This Plan zones land across Jerilderie, sets what uses are permitted or prohibited, requires Council consent for most building, subdivision and demolition, and imposes local controls on heritage, biodiversity, watercourses and flood risk. It applies to the parcels shown on the Plan’s maps.
Landowners and developers bear approval and compliance costs; the Council is the primary consent authority (subject to State environmental policies). The Plan permits some low‑impact work without consent, provides limited exceptions to standards, and contains specific operational rules for aquaculture and other activities.
This instrument is the Jerilderie Local Environmental Plan 2012 (the Plan). Mechanically it (a) establishes the local zoning framework for the land identified on the Land Zoning Map and related maps (cl 2.2; cl 1.7), (b) repeals earlier local environmental plans and deemed instruments that applied to that land (cl 1.8), (c) sets out permitted, permitted-with-consent and prohibited development uses in a Land Use Table for each zone (cl 2.3 and the Land Use Table), and (d) prescribes local development controls and mandatory procedural requirements that must be applied by the local consent authority, the Council (cl 1.6). The Plan also identifies minimum lot sizes for subdivisions (cl 4.1), local constraints on demolition and earthworks (cls 2.7, 6.1), heritage protections and the triggers for heritage assessment and management plans (cl 5.10 and Schedule 5), controls for aquaculture and intensive livestock agriculture (cls 5.19, 5.18 and Schedule 6), flood‑risk planning requirements (cl 5.21), and specific short form rules for small business and visitor accommodation types (cl 5.4).
The Plan commences on publication on the NSW legislation website (cl 1.1AA) and contains savings for development applications lodged before commencement so that unfinished applications are determined under the prior regime (cl 1.8A). It expressly recognises the operation of State environmental planning policies that prevail where the State policy so provides (cl 1.9). The Plan also contains a provision that, to the extent necessary to enable development consistent with the Plan, private covenants, agreements or similar instruments that would otherwise restrict that development do not apply, subject to enumerated exceptions (cl 1.9A).
The Plan does not itself create new criminal penalties; it establishes a local regulatory regime within the Environmental Planning and Assessment framework. Consent requirements are pervasive: subdivision (cl 2.6), demolition (cl 2.7), many uses in the Land Use Table, and a range of protected features such as heritage items and archaeological sites (cl 5.10) require development consent. Exempt and complying development categories are defined (Part 3, cls 3.1-3.3 and Schedules 2-3) and the Plan specifies local conditions and limits for those pathways (for example, Schedules and cl 3.1(5)). The consent authority for development matters under the Plan is the Council, subject to the Act (cl 1.6), and the Plan cross‑references State instruments and Guidelines it requires consent authorities to have regard to, for example the Considering Flooding guideline referenced in cl 5.21.
Current sections
Direct links to the current provisions in Jerilderie Local Environmental Plan 2012.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Land Use tbl: Am 2016 (168), Sch 1 [2]; 2017 (493), Sch 1.1 [1]; 2019 (137), Sch 6 [1]; 2022 (831), Sch 1.14[2]; 2023 (458), Sch 2.44.
Zone RU1 Primary Production
Zone RU3 Forestry
Zone RU5 Village
Zone R5 Large Lot Residential
Zone E4 General Industrial
Zone SP2 Infrastructure
Zone RE1 Public Recreation
Zone RE2 Private Recreation
Zone C1 National Parks and Nature Reserves
Zone W1 Natural Waterways
3
Permitted with consent
3 Permitted with consent
3 Permitted with consent
Agritourism; Air transport facilities; Airstrips; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Boat launching ramps; Boat sheds; Building identification signs; Business identification signs; Camping grounds; Cellar door premises; Community facilities; Correctional centres; Depots; Dual occupancies; Dwelling houses; Eco-tourist facilities; Environmental facilities; Extractive industries; Farm buildings; Farm stay accommodation; Flood mitigation works; Forestry; Freight transport facilities; Helipads; Home businesses; Home industries; Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Intensive plant agriculture; Jetties; Landscaping material supplies; Open cut mining; Plant nurseries; Recreation areas; Recreation facilities (major); Recreation facilities (outdoor); Roadside stalls; Rural industries; Rural workers’ dwellings; Veterinary hospitals; Water recreation structures; Water supply systems
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Note.
When this Plan was made, no land in the zones listed in the Table to subclause (2) were included on the Land Reservation Acquisition Map as the land is owned by a State authority, a public company or a subsidiary of a public company.
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Earthworks
6 Earthworks
6.1 Earthworks
(1) The objectives of this clause are as follows—
(a) to ensure that earthworks for which development consent is required will not have a detrimental impact on environmental functions and processes, neighbouring uses, cultural or heritage items or features of the surrounding land,
(b) to allow earthworks of a minor nature without requiring separate development consent.
(2) Development consent is required for earthworks unless—
(a) the earthworks are exempt development under this Plan or another applicable environmental planning instrument, or
(b) the earthworks are ancillary to other development for which development consent has been given.
