectives when determining an application (cl 2.3(2)).
Applicants seeking consent that would contravene a development standard must demonstrate to the consent authority that compliance is unreasonable or unnecessary and that there are sufficient environmental planning grounds to justify the contravention; the consent authority must keep a record of the assessment (cl 4.6(2)-(4)).
Where certain on-site risks or sensitivities are present, applicants must prepare and provide technical documents: an acid sulfate soils management plan is required before consent for works on mapped acid sulfate soils (cl 6.1(3)); the consent authority may require heritage management documents or conservation management plans for developments affecting heritage items or conservation areas (cl 5.10(5)-(6)); aquaculture applications must satisfy site location and operational requirements in Schedule 6 (cl 5.19(2)).
The Plan imposes quantitative caps (for example bed and breakfast maximum of five bedrooms, kiosk maximum of 10 square metres, neighbourhood shop cap 100 m2, neighbourhood supermarket 1,000 m2, secondary dwelling floor area limits) and distance rules (secondary dwellings on rural land not more than 60 m from principal dwelling) (cl 5.4; cl 5.5).
The consent authority must consider specific matters when deciding on classes of development, such as impacts on flood behaviour and evacuation capacity for land in flood planning areas (cl 5.21), and specific considerations for intensive livestock agriculture (cl 5.18).
The Plan mandates that essential services must be available or that arrangements exist to make them available before consent is given (cl 6.12).
The Plan allows suspension of covenants, agreements and the like to the extent necessary to enable development under the Plan, with listed exceptions (cl 1.9A). This alters the private-law context in which applications are assessed.
Decision-making duties:
The Council is required to consider specified matters before granting consent in many contexts (e.g., cl 6.4 terrestrial biodiversity matters at cl 6.4(3), cl 6.5 riparian matters at cl 6.5(3), cl 5.19 aquaculture matters at cl 5.19(2)-(3)). These clauses create mandatory matters for consideration rather than prescriptive outcomes.
In short, the Plan translates policy aims into permissions and preconditions, balancing prescriptive limits (maps, caps, minimum lot sizes) with an exceptions/discretion pathway (cl 4.6). Applicants have the right to pursue exempt or complying pathways where they meet schedule conditions; otherwise they bear the duty to prepare technical evidence and satisfy the Council that impacts are avoided, minimised or mitigated.
Penalties and enforcement
This Plan itself primarily prescribes permitted and prohibited development, standards, and administrative requirements; it does not set out standalone penalty provisions within its text. Enforcement and penalties for non-compliance are therefore administered through the Environmental Planning and Assessment Act 1979 and associated regulations and enforcement mechanisms under that Act, to which this Plan is expressly subject (see cl 1.6: “The consent authority for the purposes of this Plan is (subject to the Act) the Council,” and cl 1.9: “This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.”).
From the Plan’s operational text one can identify the enforcement mechanisms that will be deployed under applicable State law:
Prohibitions and consent requirements create offences or enforcement triggers under the Act where development is carried out without required consent or contrary to consent conditions; the Plan repeatedly identifies activities that “may be carried out only with development consent” (for example cll 2.6-2.7), and conversely lists exempt and complying development where consent is not required (cll 3.1-3.2; Schs 2-3). The Plan does not itself list fines or sanctions but establishes the compliance conditions that attract enforcement under the Act and regulations.
The Plan contemplates the use of conditions, covenants and possibly registered instruments to manage spatial and floor area consequences of consents (cl 4.5(9)-(10) authorises the imposition of a covenant preventing “double dipping” in floor area). Enforcement of those registered instruments would follow property law and the Act’s mechanisms where they are imposed as consent conditions.
Statutory prerequisites (such as requirement for an acid sulfate soils management plan (cl 6.1(3)), heritage management documentation (cl 5.10(5)-(6)), and essential services availability (cl 6.12)) function as compliance gateways; failure to provide required documentation would preclude lawful consent and may expose the applicant to enforcement action if development proceeds without satisfying those preconditions.
