Mechanically, this Plan replaces prior local environmental plans and fixes the zoning, permitted/prohibited uses, subdivision and development-consent rules and mapped environmental overlays that apply to land shown on its maps. It makes the Council the primary consent authority and sets tests and conditions that developers or landowners must meet before development can proceed. The Plan’s stated aims include protecting arts and cultural activity, preventing unnecessary urban sprawl, conserving environmental values and preserving heritage; affected parties are landowners, developers, the Council and relevant State/Commonwealth agencies.
This instrument is a local environmental plan for the City of Griffith (Griffith Local Environmental Plan 2014). Mechanically, it converts strategic zoning, land‑use permissions, development standards and a set of local overlays into statutory rules that operate under the Environmental Planning and Assessment Act 1979 (the Act). Key mechanical features are:
Zoning and maps: it establishes the Land Zoning Map, Lot Size Map, Heritage Map and a range of overlay maps (for example Terrestrial Biodiversity Map, Riparian Lands and Watercourses Map, Groundwater Vulnerability Map, Wetlands Map) and makes them the primary spatial reference for permitted uses and development standards (cl 1.7; cl 2.2; multiple map references throughout the Plan).
Land Use Table and schedules: the Land Use Table sets permitted, permitted‑with‑consent and prohibited uses for each zone and is supported by Schedule 1 (additional permitted uses), Schedule 2 (exempt development) and Schedule 3 (complying development) (cl 2.3; Schs 1-3).
Consent authority and process: the local Council is designated as the consent authority, subject to the Act (cl 1.6). The Plan specifies which developments require development consent (for example subdivision at cl 2.6, demolition at cl 2.7) and which may be exempt or complying (cl 3.1-3.2).
Principal development standards: the Plan contains substantive standards on subdivision and lot sizes (cl 4.1 and related clauses 4.1A-4.2G), and an exceptions regime for development standards (cl 4.6). Several standard measures that often appear in LEPs, such as adopted numerical height or floor space ratio, are explicitly not adopted here (cl 4.3-4.5 annotated as Not adopted).
Local environmental protections: the Plan imposes assessment duties and prohibitions in relation to biodiversity (cl 7.3), groundwater vulnerability (cl 7.4), riparian areas and watercourses (cl 7.5), wetlands (cl 7.6), salinity (cl 7.7) and flood planning (cl 5.21). Those overlays carry statutory gates for consent and specific matters to be addressed when the consent authority considers applications.
Current sections
Direct links to the current provisions in Griffith Local Environmental Plan 2014.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agritourism; Airstrips; Animal boarding or training establishments; Aquaculture; Artisan food and drink industries; Bed and breakfast accommodation; Building identification signs; Business identification signs; Cellar door premises; Cemeteries; Centre-based child care facilities; Correctional centres; Depots; Dual occupancies; Dwelling houses; Eco-tourist facilities; Environmental facilities; Extractive industries; Farm buildings; Farm stay accommodation; Flood mitigation work; Forestry; Function centres; Group homes; Helipads; Home businesses; Home industries; Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Local distribution premises; Offensive industries; Offensive storage establishments; Open cut mining; Plant nurseries; Recreation areas; Recreation facilities (outdoor); Respite day care centres; Restaurants or cafes; Roads; Roadside stalls; Rural industries; Rural supplies; Rural workers’ dwellings; Secondary dwellings; Sewerage systems; Signage; Truck depots; Veterinary hospitals; Warehouse or distribution centres; Waste or resource management facilities; Water supply systems
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Note.
If land, other than land specified in the table to subclause (2), is required to be acquired under the owner-initiated acquisition provisions, the Minister for Planning and Infrastructure is required to take action to enable the designation of the acquiring authority under this clause. Pending the designation of the acquiring authority for the land, the acquiring authority is to be the authority determined by order of the Minister for Planning and Infrastructure (see section 21 of the Land Acquisition (Just Terms Compensation) Act 1991).
Part 6
Urban release areas
Part 6 Urban release areas
Part 6 Urban release areas
6
Arrangements for designated State public infrastructure
6 Arrangements for designated State public infrastructure
6.1 Arrangements for designated State public infrastructure
(1) The objective of this clause is to require satisfactory arrangements to be made for the provision of designated State public infrastructure before the subdivision of land in an urban release area to satisfy needs that arise from development on the land, but only if the land is developed intensively for urban purposes.
(2) Development consent must not be granted for the subdivision of land in an urban release area if the subdivision would create a lot smaller than the minimum lot size permitted on the land immediately before the land became, or became part of, an urban release area, unless the Director-General has certified in writing to the consent authority that satisfactory arrangements have been made to contribute to the provision of designated State public infrastructure in relation to that lot.
(3) Subclause (2) does not apply to—
(a) any lot identified in the certificate as a residue lot, or
(b) any lot to be created by a subdivision of land that was the subject of a previous development consent granted in accordance with this clause, or
(c) any lot that is proposed in the development application to be reserved or dedicated for public open space, public roads, public utility undertakings, educational facilities or any other public purpose, or
(d) a subdivision for the purpose only of rectifying an encroachment on any existing lot.
(4) This clause does not apply to land in an urban release area if all or any part of the land is in a region within the meaning of the Act, Division 7.1, Subdivision 4.
(1) The objective of this clause is to ensure that earthworks for which development consent is required will not have a detrimental impact on environmental functions and processes, neighbouring uses, cultural or heritage items or features of the surrounding land.