(3) Before granting development consent for earthworks, the consent authority must consider the following matters—
(a) the likely disruption of, or any detrimental effect on, existing drainage patterns and soil stability in the locality of the development,
(b) the effect of the development on the likely future use or redevelopment of the land,
(c) the quality of the fill or the soil to be excavated, or both,
(d) the effect of the development on the existing and likely amenity of adjoining properties,
(e) the source of any fill material and the destination of any excavated material,
(f) the likelihood of disturbing relics,
(g) the proximity to, and potential for adverse impacts on, any waterway, drinking water catchment or environmentally sensitive area,
(h) any appropriate measures proposed to avoid, minimise or mitigate the impacts of the development.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Jerilderie Local Environmental Plan 2012.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Jerilderie in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to maintain and enhance agricultural land through the proper management, development and conservation of natural and man-made resources,
(b) to encourage a range of housing, employment, recreation and community facilities to meet the needs of existing and future residents of Jerilderie,
(c) to promote the efficient and equitable provision of public services, infrastructure and amenities,
(d) to conserve the environmental heritage of the land to which this Plan applies.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Official aims listed by the Plan include promoting agricultural land management, encouraging housing, employment and community facilities, efficient provision of services and conserving environmental heritage (cl 1.2). Those aims appear as declared policy objectives; the Plan implements them by allocating zones, listing permitted/prohibited uses and imposing development controls and standards across zones (Part 2, Part 4, Part 6, Schedules).
Main concepts
The Plan organises local planning around a few central instruments and concepts.
Zoning and Land Use Table. The Land Zoning Map and Land Use Table are the core operational instruments that allocate land to zones (cl 2.2; cl 2.1) and specify objectives, permitted without consent uses, permitted with consent uses, and prohibited uses for each zone (cl 2.3 and the Land Use Table). Zone categories include primary production (RU1), forestry (RU3), village (RU5), large lot residential (R5), general industrial (E4), infrastructure (SP2), public and private recreation (RE1, RE2), national parks (C1), and natural waterways (W1) (cl 2.1).
Consent authority and procedural overlays. The Council is the consent authority for this Plan (cl 1.6). The Plan sets process‑relevant obligations on the consent authority to consider zone objectives (cl 2.3(2)), to require heritage assessments or management plans in heritage contexts (cl 5.10(5)-(6)), and to keep records where an exceptions-to-standards pathway is used (cl 4.6(4)).
Development pathways. The Plan distinguishes exempt development (Part 3, cl 3.1 and Schedule 2), complying development (Part 3, cl 3.2 and Schedule 3), and development requiring consent. Exempt and complying pathways are constrained by local environmentally sensitive area exclusions (cl 3.3), building code requirements (cl 3.1(3)-(4), cl 3.2(3)(b)), and listed local conditions.
Principal development standards. Minimum lot sizes for subdivision are explicit and linked to the Lot Size Map (cl 4.1). The Plan also contains provisions for flexibility via exceptions to development standards where planning grounds are advanced (cl 4.6), together with specific restrictions on subdividing small lots in rural and conservation zones (cl 4.6(6)). Additional rural controls limit the erection of new dwellings in RU1 unless certain historical or lot size conditions are met (cl 4.2B). Rural workers’ dwellings are subject to economic and locational tests (cl 4.2C).
Local environmental protections and development impact controls. The Plan contains a suite of environment‑focussed clauses: terrestrial biodiversity (cl 6.4), groundwater vulnerability (cl 6.5), riparian land (cl 6.6), wetlands (cl 6.7), stormwater management (cl 6.3), and earthworks management (cl 6.1). Flood planning obligations require consent authorities to consider compatibility with flood function and climate change impacts and to apply the Considering Flooding guideline (cl 5.21).
Sector‑specific rules. Aquaculture and intensive livestock agriculture have tailored rules: intensive livestock developments must meet environmental assessment requirements and small capacity thresholds can be permitted without consent subject to location constraints (cl 5.18). Pond‑based and tank‑based aquaculture are controlled by cl 5.19 and Schedule 6 (site exclusions, operational requirements, species selection, pond design, freshwater use and screening of outlets).
Heritage schedule. Schedule 5 lists heritage items and a heritage conservation area. The Plan requires consent for demolition, external alteration, excavation likely to disturb relics, building on land with heritage items and subdivision affecting heritage items (cl 5.10(2)-(3)). The Plan prescribes notification requirements for archaeological sites and Aboriginal places (cl 5.10(7)-(9)).
Interplay with State policies and other statutes. The Plan is subject to State environmental planning policies (cl 1.9) and repeatedly references other legislation as relevant to the operation of particular provisions (for example, Crown land instruments under the Crown Land Management Act 2016 in cl 1.9A; the Rural Fires Act 1997 in cl 5.11; and fisheries/aquaculture legislation in cl 5.19 and Schedule 6).
Mechanically, the Plan turns maps and schedules into enforceable local planning rules which the Council must apply when exercising its consent functions, while preserving the primacy of any State environmental policy that displaces local provisions (cl 1.9).
Who it affects
The Plan distributes rights, obligations and decision‑making across a set of identifiable actors.
Landowners and developers. The primary direct subjects are landowners and development proponents in the mapped area (cl 1.3; cl 2.2). They are affected by zoning limitations, lot size minima (cl 4.1), consent triggers (for subdivision cl 2.6, demolition cl 2.7, and numerous listed uses in the Land Use Table) and by overlay controls (heritage cl 5.10, biodiversity cl 6.4, riparian cl 6.6, flood cl 5.21). Owners of heritage items listed in Schedule 5 face an explicit consent regime for demolition, external alterations and subdivisions affecting those items (cl 5.10(2)). Owners of land in mapped biodiversity, groundwater vulnerable, watercourse or wetland areas (identified on Plan maps) face additional substantive tests before consent may be granted (cls 6.4-6.7).
