Ground Water (Qualco-Sunlands) Control Act 2000
Sch 2Waterlogging and salinity risk management allocations
Start here
Get a plain-English read of Sch 2
Turn the raw legal text into a practical explanation grounded in Ground Water (Qualco-Sunlands) Control Act 2000.
Schedule 2—Waterlogging and salinity risk management allocations
Waterlogging and salinity risk management allocations Water licence number (as at 10 April 2000) 242* 263** 371* 471** Licence numbers which are each followed by a corresponding number of asterisks are each held by related irrigation enterprises. Schedule 3—Classes of well in relation to which a permit is not required 1 A well that is 2.5 metres or less in depth (or such other depth as may be prescribed by regulation). 2 A well— (a) that is not used to provide a supply of water or to drain water into, or to recharge, an underground aquifer; and (b) in relation to which requirements imposed by or under the Mining Act 1971 or the Petroleum Act 2000 are in force.