Implementation risk and administrative discretion are relevant to enforcement: many clauses require the consent authority to be “satisfied” of particular matters (for example cl 5.19(2), cl 6.4(4), cl 6.5(4), cl 5.21(2)). The sole enforcement text in the Plan is therefore to set the triggers and matters for the Council to evaluate; the imposition and later enforcement of conditions, and the prosecution of any unauthorised works, arises under the Act and the Council’s enforcement powers derived from it. Practitioners should therefore look to the Environmental Planning and Assessment Act, the Environmental Planning and Assessment Regulation and Council enforcement policies for the precise penalties and procedural enforcement pathways.
How it interacts with other laws
The Plan is designed to operate within and subordinate to the State planning framework and other specific Acts, and it expressly cross-references and defers to other instruments where relevant.
State environmental planning policies (SEPPs): Clause 1.9 makes the Plan subject to any SEPP that prevails over it under s 3.28 of the Act. The Land Use Table and other provisions repeatedly cross‑reference relevant SEPPs (for example, State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 for exempt/complying development, State Environmental Planning Policy (Housing) 2021 for residential apartment design, and several sectoral SEPPs listed in the Land Use Table notes). Where State policy conflicts with local controls, the relevant SEPP prevails as provided in the Act (cl 1.9).
Environmental Planning and Assessment Act 1979 (the Act): The Plan is made under the Act and is subject to general operation of the Act (cl 1.6). The Act supplies core processes (development application, approval conditions, appeals and merits review, offences and penalties) that the Plan triggers and refines via its provisions. The Plan’s savings provision for pre-existing development applications references Division 3.5 of the Act and makes transitional provision for DAs lodged before the Plan’s commencement (cl 1.8A).
Other State Acts and regulatory regimes: The Plan cross-references multiple substantive Acts where their processes or definitions are relevant. Examples include the Local Government Act 1993 (classification of public land, cl 5.2), National Parks and Wildlife Act 1974 (heritage items and national park land, cl 5.10 and cl 5.2), Crown Land Management Act 2016 (cl 1.9A(2)(b)), Biodiversity Conservation Act 2016 (cl 3.3(2)(j)), Fisheries Management Act 1994 and Fisheries regulations as they relate to aquaculture (cl 5.19 and Schedule 6), Rural Fires Act 1997 (cl 5.11), and Land Acquisition (Just Terms Compensation) Act 1991 (cl 5.1).
Building Code of Australia and BASIX: Exempt development requires compliance with relevant deemed‑to‑satisfy provisions of the Building Code of Australia (cl 3.1(3)(a)). Clause 4.6(8)(b) prevents the exceptions mechanism being used to contravene BASIX commitments.
Local Government Act 1993: The Plan enables classification/reclassification of public land pursuant to the Local Government Act (cl 5.2), and the Plan’s classification changes may discharge trusts on reserves subject to Governor approval where required (cl 5.2(5) note).
Private law (covenants and agreements): Clause 1.9A provides that to the extent necessary to enable development under the Plan, agreements, covenants or similar instruments that restrict carrying out of development do not apply, except for several enumerated instruments and a covenant imposed or required by the Council. Clause 1.9A(3) preserves rights or interests of public authorities under registered instruments. This creates a statutory override of some private law restraints for specified planning ends, but it expressly preserves certain statutory agreements and council covenants.
Maps and technical standards: The Plan depends on maps and the NSW Planning Portal technical standards (cl 1.7 note). Changes to maps are facilitated by environmental planning instruments as noted in cl 1.7(1)(b), and maps must be kept available for public access (cl 1.7(3)).
In effect, the Plan is an instrument within a layered web of statutory rules. It sets local permissions and constraints but defers to higher‑order SEPPs, the Act for enforcement and procedure, and other specialist statutes for specific matters (heritage, fisheries, Crown land). Where the Plan prescribes technical prerequisites, those requisites must be satisfied in the context of the other Acts, and where the Plan conflicts with a State policy the State policy will prevail as the Act provides.
Amendment history
The Plan text contains multiple internal amendment annotations and notes. The instrument has been amended repeatedly since its making; the Plan’s clauses carry amendment references that allow reconstruction of the recent amendment record as recorded in the Plan itself. Representative amendments recorded in the text include:
2015 amendments referenced in the Land Use Table (Land Use tbl: Am 2015 (576), cl 4(1)(2)).
2016 amendment: Land Use Table annotated Am 2016 (168), Sch 1[5] (Land Use table).