(2) Development consent is required for earthworks unless—
(a) the earthworks are exempt development under this Plan or another applicable environmental planning instrument, or
(b) the earthworks are ancillary to development that is permitted without consent under this Plan or to development for which development consent has been given.
(3) In deciding whether to grant development consent for earthworks (or for development involving ancillary earthworks), the consent authority must consider the following matters—
(a) the likely disruption of, or any detrimental effect on, drainage patterns and soil stability in the locality of the development,
(b) the effect of the development on the likely future use or redevelopment of the land,
(c) the quality of the fill or the soil to be excavated, or both,
(d) the effect of the development on the existing and likely amenity of adjoining properties,
(e) the source of any fill material and the destination of any excavated material,
(f) the likelihood of disturbing relics,
(g) the proximity to, and potential for adverse impacts on, any waterway, drinking water catchment or environmentally sensitive area,
(h) any appropriate measures proposed to avoid, minimise or mitigate the impacts of the development.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Griffith Local Environmental Plan 2014.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Griffith in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to prevent unnecessary urban sprawl by promoting business, industrial, rural and residential uses within and adjacent to existing precincts related to those uses,
(b) to minimise land use conflict in general by creating areas of transition between different and potentially conflicting land uses,
(c) to provide a variety of development options to meet the needs of the community with regard to housing, employment and services,
(d) to manage and protect areas of environmental significance,
(e) to recognise the historical development of the area and to preserve heritage items associated with it.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
Heritage and Aboriginal places: it lists heritage items, conservation areas, archaeological sites and Aboriginal places and makes a number of works and subdivisions on those lands subject to consent and pre‑notification/consultation requirements (cl 5.10; Sch 5).
Sector‑specific controls: there are specific clauses for intensive livestock agriculture (cl 5.18), pond/tank/oyster aquaculture with a site and operational matrix in Schedule 6 and thresholds for exempt development (cl 5.19; Sch 6), as well as protections for live music at licensed premises (cl 5.20).
Interaction, exclusions and savings: the Plan is subject to State Environmental Planning Policies that prevail (cl 1.9(1)). It contains a savings provision for development applications made before the Plan commenced (cl 1.8A) and a power to suspend private covenants to the extent they conflict with the Plan (cl 1.9A), with enumerated exclusions (for example Council covenants and certain Crown instruments).
Urban release and infrastructure sequencing: Part 6 requires DCPs and infrastructure arrangements before subdivision in designated urban release areas (cl 6.1-6.3), and provides that the Part prevails over inconsistent provisions (cl 6.4).
Mechanically, the Plan replaces previous local instruments for the specified land (cl 1.8) and takes effect on publication on the NSW legislation website (cl 1.1AA). It therefore converts strategy and maps into a binding statutory template that drives Council consent decisions, sets minimum lot sizes and creates overlay assessment triggers for environmental, heritage and infrastructure matters.
Main concepts
The Plan organises the local planning framework around a small set of recurring legal and technical concepts. Those concepts are the practical levers by which the Plan shapes private behaviour and public decision‑making.
Zoning and objectives: Zones are defined (cl 2.1) and each zone has stated objectives that the consent authority must have regard to when determining applications (cl 2.3(2)). The objectives operate as the statutory yardstick for appropriateness. The Land Use Table cross‑references uses to zones and classifies them as either permitted without consent, permitted with consent, or prohibited (cl 2.3; Land Use Table).
Maps as statutory data: multiple named maps are adopted by reference and may be combined and updated (cl 1.7). The Plan makes map data available via the NSW Planning Portal and sets the map suite as the spatial ground truth for zoning, lot sizes and overlays (cl 2.2; cl 1.7). Users must therefore consult the spatial maps alongside the textual Land Use Table.
Development consent gates and exemptions: the Plan distinguishes development that requires development consent, exempt development (Schedule 2) and complying development (Schedule 3 and related SEPP) (cl 3.1-3.2). Exempt or complying development is still subject to other statutory approvals and codes, for example the Building Code of Australia and other Acts referenced in the Plan (cl 3.1(3), 3.2(3)).
Minimum lot sizes and subdivision controls: clause 4.1 provides the primary subdivision rule by reference to the Lot Size Map, with several nuanced subclauses that create exceptions (for example area‑specific minimums in cl 4.1(3A)), special rules for strata and community title schemes (cl 4.1AA, cl 4.2A), and a suite of rural and lot‑averaging exceptions (cl 4.1B, 4.2-4.2G). The Plan therefore regulates housing density primarily through minimum lot sizes rather than, for example, FSR.
Exceptions to development standards: cl 4.6 provides a local mechanism to allow departures from development standards where compliance is "unreasonable or unnecessary" and there are sufficient planning grounds, but it explicitly excludes certain standards from being varied and limits its application for subdivisions in key rural and conservation zones (cl 4.6(2), (3), (6), (8)).
Environmental and heritage overlays: a set of overlay clauses require specific considerations and impose positive gates before consent. For biodiversity, groundwater, riparian areas, wetlands and salinity the consent authority must consider specific listed matters and must be satisfied that impacts will be avoided, minimised or mitigated (cl 7.3-7.7). Heritage and Aboriginal places attract both consent requirements and a procedural duty to notify and consult relevant bodies (cl 5.10).
Sector rules and thresholds: the Plan contains sector‑specific thresholds and locational constraints, for example for intensive livestock agriculture (cl 5.18 sets capacity thresholds and locational exclusions), and aquaculture (cl 5.19 and Schedule 6 set site location and operational requirements and where small scale operations may be permitted without consent). Those rules functionally change the marginal cost of particular agricultural and aquaculture investments.
