This Local Environmental Plan sets the land‑use zones, maps and development rules for the Hilltops local government area, replacing earlier local plans and prescribing what development needs consent, what is exempt or complying, and which environmental and heritage overlays apply.
It affects landowners, developers and the Council (the consent authority). It matters because it decides who may develop land, the conditions and costs attached to consent, and the practical constraints from overlays and site‑specific schedules that change development incentives and compliance burdens.
This instrument is a local environmental plan (the Plan) that replaces earlier local environmental plans applying to Boorowa, Harden and Young and establishes the zoning, permitted uses, development standards and local controls for land within the Hilltops local government area. Mechanically, it:
Commenced on 1 February 2023 (cl 1.1AA).
Applies to the land identified on the Land Application Map (cl 1.3(1)), except where that map marks land as “Deferred matter” (cl 1.3(1A)).
Repeals all local environmental plans and deemed environmental planning instruments that applied only to land within the Plan area (cl 1.8(1)) and removes the application of any other LEPs to the same land (cl 1.8(2)). The Plan therefore consolidates local planning rules into a single LEP for Hilltops (cl 1.8 and note).
Identifies the consent authority as the Council, subject to the Act (cl 1.6).
Establishes the zoning structure and Land Use Table which specifies, for each zone, zone objectives and what development is permitted without consent, permitted with consent, or prohibited (Part 2, cl 2.1-2.3 and the Land Use Table).
Prescribes exempt and complying development regimes linked to Schedules 2 and 3 and to the State Policy instruments (Part 3, cl 3.1-3.3, Schedule 2 and Schedule 3). Exempt and complying development are excluded on environmentally sensitive areas (cl 3.3).
Sets principal development standards and exceptions (Part 4), in particular minimum lot sizes and subdivision rules (cl 4.1, cl 4.1AA, cl 4.1A, cl 4.2), and a standard clause allowing consent authorities to permit departures from development standards where the applicant demonstrates the matters in cl 4.6(3).
Provides numerous local provisions for environmental protection, heritage, flood planning, biodiversity, riparian and groundwater protection, and specific industry controls such as aquaculture and intensive livestock agriculture (Part 5 and Part 6; e.g. cl 5.10 heritage, cl 5.19 & Sch 6 aquaculture, cl 5.18 intensive livestock, cl 5.21 flood planning, cl 6.3 terrestrial biodiversity, cl 6.4 riparian land).
Current sections
Direct links to the current provisions in Hilltops Local Environmental Plan 2022.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Land Use tbl: Am 2023 (82), Sch 2; 2025 (382), Sch 1[1]–[5]; 2026 (9), Sch 1.
Zone RU1 Primary Production
Zone RU4 Primary Production Small Lots
Zone RU5 Village
Zone R1 General Residential
Zone R2 Low Density Residential
Zone R5 Large Lot Residential
Zone E3 Productivity Support
Zone E4 General Industrial
Zone MU1 Mixed Use
Zone SP2 Infrastructure
Zone SP3 Tourist
Zone RE1 Public Recreation
Zone RE2 Private Recreation
Zone C1 National Parks and Nature Reserves
Zone C3 Environmental Management
Zone W1 Natural Waterways
Zone W2 Recreational Waterways
3
Permitted with consent
3 Permitted with consent
3 Permitted with consent
Aquaculture; Bed and breakfast accommodation; Cellar door premises; Dwelling houses; Extractive industries; Farm buildings; Farm stay accommodation; Intensive livestock agriculture; Intensive plant agriculture; Light industries; Open cut mining; Roads; Roadside stalls; Rural workers’ dwellings; Secondary dwellings; Any other development not specified in item 2 or 4
4
Prohibited
4 Prohibited
4 Prohibited
Amusement centres; Boat building and repair facilities; Car parks; Centre-based child care facilities; Commercial premises; Creative industries; Depots; Educational establishments; Entertainment facilities; Exhibition homes; Exhibition villages; Freight transport facilities; Health services facilities; Heavy industrial storage establishments; High technology industries; Home occupations (sex services); Industrial retail outlets; Industrial training facilities; Industries; Local distribution premises; Marinas; Mortuaries; Passenger transport facilities; Places of public worship; Port facilities; Registered clubs; Residential accommodation; Respite day care centres; Restricted premises; School-based child care; Service stations; Sex services premises; Storage premises; Tourist and visitor accommodation; Transport depots; Truck depots; Vehicle body repair workshops; Vehicle repair stations; Warehouse or distribution centres; Wholesale supplies
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note—
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Earthworks
6 Earthworks
6.1 Earthworks
(1) The objective of this clause is to ensure that earthworks for which development consent is required will not have a detrimental impact on environmental functions and processes, neighbouring uses, cultural or heritage items or features of the surrounding land.
(2) Development consent is required for earthworks unless—
(a) the earthworks are exempt development under this Plan or another applicable environmental planning instrument, or
(b) the earthworks are ancillary to development—
(a) permitted without consent under this Plan, or
(b) for which development consent has been granted.
(3) In deciding whether to grant development consent for earthworks, or for development involving ancillary earthworks, the consent authority must consider the following matters—
(a) the likely disruption of, or any detrimental effect on, drainage patterns and soil stability in the locality of the development,
(b) the effect of the development on the likely future use or redevelopment of the land,
(c) the quality of the fill or the soil to be excavated,
(d) the effect of the development on the existing and likely amenity of adjoining properties,
(e) the source of the fill material and the destination of the excavated material,
(f) the likelihood of disturbing relics,
(g) the proximity to, and potential for adverse impacts on, a waterway, drinking water catchment or environmentally sensitive area,
(h) appropriate measures proposed to avoid, minimise or mitigate the impacts of the development.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
(Clause 5.2)
Schedule 5
Environmental heritage
Schedule 5 Environmental heritage
Schedule 5 Environmental heritage
(Clause 5.10)
sch 5: Am 2025 (382), Sch 1[7]–[11].