2017 amendments: Several clauses and schedules were amended or inserted in 2017, for example Schedule 1 was amended in 2017 (Sch 1: Am 2017 (171), Sch 1[1][2]; 2017 (743), Sch 1[1]; cl 6.11 was amended by 2017 (493), Sch 1.2[1]).
2018 amendments: Clause 4.1A, 4.1B, 4.2C and cl 5.13 were introduced or altered by instruments recorded as 2018 (196), 2018 (406) and 2018 (770) respectively; cl 4.1A inserted 2018 (196), Sch 1[2]; cl 5.13 substituted 2018 (770), Sch 1[4]; cl 4.2C inserted 2018 (196), Sch 1[5].
2019 amendments: The Plan records amendments in 2019 (for example cl 1.8A Am 2019 (621), Sch 5[1]; Schedule 2 amended 2019 (655), Sch 1[3]).
2020 amendments: Clauses such as 4.1AA (minimum subdivision lot size for community title schemes) were inserted with references to 2020 (160), Sch 1[3]; cl 1.8A notes amendments in 2020 (160), Sch 1[1].
2021 insertions: Part 7 (Urban release areas) and related clauses were inserted in 2021 (cl 7.1 Ins 2021 (783), Sch 1[1]; pt 7 Ins 2021 (783), Sch 1[1]). Clause 5.5 was substituted in 2021 (cl 5.5 Subst 2021 (714), Sch 11.24).
2022 amendments: Several amendments in 2022 are recorded throughout the Plan, including insertion/amendment of cl 2.1 (Am 2022 (831), Sch 1.15[1][2]), cl 4.1AA (Am 2022 (831), Sch 1.15[5]) and others (for example cl 4.6 Am 2022 (831), Sch 1.15[9]; cl 6.8 Am 2022 (831), Sch 1.15[10][11]).
2023 and later: The Plan records amendments in 2023 to clauses such as 6.9 (Am 2023 (664), Sch 3.7[1]-[3]), Schedule 5 updates (Am 2023 (688), Sch 1[1]-[3]) and insertion of new local controls and Schedule changes. A 2025 insertion is recorded for cl 7.5 (Ins 2025 (346), Sch 1).
These notations indicate an active amendment history; each clause that was altered carries the short-form citation to the amending regulation or instrument. Where practitioners require the precise legislative provenance for a particular clause, the Plan’s own annotations identify the amending instrument and schedule number. The Plan’s maps are also capable of amendment by environmental planning instruments and must be kept and published as the Minister approves (cl 1.7).
Amendments frequently update zone definitions, add or refine local provisions (for example urban release area rules, biodiversity controls, aquaculture provisions), and insert exceptions or new clauses to reflect State policy changes. The Plan therefore evolves by statutory amendment; practitioners should consult the Plan’s clause annotations and the NSW legislation portal to trace the specific amending instruments if a full legislative chronology is required.
Litigation history
The text of the Plan does not cite or summarise judicial decisions that interpret its provisions. No cases are named in the Plan itself. Nevertheless, the Plan contains multiple provisions that are plausible sources of litigation or merits review under the Act’s administrative review and judicial review processes. Based on the Plan’s text, these are predictable areas where disputes commonly arise and where proceedings might be commenced:
Map interpretation and overlay boundaries: The Plan is heavily map‑driven (cl 1.7 and numerous clauses referring to the Lot Size Map, Floor Space Ratio Map, Height of Buildings Map, Terrestrial Biodiversity Map, Riparian Land and Watercourses Map, Acid Sulfate Soils Map, Heritage Map, Active Street Frontages Map, Urban Release Area Map). Disputes can arise over which map applies to a parcel, the correct geographic extent of an overlay, and whether a development site falls inside an exclusion zone (see cll 1.7, 3.3, 6.1, 6.4, 6.5).
Application of development standards and exceptions: Clause 4.6 creates a statutory exceptions pathway for contravening development standards. Litigation or review often focuses on whether the applicant has satisfied the “unreasonable or unnecessary” test and whether there are “sufficient environmental planning grounds” to justify the contravention, and whether the consent authority properly recorded its reasons (cl 4.6(2)-(4)). The Plan also excludes particular standards from the exceptions procedure (cl 4.6(8)), which can be the subject of legal argument.