Infrastructure sequencing and DCPs: for land identified as an urban release area the Plan requires certification by the Director‑General of satisfactory arrangements for State infrastructure before certain subdivisions (cl 6.1) and prevents consent for development unless a DCP with specific matters is prepared (cl 6.3). This gives infrastructure sequencing statutory teeth in release areas.
Interaction with State instruments and other Acts: cl 1.9 makes the Plan subject to State environmental planning policies that prevail. The Plan repeatedly references other Acts (for example the Heritage Act, Local Government Act, Crown Land Management Act, Land Acquisition (Just Terms Compensation) Act) and embeds procedural linkages such as notification under those statutes (cl 1.9A; cl 5.1; cl 5.2; cl 5.10).
Those concepts together create a planning architecture that privileges spatial data (maps), uses zoning/objectives as the first filter for permissible activity, employs lot size and specialised overlay tests as control points on density and environmental impact, and routes particular project types through bespoke procedural requirements. The Plan therefore prescribes both substantive standards and decision‑making processes for Council and applicants.
Who it affects
This Plan directly affects a defined set of actors and indirectly affects several others because it changes permissions, duties and approval pathways in municipal territory.
Primary affected parties
Landowners and prospective purchasers in the Griffith area: the Plan dictates permissible uses for each parcel via the Land Zoning Map and Land Use Table (cl 2.2; cl 2.3). Owners proposing subdivision are affected by minimum lot sizes (cl 4.1) and by many of the Part 7 overlay controls (for biodiversity, riparian land, wetlands, groundwater).
Developers, builders and project proponents: they must navigate the consent gates for subdivision, demolition, new dwellings, industrial developments and other uses identified in the Land Use Table (cl 2.6; cl 2.7; cl 2.3). Complying development options are available where Schedule 3 and the State SEPP apply (cl 3.2), but BCA and other approvals remain binding (cl 3.2(2)-(3)).
Council (Griffith City Council): the Council is the designated consent authority under the Plan (cl 1.6). Council is responsible for assessing applications against zone objectives (cl 2.3(2)), for keeping certain records (for example review records under cl 4.6(4)), and for preparing DCPs where required (cl 6.3). Council also has powers over classification and reclassification of public land through Schedule 4 and cl 5.2, with consequential local management effects.
State agencies and persons with statutory roles: Transport for NSW is identified as the relevant acquiring authority for classified roads (cl 5.1 table). The Director‑General has certification powers for State infrastructure arrangements in urban release areas (cl 6.1(2)). Commonwealth bodies must be consulted where development may penetrate airport obstacle surfaces (cl 7.8). The Heritage Council and local Aboriginal communities have consultation or notification roles for archaeological and Aboriginal heritage matters (cl 5.10(7)-(9)).
Primary industries, aquaculture and livestock operators: the Plan contains tailored rules that change the approval burden for those activities. Intensive livestock operations are exempt below stated thresholds and subject to locational limits, and consent authorities must consider odour, pollution and industry codes of practice (cl 5.18). Pond, tank and oyster aquaculture are regulated by site and operational requirements in cl 5.19 and Schedule 6.
Licensed premises and live‑music venues: cl 5.20 prevents consent authorities refusing development for licensed premises on enumerated grounds relating to playing and performing music, and bars refusal on noise grounds only where noise cannot be managed and minimised to an acceptable level.
Heritage owners and custodians of Aboriginal places: owners of listed heritage items, conservation areas, archaeological sites and Aboriginal heritage places face additional consent triggers, and the Council may require heritage management documents and conservation plans before granting consent (cl 5.10; Sch 5).
Indirectly affected parties
Neighbouring landowners and the community: overlay provisions require consideration of amenity impacts (for example odour in cl 5.18, riparian/water quality in cl 7.5) and the Plan contains location controls for potentially sensitive uses such as sex services premises (cl 7.11).
Utility providers and infrastructure funders: the Plan requires that essential services are available or arranged for before consent (cl 7.10; cl 6.2), and DCP and urban release area rules require infrastructure staging and contributions arrangements (cl 6.1-6.3).
Regulators under other Acts: the Plan defers where other legislative approvals are required (for example Fisheries, Crown land, Native Vegetation instruments excluded from covenant suspension), so agencies administering those Acts will be involved in multi‑agency decision pathways (cl 1.9A; multiple cross references).
The Plan therefore reshapes the incentives and compliance requirements for a wide set of local actors. It places the primary administrative burden on the Council as consent authority and applies specialised assessment and notification duties to proponents in environmentally or culturally sensitive locations.
Key duties and rights
This Plan frames a set of statutory duties for consent authorities and for applicants, and establishes rights of use and development by reference to zones, the Land Use Table and schedules. Below are the principal duties and rights set out in the instrument.
Duties on the consent authority (Council)
Have regard to zone objectives: when determining development applications the consent authority must have regard to the objectives of the zone (cl 2.3(2)).
Apply map‑based controls and gates: the Council must apply lot size limits from the Lot Size Map for subdivision (cl 4.1(3)), and observe overlay triggers on biodiversity, groundwater vulnerability, riparian land and wetlands (cl 7.3-7.6).
