Gunnedah Local Environmental Plan 2012
sch.2-secDams (Zone RU1 Primary Production)
Start here
Get a plain-English read of sch.2-sec
Turn the raw legal text into a practical explanation grounded in Gunnedah Local Environmental Plan 2012.
sch.2-sec Dams (Zone RU1 Primary Production)
Dams (Zone RU1 Primary Production)
(1) Embankment fill batter grades must not be steeper than 1:2.5 (vertical:horizontal).
(2) Minimum distance from property boundary at closest point—10m.
(3) Minimum fill embankment crest width—3m.
(4) Minimum height difference between the embankment crest level and the spillway level—1m.
(5) Minimum fill embankment height—3m (measured from ground level (existing) immediately down slope of the embankment to the top of the embankment crest level).
(6) No trees must be removed or damaged during the construction of the dam.
(7) Maximum water storage capacity—3 megalitres.