Heritage and Aboriginal cultural heritage matters: The Plan requires the consent authority to consider heritage significance and, in some cases, to notify the Heritage Council or local Aboriginal communities (cl 5.10(7)-(9)). Disputes may turn on adequacy of heritage assessments, the scope of “heritage significance”, and the sufficiency of consultation.
Environmental overlay triggers and impact assessments: Clauses 6.4 (terrestrial biodiversity) and 6.5 (riparian land and watercourses) require the consent authority to be satisfied that development will avoid, minimise or mitigate impacts. Litigation may question whether the consent authority properly assessed impacts, applied the correct standard of evidence, or took required matters into account (cl 6.4(3)-(4); cl 6.5(3)-(4)).
Flood planning requirements: Clause 5.21 imposes a multi-criterion test for development in flood planning areas (cl 5.21(2)-(3)). Disagreements over modelling, climate change projections and the adequacy of evacuation routes can produce technical and legal challenges.
Interpretation of special parcel permissions: Schedule 1 confers additional permitted uses for identified parcels. Disputes may arise about the scope and temporal limits of those permissions (for example clauses that state a consent “must not be granted after 5 years from the commencement of this Plan” for certain Schedule 1 items).
Suspension of covenants: Clause 1.9A suspends covenants and agreements to the extent necessary to enable development under the Plan, with specified exceptions. This statutory override can provoke private-law litigation about property rights, the extent of statutory displacement, and the definition of “to the extent necessary”.
Because the Plan itself does not catalogue decisions, practitioners must look to case law under the Act and to tribunal and court records for precedents interpreting the Plan’s texts. The Plan’s provisions create many administratively discretionary decisions by the consent authority, which are subject to merits review by the Land and Environment Court and to judicial review where legal error is alleged. Any litigation history relevant to a specific provision would therefore be found in reported and unreported decisions under the Act rather than within the Plan document itself.
Gotchas
This Plan contains a series of provisions that commonly produce unintended consequences for applicants and advisers if not checked carefully. These are practical “watchouts” grounded in the Plan’s text.
Maps are decisive and can be updated: Many operative rules are map‑referenced (Lot Size Map; Height of Buildings Map; Floor Space Ratio Map; Terrestrial Biodiversity Map; Riparian Land and Watercourses Map; Acid Sulfate Soils Map; Heritage Map; Active Street Frontages Map; Urban Release Area Map). The Plan treats maps as authoritative and capable of amendment by environmental planning instruments (cl 1.7). Always check the current maps on the NSW Planning Portal for parcel‑level controls before assuming a default standard.
Exempt development is limited by environment overlays: Schedule 2 sets out exempt development but cl 3.3 excludes environmentally sensitive areas from exempt or complying development (cl 3.3(1)-(2)). A work that looks like exempt development may require consent if the parcel sits within mapped environmentally sensitive areas (coastal waters, Ramsar wetlands, mapped biodiversity land, foreshore area, Acid Sulfate Soils classes 1 or 2, etc).
The Plan can override private covenants, but not always: Clause 1.9A suspends agreements, covenants and similar instruments “to the extent necessary” to enable development under the Plan, but it does not apply to covenants imposed by the Council or to specific statutory instruments (cl 1.9A(2)). It also preserves public authority rights under registered instruments (cl 1.9A(3)). Do not assume statutory suspension will remove all private-law obstacles.
“Permitted without consent” is still subject to other approvals and codes: Uses identified as “permitted without consent” under the Land Use Table may still be subject to Part 5 approvals under the Act, the Building Code of Australia, BASIX commitments, and other Acts and licences (see cl 2.3(1)(b) note and cl 3.1(3)(a) and notes). Exempt development is not exempt from approvals under other Acts (Sch 2 Note 2).
Exceptions to standards are discretionary and recorded: Clause 4.6 allows contravention of development standards only if the consent authority is satisfied specific tests are met and the authority must keep a record of the assessment (cl 4.6(3)-(4)). For standards expressly excluded from cl 4.6(8) (for example BASIX commitments, clause 5.4, clause 5.5), the exceptions route is unavailable. Applicants should not rely on cl 4.6 as an easy workaround.