Schedule 6
Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
(Clause 5.19)
Division 1
Site location requirements
Division 1 Site location requirements
Division 1 Site location requirements
Division 2
Operational requirements
Division 2 Operational requirements
Division 2 Operational requirements
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Hilltops Local Environmental Plan 2022.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on 1 February 2023 and is required to be published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Hilltops in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to advance the environmental, economic and social goals of Hilltops,
(b) to provide for the lifestyles sought by current and future residents of Hilltops, including by providing for the following—
(i) the rural lifestyle and liveability of Hilltops communities,
(ii) connected, safe and accessible communities,
(iii) diverse and affordable housing options,
(iv) timely and efficient provision of infrastructure,
(v) sustainable building design and energy efficiency,
(c) to build and sustain healthy, diverse and empowered communities that actively participate in planning and managing their future, including by providing for the following—
(i) social infrastructure that is appropriately planned and located in response to demand and demographic change,
(ii) the protection and enhancement of cultural heritage values,
(iii) land management practices that support sustainable outcomes, including water efficiency,
Includes a suspension mechanism for private instruments like covenants and agreements to the extent necessary to enable development in accordance with the Plan, with specified statutory and public-interest exceptions (cl 1.9A).
Lists local additional permitted uses for identified parcels (Schedule 1) and records heritage items and conservation areas (Schedule 5).
The Plan sets out its policy aims (cl 1.2): to protect arts and cultural activity, advance environmental, economic and social goals, provide for rural lifestyles and liveability, protect employment and rural lands, sustain natural resources and avoid development in high natural-hazard exposure areas. Those stated aims are expressed as the policy rationale in the Plan (cl 1.2), and the operational provisions implement that rationale by zoning land, specifying permitted uses, imposing minimum lot sizes, overlaying environmental controls and requiring specific assessments and management documents for sensitive development (see cll 2.3, 4.1, 5.10, 6.1-6.9). The Plan also expressly defers where State environmental planning policies prevail (cl 1.9(1)).
Practical immediate effects for practitioners are: new zoning and Lot Size Maps control subdivision and permitted uses (cl 2.2; cl 4.1); DAs made before commencement are to be assessed under the pre-existing instruments (savings provision cl 1.8A); and private instruments that would otherwise restrict development can be displaced to the extent necessary, subject to the non‑application exceptions set out in cl 1.9A.
Main concepts
The Plan organises local planning using a small set of recurring legal mechanisms. Understanding these is essential for advising clients and preparing applications.
Zones and objectives (Part 2, cl 2.1-2.3, Land Use Table)
The Plan defines a discrete set of zones (rural, residential, employment, mixed use, special purpose, recreation, conservation, waterways) (cl 2.1). Each zone entry in the Land Use Table contains objectives and specifies development that is permitted without consent, permitted with consent and prohibited (cl 2.3(1)-(2)). The consent authority must have regard to zone objectives when deciding DAs (cl 2.3(2)).
Maps and spatial instruments (cl 1.3; cl 1.7)
Application and operation of the Plan are map‑driven: Land Application Map, Land Zoning Map, Lot Size Map, Riparian Land and Watercourses Map, Terrestrial Biodiversity Map, Salinity Map, Drinking Water Catchment Map and others referred to across clauses and Schedules. The Plan allows maps to be combined and updated (cl 1.7(1)-(3)) and requires maps to be publicly available (cl 1.7(3) and notes).
Permitted, exempt and complying development (Part 3, cl 3.1-3.3; Schedules 2-3)
The Land Use Table (Part 2) distinguishes development requiring consent from development that may be carried out without consent. Schedule 2 is for additional exempt development (when populated); Schedule 3 includes local additions to complying development. Exempt and complying development must meet Building Code of Australia requirements and the Plan’s Part 3 provisions (cl 3.1(3), cl 3.2(3)(b)). Exempt or complying development is prohibited on environmentally sensitive areas defined in cl 3.3.
Principal standards and flexibility (Part 4)
Minimum lot sizes and subdivision rules play a central regulatory role (cl 4.1, cl 4.1AA, cl 4.1A). The Plan contains a standard exceptions mechanism for development standards (cl 4.6) allowing non‑compliance where the applicant demonstrates the matters in cl 4.6(3) and the consent authority records its assessment (cl 4.6(4)). Certain standards are expressly excluded from this clause (cl 4.6(8)).
Local overlay controls and assessment matters (Parts 5 and 6)
The Plan imposes requirements and assessment matters on matters such as heritage (cl 5.10), flood risk and flood planning (cl 5.21, cl 5.22), intensive livestock agriculture (cl 5.18), aquaculture (cl 5.19 and Sch 6), earthworks (cl 6.1), essential services (cl 6.2), terrestrial biodiversity (cl 6.3), riparian land (cl 6.4), groundwater vulnerability (cl 6.5), salinity (cl 6.6), and development on specified river corridors and lake margins (cl 6.9). Consent cannot be granted unless the consent authority is satisfied the development meets the relevant environmental protection objectives and mitigates adverse impacts (see, for example, cl 6.3(4)).
Covenants, planning agreements and savings (cl 1.9A; cl 1.8A)
The Plan provides that private covenants and agreements that would otherwise restrict development do not apply to the extent necessary to enable development in accordance with the Plan, with specified exceptions (cl 1.9A(1)-(2)). The Plan also protects pending development applications by requiring that DAs made before the Plan’s commencement be determined under the previous planning rules (cl 1.8A).
Local schedules and site‑specific permissions (Schedules 1, 4, 5, 6)
Schedule 1 grants particular additional uses on specified lots; Schedule 5 lists heritage items and conservation areas with associated consent triggers; Schedule 6 sets out pond/tank aquaculture minimum site and operational requirements. Schedule 4 classifies/reclassifies public land for Local Government Act purposes (cl 5.2).
Cross‑reference to State policy and the Act (cl 1.9, throughout)
The Plan is expressly subject to State environmental planning policies that prevail (cl 1.9(1)). It repeatedly references the Act and other State statutes (e.g. the Biodiversity Conservation Act 2016, Heritage Act 1977, Local Land Services Act 2013) as operative cross‑links for exclusions, notifications and standards (see cll 1.9A(2), 5.10, 5.19, 3.3 and numerous others).