Council (local consent authority). The Council is the statutory consent authority under the Plan and is responsible for interpreting zone objectives, applying local development controls and maintaining records of assessments where development standards are varied (cl 1.6; cl 2.3(2); cl 4.6(4)). The Council also has delegated administrative powers such as classifying public land under the Local Government Act as provided by cl 5.2 and is called on to notify and consult with other bodies in heritage and archaeological matters (cl 5.10(7)-(9)).
State agencies and other public authorities. The Plan identifies specific State acquisition authorities for certain reserved land categories under cl 5.1(2) (for example, Transport for NSW for classified roads, the corporation constituted under section 2.5 of the Act for regional open space, and the Minister administering the National Parks and Wildlife Act 1974 for national park land). The Plan also preserves the operation of State environmental planning policies and cross-references State planning guidelines (cl 1.9; cl 5.21).
Businesses in regulated sectors. Operators in aquaculture, intensive livestock agriculture, industrial sectors and tourism are directly regulated by the Plan’s sector rules. Aquaculture operators must comply with Schedule 6 site and operational requirements and the NSW Oyster Industry Strategy considerations (cl 5.19 and Schedule 6). Intensive livestock proposals must address odour, pollution risks and proximity tests; small‑scale feedlots and farms may be permitted without consent if they meet the capacity and locational thresholds (cl 5.18). Hospitality and entertainment businesses are affected by the Plan’s music protections: consenting authorities must not refuse licensed premises on certain grounds relating to music or dancing where noise can be managed (cl 5.20).
Aboriginal communities and heritage stakeholders. The Plan requires the consent authority to consider Aboriginal places and objects, to notify local Aboriginal communities about development proposals in Aboriginal places of heritage significance and to take responses into account within 28 days (cl 5.10(8)). The Plan lists Aboriginal archaeological sites in Schedule 5 Part 3 and therefore triggers heritage controls for archaeological disturbance (cl 5.10(2), (7)).
Neighbouring landholders and the broader community. The Plan imposes constraints designed to protect amenity, biodiversity and water quality (cls 6.3-6.7, cl 5.21). Neighbouring owners will be affected by permitted uses at zone boundaries and by the Plan’s 50 metre “development near zone boundaries” rule that allows uses permissible in the adjoining zone to be considered if compatible (cl 5.3).
Who pays and who decides: applicants pay the compliance and assessment costs (studies, heritage or biodiversity assessments, application fees) and the Council decides under the Plan’s rules (cl 1.6; see also the many consent‑triggering clauses). Certain public benefits and costs (for example, land reserved for public recreation and acquisition authorities in cl 5.1) are borne by State or local authorities.
Key duties and rights
The Plan creates specific duties for the consent authority and for applicants, and rights for landowners within its mapped area.
Duties on the consent authority (Council)
Apply zone objectives in determination of development applications (cl 2.3(2)). The Council must have regard to the objectives for development in a zone when deciding applications in that zone.
Keep records of assessments when a development standard is being contravened per the exceptions clause (cl 4.6(4)).
Require and consider heritage management documents or heritage conservation management plans where development would affect heritage items, conservation areas, archaeological sites or Aboriginal places; notify the Heritage Council or local Aboriginal communities as required and take account of any responses (cl 5.10(4)-(9)).
For aquaculture and intensive livestock approvals, the consent authority must be satisfied development meets site and operational requirements and take into account a prescribed list of environmental, odour, water quality and industry guideline matters (cl 5.19(2)-(5); cl 5.18(3)).
For flood‑affected land, the consent authority must be satisfied development is compatible with flood function and will not increase flood impacts, and must consider climate change‑related flood impacts and evacuation/safety measures (cl 5.21(2)-(3)).
Duties on applicants/proponents
Meet local development standards and state building code requirements for exempt or complying development (cls 3.1(2)-(4); cl 3.2(2)-(3)).
Where development proposes to contravene a development standard, provide the document required by regulation demonstrating the grounds required by cl 4.6(3)(a)-(b), so the consent authority can be satisfied; the consent authority must record its assessment (cl 4.6(3)-(4)).
For heritage‑relevant development, provide heritage impact statements, heritage management documents, or conservation management plans if required (cl 5.10(5)-(6)).
For aquaculture/intensive livestock, supply environmental statements, site plans demonstrating compliance with Schedule 6 and any other licence/approval details under other legislation indicated in cl 5.17(4)(b) for artificial waterbodies (cl 5.19; Schedule 6).
Rights and constraints for landowners
Right to apply for development consent for uses permitted with consent in the relevant zone (cl 2.3).
Right to carry out exempt development listed in Schedule 2, provided the development meets standards and is not in an environmentally sensitive area for exempt or complying development (cl 3.1; cl 3.3).
Right to seek complying development certificates for developments listed in Schedule 3 that meet the requirements (cl 3.2; Schedule 3).
Constraint on subdividing below minimum lot sizes shown on the Lot Size Map unless an exceptions pathway is demonstrated or specific exceptions apply (cl 4.1; cl 4.6).
Constraint on erecting new dwellings in RU1 unless the lot meets minimum size or historical permissibility exceptions; rural workers’ dwellings are subject to demonstrable economic necessity and locational tests (cls 4.2B, 4.2C).
