What this law does (mechanically): Establishes a statutory Committee (mayors plus specified State ministers) and an Advisory Group (council general managers and senior public servants) to prepare, approve and implement a statutory "work program" that maps key transport corridors and activity centres and allocates actions to councils, adjunct councils or the State (ss 6–13).
Who it affects and why it matters: Affects the four Greater Hobart councils, invited adjunct councils, State agencies and specified Ministers—because it creates a formal process to co‑ordinate infrastructure, passenger transport and land‑use planning across Greater Hobart (ss 4–5).
The Greater Hobart Act 2019 creates a statutory framework for joint strategic planning and infrastructure coordination across the municipal areas that comprise Greater Hobart. Mechanically the Act establishes two governance bodies, prescribes how they are composed and how they operate, and sets out a formal process for preparing, approving, reviewing, amending and implementing a single instrument called a work program.
Key mechanical changes introduced by the Act are the following.
Establishes the Greater Hobart Committee (the Committee) and defines its membership and voting rules (see s 6). Membership comprises the mayors of the defined Greater Hobart area councils and specific State Ministers. Ministers who hold responsibility for more than one of the identified portfolio areas have multiple votes (s 6(2)-(3)). The Committee is chaired by the Minister with primary responsibility for economic development (s 6(4)).
Establishes the Greater Hobart Advisory Group (the Advisory Group), defines its membership (senior public servants and council general managers), and allocates responsibility for drafting work programs to it (s 7, s 9).
Requires the Advisory Group to prepare a draft work program and submit it to the Committee (s 9). The Committee must either approve, approve with amendments, or refuse the draft (s 10). A draft is taken to be approved and becomes a work program only if approved by a majority of Committee members that includes no fewer than three mayors (s 10(2)-(3)).
Defines what a work program must contain, notably a map identifying key transport corridors and activity centres, specific actions, and assignment of responsibilities among the parties named in the Act (s 8(1)-(6)). The Advisory Group must, when preparing a draft work program, seek to further the resource management and planning objectives in Part 1 of Schedule 1 to the Land Use Planning and Approvals Act 1993, consider the Southern Tasmania Regional Land Use Strategy, and be consistent with any applicable State Policy under the State Policies and Projects Act 1993 (s 8(7)).
Current sections
Direct links to the current provisions in Greater Hobart Act 2019.
service infrastructure means infrastructure related to the provision of gas, water, sewerage, electricity or telecommunications;
Southern Tasmania Regional Land Use Strategy means the regional land use strategy, in force from time to time under section 5A of theLand Use Planning and Approvals Act 1993 , that applies to the area of Tasmania that includes the Greater Hobart area;
transport infrastructure means infrastructure to enable road, rail, water or air transport or the movement of pedestrians or bicyclists;
work program means a draft work program, as amended from time to time under section 12(3) , that is approved under section 10(1) and that has not been revoked under section 12(4) .
4
Object of Act
4 Object of Act
(1) The object of this Act is to assist the Greater Hobart area councils and the State Government to better co-ordinate, across the Greater Hobart area –
(a) the efficientuse of infrastructure; and
(b) ease of access to infrastructure, in all locations, for persons of all abilities and needs; and
(c) strategic planning, and other actions, in relation to future land use and development in the Greater Hobart area –
so as to improve the health and wellbeing of persons, and enable the Greater Hobart Objectives to be achieved, in the Greater Hobart area.
(2) The principal way in which the object of this Act is to be achieved is by establishing a process for the formation and implementation of a work program that seeks to further the Greater Hobart Objectives in the Greater Hobart area.
5
Greater Hobart Objectives
5 Greater Hobart Objectives
For the purposes of this Act, the Greater Hobart Objectives are –
(a) to encourage and promote, in the making of strategic planning decisions, and decisions about land use, in relation to the Greater Hobart area, the consideration of potential benefits, and implications, for that area, of such decisions; and
(b) to facilitate the efficient and safe flow of transport, to improve access to, and to further the use of, public passenger transport, and to encourage and promote the use of transport with low-carbon emissions, in the Greater Hobart area; and
(c) to further the maintenance and accessibility of existing, and the development of new, cultural, sporting, recreational and community facilities, that complement, link to, and contribute to, the cultural experiences able to be provided in the Greater Hobart area; and
(d) to encourage, promote and provide for urban renewal, and affordable housing, that enhance amenity, liveability, ease of access to places and facilities and the provision of passenger transport; and
(e) to encourage, promote and provide for the development of hubs for specialised purposes such as science, sport, recreation, social activity, economic activity, technology, industry, education or the arts; and
(f) to encourage, promote and provide for, where suitable –
(i) the efficient and effective integration and co-location of the facilities, housing and hubs that are referred to in the other paragraphs of these objectives; and
(ii) the transport infrastructure, and the service infrastructure, that is necessary or desirable in relation to such facilities, housing and hubs; and
(g) any other prescribed objectives.
Part 2
Administration
Part 2 Administration
6
Greater Hobart Committee
6 Greater Hobart Committee
(1) There is established by this subsection the Greater Hobart Committee (the Committee).
(2) The Committee is comprised of the following members:
(a) each of the mayors of the Greater Hobart area councils;
(b) the Minister with primary responsibility for economic development;
(c) the Minister with primary responsibility for infrastructure;
(d) the Minister with primary responsibility for housing;
(e) the Minister with primary responsibility for community development.
(3) A Minister who is responsible for more than one of the areas referred to in subsection (2) has as many votes at a meeting of the Committee as he or she has such areas of responsibility.
(4) The person who is a member of the Committee under subsection (2)(b) is to be the chairperson of the Committee.
(5) The meetings and procedure of the Committee are, subject to this Act and the regulations, to be as determined by the Committee.
7
Greater Hobart Advisory Group
7 Greater Hobart Advisory Group
(1) There is established by this subsection the Greater Hobart Advisory Group (the Advisory Group).
(2) The Advisory Group is comprised of the following members:
(a) each person who is a general manager, within the meaning of the Local Government Act 1993 , for a Greater Hobart area council;
(b) the Secretary of a department that is nominated by the Minister for the purposes of this paragraph;
(e) the Secretary of the department, the primary purpose of which is to assist the Minister who has primary responsibility for community development;
(f) the Secretary of the department, the primary purpose of which is to assist the Minister who has primary responsibility for economic development;
(g) the Chief Executive Officer of Infrastructure Tasmania or, if that unit of administration ceases to exist, another unit of administration nominated by the Minister.
(3) The person who is a member of the Advisory Group under subsection (2)(f) is to be the chairperson of the Advisory Group.
(4) The meetings and procedure of the Advisory Group are, subject to this Act and the regulations, to be as determined by the Advisory Group.