In sum, the Plan is an LEP that combines spatial zoning, numerical/qualitative development standards, overlay protection and a map‑driven regime with specific local departures (schedule items and exception clauses). Practitioners must treat the Plan as a map-and-schedule centred code that defers to State policy and the Act on any conflict (cl 1.9(1)).
Who it affects
Explicitly and practically, the Plan affects the following groups and interests:
Landowners and prospective purchasers within the Hilltops Plan area: their land is re‑zoned, minimum lot sizes and permitted uses set out on the Land Zoning Map and Lot Size Map will constrain or enable subdivision, intensification, dwellings and commercial activities (cl 1.3; cl 2.2; cl 4.1; cl 4.1A). Schedule 1 identifies specific additional uses on particular lots (Sch 1), so owners of those parcels are affected by bespoke permissions.
Developers, builders and designers: the Plan determines what requires development consent, what can be exempt or complying development and the relevant standards (Part 2, Part 3, Sch 2-3). For example, temporary uses are limited to 52 days in a 12‑month period unless used as a sales office (cl 2.8). Complying/exempt development must meet Building Code of Australia and Plan standards (cl 3.1(3), cl 3.2(3)(b)).
Hilltops Council (the consent authority): the Council is the consent authority for the Plan area (cl 1.6) and is required to apply the zone objectives (cl 2.3(2)), consider the specified assessment matters (heritage, biodiversity, riparian, flood planning, etc.) and to keep records where development standards are contravened under cl 4.6(4). The Plan also permits the Council to classify or reclassify public land (cl 5.2), and designates the Council or State authorities as acquisition authorities for land in Schedule mapping (cl 5.1).
Existing holders of private covenants, agreements and instruments: those instruments are, in many cases, suspended to the extent necessary to enable development consistent with the Plan (cl 1.9A(1)), but specific categories are excluded from suspension (cl 1.9A(2)). Public authorities’ rights under registered instruments are preserved (cl 1.9A(3)).
Heritage owners and managers: heritage items and conservation areas are listed in Schedule 5 and trigger mandatory consent requirements for demolition, external alterations, specified internal alterations, and subdivision (cl 5.10(2)-(3)). Owners proposing works on archaeological Aboriginal places must engage with local Aboriginal communities and the Heritage Council per cl 5.10(7)-(9).
Primary producers and rural enterprises: rural zones RU1 and RU4 have particular objectives and permitted uses (Part 2 Land Use Table). The Plan contains detailed provisions on intensive livestock agriculture (cl 5.18) and farm stay/farm gate premises (cl 5.24-5.25). Minimum lot sizes, subdivision rules, and protections against fragmentation (cl 4.1, cl 4.2, cl 4.1AA) directly affect primary production holdings.
Aquaculture and fisheries operators: the Plan contains targeted rules for pond‑based, tank‑based and oyster aquaculture (cl 5.19 and Sch 6), including site exclusion zones, operational requirements (no discharge to natural waterbodies for intensive systems except open flow through,Sch 6 Div 2 cl 4), and exemptions for development within priority oyster aquaculture areas (cl 5.19(6)).
Licensed premises and nightlife operators: cl 5.20 prohibits consent being refused merely on the basis of music genre, live/amplified music, presence of a stage or dance floor, or decorative staging features, and bars consent authorities from refusing consent on noise from music if the noise can be managed to acceptable levels (cl 5.20(1)-(2)). This affects venue operators and residents near licensed premises.
Residents in flood‑ and bushfire‑prone areas: flood planning and special flood considerations impose specific assessment matters and thresholds for development in flood planning areas and between flood planning area and probable maximum flood (cl 5.21-5.22). Clause 5.11 permits bush fire hazard reduction works authorised by the Rural Fires Act 1997 without consent.
State and other public authorities: the Plan preserves State policy primacy (cl 1.9) and sets out which State authority is the relevant acquisition authority for owner-initiated acquisitions (cl 5.1). It also preserves the Crown’s entitlement to use existing Crown buildings (cl 5.12(2)).
Aboriginal communities: the Plan requires consultation and specific consideration for Aboriginal places of heritage significance (cl 5.10(8)) and identifies land of high Aboriginal cultural significance as an environmentally sensitive area for exempt/compliant development exclusions (cl 3.3(2)(g)).
Practitioners should note who has decision power (Council as consent authority, cl 1.6; Ministerial and State functions where specified) and who bears the cost or benefit of particular rules (e.g. owners of heritage items face consents and possible conservation obligations under cl 5.10; primary producers are constrained by subdivision and land fragmentation controls under cl 4.1 and cl 4.2).
Key duties and rights
The Plan allocates duties, decision factors and some rights. Below is a practical ordering of those legal duties and rights as the Plan sets them out.
Consent authority duties and decision framework
The Council is the consent authority and must have regard to zone objectives when deciding applications (cl 1.6; cl 2.3(2)). For particular types of development the Plan prescribes mandatory matters to be considered and thresholds that must be satisfied before consent can be granted (for example cl 5.19(2) for pond/tank aquaculture, cl 6.3(3)-(4) for terrestrial biodiversity, cl 6.4(3)-(4) for riparian land, cl 5.21(2)-(3) for flood planning).
When a development would contravene a development standard, the consent authority must be satisfied the applicant has demonstrated the matters in cl 4.6(3) and the authority must keep a record of the assessment (cl 4.6(3)-(4)). The EP&A Regulation 2021 requires an accompanying document for such contraventions (cl 4.6 note).
Applicant duties and evidentiary thresholds
Applicants must comply with the Building Code of Australia requirements for exempt and complying development (cl 3.1(3)(a); cl 3.2(3)(b)).
For contravening development standards, applicants must provide the document required by the regulations setting out grounds under cl 4.6(3) (cl 4.6 note).
For heritage, where the consent authority requires a heritage management document or conservation management plan, the applicant must prepare and submit it before consent is granted (cl 5.10(5)-(6)). For Aboriginal places, the consent authority must be satisfied the effect on heritage significance has been adequately investigated and must notify and consider local Aboriginal communities’ responses (cl 5.10(8)).
For aquaculture and intensive livestock projects, the applicant must demonstrate compliance with site and operational requirements in Schedule 6 (cl 5.19(2), Sch 6); for intensive livestock, applicants must address odour, water pollution, soil degradation and demonstrate intention to comply with industry codes (cl 5.18(3)(a)-(g)).