Heritage and Aboriginal obligations: before granting consent for works affecting heritage items, archaeological sites or Aboriginal places Council must consider heritage significance, may require heritage assessment documents or conservation plans and must notify the Heritage Council or local Aboriginal communities where prescribed (cl 5.10(4)-(9)).
Flood planning assessment: in flood planning areas the consent authority must be satisfied that the development is compatible with flood function and does not increase flood risk, and must consider climate change projection impacts and evacuation capacity (cl 5.21(2)-(3)).
Recordkeeping: when granting consent that contravenes a development standard, the consent authority must keep a record of the assessment under cl 4.6(4).
Consultation for airspace matters and airport operations: if a proposal will penetrate Limitation or Operations Surfaces the consent authority must consult the relevant Commonwealth body and accept its advice where it objects (cl 7.8(2)-(4)).
Duties on applicants and developers
Obtain development consent where required: subdivision, demolition and many other developments require consent (cl 2.6; cl 2.7). Exempt or complying development are set out in Schedule 2 and Schedule 3, but are still subject to other approval requirements (cl 3.1(2)-(3); cl 3.2(2)-(4)).
Meet technical standards: exempt and complying development must meet the Building Code of Australia deemed‑to‑satisfy provisions or be structurally adequate (cl 3.1(3)(a)). Complying development must also be permissible in the zone (cl 3.2(3)(a)).
Prepare supporting documents: where relying on cl 4.6 to depart from a development standard, applicants must demonstrate that compliance is unreasonable or unnecessary and provide a statement addressing the matters set out in the regulations under the Act (cl 4.6(3); note re EP&A Regulation).
Heritage, biodiversity and water assessments: developments in mapped heritage, biodiversity, groundwater vulnerable or riparian areas must provide appropriate assessment material and where required heritage management documents, conservation plans or statements of environmental effects (cl 5.10(5)-(6); cl 7.3(3)-(4); cl 7.4(3)-(4); cl 7.5(3)-(4)).
Infrastructure and service arrangements: proponents in urban release areas must ensure adequate arrangements for designated State public infrastructure before subdivision and DCP compliance where required (cl 6.1-6.3). For ordinary development, essential services must be available or arranged (cl 7.10).
Rights conferred on landholders and developers
Permitted uses under zoning: where a use is identified as "permitted without consent" in the Land Use Table and meets any applicable exempt development standards, the use can be carried out without development consent subject to other approvals (cl 2.3; Sch 2).
Additional permitted uses on specific land: Schedule 1 provides for particular additional permitted uses on specified parcels (for example freight facility at Lot 3 Irrigation Way, cl Sch 1.1).
Access to exceptions and variations: cl 4.6 provides a statutory pathway to seek consent to contravene a development standard where planning grounds are demonstrated, subject to exclusions and recordkeeping (cl 4.6(2)-(8)).
Complying development certificate pathway: where development meets the complying development criteria in Schedule 3 and the State SEPP, proponents can seek a complying development certificate as an alternative to development consent (cl 3.2(2)-(4)).
Limits and special procedural features
Suspension of covenants: cl 1.9A permits suspension of private covenants to the extent they restrict carrying out development under this Plan, subject to explicit exclusions (for example Council‑imposed covenants and certain Crown or conservation instruments) (cl 1.9A(1)-(3)).
Non‑adoption of certain standards: where the Plan has "Not adopted" entries for height, floor space ratio and calculation rules (cl 4.3-4.5), the absence of a local numerical cap means development assessment must rely on zone objectives, design controls and other applicable instruments rather than a fixed local numerical standard.
These duties and rights design the administrative interaction between applicants and Council, with tiered obligations for sensitive areas and specific sector thresholds. The Plan frequently cross‑references other legislation and State policies, so the rights it confers are conditional on obtaining all other required statutory approvals.
Penalties and enforcement
The Plan itself sets permissions, assessment duties and procedural gates, but it does not prescribe monetary penalties or criminal offences within its text. Enforcement and penalties for non‑compliance with development controls therefore arise under the Environmental Planning and Assessment Act 1979 and related legislation rather than within the LEP text. The instrument does, however, create specific compliance and enforcement triggers that will be relevant to any enforcement action taken under the Act.
Key enforcement‑relevant features in the Plan
Requirement for development consent for specified activities: the Plan establishes that subdivision (cl 2.6) and demolition (cl 2.7) are subject to development consent, and lists uses that are prohibited (Land Use Table). Carrying out development without required consent will be an operational breach that enforcement authorities act on pursuant to the Act.
Recordkeeping when departing development standards: where cl 4.6 is used to approve a contravention of a development standard, the consent authority must keep a record of the assessment (cl 4.6(4)). That record forms part of the administrative record that would be examined in any challenge or enforcement proceeding.
Heritage and Aboriginal place procedural protections: cl 5.10 requires the Council to notify the Heritage Council (cl 5.10(7), (9)) and local Aboriginal communities (cl 5.10(8)) in certain cases. Failure to follow prescribed procedural steps can be relevant in judicial review or merits review of a consent decision.
Overlay compliance conditions: consent authorities must be satisfied about avoidance, minimisation or mitigation of impacts for biodiversity, groundwater, riparian land and wetlands (cl 7.3-7.6). Conditions attached to consents to secure mitigation measures become enforceable consent conditions; non‑compliance with those conditions is enforceable under the Act.
Infrastructure sequencing: Part 6 prohibits certain subdivisions in urban release areas absent certification that satisfactory infrastructure arrangements exist (cl 6.1). If a subdivision proceeds in contravention, it would be subject to enforcement action under the Act and any relevant land management statutes.