Part 3
Work Program
Part 3 Work Program
Division 1
Contents of work program
Division 1 Contents of work program
8
Contents of work program
8 Contents of work program
(1) A work program is to set out the specific actions, including actions in relation to the corridors and activity centres that are identified in the map included in the work program under subsection (3) , that are to be carried out by, or on behalf of, the following:
(a) any one or more of the Greater Hobart area councils;
(b) an adjunct council;
(c) the State Government –
so as to further the Greater Hobart Objectives.
(2) Without limiting the generality of subsection (1) , a work program may include actions to enable the better coordination between Greater Hobart area councils, or between Greater Hobart area councils and the State, of decisions about infrastructure, strategic planning decisions, and decisions about land use.
(3) A work program is to include a map that identifies existing key transport corridors, and activity centres, within the Greater Hobart area.
(4) A work program –
(a) may contain any prescribed matter; and
(b) must contain any matter that must, in accordance with the regulations, be included in such programs.
(5) A work program may include proposed actions that, if carried out, would –
(a) expand the corridors and activity centres that have been identified in the map included in the work program under subsection (3) ; or
(b) establish, within the Greater Hobart area, new transport corridors or activity centres.
(6) A work program is to identify which persons, or bodies, are to be jointly or separately responsible for ensuring that specific actions, set out in the work program, are carried out.
(7) The Advisory Group, in preparing a draft work program, must –
Preparation and approval of draft work programs, &c.
Division 2 Preparation and approval of draft work programs, &c.
9
Advisory Group to prepare draft work program
9 Advisory Group to prepare draft work program
(1) The Advisory Group is to –
(a) prepare a draft work program as soon as practicable after the day on which this Act commences; and
(b) prepare a draft work program as soon as practicable after the day on which a work program is revoked in accordance with section 12(4) .
(2) As soon as practicable after a draft work program is prepared under subsection (1) , the Advisory Group is to submit the draft to the Committee.
10
Committee may approve draft work program
10 Committee may approve draft work program
(1) The Committee, as soon as practicable after a draft work program is submitted to it under section 9(2) , must –
(a) approve the draft work program; or
(b) after consulting with the Advisory Group, approve the draft work program, amended as the Committee thinks fit; or
(c) refuse to approve the draft work program.
(2) A draft work program is only to be taken to be approved under subsection (1)(a) or (b) if the majority of the members of the Committee, including no fewer than 3 of the members who are mayors of Greater Hobart area councils, have approved the draft work program under subsection (1)(a) or (b) respectively.
(3) A draft work program comes into effect as a work program on the day on which the draft work program is approved under subsection (1)(a) or (b) .
(4) The Committee must provide a copy of a work program to the Greater Hobart area councils as soon as practicable after the work program comes into effect under subsection (3) .
Division 3
Review, amendment, revocation and implementation of work programs
Division 3 Review, amendment, revocation and implementation of work programs
11
Review of work programs
11 Review of work programs
(1) The Advisory Group, within 3 months after a work program has been in effect for 3 years, is to begin a review of the work program.
(2) The Advisory Group is to review a work program by –
(a) reviewing the extent to which, and the manner in which, the specific actions set out in the work program were carried out; and
(b) considering whether other actions should be set out in the work program.
(3) The Advisory Group, within 6 months after beginning a review under subsection (1) or a longer period allowed by the chairperson of the Committee, must provide to the Committee a report in relation to the review of the work program.
(4) The chairperson of the Committee must, as soon as practicable after allowing a longer period under subsection (3) , notify the members of the Committee of that longer period.
12
Amendment or revocation of work program
12 Amendment or revocation of work program
(1) The Advisory Group may prepare a draft amendment of a work program or a draft revocation of a work program.
(2) Division 2 applies in relation to a draft amendment of a work program, or a draft revocation of a work program, that is prepared under subsection (1) , as if the draft amendment or draft revocation were a draft work program.
(3) If, in accordance with Division 2 as applied under subsection (2) to a draft amendment of a work program, the draft amendment of a work program is approved under section 10(1)(a) or (b) , the work program is amended by the draft amendment of the work program on and from the day of the approval.
(4) If, in accordance with Division 2 as applied under subsection (2) to a draft revocation of a work program, the draft revocation of a work program is approved under section 10(1)(a) or (b) , the work program is revoked on and from the day of the approval.
13
Implementation of work program
13 Implementation of work program
(1) The Greater Hobart area councils and the State Government must take reasonable steps to ensure that the work program is implemented.
(2) An adjunct council must take reasonable steps to ensure that it carries out any actions that the work program specifies that the adjunct council is to carry out.
(3) A use, or development, within the meaning of the Land Use Planning and Approvals Act 1993 is not to be taken to be authorised for the purposes of that Act by reason only that the use or development is specified in a work program.
14
Consistency between work program and regional land use strategy
14 Consistency between work program and regional land use strategy
(1) The Committee may decide that it is of the opinion that amendments to the Southern Tasmania Regional Land Use Strategy are required to be made in order to ensure that some or all of those activities that are to be implemented in a work program so as to further the Greater Hobart Objectives are consistent with the Strategy.
(a) by the majority of the members of the Committee; and
(b) if that majority includes no fewer than 3 of the members who are mayors of Greater Hobart area councils.
(3) If a decision is made under subsection (1) , the chairperson of the Committee is to give a notice to the Planning Minister requesting the Planning Minister to consider whether amendments to the Southern Tasmania Regional Land Use Strategy are required to be made under section 5A of theLand Use Planning and Approvals Act 1993 in order for the work program to be consistent with the Strategy.
(4) The Planning Minister, after receiving a notice under subsection (3) , is to advise the chairperson of the Committee in writing that the Planning Minister –
(a) is of the opinion that the work program is consistent with the Southern Tasmania Regional Land Use Strategy; or
(b) is of the opinion that the work program is not consistent with the Southern Tasmania Regional Land Use Strategy.
(5) If the Planning Minister advises the chairperson of the Committee, in a notice under subsection (4) , that the Minister is of the opinion that the work program is not consistent with the Southern Tasmania Regional Land Use Strategy, the notice is to set out –
(a) the extent, if any, to which the work program is not consistent with the Strategy; and
(b) the reasons why the Planning Minister intends, or does not intend, to amend the Southern Tasmania Regional Land Use Strategy under section 5A of theLand Use Planning and Approvals Act 1993 so that the work program becomes consistent with the Strategy.
(6) The chairperson of the Committee, as soon as practicable after receiving advice under subsection (5) , is to provide the advice to the Committee.
(7) The Committee, after considering the advice provided to it under subsection (6) , is to consider whether the Committee wishes to make amendments to the work program under Division 3 so that, in the opinion of the Committee, the work program will be consistent with the Southern Tasmania Regional Land Use Strategy.