Rights created or curtailed by the Plan
Rights to carry out development permitted without consent are preserved subject to other Acts and overlay exclusions (cl 2.3 notes; cl 3.1(3)(c) and cl 3.3 where environmentally sensitive areas are excluded). Exempt development remains subject to approvals under other Acts (Schedule 2 note).
Owners of land subject to private covenants and instruments have those instruments suspended to the extent necessary for compliant development (cl 1.9A(1)), except where the Plan expressly excludes suspension (cl 1.9A(2)). The Plan preserves public authorities’ rights under registered instruments (cl 1.9A(3)).
Applicants for DAs made before the Plan’s commencement retain the right to be determined under the old instrument (cl 1.8A). That is a savings right.
Procedural and consultation duties
For archaeological sites (other than State heritage register land), the consent authority must notify the Heritage Council before granting consent and consider any response within 28 days (cl 5.10(7)).
For Aboriginal places, the consent authority must notify local Aboriginal communities in an appropriate manner and consider responses within 28 days (cl 5.10(8)).
For demolition, subdivision or works affecting heritage items, consent is required unless the consent authority advises in writing that the proposed development is minor and will not affect heritage significance (cl 5.10(2)-(3)).
Limitations to administrative discretion and notable prohibitions
The Plan prohibits canal estate development (cl 2.9).
The exceptions clause (cl 4.6) gives discretion to permit contraventions but excludes some standards from being relaxed (cl 4.6(8) , standards for complying development, BASIX commitments, clause 5.4 and 5.5 as specified). Certain subdivision contraventions are forbidden under cl 4.6(6) for particular rural and conservation zones (no consent if subdivision results in multiple lots below minimum or at least one under 90% of the standard).
Temporary uses have prescribed limits and conditions for consent (cl 2.8).
Exempt and complying development cannot be carried out on environmentally sensitive areas (cl 3.3).
Record‑keeping and transparency duties
The consent authority must keep a record of its assessment under cl 4.6(3) (cl 4.6(4)). The Plan requires maps be kept and made available to the public in accordance with Ministerial arrangements (cl 1.7(3)).
Interplay with State policy and other statutory instruments
The Plan is subject to State environmental planning policies that prevail (cl 1.9(1)). Many Plan provisions refer to other Acts where particular rights or duties are allocated (e.g. biodiversity certification under the Biodiversity Conservation Act 2016 is excluded from covenant suspension cl 1.9A(2)(b); heritage duties reference the Heritage Act 1977 in cl 5.10). Practitioners must observe these cross‑references.
In short, the Plan imposes a regime that: (1) confers rights to carry out certain development by zone; (2) sets non‑delegable duties on the consent authority to consider overlay matters and notify relevant authorities/communities; (3) creates procedural duties for applicants to prepare specified management documents; and (4) limits private instruments where they would impede Plan‑consistent development, subject to express exclusions.
Penalties and enforcement
The text of this Plan does not itself set out offences, penalties or detailed enforcement procedures. The Plan repeatedly frames rights and permissions in terms of development consent and references “the Act” and the State Policy framework (for example, cl 1.6 notes the consent authority is the Council “subject to the Act”, and cl 1.9(1) acknowledges State environmental planning policies that prevail). That means enforcement and penalties for unauthorised works, breaches of conditions or other contraventions will be matters governed by the Environmental Planning and Assessment Act and its regulations, and other relevant Acts invoked by particular provisions (for example, the Heritage Act 1977, the Biodiversity Conservation Act 2016, or the Local Government Act 1993), rather than by express sanction provisions in this Plan.
What the Plan does say that affects enforcement practice
Development that requires consent cannot lawfully be carried out without consent; the Plan distinguishes permitted-without-consent development from development that requires consent (Part 2, cl 2.3; Part 3). Practitioners should therefore treat any work outside the Plan’s permitted classes and not covered by exempt/compliant pathways as potentially unauthorised.
The Plan requires documentation and investigations in particular contexts (heritage management documents, heritage conservation management plans, aquaculture site and operational requirements, intensive livestock assessments). Failure to provide required documents or comply with imposed conditions will engage the enforcement regime of the Act and any other named statute (e.g. cl 5.10(5)-(6), cl 5.19(2), cl 5.18(3)).
Where the consent authority grants consent involving a non‑compliance with a development standard using the exceptions clause (cl 4.6), the authority must keep a record of that assessment (cl 4.6(4)); that record is relevant evidence in any subsequent enforcement or merits review.
Practical implication for advisers
Because the Plan itself is silent on penalties, practitioners must consult the Environmental Planning and Assessment Act 1979 and the relevant regulations for enforcement processes, penalties, remediation powers, compliance notices and criminal/civil sanctioning. The Plan’s consistent cross‑references to other Acts mean that contraventions may also trigger enforcement under those statutes (for example, unlawful damage to a State‑listed heritage item could trigger heritage Act processes). The Plan’s provisions that require involvement or notice to ministerial/statutory bodies (cl 5.10(7)-(9)) create additional procedural steps that, if ignored, could render a consent invalid or subject to challenge.
In short, the Plan allocates rights and permissions and imposes duties but leaves the statutory enforcement machinery and penalties to the Act and other named legislation; the absence of penalty provisions in the Plan means advising clients requires immediate cross‑reference to the Act and regulations.
How it interacts with other laws
The Plan is integrative: it sits inside the State planning framework and references numerous State Acts and policies that constrain or interact with its provisions. The Plan itself records key interdependencies and exceptions.
Primacy of State policies and the Act
The Plan is subject to any State environmental planning policy that prevails over it “as provided by section 3.28 of the Act” (cl 1.9(1)). Practically, that means State SEPPs (for housing, transport and infrastructure, resources and energy, resilience and hazards, industry and employment, primary production) may override the Plan in areas of inconsistency; the Plan lists those SEPPs as likely relevant in the Land Use Table notes (Land Use Table note and Part 2 notes).
