The regulations revolve around a small set of legal concepts, each tied to the mechanics of implementing a highway infrastructure project. These concepts are: the Project, the Commissioner as project authority, ongoing maintenance and operation, authorisations for permanent closure of roads, authorisations for permanent limitation or closure of government railway lines, and declarations and authorisations for permanent obstruction of navigation in a delineated part of the Port River.
Project: The regulations define Project as the Port River Expressway Project (reg 3). The instrument does not attempt to re-specify completed works on commencement day; instead reg 4(2) records that particulars of completed features remain in the revoked regulations (Schedule 1 Parts 1 and 2 of the revoked instrument), except for two named clauses (5A and 9). The spatial extent of the Project is not reproduced in these regulations but is expressly referenced to Figures 2 to 5 in Schedule 2 of the revoked regulations (reg 4(3)). Therefore the concept of the Project within this instrument is partly defined by reference to an external, revoked instrument’s figures.
Commissioner as project authority: Regulation 5 states that responsibility for carrying out the Project continues to be assigned to the Commissioner as the project authority. The regulations do not define "Commissioner"; that definition must be sought in the Highways Act 1926 or other primary law. The Commissioner therefore, within the scope of these regulations, is the decision-maker authorised to exercise the powers set out in Schedule 1 Part 2.
Ongoing maintenance and operation: Schedule 1 Part 1 identifies two named bridges , The Lieutenant Tom ‘Diver’ Derrick, VC, DCM Bridge (road bridge) and The Saint Mary MacKillop Bridge (rail bridge) , and declares that maintenance and operation of these structures and their associated works will continue (Schedule 1 Part 1, clauses 1-2). Construction is stated to be complete for both structures. The wording is declaratory; the regulations do not specify who performs the maintenance but link responsibility for carrying out the Project to the Commissioner (reg 5).
Permanent closure of roads: Schedule 1 Part 2 Division 1, cl 3 authorises the Commissioner, pursuant to s 39G(1)(b) of the Act, to permanently close any road that it is necessary to permanently close for the purposes of implementing the Project. The authority is framed by the statutory criterion of necessity for Project implementation, rather than listing individual roads in the instrument.
Permanent limitation or closure of government railway lines: Schedule 1 Part 2 Division 2, cl 4(1) authorises, pursuant to s 39G(2)(b) of the Act, the Commissioner to permanently limit the use of certain government railway lines or to permanently close any or all of those lines as required. Subregulation 4(2) enumerates three corridors: the corridor between Francis Street and Eastern Parade, Port Adelaide; and two corridors listed subject to their transfer from the Australian Rail Track Corporation to the Crown, namely between Signal 1456 (Glanville Station) and Signal 3 (Birkenhead), and between Signal 14 (Gillman Junction) and Signal 1155 (Port Adelaide Junction).
Permanent obstruction of navigation: Schedule 1 Part 2 Division 3, cl 5 declares, pursuant to s 39H(2) of the Act, that permanent obstruction of navigation over the delineated area of the Port River (the area bounded by bold black lines in Figures 2 and 3 of Schedule 2 of the revoked regulations) is necessary for Project implementation, and accordingly authorises the Commissioner to permanently obstruct navigation over that area. The term "delineated area" is given its meaning by that cross-reference.
Revocation and continuity: Schedule 2 revokes the 2004 regulations, while reg 4(2) preserves particulars of completed features in the revoked regulations (with exceptions). The instrument therefore functions as a successor instrument preserving some matters and restating ongoing authorisations while removing the older subordinate law.
Together, these concepts create a framework in which the Commissioner is empowered to alter public access and transport corridors , roads, government-owned railway lines, and navigable waterways within a specified area , for the explicit purpose of implementing the Port River Expressway Project. The instrument does not itself set out procedures, compensation or detailed operational rules; it relies on the enabling provisions of the Highways Act 1926 cited in the relevant clauses.