Part 4
Adjunct Councils
Part 4 Adjunct Councils
15
Adjunct councils
15 Adjunct councils
(1) The Committee may invite to become an adjunct council a council to which the Southern Tasmania Regional Land Use Strategy applies.
(2) A council that receives an invitation under subsection (1) may, by notice to the Committee accepting the invitation, become an adjunct council.
(3) A work program may, if an adjunct council agrees, allocate to the adjunct council the performance, in the municipal area of the council, of actions specified in the work program.
(4) A council ceases to be an adjunct council if –
(a) the council notifies the Committee that the council wishes to cease to be an adjunct council; or
(b) the Committee notifies the council that the council is to cease to be an adjunct council.
Part 5
Miscellaneous
Part 5 Miscellaneous
16
Regulations
16 Regulations
(1) The Governor may make regulations for the purposes of this Act.
(2) Without limiting the generality of subsection (1) , the regulations may be made in relation to one or more of the following:
(a) the procedures to be followed by the Advisory Group or the Committee in meetings of the Advisory Group or the Committee;
(b) matters that may be, or that are required to be, included in work programs.
(3) The regulations may be made so as to apply differently according to matters, limitation or restrictions, whether as to time, circumstance or otherwise, specified in the regulations.
(4) The regulations may authorise any matter to be from time to time determined, applied or regulated by the Minister, the Advisory Group or the Committee.
(a) the administration of this Act is assigned to the Minister for State Growth; and
(b) the department responsible to that Minister in relation to the administration of this Act is the Department of State Growth.
Source text: opening excerpt
Sourced from Tasmanian Legislation Online (legislation.tas.gov.au), CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
1 Short title
1 Short title
This Act may be cited as the Greater Hobart Act 2019 .
2 Commencement
2 Commencement
This Act commences on a day to be proclaimed.
3 Interpretation
3 Interpretation
In this Act, unless the contrary intention appears –
activity centre means an area in which services, employment, or retail, commercial or social activity, are concentrated and includes an area that is –
(a) a community meeting place; or
(b) a place at which community or government services are or may be provided; or
(c) an educational facility; or
(d) a place for sport, recreation, leisure or entertainment; or
(e) a place where residential use or development occurs in an urban area of mixed land use;
adjunct council means a council that is an adjunct council under section 15 ;
Advisory Group means the Greater Hobart Advisory Group established by section 7(1) ;
chairperson of the Committee means the person appointed under section 6(4) to be the chairperson of the Committee;
Committee means the Greater Hobart Committee established by section 6(1) ;
[Section 3 Amended by No. 26 of 2022, s. 15, Applied:01 Dec 2022]
draft work program means a draft work program prepared under section 9(1) by the Advisory Group;
means the area containing each municipal area of the Greater Hobart area councils;
Requires periodic review of a work program by the Advisory Group starting three years after the work program has been in effect, with reporting obligations to the Committee (s 11).
Requires the Committee to consider whether amendments to the Southern Tasmania Regional Land Use Strategy are necessary and establishes a formal notice and response mechanism with the Planning Minister about consistency between the work program and the regional strategy (s 14).
Permits the Committee to invite other councils (adjunct councils) to participate as adjunct councils and allows work programs to allocate specified actions to them (s 15).
Imposes an obligation on Greater Hobart area councils, adjunct councils and the State Government to take reasonable steps to implement the work program (s 13).
Prescribes the Governor-in-Council power to make regulations, including procedural rules and matters to be included in work programs, and permits the regulations to authorise determinations by the Minister, Advisory Group or Committee (s 16).
Mechanically the Act does not create new land use approval powers. It explicitly states that a use or development identified in a work program does not, by reason only of being specified in the work program, become authorised under the Land Use Planning and Approvals Act 1993 (s 13(3)). The Act also delegates administration of the Act to the Minister for State Growth and the department responsible to that Minister until an Administrative Arrangements Order provides otherwise (s 17).
The Act therefore creates a governance and coordination instrument , the work program , with mapped corridors and activity centres and assigned responsibilities, and insists on consistency with existing planning instruments. It confers procedural powers to request changes to the regional land use strategy, places implementation expectations on local and State actors, and provides for secondary regulation to fill procedural or content detail gaps.
Main concepts
The Act rests on a small number of statutory concepts that structure its operation. Those concepts determine what a work program can do and how the Committee and Advisory Group must approach it.
Work program (defined in s 3 and elaborated in Pt 3): A work program is the Act’s central instrument. It is a document that identifies corridors and activity centres on an included map, sets out specific actions to be undertaken by Greater Hobart area councils, adjunct councils and the State Government to further the Greater Hobart Objectives (s 8(1)-(3), s 3 definition). The Act treats draft work programs and amendments to work programs under the same procedural route (s 9-12).
Greater Hobart Objectives (s 5): These objectives guide the content of work programs. They include encouraging consideration of area-wide benefits in strategic planning, facilitating efficient and safe transport flow including public passenger transport and low-carbon modes, developing and maintaining cultural, sporting and community facilities, promoting urban renewal and affordable housing, and encouraging hubs for specialised activity and co-location of facilities and infrastructure (s 5(a)-(f)). The objectives include a catch-all for "any other prescribed objectives" (s 5(g)).
Activity centre (definition in s 3): The Act defines activity centres broadly to include community meeting places, government or community service locations, educational facilities, places for sport and recreation, and mixed-use urban residential areas (s 3, activity centre). The work program must map activity centres and transport corridors (s 8(3)).
Greater Hobart Committee (s 6): The Committee is the decision maker that approves, amends or refuses draft work programs submitted by the Advisory Group. The Committee’s composition , mayors plus named State Ministers , and the explicit quorum-like approval rule that a majority must include no fewer than three mayors are core governance features (s 6(2), s 10(2)).
Advisory Group (s 7): The Advisory Group prepares the draft work program and carries out reviews and reports. Its membership is senior public servants and council general managers; it is chaired by the Secretary of the department that assists the economic development Minister (s 7(2)-(3)). The Advisory Group must align draft work programs with planning objectives, the Southern Tasmania Regional Land Use Strategy and applicable State Policy (s 8(7)).
Adjunct council (s 15): Councils to which the Southern Tasmania Regional Land Use Strategy applies may be invited to join as adjunct councils; a council becomes an adjunct council by notice of acceptance (s 15(1)-(2)). If an adjunct council agrees, a work program may allocate to that council actions within its municipal area (s 15(3)).
Consistency with existing planning instruments (s 8(7), s 14): The Act requires the Advisory Group to seek to further statutory planning objectives, consider the regional land use strategy and be consistent with State Policy when preparing drafts (s 8(7)). The Committee can request the Planning Minister to consider amendments to the Southern Tasmania Regional Land Use Strategy where it forms the opinion that amendments are required for consistency with a work program (s 14(1)-(3)). The Planning Minister must respond in writing with an opinion on consistency and reasons regarding amendments (s 14(4)-(5)).