Cross‑references to specific statutes and how they are used
Biodiversity and land conservation: the Plan excludes suspension of instruments that relate to biodiversity certification under the Biodiversity Conservation Act 2016 (cl 1.9A(2)(b)) and excludes private land conservation agreements continued under transitional biodiversity regulations (cl 1.9A(2)(c),(g),(h)). Clause 6.3 and cl 3.3 identify lands of high biodiversity significance and direct that exempt/compliant development not occur there (cl 3.3(2)(g); cl 6.3). These cross‑references mean biodiversity law and its approvals/licences operate alongside the Plan.
Heritage: cl 5.10 relies on the Heritage Act 1977 in multiple ways,heritage items and conservation areas trigger consent, the Heritage Council must be notified for archaeological sites (cl 5.10(7)), and demolition of nominated State heritage items requires Heritage Council notification (cl 5.10(9)). Heritage processes and obligations under the Heritage Act therefore run in tandem with the Plan’s consent requirements.
Crown land and Crown instruments: cl 1.9A(3) preserves rights and interests of public authorities under registered instruments; cl 1.9A(2)(d) excludes suspension of relevant instruments under the Crown Land Management Act 2016, section 13.4. Clause 5.12 preserves existing Crown building use and does not fetter infrastructure development permitted under State policy (cl 5.12(1)-(2)).
Local government classification and trust discharges: cl 5.2 engages the Local Government Act 1993 by enabling classification or reclassification of public land, discharging trusts where specified (cl 5.2(1)-(5) and notes). Schedule 4 records classification entries.
Water, fisheries and aquaculture law: cl 5.19 and Schedule 6 cross‑refer to the Fisheries Management Act 1994 and the Fisheries Management (Aquaculture) Regulation 2017 (Sch 6 references). They also require reference to industry development plans and the NSW Oyster Industry Sustainable Aquaculture Strategy for oyster aquaculture (cl 5.19(5)). Water‑related environmental outcomes are also governed by flood guidelines and the Flood Risk Management Manual invoked in cl 5.21(4)-(5). The Plan’s aquaculture operational rules interact with licencing and approvals that the Fisheries Act and associated regulations control.
Rural fire, bushfire and environmental hazard laws: cl 5.11 explicitly allows bush fire hazard reduction work authorised under the Rural Fires Act 1997 to occur without development consent; that statute’s regime sits alongside the Plan for bushfire mitigation works. Flood planning clauses (cl 5.21-5.22) reference State flood guidelines and manuals rather than giving prescriptive numerical floors in the LEP itself.
Suspension of private instruments versus other statutory instruments
Clause 1.9A permits suspension (non‑application) of private covenants and agreements to the extent necessary to enable development in accordance with the Plan, but expressly excludes covenants imposed by the Council, biodiversity certification, private land conservation agreements continued by regulation, Trust agreements continued by regulation, relevant Crown Land instruments, land management code approvals, and planning agreements under the Act (cl 1.9A(2)(a)-(i)). Rights of public authorities under registered instruments are unaffected (cl 1.9A(3)). The Governor’s prior approval of the clause is noted (cl 1.9A(4) referencing section 3.16 of the Act), signalling an interaction between executive approval and local instrument operation.
Records, maps and technical standards
The Plan requires maps to be kept and made available in forms and under arrangements approved by the Minister (cl 1.7(3)) and references the Department’s “Standard technical requirements for LEP maps and Standard requirements for LEP GIS data”. This requires practitioners to ensure that map‑based analysis (zone, lot size, overlays) conforms with the Ministerial technical standards and that reliance on maps is consistent with the regulations.
Practical trade‑offs and compliance intersections
Where the Plan permits a use but another Act requires a licence or prohibits the activity (e.g. aquaculture in certain conservation zones, or excavation affecting Aboriginal objects under the National Parks and Wildlife Act), the other Act’s licencing and prohibitions continue to apply,the Plan notes exempt development remains subject to approvals under other Acts (Schedule 2 note).
The exceptions to development standards mechanism (cl 4.6) operates inside the regulatory framework formed by the Act and the EP&A Regulation 2021; applications seeking non‑compliance must supply the statutory supporting documentation required by the regulations (cl 4.6 note), and certain standards (complying development standards, BASIX commitments) are excluded from variation (cl 4.6(8)).
In short, the Plan is not stand‑alone law. It is expressly framed to operate within the State planning framework, cross‑linked to heritage, biodiversity, fisheries, Crown land, local government and flood/ bushfire law. Practitioners must map Plan provisions to the applicable State statutes and policies named in the instrument for a complete legal assessment.
Amendment history
The Plan text contains its commencement date and several recorded amendments and substitutions. The following items are recorded in the Plan as enacted or subsequently amended in the text provided:
Commencement: the Plan commenced on 1 February 2023 and required publication on the NSW legislation website (cl 1.1AA).
Repeal of predecessor LEPs: cl 1.8 lists the repealed local environmental plans, specifically Boorowa LEP 2012, Harden LEP 2011 and Young LEP 2010 (cl 1.8 note). The clause also preserves one specific provision of the repealed Young LEP (cl 1.8(2A)).
Land Use Table amendment notes: the Land Use Table carries an amendment annotation: "Land Use tbl: Am 2023 (82), Sch 2; 2025 (382), Sch 1[1]-[5]; 2026 (9), Sch 1." That indicates the Land Use Table was amended in 2023, 2025 and 2026; the Plan text reproduces those amendment stamps. Readers should consult the consolidated LEP for the exact wording changes effected by those amending instruments.
Clause substitutions and amendments: several clauses carry annotations showing substitution or amendment dates:
Clause 5.24 (Farm stay accommodation) is noted as substituted 2023 (458), Sch 1[4].
Schedule 5 (Environmental heritage) carries an annotation "sch 5: Am 2025 (382), Sch 1[7]-[11]" indicating heritage schedule amendments in 2025.
Repeals: some subordinate items or elements are marked "Repealed" in the body of the Plan (for example, in cl 1.7(1AA) the note "Repealed" appears and in cl 3.1(3)(e) something was repealed). The Plan itself notes when subclauses or items have been repealed; practitioners must treat those parts as absent and consult the consolidated Plan or amending instruments for the amendment history.