Other notable rights or constraints
Suspension of certain private covenants where necessary for development consistent with the Plan, but not including covenants imposed by Council or certain Crown/heritage conservation instruments (cl 1.9A). This affects contract freedom in the sense that some private restrictions can be overridden to permit Plan‑consistent development, though specific public and conservation instruments are preserved.
For licensed premises, an enforceable restriction on grounds of refusal based purely on particular aspects of music or dancing where noise can be managed (cl 5.20).
The Plan gives the Council significant discretionary duties (for example, to be satisfied about a list of environmental outcomes before granting consent for sensitive activities) but also sets bright‑line local limits for small enterprises and visitor accommodation (cl 5.4), which operate as de facto rights to small‑scale uses provided the thresholds are met.
Penalties and enforcement
The Plan itself sets out permit, consent and process regimes; it does not in the text supplied create specific criminal offences or express monetary penalties. Enforcement mechanisms therefore arise through the statutory planning framework to which the Plan is subject and through the exercise of consent authority powers. Key enforcement and compliance points identifiable in the Plan text are:
Consent triggers and compliance. The Plan makes numerous activities subject to development consent (for example, subdivision cl 2.6, demolition cl 2.7, heritage works cl 5.10(2)). Performing such activities without required consent will engage the compliance and enforcement mechanisms of the Environmental Planning and Assessment Act and related regulations (the Plan repeatedly references the Act and its procedural scheme; cl 1.6, notes across parts).
Conditions on certificates and approvals. Complying development certificates and exempt categories are subject to conditions (cl 3.2(4); Schedule 3, General conditions referencing Schedule 6 of the State SEPP). Non‑compliance with a condition may lead to enforcement action.
Heritage enforcement triggers. Demolition, moving, alteration or excavation affecting a heritage item or Aboriginal place requires consent (cl 5.10(2)). The Plan requires notification and consultation for archaeological or state heritage items (cl 5.10(7)-(9)); failure to comply could prompt statutory intervention by the Heritage Council or the consent authority.
Public land classification and acquisition. The Plan identifies acquisition authorities (cl 5.1) and classifies or reclassifies public land (cl 5.2 and Schedule 4). Where land is acquired or reclassified, different statutory processes apply; the Plan itself notes that the owner‑initiated acquisition provisions in the Land Acquisition (Just Terms Compensation) Act 1991 may be engaged (cl 5.1(1)-(3)).
Regulatory interplay. Several Plan clauses explicitly preserve other statutory regimes that carry their own compliance and enforcement paths: the Rural Fires Act for hazard reduction (cl 5.11), fisheries and aquaculture licensing (cl 5.19, Schedule 6), Crown land instruments that cannot be suspended by cl 1.9A, and State environmental planning policies that prevail in the event of conflict (cl 1.9).
Implementation and enforcement risk factors in the Plan
Discretion and record keeping. The exceptions-to-standard route (cl 4.6) allows the Council to grant consent despite contravening standards if the applicant demonstrates the necessary grounds. That discretion requires the Council to keep records (cl 4.6(4)), which creates a compliance record that is potentially subject to review and challenge; it also requires applicants to prepare justification documents per the Environmental Planning and Assessment Regulation referenced in cl 4.6(3) (note).
Interagency consultation requirements. Heritage and environmental triggers require referral or notification to other statutory bodies (cl 5.10(7)-(9); cl 5.17(5)). Practical enforcement depends on timely consultation and responses by those bodies, which introduces implementation timing risk.
Overlap with State policies. Because State SEPPs can prevail (cl 1.9), enforcement outcomes can change where a State policy displaces a local rule. This creates legal uncertainty for both applicants and the Council when State and local instruments interact.
The Plan therefore relies on enforcement and penalty powers provided under the broader Environmental Planning and Assessment Act, related regulations and sectoral Acts, rather than setting novel sanctions itself. In practice, enforcement will be exercised through the Council’s consent decisions, imposition of development conditions, compliance checks and, where necessary, escalation to State enforcement bodies referenced by the Plan.
How it interacts with other laws
The Plan is expressly situated within a network of State and Commonwealth statutory instruments and policy guidance. The Plan both defers to and incorporates other legal regimes in multiple ways.
State environmental planning policies (SEPPs). Clause 1.9 states the Plan is subject to any SEPP that prevails under section 3.28 of the Act. The Land Use Table also lists several SEPPs and chapters that may be relevant (for example, SEPP (Housing) 2021, SEPP (Transport and Infrastructure) 2021 Chapter 2, SEPP (Primary Production) 2021 Chapter 2, and others). Where a SEPP has operative force that displaces a local clause, the SEPP will prevail; the Plan records that principle (cl 1.9(1)).
Environmental Planning and Assessment Act (the Act). The Plan repeatedly references the Act for procedural and power relationships (for example, cl 1.6 “subject to the Act”, cl 1.8A refers to Division 3.5 of the Act regarding applications tied to new instruments). Exceptions to standards clause (cl 4.6) follows the Act’s framework by requiring the consent authority to be satisfied of particular matters and to keep an assessment record (cl 4.6(3)-(4)). Where the Plan refers to consent, the Act provides the statutory basis and enforcement scheme.
Crown and special purpose legislation. Clause 1.9A excludes a number of Crown or conservation instruments from the Plan’s covenant suspension provision; it lists the Crown Land Management Act 2016, National Parks and Wildlife Act 1974, Nature Conservation Trust Act 2001, Native Vegetation Act 2003, Threatened Species Conservation Act 1995 and planning agreements under the Act (cl 1.9A(2)(a)-(g)). Those instruments maintain separate control over certain lands and agreements.