Industry thresholds and locational exclusions: cl 5.18 establishes thresholds and locational restrictions for intensive livestock agriculture; cl 5.19 and Schedule 6 impose site and operational restrictions for aquaculture. Undertaking such development in contravention of the Plan will attract enforcement attention and potential remedial or penal measures under the Act and relevant environmental protection statutes.
Who enforces
The designated consent authority (Council) administers the Plan and will be the primary regulator for breaches in its area when a development is undertaken without consent or in contravention of consent conditions (cl 1.6).
State agencies and the courts exercise enforcement and review powers under the Act and associated statutes. The Plan references those Acts and policies, making clear that compliance obligations are multi‑instrument in practice (see cross‑references throughout, for example cl 1.9 and the various notes linking to other Acts).
Practical note on penalties
Because the Plan contains no standalone penalty schedule, the quantification of fines, orders for remediation, stop work notices or compulsory acquisition remedies is governed by other legislation cited in the Plan and by the enforcement provisions of the Act. Practitioners should therefore pair any enforcement strategy with the Act and relevant regulations that specify penalties and enforcement procedures.
In short, the Plan creates the compliance obligations and procedural steps that trigger enforcement under broader statutory regimes. The Plan itself provides the substantive controls; the Act provides the enforcement machinery.
How it interacts with other laws
The Plan is expressly drafted to interlock with State environmental planning policies and multiple subject‑specific Acts. It both defers to and incorporates procedural and substantive requirements emanating from those laws. The Plan contains explicit cross‑references and express exclusions that define the interaction.
Primary interactions called out in the text
State environmental planning policies (SEPPs): cl 1.9(1) states that the Plan is subject to any SEPP that prevails as provided by section 3.28 of the Act. The Plan also lists a number of SEPPs as potentially relevant in the Land Use Table preface (for example SEPP (Housing) 2021, SEPP (Transport and Infrastructure) 2021, SEPP (Industry and Employment) 2021). That means where a SEPP applies and is expressed to prevail it will override inconsistent provisions in this LEP.
Environmental Planning and Assessment Regulation 2021: cl 4.6 references that the Regulation requires an applicant to accompany a development application that proposes to contravene a development standard with a specified document explaining the grounds. The Regulation therefore prescribes procedural materials required where cl 4.6 is engaged.
Heritage Act 1977 and Heritage Council: cl 5.10 gives effect to the procedural interface with the Heritage Act by requiring notification of the Heritage Council and referencing State heritage listing and interim heritage orders.
Local Government Act 1993: cl 5.2 links classification and reclassification of public land under this Plan to Part 2 of Chapter 6 of the Local Government Act and notes the Plan’s ability to discharge trusts under section 30 of that Act.
Land Acquisition (Just Terms Compensation) Act 1991: cl 5.1 adopts the owner‑initiated acquisition provisions and designates which State authority will acquire certain reserved land types, referencing section 3.15 of the Act.
Crown Land Management Act 2016 and other Crown instruments: cl 1.9A(2) excludes certain Crown instruments from the Plan’s power to suspend covenants. The Plan therefore does not disturb Crown land instruments that are within the meaning of s 13.4 of the Crown Land Management Act.
Fisheries, Water and Rural Land statutes: cl 5.19 and Schedule 6 cross‑reference the Fisheries Management Act and aquaculture industry development plans. cl 5.17 links to the Water Management Act 2000 for irrigation corporation areas. cl 1.9A excludes property vegetation plans, biobanking agreements, and other instruments under the Native Vegetation Act, Threatened Species Conservation Act and related Acts.
Rural Fires Act 1997: cl 5.11 confirms that bushfire hazard reduction work authorised by the Rural Fires Act may be undertaken without development consent, acknowledging a direct statutory carve‑out.
Building Code of Australia and BASIX: cl 3.1(3)(a) requires exempt development to meet the Building Code deemed‑to‑satisfy provisions, and cl 4.6(8)(b) excludes BASIX commitment standards from variation via the exceptions clause.
Commonwealth aviation regulation: cl 7.8 requires consultation with the relevant Commonwealth body where development would penetrate Limitation or Operations Surfaces for Griffith Airport, thereby connecting local planning controls to Commonwealth aviation safety and airspace laws.
Consequences of these interactions
Supremacy where applicable: SEPPs and the Act retain precedence where they are expressed to prevail (cl 1.9(1)). Practically, applicants and Council must check both State instruments and this LEP before taking action.
Multi‑agency approvals: many developments require approvals or licences under other Acts in addition to Plan consent, for example aquaculture licences under Fisheries legislation, water entitlements under the Water Management Act, or approvals for works on Crown land. The Plan repeatedly requires that consent authorities consider whether other authorisations are needed (for example cl 5.17(4)(b)).
Procedural coordination: the Plan prescribes notification duties (Heritage Council, Aboriginal communities) and consultation (Commonwealth for airspace) that must be factored into the statutory timetable for application processing and can affect viability and timing.
Limited displacement of private covenants: cl 1.9A grants a limited power to set aside private covenants that conflict with the Plan, but with a defined list of excluded instruments. That alters the legal effect of private encumbrances in some cases but preserves others (for example Council covenants remain effective).
For practice, the Plan is not a stand‑alone instrument: every assessment must be carried out against the Plan and the suite of State and Commonwealth laws it references. The Plan sets the local rules and gates; other Acts supply licences, technical standards and enforcement powers.