Not adopted entries: several development standards (height of buildings cl 4.3, floor space ratio cl 4.4, calculation of floor space ratio cl 4.5, architectural roof features cl 5.6, development below mean high water mark cl 5.7, dwelling house affected by natural disaster cl 5.9) are labelled “[Not adopted]” or “[Not applicable]”. Those annotations indicate that the Plan includes placeholders for standard LEP clauses that were not selected in this instrument when made.
What the textual amendment stamps mean in practice
Those amendment notations record that the Plan has been amended since its original making; the Plan text before you includes those amendment stamps. They do not, by themselves in this document, show the detailed content of the amendments. For precise historical drafting changes or the legislative instruments effecting amendments, a practitioner must consult the NSW legislation website for the amending instruments referenced (for example, the Gazette instrument numbers or the consolidated LEP version). The Plan indicates where substantive changes have been made (e.g. changes to the Land Use Table and to flood-related provisions), and those items will materially affect permitted uses and overlay assessments.
Practitioners advising on older consents or appeals should check whether an application was made before or after any amendment and rely on the savings clause for DAs made prior to commencement (cl 1.8A), and should also check the dates on the amendment annotations cited above.
Litigation history
The text of this Plan contains no court decisions, case citations or a litigation history. It does not name any judicial determinations. Where the Plan references the Act, regulations or other statutes (for example cl 4.6 note referring to the Environmental Planning and Assessment Regulation 2021), those external instruments have their own jurisprudence which is not set out in this Plan.
Practical consequence for advisers and litigators
Because the Plan itself contains no reported cases or judicial interpretation, any argument about the proper construction or admissible uses under its clauses will rely on case law under the Environmental Planning and Assessment Act, State environmental planning policies, and decisions interpreting common LEP provisions such as the exceptions to development standards (cl 4.6). The Plan expressly records the requirement for the consent authority to keep a record under cl 4.6(4) and for applicants to provide documentation in accordance with the regulations,these procedural steps are often central in disputes over special case approvals.
For dispute and merits review, practitioners should examine the Act and relevant case law interpreting contravention/demonstration standards, heritage obligations, and overlay controls referenced by the Plan. The Plan provides the substantive framework; litigation will turn on how courts have construed equivalent provisions in the Act and other SEPPs and on facts specific to a development application.
In short, there is no litigation history recorded in the Plan text provided. Where advice or representation is required in contested matters, counsel and advisers must build arguments from the Act, regulations, relevant SEPP jurisprudence and LEP interpretation authorities rather than from any cases named in this Plan.
Gotchas
The Plan contains several practical traps and non‑obvious interactions that can affect clients and applicants. The following are concrete operational pitfalls, each cited to the Plan.
DAs pending at commencement are preserved under the old rules (cl 1.8A). If a client lodged an application shortly before 1 February 2023, the application must be determined as if this Plan had not commenced. Mistakenly assessing that DA under the new Plan is an avoidable error.
Map reliance and deferred matter (cl 1.3; cl 1.7). Many permissions, prohibitions and lot size standards are map‑driven. Land marked “Deferred matter” is outside the Plan (cl 1.3(1A)). Practitioners must check the live Land Zoning Map, Lot Size Map and overlay maps. Maps are amendable (cl 1.7(1)-(2)) and can be combined; reliance on an outdated map layer is risky.
Suspension of covenants is limited (cl 1.9A). Clause 1.9A allows private covenants and agreements to be displaced to the extent necessary, but it explicitly excludes covenants imposed by the Council, biodiversity certification under the Biodiversity Conservation Act 2016, private land conservation agreements continued by regulation, relevant Crown Land instruments, mandatory code instruments for set aside areas, conservation agreements under the National Parks and Wildlife Act 1974, property vegetation plans continued under transitional regulations, Trust agreements under the Nature Conservation Trust Act 2001, and planning agreements under the Act (cl 1.9A(2)(a)-(i)). Practitioners should not assume all private covenants can be ignored.
Subdivision and secondary dwellings interplay (cl 2.6(2), cl 4.1A, cl 4.2A). Subdivision consent must not result in principal and secondary dwellings being on separate lots unless the resulting lots meet the Lot Size Map minima (cl 2.6(2)). Clause 4.2A prevents erection of dwellings on RU1, RU4 or C3 where no dwelling has previously been erected unless minimum lot sizes or grandfathered exceptions are met. Dual occupancy and multi‑dwelling minimum lot sizes differ by zone (cl 4.1A). These interlocking rules make subdivision involving secondary dwellings legally delicate.
Exempt and complying development excluded on environmentally sensitive areas (cl 3.3). Do not assume an activity is exempt even if it appears in Schedule 2 or in State Codes; the environmentally sensitive area overlays (cl 3.3(2)(ja),(jb)) bar exempt/compliant development on mapped riparian and sensitive land.
Exceptions to development standards have forbidden outcomes (cl 4.6(6), (8)). Clause 4.6 allows departures but forbids use of the clause to permit subdivisions in rural and conservation zones that would create multiple lots below minimum areas or at least one lot under 90% of the minimum (cl 4.6(6)). Clause 4.6(8) disallows contraventions of complying development standards and BASIX commitments and excludes clauses 5.4 and 5.5 from variation. Practitioners must not rely on cl 4.6 to obtain what it expressly excludes.
Music and licensed premises (cl 5.20). Consent authorities cannot refuse licensed‑premises DAs on a list of stylistic or staging factors (genre, live/amplified, number of performers, dance floors, decorations) (cl 5.20(1)), and cannot refuse on the grounds of music noise if it can be managed to acceptable levels (cl 5.20(2)). Practitioners drafting objections by neighbours based solely on music type or dancing should be alerted that the Plan prohibits those grounds. Conversely, applicants must show noise will be managed.
Intensive livestock agriculture thresholds provide permitted‑without‑consent loopholes but with tight locational constraints (cl 5.18(4)-(5)). Small scale feedlots/poultry/pig units can be carried out without consent if they meet capacity thresholds and locational buffers (cl 5.18(4)-(5)), but the clause does not apply if the activity is otherwise prohibited (cl 5.18(6)). That delegated “no consent required” route is location and capacity sensitive.