Heritage regime. The Plan cross‑references the Heritage Act 1977 for State Heritage Register items and interim heritage orders (cl 3.1(3)(d) and cl 5.10). Clauses require the consent authority to notify the Heritage Council and to consider its submissions in certain cases (cl 5.10(7), (9)).
Water, fisheries and environmental protection laws. Aquaculture provisions require consideration of the Fisheries Management Act 1994 (cl 5.19) and Schedule 6 references the Fisheries Management (Aquaculture) Regulation 2017 in defining intensive aquaculture (Schedule 6 Div 1(6)). Artificial waterbodies and related controls reference the Water Management Act 2000 and the Local Land Services Act 2013 in cl 5.17(4). Protection of the Environment Operations Act 1997 is mentioned as a relevant statute for licences and approvals in the context of artificial waterbodies (cl 5.17(4)(b)).
Local Government Act 1993. The Plan lets the Council classify or reclassify public land under Part 2 of Chapter 6 of the Local Government Act (cl 5.2). It also notes that section 30 of the Local Government Act permits the Plan to discharge trusts where public reserves are reclassified (cl 5.2 note).
Building Code of Australia and BASIX. Exempt and complying development pathways require compliance with the Building Code of Australia (cl 3.1(3)(a); cl 3.2(3)(b)). Clause 4.6(8)(b) bars use of the exceptions-to-standard power to contravene standards that form part of a BASIX commitment.
Flood and planning guidance. The Plan references the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual and requires the consent authority to take those into account in flood‑risk decisions (cl 5.21(3)-(5)).
Practical interaction consequences
Multi‑licence compliance. Several Plan clauses require proponents to obtain, and have regard to, licences, approvals or exemptions under other Acts. For example, Schedule 6 disclaims that nothing in its conservation exclusion zones affects licensing or other statutory approvals under other Acts. Applicants must therefore navigate multiple statutory regimes in sequence or in parallel.
Overriding State policy. Where a SEPP displaces a local clause, developers and the Council must determine which instrument applies to avoid inconsistent approvals. The Plan flags that eventuality (cl 1.9(1)).
Preserved public rights and reserved instruments. Although the Plan suspends private covenants to enable Plan‑consistent development (cl 1.9A(1)), it expressly preserves Crown, conservation, native vegetation or planning agreement instruments. Practitioners must therefore check each title and registered instrument for exceptions preserved by cl 1.9A(2)-(3).
Overall, the Plan is designed to operate as the local arm of a multi‑layered statutory system. Compliance requires coordinating approvals and standards under the Plan with obligations under State SEPPs, sectoral Acts and building regulation.
Amendment history
The Plan text contains in‑line amendment annotations and notes referencing legislative amendments and the addition or repeal of certain clauses. The Plan as supplied records a number of specific amendments and repeals:
Clause 1.8A (Savings provision relating to development applications) is marked as amended: “cl 1.8A: Am 2019 (621), Sch 5[1]”. The text includes the savings rule that development applications made before the Plan’s commencement are to be determined as if the Plan had not commenced (cl 1.8A).
Clause 1.9A (Suspension of covenants, agreements and instruments) is annotated as amended: “cl 1.9A: Am 2019 (621), Sch 5[2]-[4]”. That clause contains the Governor’s approval reference under section 3.16 of the Act and lists specific instrument types excluded from the covenant suspension (cl 1.9A(2)).
Clause 2.1 (Land use zones) includes an amendment note: “cl 2.1: Am 2022 (831), Sch 1.14[1]”. This indicates the zone list or wording was updated in 2022.
The Land Use Table is annotated with multiple amendments across years: “Land Use tbl: Am 2016 (168), Sch 1 [2]; 2017 (493), Sch 1.1 [1]; 2019 (137), Sch 6 [1]; 2022 (831), Sch 1.14[2]; 2023 (458), Sch 2.44.” Those annotations indicate the Land Use Table has been amended multiple times in 2016, 2017, 2019, 2022 and 2023.
Clause 4.6 had certain subclauses repealed as indicated by “(5) (Repealed)” and “(7) (Repealed)”. There is also a note that at the Plan’s making, it did not include certain zones , a reflection of subsequent zone inclusions.
Clause 6.2 is explicitly marked as repealed: “cl 6.2: Rep 2021 (225), Sch 1.”
Clause 5.4 bears an amendment note: “cl 5.4: Am 2018 (406), Sch 1.70 [1] [2]”. That clause contains the small‑scale use thresholds and additions such as the neighbourhood supermarket limit (cl 5.4(7AA)).
Clause 3 and associated Schedules carry references to the State SEPP (Exempt and Complying Development Codes) 2008 which has State‑wide application; Schedule cross‑references indicate the Plan relies on the State instrument where appropriate (cl 3.1 notes; Schedule 3 notes).
The Plan’s amendment annotations show that local controls have been iteratively updated over time, particularly the Land Use Table and small‑scale business limits. The Plan also contains express provisions that were not adopted (for example cl 4.3 Height of buildings; cl 4.4 Floor space ratio; certain cl 5.xx items “Not adopted” or “Not applicable”), indicating that particular standard categories were intentionally left blank or deferred.