Amendment history
The instrument text contains in‑line marginal amendment notes identifying the legislative instruments and years that altered specific clauses. The amendment record presented in the Plan shows iterative changes since the Plan was made. The Plan itself records these amendments at clause level; salient entries in the embedded notes are as follows.
Notable amendments recorded in the text
2015 amendments: multiple clauses show amendment annotations to 2015 (for example cl 4.1 amended 2015 (574), Sch 1[6]; the Land Use Table notes include 2015 amendments).
2017 and 2018: the Land Use Table and specific clauses record amendments in 2017 (493), and cl 5.4 notes amendments in 2018 (406), inserting or modifying use controls and floor area caps.
2019 package of amendments: several clauses carry the annotation Am 2019 (621), Sch 5, including the savings provision cl 1.8A (Am 2019 (621), Sch 5[1]) and suspension of covenants cl 1.9A (Am 2019 (621), Sch 5[2]-[4]). Cl 6.1 also records an amendment 2019 (621), Sch 5[5].
2021 changes: some repeals and insertions are noted in 2021; for example cl 7.2 is marked as repealed 2021 (225), Sch 1.
2022 updates: cl 2.1 shows amendments 2022 (832), Sch 1.7[1], and cl 4.1AA and several lot size/strata related clauses reference 2022 (832), Sch 1.7[3-5]. Schedule and zone updates also record 2022 changes.
2023 adjustments: multiple new clauses and insertions in 2023 (576) appear: cl 2.1 amendment 2023 (576), Sch 1[1]; cl 4.1C inserted 2023 (576), Sch 1[5]; cl 5.5 was substituted 2023 (576), Sch 1[6]; cl 7.13 was inserted 2023 (576), Sch 1[7]; Schedule 5 amended 2023 (576), Sch 1[8].
2024: cl 4.1 notes an amendment 2024 (81), Sch 1[1] in the marginal note.
How the Plan records changes
Clause‑level marginal notes: the Plan shows amendment provenance beside affected clauses with the year and instrument identifier (for example "Am 2019 (621), Sch 5[1]").
Insertions and repeals: the text indicates where provisions were inserted or repealed, for example cl 1.9A shows "Am 2019 (621), Sch 5[2]-[4]" and cl 7.2 is shown as "Rep 2021 (225), Sch 1".
Schedules updated: amendments to schedules (Schedules 1, 4, 5 and 6) are similarly footnoted in the Plan.
Practitioner implications
Dynamic content: because the Plan has a history of frequent amendments across many clauses, practitioners must check the consolidated instrument on the NSW legislation website and the associated maps on the Planning Portal to ensure they work from the current operative text and current maps (cl 1.7 note).
Clause‑specific changes: several substantive operational rules have been introduced or modified over time, notably around lot size exceptions, aquaculture and rural subdivision. The marginal notes provide a trace for legislative provenance but do not substitute for checking the operative consolidated instrument.
The Plan’s embedded amendment notes are the authoritative internal record of staged changes. For precise drafting history and to identify the current operative wording, consult the consolidated Plan on the legislation website and the associated amendment instruments cited in the marginal notes.
Litigation history
The text of the Plan does not list judicial decisions or administrative appeals. No cases are named in the instrument itself. The Plan therefore contains no recorded litigation history within its text.
Practical observation on likely dispute areas (based on text)
Although the Plan does not report cases, the following provisions are ones that commonly generate disputes in practice and therefore are potential sources of litigation or merits review proceedings under the Act and related statutes:
Exceptions to development standards (cl 4.6): departures from development standards frequently form the subject matter of merits review, judicial review or merits challenges because they engage discretionary trade‑offs and require a written rationale where standards are contravened. cl 4.6 requires demonstration that compliance is unreasonable or unnecessary and that there are sufficient environmental planning grounds, and requires the consent authority to keep a record (cl 4.6(3)-(4)). Those administrative materials are often central to any challenge.
Minimum lot sizes and subdivision exceptions (cl 4.1 and related clauses): disputes can arise over whether proposed subdivisions comply with the Lot Size Map and where exceptions (for example lot averaging cl 4.1B, rural subdivision cl 4.2, boundary adjustments cl 4.2G) are lawfully applied. Disagreements over interpretation of "existing holding" (cl 4.2C(5)) and calculation of areas for split zones (cl 4.1C) can provoke review.
Heritage and Aboriginal site decisions (cl 5.10): consents for demolition, alterations or subdivision affecting heritage items and Aboriginal places require procedural steps including notices to the Heritage Council and local Aboriginal communities. Procedural failures or contested assessments of heritage significance are common grounds for objections and legal challenges.
Environmental overlay decisions (cl 7.3-7.6): decisions in mapped biodiversity, riparian and groundwater vulnerable areas require detailed environmental assessments and explicit consideration of avoidance, minimisation and mitigation measures. The Plan instructs consent authorities to be satisfied about these matters; disputes commonly allege inadequate assessment or insufficient mitigation.
Flood planning and climate change considerations (cl 5.21): the Plan requires consent authorities to consider projected changes due to climate change when assessing flood impacts. Disputes can centre on the adequacy of the flood risk assessment and the interpretation of "compatible with flood function and behaviour" and evacuation capacity.
Aquaculture and intensive livestock thresholds and locational rules (cl 5.18, cl 5.19, Sch 6): technical disputes about whether a proposed operation falls within exempt thresholds, whether locational exclusions apply, or about adequacy of management plans, can trigger regulatory review and objections.