Aquaculture operational rules: no freshwater discharge from intensive pond/tank systems to natural waterbodies except from open flow through systems (Sch 6 Div 1 cl 4). Intensive aquaculture requires ponds that can be drained and dried (Sch 6 Div 1 cl 3). Oyster aquaculture has separate allowances and references to NSW oyster strategy and industry development plans (cl 5.19(5)-(6)). Practitioners must coordinate planning approvals with fisheries licencing.
Heritage notification windows and consequences (cl 5.10(7)-(9)). Where the Plan requires notification to the Heritage Council or local Aboriginal communities, the consent authority must wait and consider responses within 28 days. Missing or inadequate consultation can invalidate a decision or create grounds for review.
Public land classification and trust discharge (cl 5.2). Schedule 4 entries (if populated) can change trust statuses of reserves and enable discharge of trusts under the Local Government Act; the Plan records that Governor’s approval is required for some discharges (cl 5.2(5) note). This is a governance risk in rezoning and subdivision.
Complying development certificate conditions reference State Policy (Sch 3 Part 2, sch.3-sec-oc.2). Any local complying development certificate is subject to the same conditions set out in Schedule 6 to the 2008 Exempt & Complying Development Codes SEPP. Practitioners must check both the SEPP and the Plan’s Schedules.
Those items are concrete operational traps visible in the Plan text and should be on any checklist used to advise landowners or make applications.
How to comply
This section sets out a practical compliance checklist and stepwise approach derived from the Plan’s requirements. It assumes a practitioner is advising a client seeking to undertake development within the Hilltops Plan area.
Confirm the applicable spatial instruments
Check the current Land Application Map to confirm the Plan applies to the lot (cl 1.3(1)-(1A)). Verify whether the lot is marked “Deferred matter” (cl 1.3(1A)).
Confirm the Land Zoning Map, Lot Size Map and any overlay maps relevant to the property (Riparian Land and Watercourses Map, Terrestrial Biodiversity Map, Groundwater Vulnerability Map, Salinity Map, Drinking Water Catchment Map, Heritage Map, Environmentally Sensitive Land Map). The Plan makes the maps determinative for many rules (cl 1.7; cl 2.2; cl 6.3; cl 6.4; cl 6.5; cl 6.6).
Identify permitted uses and cross‑check prohibitions
Use the Land Use Table for the parcel’s zone to see whether the proposed use is permitted without consent, permitted with consent, or prohibited (cl 2.3(1), Land Use Table). If the use is not listed, check whether “Any other development not specified” appears in the permitted with consent column for that zone.
Check Schedule 1 for any site‑specific additional permitted uses applying to the lot (Sch 1). If the parcel is listed in Schedule 1, read the conditions set out.
Determine whether the activity is exempt or complying development
Consult Schedule 2 (additional local exempt development) and Schedule 3 (additional complying development) and the State SEPP (Exempt & Complying Development Codes) for the scope and conditions of exempt and complying classes (cl 3.1-3.2). Remember exempt/compliant development is barred on environmentally sensitive areas (cl 3.3). Ensure compliance with the Building Code of Australia (cl 3.1(3)(a), cl 3.2(3)(b)).
Check overlay and local provisions that may require additional documentation
If the site is within a heritage place, archaeological site or heritage conservation area, expect consent for demolition, external works, interior structural changes where specified and possible requirements for heritage management documents or conservation management plans (cl 5.10(2)-(6)). For archaeological or Aboriginal heritage, allow the statutory notification periods (cl 5.10(7)-(9)).
If the site intersects biodiversity, riparian, groundwater vulnerability, salinity or drinking water catchment overlays, prepare ecological, hydrological and management documentation to address the matters identified in cl 6.3, cl 6.4, cl 6.5, cl 6.6 and cl 6.8. The consent authority must be satisfied that the development avoids, minimises or mitigates significant adverse environmental impacts (e.g. cl 6.3(4), cl 6.4(4), cl 6.5(4)).
If the site is in a flood planning area or between flood planning and probable maximum flood, prepare flood impact assessments and evacuation/safety measures consistent with the Considering Flooding guideline and the Flood Risk Management Manual invoked in cl 5.21 and cl 5.22.
For intensive livestock agriculture or aquaculture, ensure the design meets Schedule 6 and cl 5.18 operational/location thresholds. For intensive pond/tank aquaculture, ponds must be drainable and freshwater discharge to natural waterbodies is restricted (Sch 6 Div 1 cl 3-4).
Subdivision and lot size compliance
Check the Lot Size Map and cl 4.1 for minimum subdivision lot sizes. For community title schemes, note cl 4.1AA overrides 4.1 in specified zones. For dual occupancies and multi-dwelling development, apply cl 4.1A minimum lot sizes by zone. For rural subdivision flexibility under cl 4.2, ascertain whether subdivision is for primary production and whether the lot would or could contain a dwelling (cl 4.2(3)-(5)).
Check for covenant suspension applicability and exceptions
If private covenants impede the proposed development, evaluate whether cl 1.9A(1) applies to suspend the covenant to the extent necessary. Carefully check the exclusions in cl 1.9A(2) , if the covenant is one of those excluded the developer cannot rely on suspension.
BASIX, complying development standards and exceptions
Be mindful that cl 4.6(8) excludes variation of complying development standards and BASIX commitments. If the proposal relies on the exceptions mechanism in cl 4.6 to contravene any standard, prepare the document required under the EP&A Regulation 2021 demonstrating the cl 4.6(3) grounds and anticipate the consent authority’s record keeping obligation (cl 4.6(3)-(4)).
Prepare and lodge an application addressing prescribed assessment matters
Prepare the DA materials so the consent authority can be satisfied of the matters required by specific clauses: heritage impact, biodiversity impact assessments, flood and evacuation plans, odour and emissions for intensive livestock (cl 5.18(3)), aquaculture operational plans (cl 5.19(2)-(3), Sch 6), bushfire asset protection zones where applicable (cl 6.10 for Carinya Estate), and essential services availability (cl 6.2).
Where the Plan requires consultation (Heritage Council, local Aboriginal communities, relevant State agencies), allow the statutory timeframes and integrate responses into the DA package (cl 5.10(7)-(9)).