For practitioners, the amendment history flags where substantive local rules may have changed over recent years (notably 2018-2023) and indicates that the Land Use Table and small‑scale use thresholds are areas to check for the current operative text. The Plan also notes the technical requirement that maps adopted by the Plan must be kept and made available in accordance with Ministerial arrangements (cl 1.7(3)), so up‑to‑date map editions are part of the operative history of the Plan.
Litigation history
The Plan text supplied does not record or cite any litigation or court decisions interpreting the Plan. No case law, judicial determinations or tribunal decisions are named or discussed in the instrument. Consequently the Plan itself provides no internal litigation history to draw on.
However, the Plan does create decision points that commonly give rise to disputes in land use planning practice, and which therefore merit attention as potential litigation or merits review flashpoints. The text highlights several specific procedural and substantive areas where legal controversy tends to arise:
Exceptions to development standards (cl 4.6). The Plan permits the consent authority to grant consent for developments that contravene development standards if the applicant demonstrates compliance with the cl 4.6(3) tests (unreasonable or unnecessary compliance and sufficient environmental planning grounds). Clause 4.6 requires the consent authority to keep a record of its assessment (cl 4.6(4)). In practice, those sorts of discretionary exceptions generate disputes about the sufficiency of the applicant’s justification, the adequacy of the Council’s reasoning and record keeping, and whether the exception was lawfully exercised. The Plan’s record-keeping requirement creates an evidentiary trail that would be material in any merits review or judicial review application under the Act.
Heritage approvals and archaeological disturbance (cl 5.10). The Plan requires notification to the Heritage Council and local Aboriginal communities in particular circumstances (cl 5.10(7)-(9)). Disputes commonly arise over whether the consent authority adequately considered heritage significance, whether proper consultation occurred and whether appropriate heritage management documents were required and complied with. The Plan’s specific notification windows (28 days) and requirements for heritage management documents provide administrable triggers that could form the basis for review challenges if not followed.
Flood planning and climate change considerations (cl 5.21). The Plan requires the consent authority to consider projected changes due to climate change, evacuation capacity, and flood behaviour impacts. Disputes can arise over technical modelling, choice of guidelines (the Plan references the Considering Flooding guideline and Flood Risk Management Manual), and the adequacy of mitigation measures proposed in applications.
Interplay with State policies (cl 1.9). Where a SEPP prevails over a local clause, disagreement over which instrument controls a development can give rise to litigation. The Plan’s own acknowledgment that SEPPs may prevail flags an area where legal interpretation and conflict resolution can arise.
Covenants suspension (cl 1.9A). The Plan’s power to suspend private covenants to enable Plan‑consistent development (subject to exceptions) may give rise to disputes with third-party covenant beneficiaries or public authorities whose rights are preserved under cl 1.9A(2)-(3).
Because the Plan is part of the Act’s regulatory matrix, any disputes about its application would generally be addressed through the merits review and appeal processes provided by the Environmental Planning and Assessment Act and related appeal avenues (for example, the Land and Environment Court), although the Plan text itself does not set out the appeal mechanisms. Practitioners should therefore approach the Plan’s discretionary and consultation triggers as likely loci of challenge and should ensure robust documentation where cl 4.6 exceptions, heritage assessments, flood evaluations or covenants suspension arguments are advanced.
Gotchas
The Plan contains several technical and practical traps for the unwary practitioner or applicant. These “gotchas” are points where a proposal may appear straightforward but, because of map overlays, thresholds or interaction with other instruments, the proposal falls into a regulated or prohibited category.
Map reliance: operative constraints are map‑driven. The Plan repeatedly directs users to the Land Zoning Map, Lot Size Map, Terrestrial Biodiversity Map, Wetlands Map, Watercourse Map and Groundwater Vulnerability Map (for example cl 2.2; cl 4.1(2); cl 6.4(2)). A proposal that is permissible in principle on a plain reading of the Land Use Table may be subject to overlays in the maps that impose additional tests or preclude exempt/dev categories (cl 3.3). Practitioners must check every relevant map layer; an error in map selection can change whether development is exempt, complying or requires full consent.
Exempt/compliant exclusions for environmentally sensitive areas. Exempt or complying development is barred on “environmentally sensitive areas for exempt or complying development” defined in cl 3.3(2) (coastal waters, Ramsar wetlands, lands of high Aboriginal cultural significance, etc.). If a site lies within 100 metres of certain protected areas, a development that would otherwise be exempt becomes a consented application with attendant assessment requirements.
Covenant suspension limits. Clause 1.9A suspends private restrictions to the extent necessary to enable Plan‑consistent development, but it explicitly excludes covenants imposed by the Council and a list of Crown, conservation and planning agreement instruments (cl 1.9A(2)). Also cl 1.9A(3) preserves public authority rights under registered instruments. Practitioners must not assume covenant suspension is universal; title searches and identification of Crown/conservation instruments are essential.
Secondary dwellings and strata/community subdivisions. The Plan has layered restrictions: secondary dwellings outside rural zones are capped by floor area limits (cl 5.4(9)), strata or community title subdivisions have special lot size rules (cl 4.1AA; cl 4.2A), and clause 4.2B bars erection of a new dwelling on RU1 unless the lot meets minimum size or historical consent exceptions. An application involving secondary dwellings, strata or community title reconfiguration may be shaped by multiple, sometimes overlapping, constraints.