“Additional permitted uses” are parcel‑specific and sometimes time‑limited: Schedule 1 confers additional uses for specific lots; some of these permissions carry temporal limits (for example a consent “must not be granted after 5 years from the commencement of this Plan” for certain items). Verify the Schedule 1 text for any temporal or spatial constraint (Sch 1).
Heritage and Aboriginal heritage processes can extend timing and cost: Works affecting heritage items, conservation areas or Aboriginal places may require heritage management documents or conservation management plans, and the consent authority is required to notify the Heritage Council or local Aboriginal communities in specific circumstances (cl 5.10(5)-(9)). These additional documentary requirements are decision gates and can lead to referral obligations and consultation time.
Environmental trigger distances and categories are prescriptive: Riparian buffer distances (40 m for Category 1, 20 m for Category 2, 10 m for Category 3) and acid sulfate soil class rules trigger consent and management plan obligations (cll 6.5(2), 6.1(2)). If a development intrudes into these distances, the Plan requires the consent authority to refuse consent unless it is satisfied that impacts are avoided, minimised or mitigated (cll 6.4(4), 6.5(4)).
Floor space “double dipping” risk and covenants: Clause 4.5(9) explicitly contemplates conditions requiring a covenant to prevent floor area being created on one lot solely because the site included another lot, and cl 4.5(10) adjusts floor space calculations accordingly. This may reduce speculative strategies that rely on aggregate site calculations.
Urban release area special regime: For land hatched as Urban Release Area, development consent cannot generally be granted until a development control plan providing a staging plan and other matters is prepared (cl 7.4(2)-(3)). Part 7 prevails over inconsistent provisions (cl 7.6). If a parcel is located in an urban release area, there are additional gating requirements and infrastructure availability preconditions (cl 7.3).
Exempt/compliant lists are not exhaustive and State policy may displace local permissions: Some exempt and complying development types are defined in State SEPPs with State‑wide effect. Clause 1.9 confirms SEPPs prevail where they do. Check both local and State lists to confirm the correct pathway.
These “gotchas” are concrete operational constraints and procedural traps that create costs and timing uncertainty unless addressed up front.
How to comply
A practical compliance roadmap based on the Plan’s provisions and the duties it imposes.
Confirm the zoning and applicable maps
Start with the Land Zoning Map to identify the zone (cl 2.2), then check associated overlay maps (Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Terrestrial Biodiversity Map, Riparian Land and Watercourses Map, Acid Sulfate Soils Map, Heritage Map, Active Street Frontages Map and Urban Release Area Map) to determine parcel‑specific rules (cl 1.7). The Plan treats maps as authoritative and subject to amendment; always work from the latest published maps on the NSW Planning Portal.
Check the Land Use Table and Schedule 1
Determine whether the proposed use is permitted with consent, permitted without consent, or prohibited in the zone (cl 2.3; Land Use Table). If the land is listed in Schedule 1, identify whether additional permitted uses apply and whether any temporal limits attach (Sch 1).
Determine whether the proposal is exempt or complying development
Compare the proposal against Schedule 2 for exempt development (cl 3.1; Sch 2). Ensure the site is not in an environmentally sensitive area excluded from exempt or complying development (cl 3.3). If complying development is plausible, check Schedule 3 and the relevant State SEPP for applicable development standards and certificate conditions (cl 3.2; Sch 3). Remember exempt/compliant development still requires compliance with other Acts and the Building Code of Australia (cl 3.1(3)(a); Sch 2 Note 2).
Identify technical preconditions
If the site is on mapped acid sulfate soils and the proposed works are within the triggers at cl 6.1(2), prepare an acid sulfate soils management plan in accordance with the Acid Sulfate Soils Manual and provide it with the application (cl 6.1(3)). If development affects heritage items or conservation areas, be prepared to produce a heritage management document or conservation management plan (cl 5.10(5)-(6)). For aquaculture and intensive livestock proposals, follow cl 5.19 and cl 5.18 and the Schedule 6 requirements.
Check flood, riparian, biodiversity and foreshore controls
If the land is within a mapped flood planning area or riparian buffer, prepare flood impact and evacuation analysis and demonstrate that the development is compatible with flood function and will not worsen flood impacts (cl 5.21). For riparian land, provide evidence on water quality, bank stability and habitat impacts and show avoidance, minimisation or mitigation measures (cl 6.5).