Reasonable steps duty (s 13): Implementation is framed as an obligation to take reasonable steps rather than an absolute enforcement mechanism. Greater Hobart area councils and the State Government must take reasonable steps to ensure the work program is implemented; adjunct councils must take reasonable steps to carry out actions allocated to them (s 13(1)-(2)).
These concepts structure incentives and discretion. The Committee’s approval rule gives local council mayors (three or more) an effective veto over work programs unless they agree, while Ministers have multiple votes if they hold several designated portfolios (s 6(3), s 10(2)). The Advisory Group is required to operate within the existing planning policy architecture, which constrains a work program’s content to be consistent with statutory planning goals and State Policies (s 8(7)). The Act delegates finer procedural detail to regulation and expressly permits regulations to authorise the Minister, Advisory Group or Committee to determine matters from time to time (s 16(2), s 16(4)). The Act therefore creates a formal, mapped planning coordination tool bounded by existing planning law, with governance that balances mayoral participation and State ministerial involvement.
Who it affects
The Act identifies specific actors with duties, decision rights, and potential obligations. The immediate affected parties are the following.
Greater Hobart area councils: The Act defines the Greater Hobart area councils to be the Clarence City Council, the Glenorchy City Council, the Hobart City Council and the Kingborough Council (s 3). These councils supply the mayors who are members of the Committee (s 6(2)(a)) and the general managers who are members of the Advisory Group (s 7(2)(a)). The work program may specify actions to be carried out by any one or more of these councils (s 8(1)(a)). Once a work program is approved the Greater Hobart area councils must take reasonable steps to ensure the work program is implemented (s 13(1)). The Committee must provide a copy of a work program to the Greater Hobart area councils as soon as practicable after approval (s 10(4)).
Adjunct councils: Any council to which the Southern Tasmania Regional Land Use Strategy applies may be invited by the Committee to become an adjunct council (s 15(1)). A council becomes an adjunct council by notice of acceptance to the Committee (s 15(2)). If an adjunct council agrees, a work program may allocate actions to be performed in the adjunct council’s municipal area (s 15(3)). Adjunct councils must take reasonable steps to carry out any actions allocated to them (s 13(2)). An adjunct council can cease to be an adjunct council by notice or by Committee notification (s 15(4)).
State Government: Specific State Ministers are members of the Committee, namely Ministers with primary responsibility for economic development, infrastructure, housing and community development (s 6(2)(b)-(e)). The Committee’s chair is the Minister with primary responsibility for economic development (s 6(4)). The Act assigns the Department of State Growth, and the Minister for State Growth, responsibility for administering the Act until an Administrative Arrangements Order provides otherwise (s 17). The State Government is a designated actor for whom a work program may set out specific actions (s 8(1)(c)), and it must take reasonable steps to ensure the work program’s implementation (s 13(1)). The Planning Minister (as defined in s 3) is the addressee of the Committee’s request for advice on whether amendments to the Southern Tasmania Regional Land Use Strategy are required (s 14(3)-(5)).
Senior public servants and nominated Department Secretaries: The Advisory Group membership includes council general managers and named Secretaries of departments including a Secretary nominated by the Minister, the Secretary of the department responsible to the Planning Minister, the Secretary of the department assisting the community development Minister, the Secretary of the department assisting the economic development Minister, and the Chief Executive Officer of Infrastructure Tasmania or a nominee if that administrative unit ceases to exist (s 7(2)(b)-(g)). These persons prepare and oversee the drafting and review of work programs (s 9, s 11).
Infrastructure Tasmania and Homes Tasmania: The Act recognises Infrastructure Tasmania as an administrative unit of the Department of State Growth (s 3). The definition of Homes Tasmania is inserted by reference to the Homes Tasmania Act 2022 as amended (s 3 as amended). The Advisory Group includes a person nominated by Homes Tasmania (s 7(2)(d) as amended).
The public and applicants for planning approval: Although the Act does not create direct private rights to development, it can shape strategic direction that may affect private actors. The Act expressly provides that a use or development identified in a work program is not authorised for the purposes of the Land Use Planning and Approvals Act 1993 by reason only of being specified in the work program (s 13(3)). That means property owners and applicants cannot rely solely on a work program as planning approval.
In short, the Act imposes coordination and implementation expectations on local government and the State, allocates decision-making and drafting roles to specific office-holders, and creates an instrument that can influence planning alignment without itself conferring statutory planning permissions. The degree of practical effect on private parties will derive from the content of approved work programs and any subsequent amendments to the Southern Tasmania Regional Land Use Strategy or other statutory planning instruments sought through the procedure in s 14.
Key duties and rights
The Act sets out duties and decision rights across institutional players. Below are the principal express duties, powers and procedural entitlements under the Act, with section references.
Drafting duty: The Advisory Group must prepare a draft work program as soon as practicable after commencement and again after any revocation of a work program (s 9(1)). As soon as practicable after preparing a draft, the Advisory Group must submit it to the Committee (s 9(2)). The Advisory Group is therefore the primary drafter and reviewer (s 7, s 9, s 11).
Committee approval power: The Committee must, as soon as practicable after receiving a draft work program, either approve it, approve it with amendments after consultation with the Advisory Group, or refuse it (s 10(1)). A draft becomes effective as a work program on the day it is approved (s 10(3)).
Voting rule: A draft work program is only to be taken to be approved under s 10(1)(a) or (b) if a majority of Committee members, including no fewer than three of the members who are mayors of Greater Hobart area councils, approve it (s 10(2)). This creates a specific approval threshold that requires mayoral support from at least three of the four Greater Hobart council mayors.
Chairperson appointments: The Committee’s chair is the Minister who is a Committee member by reason of having primary responsibility for economic development (s 6(4)). The Advisory Group’s chair is the person who is a member under s 7(2)(f), that is the Secretary of the department whose primary purpose is to assist the economic development Minister (s 7(3)).
Composition and votes: The Committee is comprised of the mayors of the Greater Hobart area councils and specific Ministers, namely Ministers with primary responsibility for economic development, infrastructure, housing and community development (s 6(2)). A Minister who is responsible for more than one of the specified areas has as many votes as the number of those areas of responsibility (s 6(3)).
Content constraints and duties: The Advisory Group must seek to further the objectives of the resource management and planning system (as set out in Part 1 of Schedule 1 to the Land Use Planning and Approvals Act 1993), consider the Southern Tasmania Regional Land Use Strategy, and be consistent with any applicable State Policy under the State Policies and Projects Act 1993 when preparing a draft work program (s 8(7)). Work programs must include a map identifying transport corridors and activity centres and may include prescribed or regulation-specified matters (s 8(3)-(4)).