Process‑level notes relevant to litigation risk
Procedural compliance matters: several Plan provisions mandate pre‑application notifications and the right to comment for external bodies (Heritage Council, local Aboriginal communities, Commonwealth aviation bodies). Failure to follow these procedures can be a legal weakness in a consent decision.
Multi‑instrument decision making: because the Plan cross‑references other SEPPs and Acts that may prevail (cl 1.9), litigation may involve multi‑instrument arguments about which instrument governs a particular component of a proposal.
Because the Plan contains no internal case law record, parties seeking to understand precedent should examine decisions under the Act and relevant administrative tribunals or courts, focusing on the issues highlighted by the Plan’s high‑risk clauses.
Gotchas
This Plan contains several provisions and drafting features that can create traps for practitioners and proponents if not checked carefully. The following items are practical "gotchas" sourced directly from the Plan.
Maps and combined map layers: the Plan relies on multiple named maps and permits maps to be combined into a single map (cl 1.7(1)-(2)). Practitioners must check the current consolidated map set on the Planning Portal rather than relying on a single paper map, because combined mapping may obscure overlay extents that trigger obligations such as heritage or biodiversity assessments.
Savings for pre‑commencement DAs: cl 1.8A ensures that development applications lodged before the Plan commenced and not finally determined are to be determined as if the Plan had not commenced. That can produce counterintuitive outcomes: an application submitted earlier may escape new constraints in the LEP while new applicants are subject to them (cl 1.8A). Check lodgement dates carefully.
Suspension of private covenants with enumerated exclusions: cl 1.9A allows the Plan to set aside private covenants to the extent necessary to permit development under the Plan but expressly excludes Council‑imposed covenants and a range of Crown and conservation agreements (cl 1.9A(2)). Do not assume that a private covenant is nullified; verify whether the covenant is one of the excluded classes.
Exceptions to standards are limited for subdivisions: cl 4.6 allows contravention of development standards in some circumstances but explicitly prevents the clause being used to permit subdivisions that would create two or more lots below minimum areas in specified zones or create a lot less than 90 per cent of a minimum area (cl 4.6(6)). Practitioners cannot rely on cl 4.6 to permit substantial under‑sizing in key rural and conservation zones.
"Not adopted" height and FSR: clauses 4.3-4.5 record "Not adopted". This means there are no local numeric height and floor space ratio controls in the Plan. Do not assume that an absence of numeric limits gives free rein; Council will assess against zone objectives (cl 2.3(2)), design controls, DCPs and any relevant State policy. Also check if other instruments (SEPP, DCP) impose numeric limits.
Complying development does not remove other approvals: cl 3.2 requires complying development to meet the Building Code and any Council approvals for on‑site effluent where needed. Even where complying development certificates are available, other licences or approvals (for example environmental licences) may still be required (cl 3.2(3)).
Heritage procedural traps: cl 5.10(3) and (7)-(9) set out when consent is required and when the Heritage Council or local Aboriginal communities must be notified. Failure to notify where required, or to provide a heritage management document or conservation plan when demanded by Council, can lead to procedural challenges.
Part 6 urban release sequencing: in urban release areas, subdivision creating lots smaller than previously permitted is not allowed unless the Director‑General certifies satisfactory arrangements for designated State public infrastructure (cl 6.1(2)). Practitioners must anticipate an extra certification step for such subdivisions and the possibility of a certificate condition precedent.
Aquaculture and intensive livestock locational exclusions and thresholds: cl 5.18(4) sets explicit locational exclusions for exempt intensive livestock activities (for example not in environmentally sensitive areas, within specified distances of dwellings, or within a set distance of other farms). Similarly, cl 5.19 and Schedule 6 impose operational requirements and conservation exclusion zones. Mistakes in measuring distances, or misclassifying the area as environmentally sensitive, can invalidate an exemption claim.
Music protections for licensed premises: cl 5.20 prevents consent authorities from refusing licensed premises on enumerated grounds relating to music and limits refusal on noise grounds only if the consent authority is satisfied the noise cannot be managed to an acceptable level. Neighbours opposing a venue on the basis of music should consider that the Plan constrains refusal grounds.
Development near zone boundaries: cl 5.3 allows uses permitted in an adjoining zone to be granted within 20 metres of a boundary in certain circumstances, but it explicitly excludes several sensitive zones (cl 5.3(3)). Misreading the excluded zones can lead to incorrect assumptions about cross‑zonal rights.
Essential services requirement: cl 7.10 requires proof of availability or arrangements for essential services. This is a non‑technical but critical gate: a consent may be refused where proponents cannot demonstrate water, electricity, sewage and access arrangements.
Special local land clauses: the Plan contains site‑specific rules and DCP prerequisites for parcels (for example Sch 1 additional permitted uses, cl 7.12 Nericon, cl 7.13 Crossing Street release). Always check schedules and Part 7 provisions for parcel‑level requirements.
In practice, the safe approach is to begin any project by checking the current maps, identifying overlay triggers, confirming whether a consent or a complying certificate is needed, and reviewing any parcel‑specific schedule entries. Don’t assume that an absence of a numeric standard means an absence of constraint.
How to comply
Practical step‑by‑step approach to assessing and securing development under this Plan, grounded in the Plan’s clauses and schedules.