Minimum lot sizes and sewer access exception. Clause 4.1(3) enforces the Lot Size Map minima, but cl 4.1(4A) allows the consent authority to grant consent for subdivisions in a mapped “Area A” down to 5,000 square metres provided the resulting lots will have access to reticulated sewer. The sewer access condition is a hard precondition in the Plan text; the availability of reticulated sewer is therefore a decisive practical constraint on lot‑size relief.
Canal estate prohibition. The Plan prohibits canal estate development (cl 2.9). The Plan’s definition involves constructed canals, dwellings, and fill or excavation to create waterways or meet flood planning requirements (cl 2.9(2)(a)-(c)). Proposals that mix excavation and residential uses in riparian areas or floodplains may be caught even if not labelled “canal estate” by proponents.
Aquaculture technical rules and other licences. Aquaculture is regulated both by the Plan (cl 5.19 and Schedule 6) and by separate fisheries and water management legislation. Schedule 6 includes species selection, pond design for intensive systems, no discharge to natural waterbodies for intensive systems (cl 4), and screening requirements (Schedule 6 Div 1). Artificial waterbodies in irrigation areas have a separate set of requirements and must be assessed for licensing under other Acts (cl 5.17(3)-(5)). An aquaculture proponent who satisfies Plan criteria may still need multiple statutory licences.
Heritage and archaeological notification windows. For archaeological sites not on the State Heritage Register, the consent authority must notify the Heritage Council and consider any response within 28 days (cl 5.10(7)); similarly, for Aboriginal places the local Aboriginal communities must be notified with a 28‑day response period (cl 5.10(8)). Failure to allow or act on the statutory consultation windows can be grounds for procedural challenge.
Noise and entertainment constraints are limited but not unlimited. Clause 5.20 prevents a consent authority from refusing licensed‑premises developments purely on enumerated aesthetic or music‑style grounds, and bars refusal for music‑related noise where noise may be managed and minimised to an acceptable level (cl 5.20(1)-(2)). However cl 5.20(2) preserves the local authority’s residual power to refuse if noise cannot be managed. Applicants should not assume an automatic permit for amplified live music; a clear noise management strategy will be required to engage the protection in cl 5.20.
Development near zone boundaries: 50 metre rule. Clause 5.3 allows the consent authority to permit a use permitted in an adjoining zone within 50 metres of a zone boundary if it is not inconsistent with both zones’ objectives and is desirable for compatible planning. Applicants should note the 50 metre limit and the Council’s need to be satisfied about compatibility; proposals beyond that strip cannot rely on the clause.
Restrictions that are “Not adopted” or “Not applicable”. Several clauses (for example cl 4.3 Height of buildings, cl 4.4 Floor space ratio, cl 5.7 Development below mean high water mark and a number of cl 5.xx items) are marked “Not adopted” or “Not applicable” in the Plan. Practitioners must not assume blank entries mean an absence of limits; in such cases State or other instruments may still apply, and the Plan’s silence does not constitue legal approval.
These gotchas point to frequent practical failures: inadequate map checks, failure to reconcile Plan limits with other statutory approvals (water, fisheries, heritage), insufficient heritage or flood evidence, ignoring covenant exceptions, and misreading the interplay between exempt/compliant categories and environmentally sensitive area exclusions.
How to comply
Compliance requires a structured approach that addresses mapping, zoning, the relevant development pathway, substantive technical requirements and interagency approvals. Below is a practical checklist and process flow grounded in the Plan’s operative clauses.
Confirm applicable maps and zoning
Obtain and inspect the latest Land Zoning Map, Lot Size Map, Terrestrial Biodiversity Map, Watercourse Map, Wetlands Map, Groundwater Vulnerability Map and Heritage Map as adopted under cl 1.7 and referenced throughout the Plan. The Plan makes these maps definitive for zone and overlay application (cl 2.2; cl 1.7).
Verify whether the site sits within Schedule 5 heritage items or conservation areas; Schedule 5 lists named items and the Jerilderie Main Street Conservation Area.
Determine permitted use and development pathway
Check the Land Use Table (cl 2.3 and the Land Use Table) to see whether the proposed use is permitted without consent, permitted with consent or prohibited in the relevant zone.
If the use appears exempt or complying, apply the tests in Part 3: an exempt development must meet Schedule 2 standards and not be in an environmentally sensitive area for exempt or complying development (cl 3.1; cl 3.3). A complying development must meet Part 1 Schedule 3 standards and relevant Building Code and local Council approvals (cl 3.2).
If the development is permitted only with consent, prepare to make a development application.
Identify overlay triggers and special controls
Heritage: If site is on Schedule 5 or within a heritage conservation area, prepare specialised heritage documentation. The Plan allows the consent authority to require a heritage management document or conservation management plan and mandates notification procedures for archaeological sites and Aboriginal places (cl 5.10(4)-(9)).
Flooding: For land in a flood planning area, ensure design addresses compatibility with flood function, evacuation capacity and climate change projections. The consent authority must be satisfied about those matters (cl 5.21).
Biodiversity and watercourse/wetland overlays: If land is mapped as Biodiversity, Watercourse, Wetland or Groundwater Vulnerable, prepare ecological assessments addressing the cl 6.4-6.7 tests and mitigation measures.
Aquaculture and intensive livestock: If relevant, check Schedule 6 and cl 5.18/5.19 for species, pond design, discharge and siting restrictions. Ensure alignment with any separate fisheries or water licences.