Review duty: The Advisory Group must begin a review of a work program within three months after the work program has been in effect for three years, and must provide a report to the Committee within six months after starting the review, or within a longer period allowed by the Committee chair (s 11(1)-(3)). This creates an explicit periodic review requirement.
Amendment and revocation procedure: The Advisory Group may prepare draft amendments or draft revocations; the approval procedure in Division 2 applies to such drafts as if they were new drafts (s 12(1)-(2)). If approved, amendments take effect on the day of approval and revocations likewise (s 12(3)-(4)).
Implementation duty framed as "reasonable steps": Once a work program is in effect, the Greater Hobart area councils and the State Government must take reasonable steps to ensure implementation (s 13(1)). Adjunct councils must take reasonable steps to carry out actions allocated to them (s 13(2)). The Act does not provide a statutory definition of "reasonable steps" within its text; therefore the ordinary legal meaning will be relevant in any enforcement context.
Non-authorising statement: A work program does not itself authorise a use or development under the Land Use Planning and Approvals Act 1993 (s 13(3)). This limits property or developer expectations about relying on a work program as statutory planning permission.
Interaction with regional strategy: The Committee may decide that it is of the opinion that amendments to the Southern Tasmania Regional Land Use Strategy are required to ensure consistency. The Committee must make that decision by majority that includes no fewer than three mayors (s 14(1)-(2)). The chairperson then gives notice to the Planning Minister requesting consideration of amendments under s 5A of the Land Use Planning and Approvals Act 1993. The Planning Minister must respond in writing, stating whether the work program is consistent with the regional strategy or not and, if not consistent, the extent and reasons and whether the Minister intends to amend the regional strategy (s 14(3)-(5)). The Committee must consider the Minister’s advice and then consider whether to amend the work program (s 14(6)-(7)).
Regulations and delegated powers: The Governor may make regulations, and regulations may prescribe meeting procedures, content matters for work programs and may authorise matters to be determined by the Minister, Advisory Group or Committee (s 16(1)-(4)). This is a delegated-power channel the decision makers can use to fill procedural or content gaps.
Taken together the Act creates duties to draft, review and implement a coordinated work program; it allocates final approval power to the Committee subject to a specific mayoral-majority rule; requires the Advisory Group to respect existing statutory planning frameworks; and leaves enforcement of implementation framed around "reasonable steps" rather than specified sanctions.
Penalties and enforcement
The Act contains no express monetary fines, civil penalties or criminal offences for non‑compliance. The text provides governance and administrative obligations with procedural and reporting requirements, and a duty to take reasonable steps to implement approved work programs, but it does not create explicit sanction mechanisms such as pecuniary penalties, orders for specific performance in the Act itself, or the power for the Committee to issue fines or refuse council functions for non‑compliance.
Key enforcement-related features and their implications, drawn directly from the Act, are:
Reasonable-steps obligation: The principal enforcement mechanism in the Act is the obligation that Greater Hobart area councils and the State Government "must take reasonable steps to ensure that the work program is implemented" and that adjunct councils "must take reasonable steps" to carry out allocated actions (s 13(1)-(2)). The Act does not elaborate what constitutes "reasonable steps". As a statutory duty framed in ordinary legal language, its enforcement in practice would rely on administrative and political pressure, potential judicial review if a mandatory procedural obligation or public law duty were alleged, or other statutory remedies outside this Act.
No statutory penalty clauses: There are no sections in the provided text that specify fines, penalty units, offences, or enforcement powers of a regulatory agency. The absence of penalty provisions means the Act relies on institutional checks , committee approval rules, the need for mayoral majorities, reporting and review obligations (s 10, s 11) , and political accountability rather than specified statutory sanctions.
Regulatory delegation: The Governor may make regulations and the regulations may authorise the Minister, Advisory Group or Committee to determine or regulate matters (s 16(1)-(4)). While the Act itself contains no specified sanctions, regulations made under the Act could, in principle, create enforceable procedural obligations and penalties if drafted to do so. The Act expressly allows the regulations to apply differently according to matters specified in the regulations (s 16(3)) and to authorise determinations by the Minister or bodies constituted under the Act (s 16(4)). Any coercive powers, penalties or administrative enforcement mechanisms that might exist therefore depend on the content of regulations made under s 16; such regulations are not included in the Act’s text as provided.
Political and reputational levers: The Act embeds transparency and institutional roles , the Committee must provide a copy of an approved work program to the Greater Hobart area councils (s 10(4)); the Advisory Group must report to the Committee after reviews (s 11(3)). Absent statutory sanctions, compliance pressure will primarily be political, reputational and administrative. The Secretary-level membership of the Advisory Group and the ministerial composition of the Committee situates responsibility at senior levels of government, which is likely intended to leverage ministerial and council accountability rather than judicial sanctions.
Limits on legal reliance by third parties: The Act makes clear that being specified in a work program does not in itself authorise land use or development under the Land Use Planning and Approvals Act 1993 (s 13(3)). That reduces the risk of private parties claiming enforceable rights based solely on work program listings. It also signals that planning-authority enforcement remains governed by the Land Use Planning and Approvals Act and associated instruments, not this Act.
In practical terms, the Act’s enforcement architecture is administrative and institutional. Compliance will be driven by the statutory requirement to prepare and review work programs, the allocation of responsibilities within those programs (s 8(6)), ministerial and mayoral involvement in approvals (s 6, s 10), and any regulatory instruments the Governor may make under s 16. If stakeholders require stronger coercive mechanisms, they would need to look to regulations made under s 16 or to separate legislation that creates enforcement remedies. The Act itself does not create a catalogue of penalties.
How it interacts with other laws
The Act is drafted to operate alongside and within the existing Tasmanian planning and administrative law architecture. The text explicitly references and constrains work programs by other statutory instruments, and it provides a procedure to seek amendments to a key regional planning instrument. The main statutory interactions are the following, with the specific textual hooks cited.
Land Use Planning and Approvals Act 1993 (LUPAA): The Act requires the Advisory Group to seek to further the objectives of the resource management and planning system as set out in Part 1 of Schedule 1 to LUPAA when preparing a draft work program (s 8(7)(a)). It also explicitly states that a use or development is not authorised under the LUPAA by reason only that it is specified in a work program (s 13(3)). Furthermore, s 14 provides a defined interaction: if the Committee considers that amendments to the Southern Tasmania Regional Land Use Strategy are required, the chairperson must give notice to the Planning Minister requesting consideration of amendments under s 5A of LUPAA. The Planning Minister must advise in writing whether the work program is consistent with the Southern Tasmania Regional Land Use Strategy and, if not, the extent of inconsistency and reasons regarding proposed amendments (s 14(3)-(5)). Therefore the Act is designed to operate in a consultative and complementary way with LUPAA-based instruments, but the Act does not supplant LUPAA or authorise development.