Comply with development consent conditions and recordkeeping obligations
Where consent is granted with conditions, ensure compliance; the Plan’s structure places many mitigation obligations in consent conditions, and failure to comply may trigger enforcement under the Act and other statutes to which the Plan refers. When a consent is granted under cl 4.6, keep records demonstrating the assessment (cl 4.6(4)).
Pre‑application and planning strategy steps
For larger or staged urban release areas, cl 6.11 mandates a development control plan with staging, transport hierarchy, landscaping strategies and infrastructure staging before the consent authority will grant development consent. For such projects, prepare a DCP that directly responds to cl 6.11(2)(a)-(j).
Check acquiring State approvals and licences outside planning consent
Remember that exempt development under the Plan remains subject to licences and approvals under other Acts (Schedule 2 note). For aquaculture, fisheries licences and industry development plans under the Fisheries Management Act and regulations will be required in addition to planning consent (cl 5.19(5)).
Seek confirmation where boundary‑spanning uses are proposed
Where the proposed development is near a zone boundary and the other zone contains uses that would enable a more logical development, cl 5.3 allows the consent authority to grant consent for uses permissible in the adjoining zone subject to compatibility tests and limits on where the clause applies. If relying on cl 5.3, prepare justification addressing cl 5.3(4)(a)-(b).
Practical documentation checklist (minimum)
Current maps and zoning/lot size printouts.
Site survey and plans showing overlays (riparian, biodiversity, heritage, flood).
Statement of environmental effects addressing specific Plan clauses (heritage, biodiversity, riparian, groundwater, salinity, flood).
Heritage management document or conservation management plan where required (cl 5.10(5)-(6)).
Noise management plan and evidence for managing music/noise for licensed premises (to satisfy cl 5.20(2)).
BASIX certificate and any building code compliance documentation required for exempt/complying development (cl 3.1(3)(a), cl 3.2(3)(b)).
For contravening development standards, the statutory cl 4.6(3) demonstration document required by the EP&A Regulation 2021 and supporting environmental planning grounds (cl 4.6 note).
For aquaculture and intensive livestock, site design documentation demonstrating compliance with Schedule 6 and cl 5.18 capacities and buffers.
Following these steps will align applications with the Plan’s procedural and substantive requirements. The Plan’s multiple map‑based overlays and specific local controls mean that the early step of confirming maps and overlays is the most cost‑effective compliance action.
(iv) the siting and arrangement of land uses for development in response to climate change,
(v) the planning of development to manage emissions,
(vi) planning decisions that recognise the basic needs and expectations of diverse community members,
(d) to facilitate a strong and diverse economy by providing a range of services and opportunities for residents and investors, including by providing for the following—
(i) the protection of employment lands and rural lands from incompatible land uses to enhance productivity over time,
(ii) accessibility to expand markets for economic activity,
(iii) economic activity, value adding opportunities and job creation,
(iv) long-term sustainable productivity and intensive agriculture, subject to consideration of soil types, topography and environmental impact,
(v) major infrastructure projects,
(vi) innovative renewable energy projects,
(e) to recognise and sustain the diverse natural environment and natural resources that support the liveability and economic productivity of Hilltops, including by providing for the following—
(i) the avoidance of further development in areas with a high exposure to natural hazards,
(ii) the minimisation of alterations to natural systems, including natural flow regimes and floodplain connectivity, through effective management of riparian environments,
(iii) the retention and protection of remnant vegetation,
(iv) the revegetation of endemic vegetation to sustain natural resource values, reduce the impact of invasive weeds and increase biodiversity,
(v) buffers and setbacks to minimise the impact of conflicting land uses and environmental values, including potential impacts on noise, water, biosecurity and air quality,
(vi) the management of water on a sustainable and total water cycle basis to provide sufficient quantity and quality of water for consumption, while protecting biodiversity and the health of ecosystems.
(1A) Despite subclause (1), this Plan does not apply to the land identified as “Deferred matter” on the Land Application Map.
1 Definitions
1 Definitions
1.4 Definitions
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note—
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note—
The following local environmental plans are repealed under this provision—
Boorowa Local Environmental Plan 2012
Harden Local Environmental Plan 2011
Young Local Environmental Plan 2010
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
(2A) Despite the repeal of Young Local Environmental Plan 2010, clause 1.8(1A) of that Plan continues to have effect.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) [Not applicable]
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in a zone to be carried out in accordance with this Plan or with a consent granted under the Act, an agreement, covenant or other similar instrument that restricts the carrying out of the development does not apply to the extent necessary to serve the purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to biodiversity certification conferred under the Biodiversity Conservation Act 2016, Part 8, or
(c) to a private land conservation agreement within the meaning of the Biodiversity Conservation Act 2016, or
(d) to a relevant instrument within the meaning of the Crown Land Management Act 2016, section 13.4, or
(e) to the relevant provisions of a land management (native vegetation) code, and the necessary mandatory code compliant certificate, in relation to a set aside area under the Local Land Services Act 2013, Part 5A, or
(f) to a conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(g) to a property vegetation plan within the meaning of the Native Vegetation Act 2003 that is continued in force by the Biodiversity Conservation (Savings and Transitional) Regulation 2017, or
(h) to a Trust agreement within the meaning of the Nature Conservation Trust Act 2001 that is continued in force by the Biodiversity Conservation (Savings and Transitional) Regulation 2017, or
(i) to a planning agreement within the meaning of the Act, Division 7.1.
(3) This clause does not affect the rights or interests of a public authority under a registered instrument.
(4) Under the Act, section 3.16, the Governor, before the making of this clause, approved of subclauses (1)–(3).
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU4 Primary Production Small Lots
RU5 Village
Residential Zones
R1 General Residential
R2 Low Density Residential
R5 Large Lot Residential
Employment Zones
E3 Productivity Support
E4 General Industrial
Mixed Use Zones
MU1 Mixed Use
Special Purpose Zones
SP2 Infrastructure
SP3 Tourist
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
C3 Environmental Management
Waterway Zones
W1 Natural Waterways
W2 Recreational Waterways
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes—
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes—
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note—
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Pl
This is an opening excerpt, not the complete document.