Confirm spatial status and zoning
Consult the Land Zoning Map, Lot Size Map, Heritage Map, Terrestrial Biodiversity Map, Riparian Lands and Watercourses Map, Groundwater Vulnerability Map, Wetlands Map and any other relevant named maps maintained on the NSW Planning Portal (cl 1.7; cl 2.2). These maps determine permissible uses, minimum lot sizes and overlay triggers.
Identify use permissibility and pathway
Use the Land Use Table and Schedule 1 to determine whether the proposed use is permitted without consent, permitted with consent, or prohibited in the zone (cl 2.3; Sch 1). If the use sits in "permitted without consent" and meets Schedule 2 specifications it may be exempt development (cl 3.1). If it matches Schedule 3 criteria and complies with the required standards it may be complying development (cl 3.2).
Check lot size and subdivision rules
For any proposed subdivision, calculate resulting lot areas against the Lot Size Map and the specific rules in cl 4.1 and related clauses (cl 4.1, 4.1A, 4.1B, 4.1C). If parcels straddle zones, apply cl 4.1C (split zones). For strata or community title schemes consult cl 4.1AA and 4.2A.
Identify overlay triggers and required assessments
If the land is mapped for biodiversity, groundwater vulnerability, riparian land, wetlands or is in a flood planning area, compile the specific assessment material set out in those clauses. For biodiversity (cl 7.3) and riparian land (cl 7.5) ensure the proposal proves avoidance, minimisation or mitigation and prepares relevant studies. For flood planning (cl 5.21) incorporate climate projections, evacuation and design measures in the EIS or statement of environmental effects.
Heritage and Aboriginal places
If the site is a heritage item, within a conservation area, an archaeological site or an Aboriginal place, prepare heritage management documents or conservation plans if required (cl 5.10(5)-(6)). Notify the Heritage Council or local Aboriginal communities where the clause prescribes (cl 5.10(7)-(9)) and consider obtaining pre‑application advice.
Sector‑specific compliance
For intensive livestock agriculture, check capacity thresholds and locational exclusions in cl 5.18 and prepare odour, effluent and management plans where consent is required. For aquaculture, apply the site location and operational requirements in cl 5.19 and Schedule 6; ensure species are consistent with industry development plans (cl 5.19(2)(a) and Sch 6 Div 2).
Use exceptions and variations carefully
If a development standard cannot be met, and if cl 4.6 is available, prepare the required justification demonstrating compliance with cl 4.6(3) and any documentation required by the EP&A Regulation. Remember cl 4.6 excludes certain standards and limits variation for subdivisions in specified zones (cl 4.6(6), (8)).
Infrastructure, DCPs and urban release areas
If the land is within an urban release area consult cl 6.1-6.3: ensure the Director‑General has certified satisfactory arrangements for designated State public infrastructure where necessary (cl 6.1(2)), and confirm if a development control plan has been prepared that covers staging, transport, landscaping, stormwater, hazards and urban design (cl 6.3(2)-(3)). Council will not grant consent in the absence of a required DCP.
Procedural and external approvals
Confirm other statutory approvals required under other Acts identified by the Plan (for example fisheries licences, water entitlements, Crown land approvals). The Plan frequently requires the consent authority to consider whether a licence or approval under other legislation is required (for example cl 5.17(4)(b)). Factor these into the project timeline.
Consult and document
Engage early with Council as consent authority (cl 1.6) and with any external agencies identified by the Plan (Heritage Council, relevant Commonwealth aviation body, Transport for NSW, Director‑General for infrastructure certification). Prepare environmental impact statements, heritage management documents and technical reports as needed. Keep records of consultations and all supporting documents; cl 4.6(4) requires the consent authority to keep records where standards are varied.
Consider exempt and complying development pathways
Where development is specified in Schedule 2 or Part 1 of Schedule 3 and meets the relevant standards, consider the exempt or complying development pathway (cl 3.1-3.2). Remember that complying development requires satisfaction of BCA provisions and any local Council conditions for on‑site effluent systems on unsewered land (cl 3.2(3)).
Special procedural obligations
For proposals that may penetrate airport surfaces consult the relevant Commonwealth body early (cl 7.8). For licensed premises relying on live music, be aware of the protections in cl 5.20 and prepare a noise management plan showing how noise will be managed and minimised.
Verify covenant status
Before relying on cl 1.9A to argue a private covenant is displaced, confirm whether the covenant is excluded (Council covenants, Crown instruments and other listed instruments under cl 1.9A(2)). If the covenant is excluded it remains effective even if inconsistent with the Plan.
Prepare for conditions and enforcement
Expect Council to impose conditions that secure mitigation measures for biodiversity, water quality, heritage conservation, flood resilience and infrastructure delivery. These conditions will be enforceable under the Act; ensure the operation plan and compliance arrangements are prepared to meet them.
Final checks and certifications
Prior to lodgement, ensure all required technical reports, BCA/BASIX commitments (where applicable) and any other statutory statements are assembled. If seeking to contravene a development standard, include the required variation justification document mandated by the EP&A Regulation.
Following these steps aligns a project with the Plan’s spatial controls, the statutory consent gates and the overlay‑specific assessment matters. Always confirm the current consolidated text and maps on the NSW legislation website and the Planning Portal because the Plan records multiple amendments and map updates (cl 1.7 notes and amendment marginalia).
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Griffith Local Environmental Plan 2002
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.
(5) Subclause (3) (d) does not apply to the temporary use of a dwelling as a sales office mentioned in subclause (4).
2 Canal estate development prohibited
2 Canal estate development prohibi
This is an opening excerpt, not the complete document.