Southern Tasmania Regional Land Use Strategy: The Act requires consideration of and deference to the Southern Tasmania Regional Land Use Strategy in drafting (s 8(7)(b)), and provides a formal route for the Committee to request the Planning Minister to consider amendments to that Strategy where necessary to ensure consistency with a work program (s 14(1)-(3)). The Planning Minister’s written advice and the Committee’s subsequent deliberation are built into the statutory procedure (s 14(4)-(7)). Thus the work program can prompt a potential change to the regional strategy, but that change is effected only via the Planning Minister’s processes under LUPAA.
State Policies and Projects Act 1993: Draft work programs must be consistent with any applicable State Policy within the meaning of the State Policies and Projects Act 1993 (s 8(7)(c)). That requirement integrates State-level policy frameworks into the preparation of work programs.
Local Government Act 1993: The Act imports terms from the Local Government Act by reference. The term "general manager" and the meaning of "mayor" are defined in, or have the same meaning as, the Local Government Act 1993 and are used in composition and membership rules (s 3 definitions; s 6(2)(a); s 7(2)(a)). The Act thereby relies on local government office definitions under that statute for composition and role allocation.
Homes Tasmania Act 2022: The Act’s definition section, as amended, incorporates Homes Tasmania as established by s 9(1) of the Homes Tasmania Act 2022. The Advisory Group membership includes a person nominated by Homes Tasmania (s 3 definition, s 7(2)(d) as amended). That identifies an institutional channel for housing-related specialised input into work programs.
Administrative Arrangements Act 1990: The Act assigns administration to the Minister for State Growth and the Department of State Growth until provision is made by order under s 4 of the Administrative Arrangements Act 1990 (s 17). That is an administrative housekeeping provision that ties the Act’s administration to existing executive arrangements until an order modifies those arrangements.
Regulations under the Greater Hobart Act: The Governor may make regulations and the regulations may authorise matters to be determined by the Minister, Advisory Group or Committee (s 16). Regulation-making power can therefore shape procedural interfaces with other Acts by prescribing matters required to be included in work programs, meeting procedures, or delegation of tasks.
Infrastructure Tasmania: The Act refers to Infrastructure Tasmania as an administrative unit of the Department of State Growth and includes the Chief Executive Officer of Infrastructure Tasmania in the Advisory Group membership, with a fallback nominee if the administrative unit ceases to exist (s 3 definition, s 7(2)(g)). This establishes a mandated role for Infrastructure Tasmania in drafting and reviewing work programs, thereby linking the Act to infrastructure planning practice.
Net effect of these interactions: The Act is intentionally embedded within the planning and administrative ecosystem. Work programs are required to be formed with explicit reference to existing planning objectives, regional strategies and State Policies (s 8(7)). The Committee has a statutory route to request changes to the regional land use strategy but cannot itself amend that strategy , that remains within the Planning Minister’s statutory powers under LUPAA (s 14). The Act therefore creates a formal coordination layer which must operate consistently with and, when appropriate, seek changes to other planning instruments, but it leaves substantive land-use authorisations and final statutory planning powers in the pre-existing legislative framework.
Amendment history
The Act text provided includes express notations of amendment to section 3 and section 7 by a subsequent Act. The specific amendment history available in the statutory text is as follows.
Amendments recorded in the text: The notes inserted in the definitions at s 3 indicate that:
Section 3 was amended by No. 26 of 2022, s 15, with application date 01 Dec 2022. The Act text shows bracketed editorial notes marking that amendment, for example adjacent to the definitions of "adjunct council" and other entries (s 3 as annotated).
Section 7 subsection (2) was amended by No. 26 of 2022, s 16, with application date 01 Dec 2022. That is recorded in the Advisory Group membership list where an item now reads "a person nominated by Homes Tasmania" and has the amendment notation.
Incorporation of Homes Tasmania: The definitions in s 3 include "Homes Tasmania" with a cross-reference to the Homes Tasmania Act 2022, s 9(1). That insertion appears as a result of the noted 2022 amendment. The definition therefore ties the Advisory Group membership to Homes Tasmania by name (s 7(2)(d) as amended).
Commencement: The Act itself provides that it "commences on a day to be proclaimed" (s 2). No commencement day is specified in the text supplied. That is an ordinary form of commencement clause that requires a later proclamation instrument to bring the Act into force.
No other amendment annotations appear in the supplied text. The extant notes in the supplied version specifically mark s 3 and s 7 amendments by No. 26 of 2022 as applied on 01 Dec 2022.
What the amendment entries in the text indicate practically is limited. They confirm that the Act was adjusted to incorporate Homes Tasmania and to alter Advisory Group membership to include a nominee from Homes Tasmania. Where the text notes amendments but does not reproduce the pre-amendment language, the supplied version should be treated as the operative consolidated text as annotated. There is no further amendment chronology, commencement proclamation date or other amendment materials included in the supplied text. Any further amendment history outside the notations in s 3 and s 7 is not contained in the provided material and therefore is not reported here.
Litigation history
The Act text provided contains no references to litigation, judicial interpretations, or case law. It does not list any proceedings challenging the Act or citing the Act. The Act also does not name or cite any judicial decisions.
Consequently, there is no litigation history contained within the statutory text supplied to rely upon. Any judicial construction or enforcement action that might interpret terms such as "reasonable steps", "activity centre", the scope of Committee powers, or interactions with the LUPAA is outside the scope of the provided material. If a practitioner requires cases construing these terms or how courts have treated similar governance obligations, those must be identified from case law databases rather than from the Act text itself. The Act as provided does not inform about past litigation or settled judicial interpretations.
Gotchas
This Act contains several provisions where simple readings can lead to misplaced expectations or operational risk. The following are concrete "gotchas" , specific features that commonly produce misreading or require attention in practice, each grounded in the Act text.
Work program is not a planning approval: A work program cannot be relied upon to authorise development or use under the Land Use Planning and Approvals Act 1993. The Act states that a use or development is not to be taken to be authorised under that Act "by reason only that the use or development is specified in a work program" (s 13(3)). Practitioners should avoid advising stakeholders that inclusion in a work program equates to statutory planning approval.
Approval requires mayoral support threshold: For a draft work program to be taken as approved, a majority of Committee members must approve and that majority must include no fewer than three mayors of the Greater Hobart area councils (s 10(2)). This is not merely a majority-rule process; it effectively guarantees that at least three of the four mayors must support approval. The procedural composition gives substantial gatekeeping power to local government.