Ensure essential services and infrastructure availability
The consent authority must be satisfied that essential services (water supply, electricity, sewage disposal, stormwater drainage and road access) are available or that arrangements exist to make them available (cl 6.12). For land in an urban release area, confirm public utility infrastructure availability and that a DCP with staging has been prepared if required (cll 7.3-7.4).
Understand the covenant suspension and private law context
If private covenants or agreements obstruct the development, consider whether clause 1.9A may operate to suspend them to the extent necessary, but check the exceptions list (cl 1.9A(2)). Do not assume the clause removes all private-law obstacles; consult title instruments and seek legal advice where conflicting registered instruments exist.
If seeking to contravene a development standard, document the grounds under cl 4.6
Where a proposed development does not meet a mapped standard, prepare a written case demonstrating why compliance is unreasonable or unnecessary and the environmental planning grounds that justify the contravention; the consent authority must record its assessment (cl 4.6(2)-(4)). Note cl 4.6(8) excludes some standards from this mechanism.
Prepare the development application with the required supporting material
Include site plans, elevations, heritage reports (if applicable), acid sulfate soils plans (if applicable), flood and evacuation reports (if applicable), biodiversity assessments for mapped “Biodiversity land” (cl 6.4), riparian impact assessments (cl 6.5), details on essential services (cl 6.12), BASIX where relevant and any supporting evidence for exceptions sought under cl 4.6.
Engage early with the consent authority and statutory consultees
Use pre-DA enquiries with the Council to verify mapping, confirm technical requirements, check whether the site is in an urban release area or heritage conservation area and whether a DCP or heritage management plan will be required (cll 5.10, 7.4). For matters triggering referral to the Heritage Council or Aboriginal communities, build the consultation timetable into the project plan (cl 5.10(7)-(9)).
Where relevant, check SEPPs and other State instruments
Confirm whether a State environmental planning policy applies and prevails over the Plan (cl 1.9). For some matters (e.g., housing design under SEPP Housing 2021, or complying development under the Exempt and Complying Development Codes SEPP), the State instrument supplies content and conditions that interact with the local Plan.
Anticipate registered covenant or condition outcomes
Be aware the Council may require an enforceable covenant to prevent floor space being created on a lot that is intended to be restricted under a consent (cl 4.5(9)-(10)). Build this into negotiations and title arrangements.
Time and cost considerations
Expect additional time and cost where heritage, biodiversity, riparian, acid sulfate soils, flood planning, or urban release area controls apply. These create documentary and technical obligations that must be satisfied before consent is granted (cll 6.1, 6.4, 6.5, 5.21, 7.4).
In summary, compliance requires a parcel‑specific check of maps and zone rules, early scoping of technical requirements (heritage, flood, biodiversity, acid sulfate soils), confirmation of services/infrastructure, and an understanding of the exceptions mechanism and its limits. Practitioners should use the Plan’s clause cross‑references as a checklist for required supporting material and for matters the consent authority must consider in its decision.
(1A) Despite subclause (1), this Plan does not apply to the land identified as “Deferred matter” on the Land Application Map.
1 Definitions
1 Definitions
1.4 Definitions
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
Note.
However, the following local environmental plans continue to apply to the land identified as “Deferred matter” under clause 1.3(1A)—
Kiama Local Environmental Plan 1996
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
(1) If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
(2) If a development application has been made before the commencement of Kiama Local Environmental Plan 2011 (Amendment No 16) in relation to land to which that Plan applies and the application has not been finally determined before that commencement, the application must be determined as if that Plan had not commenced.
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU2 Rural Landscape
Residential Zones
R2 Low Density Residential
R3 Medium Density Residential
R5 Large Lot Residential
Employment Zones
E1 Local Centre
E3 Productivity Support
E4 General Industrial
Special Purpose Zones
SP2 Infrastructure
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
C2 Environmental Conservation
C3 Environmental Management
Waterway Zones
W4 Working Waterfront
cl 2.1: Am 2022 (831), Sch 1.15[1] [2].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects
This is an opening excerpt, not the complete document.