Check size and small‑scale thresholds
Lot size: Confirm minimum lot size per Lot Size Map and consider cl 4.1 and any cl 4.1(4A) exceptions (Area A and sewer access). For strata/community subdivisions, review cl 4.1AA and cl 4.2A.
Small business limits (cl 5.4): apply area caps for home businesses (50 sqm), home industries (100 sqm), kiosks (50 sqm), neighbourhood shops (100 sqm), neighbourhood supermarkets (1,000 sqm), industrial retail outlets (max 67% of industry GFA or 400 sqm), B&B (max 5 bedrooms), farm stay (max 10 bedrooms), and secondary dwellings (greater of 60 sqm or 50% of principal dwelling floor area, cl 5.4(9)).
If proposing to contravene a development standard, prepare an exceptions justification
If a standard would be contravened, prepare the document required by regulation that demonstrates compliance with cl 4.6(3) tests: that compliance is unreasonable or unnecessary and that sufficient environmental planning grounds justify the contravention. Expect the Council to keep a record of its evaluation under cl 4.6(4).
Address covenant status and title instruments
Conduct a thorough title search. Where private covenants appear to prevent development, assess whether cl 1.9A could render them inapplicable to the extent necessary to enable Plan‑consistent development. Verify whether any covenant is excluded by cl 1.9A(2) (for example, Council‑imposed covenants, Crown instrument, conservation agreements). Also confirm registered interests of public authorities which cl 1.9A(3) preserves.
Prepare technical studies and management plans
Heritage impact statements, heritage management documents or conservation management plans where the Council requires them (cl 5.10(5)-(6)).
Flood risk assessments and evacuation strategy that address the Considering Flooding guideline and Flood Risk Management Manual as referenced in cl 5.21.
Biodiversity and ecological assessments for terrestrial biodiversity overlays (cl 6.4); groundwater impact statements for mapped vulnerable areas (cl 6.5); riparian impact assessments for works near watercourses (cl 6.6); wetland impact assessments (cl 6.7).
For earthworks supply design and erosion/sediment control plans addressing cl 6.1 matters (drainage, soil stability, fill quality, source/destination of fill, proximity to waterways and likelihood of disturbing relics).
For aquaculture, supply designs complying with Schedule 6: pond draining capability for intensive systems, no discharge rules for intensive systems, screening of outlets and species selection consistent with relevant aquaculture industry development plans (Schedule 6 Div 1-2; cl 5.19).
Engage required consultation and notifications
When heritage or Aboriginal place issues are present, allow for the 28‑day notification periods specified in cl 5.10(7)-(9) and include local Aboriginal communities and the Heritage Council in the process.
For artificial waterbodies in irrigation corporation areas, identify relevant licences as required by cl 5.17(4)(b) and provide details in statements of environmental effects.
Lodge a complete application and manage conditions
Ensure applications include the required environmental statements, the exceptions justification (if relevant under cl 4.6), and documentation that addresses the cl 6.x clauses and cl 5.21 flood tests.
If applying for a complying development certificate, ensure the development meets the specified conditions in Schedule 3 and any referenced State SEPP conditions (cl 3.2(4); sch.3‑sec General conditions).
Post‑approval compliance
Be prepared for conditions that require ongoing management or conservation works (cl 5.10(10) allows consent to be granted in return for required conservation work). Implement monitoring and management provisions set in approvals (for example aquaculture management strategy cl 5.13(3)(k) and cl 5.13(3)(k)(i)-(v)).
If subject to operational constraints (noise management for licensed premises, stormwater retention under cl 6.3, or essential services availability cl 6.8), provide evidence of performance or servicing arrangements.
Practical tips
Early engagement with Council will reduce the risk of unanticipated information requests: Council is well placed to indicate whether a heritage management document, flood modelling or species assessment will be required (cl 5.10(5); cl 5.21(3)).
Cross‑check State licensing regimes where Schedule 6 or cl 5.17 references licensing under fisheries, water management or environmental protection legislation. Plan approvals do not substitute for other statutory licences.
Document the chain of reasoning when seeking to invoke cl 4.6 exceptions and keep a complete contemporaneous audit trail so that the Council can meet its recording obligation (cl 4.6(4)).
For small hospitality or retail proposals use the cl 5.4 thresholds as a compliance gateway; exceeding those thresholds may materially change the application pathway and trigger broader assessment.
Following these steps will align an application with the Plan’s procedural and substantive tests and reduce the probability of refusal or procedural challenge based on the Plan’s requirements.
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Jerilderie Local Environmental Plan 1993
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU3 Forestry
RU5 Village
Residential Zones
R5 Large Lot Residential
Employment Zones
E4 General Industrial
Special Purpose Zones
SP2 Infrastructure
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
Waterway Zones
W1 Natural Waterways
cl 2.1: Am 2022 (831), Sch 1.14[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.
(5) Subclause (3) (d) does not apply to the temporary use of a dwelling as a sales office mentioned in subclause (4).
2 Canal estate development prohibited
2 Canal estate development prohibited
2.9 Canal estate development prohibited
(1) Canal estate development is prohibited on land to which this Plan applies.
(2) In this Plan, canal estate development means development that involves—
(a) a constructed canal, or other waterway or waterbody, that—
(i) is inundated by surface water or groundwater movement, or
(ii) drains to a waterway or waterbody by surface water or groundwater movement, and
(b) the erection of a dwelling, and
(c) one or both of the following—
(i) the