Ministers may have multiple votes: A Minister holding responsibility for more than one specified portfolio has as many votes at Committee meetings as the number of such areas of responsibility (s 6(3)). That can create asymmetric voting influence for the State side if a single Minister holds multiple relevant portfolios. The interaction of s 6(3) with s 10(2) should be considered when calculating coalition possibilities to secure approval.
"Reasonable steps" is undefined: The Act uses the phrase "must take reasonable steps" as the standard for implementation by councils and the State (s 13(1)-(2)). The Act does not define what "reasonable steps" are. That leaves scope for contest about what actions are legally required to implement a work program and how enforcement might proceed. In litigation or dispute settings ordinary legal tests for reasonableness and public law obligations would be engaged, but the Act offers no procedural enforcement route.
Regulations can expand delegated power: The Governor may make regulations authorising matters to be determined or regulated by the Minister, the Advisory Group, or the Committee (s 16(4)). The Act therefore leaves open the potential for significant procedural detail to be set out in subordinate legislation or delegated determinations. Practitioners should check the regulations when advising on process, because the Act itself defers to regulation for procedural specifics.
Committee may request but cannot itself amend the regional strategy: If the Committee forms the opinion that the Southern Tasmania Regional Land Use Strategy needs amending, the Committee can notify the Planning Minister and request consideration under s 5A of LUPAA (s 14(1)-(3)). However, the power to amend the regional strategy remains with the Planning Minister under LUPAA; the Committee can request but not unilaterally revise the regional strategy.
Work program maps can be expanded or create new corridors and activity centres: A work program may include proposed actions that would expand identified corridors and activity centres or establish new ones (s 8(5)). Inclusion of such proposals in a work program could drive further strategic planning actions, but those changes do not directly change statutory planning instruments without the LUPAA processes where relevant.
Membership mix brings political and bureaucratic actors together: The Committee is made up of elected mayors and Ministers, while the Advisory Group is staffed by general managers and Secretaries (s 6-7). This design gives both political and bureaucratic actors decision roles, which can produce tensions over priorities and timing. The Act provides few mechanisms to resolve such tensions beyond the approval rules and the advisory consultation obligations.
No express penalty for non-implementation: Because the Act lacks explicit penalties, non-implementation tends to be addressed by political, administrative and reputational means rather than statutory fines or direct compulsion. Councils and the State must "take reasonable steps" but the instrument does not specify enforcement modalities.
Adjunct council participation is voluntary and reversible: Councils become adjunct councils only by accepting an invitation (s 15(2)) and can cease being adjunct councils by notice from either the council or the Committee (s 15(4)). Work programs that allocate significant action responsibilities to adjunct councils therefore rest on the adjunct council’s continuing consent, potentially creating implementation fragility.
Each of these features can materially affect drafting, approval prospects, implementation risk and enforceability. For example, work program drafters should be explicit in assigning responsibilities and timeframes to mitigate ambiguities about what counts as "reasonable steps". Committees should be conscious of the mayoral threshold which gives local government a firm voice in approval. Finally, proponents and private parties should be advised that work program inclusion is strategic guidance rather than a substitute for statutory planning approvals.
How to comply
Compliance under the Act involves following the prescribed processes for drafting, approving, reviewing and implementing work programs, and ensuring alignment with statutory planning objectives and State Policy. Below are practical steps and controls that bodies named in the Act should implement to meet the Act’s requirements and to manage implementation risk, with references to the relevant sections.
Set up institutional roles and meeting procedures
Confirm Committee and Advisory Group membership in accordance with s 6 and s 7. Ensure the Minister with primary responsibility for economic development is identified as Committee chair (s 6(4)) and that the Secretary designated under s 7(2)(f) chairs the Advisory Group (s 7(3)).
Establish meeting procedures and quorum rules consistent with the Act and any regulations made under s 16. While the Act leaves meeting procedure details to the Committee and the Advisory Group (s 6(5), s 7(4)), ensure written procedures are in place to record votes, particularly because s 6(3) creates multiple voting rights for Ministers holding multiple portfolios.
Track any regulations promulgated under s 16 that set out procedural requirements or content obligations. Regulations may prescribe matters that must be included in work programs (s 8(4)(b)).
Drafting the draft work program (Advisory Group responsibilities)
Start a draft as soon as practicable after commencement or after revocation, as required (s 9(1)). Record timelines and decision milestones so the Advisory Group can evidence compliance with the "as soon as practicable" standard.
Ensure the draft includes the required map identifying existing key transport corridors and activity centres (s 8(3)). Use the Act’s definition of "activity centre" (s 3) to categorise mapped items.
Align the draft with the LUPAA resource management objectives (Part 1 of Schedule 1 to LUPAA), consider the Southern Tasmania Regional Land Use Strategy, and ensure consistency with applicable State Policy (s 8(7)(a)-(c)). Document how the draft furthers the statutory objectives to allow the Committee to assess consistency and statutory conformity.
Clearly specify which body or person is responsible, jointly or separately, for each action in the draft work program (s 8(6)). Because implementation obligations are framed as "reasonable steps" (s 13), clarity on responsibility and expected steps lowers the risk of disputes over sufficiency of performance.
Submission and Committee approval process
Submit the draft to the Committee as soon as practicable after preparation (s 9(2)). Keep auditable records of the submission and any supporting materials.
Anticipate the approval threshold: a majority of Committee members, including at least three mayors, is required for approval (s 10(2)). Prepare engagement plans for mayors to secure the required support, and have a process for the Advisory Group to consult with the Committee in the event the Committee proposes amendments (s 10(1)(b)).
On approval, provide copies of the approved work program to the Greater Hobart area councils promptly (s 10(4)). Maintain distribution logs.
Implementation obligations and records
Once approved, each Greater Hobart area council and the State Government must take reasonable steps to ensure implementation (s 13(1)). Because "reasonable steps" is not defined, councils and State agencies should document the steps taken, the resources allocated, meeting minutes, procurement actions, project plans, and progress reports to demonstrate reasonableness.
For adjunct councils allocated actions in a work program, ensure acceptance is formalised by notice to the Committee (s 15(2)) and that implementation responsibilities are recorded and budgeted (s 15(3), s 13(2)). Adjunct councils should retain the right to notify the Committee if they intend to cease being an adjunct council (s 15(4)(a)) and prepare contingency arrangements for any reallocation of actions.
Track inter-agency dependencies and secure commitments from State agencies and Infrastructure Tasmania early in the process, since the Advisory Group includes the Chief Executive Officer of Infrastructure Tasmania (s 7(2)(g)).
Review and amendment cycle
Start a review of the work program within three months after it has been in effect for three years (s 11(1)). The Advisory Group must report to the Committee within six months after beginning the review, or within a longer period allowed by the Committee chair (s 11(3)). Maintain a review schedule and allocate resources to timely completion.
Where the Committee considers amendments to the Southern Tasmania Regional Land Use Strategy may be required, follow the notification process to the Planning Minister and retain the Planning Minister’s written advice as part of the record (s 14(1)-(5)). If the Planning Minister advises the Committee the work program is not consistent with the Strategy, the Committee must consider whether to amend the work program accordingly (s 14(6)-(7)).
Use the Amendment and Revocation procedures in s 12 to prepare, submit and seek Committee approval for any draft amendments or revocation. Treat draft amendments like new drafts under Division 2 procedures (s 12(2)).
Regulatory compliance
Monitor regulations made under s 16. Regulations may require additional content in work programs, impose procedural obligations for meetings or consultations, and may authorise determinations by the Minister, Advisory Group or Committee (s 16(2), s 16(4)). Ensure the work program and process comply with any such regulations.
Where regulations prescribe matters to be included in a work program (s 8(4)(b) and s 16(2)(b)), include those items to avoid procedural invalidity.
Communicating with stakeholders and managing expectations
When engaging with developers, community groups or infrastructure providers, emphasise that a work program is strategic guidance and does not constitute planning approval under LUPAA (s 13(3)). Use this in contractual, procurement and public communications to avoid misunderstandings about legal entitlement.
For items that may require amendment of the Southern Tasmania Regional Land Use Strategy, prepare supporting materials that the Planning Minister will require to assess consistency and justification for amendment requests under LUPAA (s 14).
Recordkeeping and accountability
Maintain auditable records at each stage: draft preparation and supporting analyses, submissions to the Committee, Committee decisions and voting records (to demonstrate compliance with the s 10(2) approval threshold), distribution of approved work program copies, review reports, Planning Minister correspondence, and implementation evidence of "reasonable steps" for each responsible entity (s 9-11, s 13, s 14).
Where actions entail budgets or capital works, ensure financial approvals align with council and State budgeting rules and are traceable to the work program obligations.
Risk management and dispute resolution
Prepare contingency plans where actions are contingent on adjunct councils’ continuing acceptance (s 15(3)-(4)). Build in periodic status reviews and exit protocols.
Because the Act lacks express enforcement sanctions, maintain diplomatic channels for dispute resolution, including protocols for escalation to the Committee, mediation between councils and the State, and documented escalation to Ministers if implementation stalls.
Administrative responsibility
Until an Administrative Arrangements Order changes responsibility, the Department of State Growth administers the Act and the Minister for State Growth is the responsible Minister (s 17). For practical purposes ensure liaison channels with that department are established and that administrative tasks (such as publishing the approved work program, if required) are assigned.
Following these steps aligns procedures and documentation with the Act’s explicit requirements, reduces legal uncertainty around "reasonable steps", and prepares for the practical governance elements of approval and implementation. The Act’s emphasis on mapped corridors and activity centres (s 8(3)), the need for mayoral-majority approval (s 10(2)) and the integration with LUPAA and State Policy (s 8(7), s 14) suggest that careful statutory cross-referencing, robust evidence-based drafting and early multi-level stakeholder engagement will materially reduce implementation risk.
Greater Hobart area councils means the following councils:
(a) the Clarence City Council;
(b) the Glenorchy City Council;
(c) the Hobart City Council;
(d) the Kingborough Council;
Greater Hobart Objectives means the objectives specified in section 5 ;
[Section 3 Amended by No. 26 of 2022, s. 15, Applied:01 Dec 2022]Homes Tasmania means Homes Tasmania established by section 9(1) of theHomes Tasmania Act 2022 ;
infrastructure means –
(a) any built structure; and
(b) transport infrastructure; and
(c) service infrastructure;
Infrastructure Tasmania means the administrative unit, of the Department of State Growth, known as Infrastructure Tasmania;
mayor has the same meaning as in the Local Government Act 1993 ;
passenger transport means transport primarily for the purpose of carrying passengers, whether or not on the payment of a fare;
Planning Minister means the Minister assigned the administration of the Land Use Planning and Approvals Act 1993 ;
service infrastructure means infrastructure related to the provision of gas, water, sewerage, electricity or telecommunications;
Southern Tasmania Regional Land Use Strategy means the regional land use strategy, in force from time to time under section 5A of theLand Use Planning and Approvals Act 1993 , that applies to the area of Tasmania that includes the Greater Hobart area;
transport infrastructure means infrastructure to enable road, rail, water or air transport or the movement of pedestrians or bicyclists;
work program means a draft work program, as amended from time to time under section 12(3) , that is approved under section 10(1) and that has not been revoked under section 12(4) .
4 Object of Act
4 Object of Act
(1) The object of this Act is to assist the Greater Hobart area councils and the State Government to better co-ordinate, across the Greater Hobart area –
(a) the efficientuse of infrastructure; and
(b) ease of access to infrastructure, in all locations, for persons of all abilities and needs; and
(c) strategic planning, and other actions, in relation to future land use and development in the Greater Hobart area –
so as to improve the health and wellbeing of persons, and enable the Greater Hobart Objectives to be achieved, in the Greater Hobart area.
(2) The principal way in which the object of this Act is to be achieved is by establishing a process for the formation and implementation of a work program that seeks to further the Greater Hobart Objectives in the Greater Hobart area.
5 Greater Hobart Objectives
5 Greater Hobart Objectives
For the purposes of this Act, the Greater Hobart Objectives are –
(a) to encourage and promote, in the making of strategic planning decisions, and decisions about land use, in relation to the Greater Hobart area, the consideration of potential benefits, and implications, for that area, of such decisions; and
(b) to facilitate the efficient and safe flow of transport, to improve access to, and to further the use of, public passenger transport, and to encourage and promote the use of transport with low-carbon emissions, in the Greater Hobart area; and
(c) to further the maintenance and accessibility of existing, and the development of new, cultural, sporting, recreational and community facilities, that complement, link to, and contribute to, the cultural experiences able to be provided in the Greater Hobart area; and
(d) to encourage, promote and provide for urban renewal, and affordable housing, that enhance amenity, liveability, ease of access to places and facilities and the provision of passenger transport; and
(e) to encourage, promote and provide for the development of hubs for specialised purposes such as science, sport, recreation, social activity, economic activity, technology, industry, education or the arts; and
(f) to encourage, promote and provide for, where suitable –
(i) the efficient and effective integration and co-location of the facilities, housing and hubs that are referred to in the other paragraphs of these objectives; and
(ii) the transport infrastructure, and the service infrastructure, that is necessary or desirable in relation to such facilities, housing and hubs; and
(g) any other prescribed objectives.
Part 2 Administration
Part 2 Administration
6 Greater Hobart Committee
6 Greater Hobart Committee
(1) There is established by this subsection the Greater Hobart Committee (the Committee).
(2) The Committee is comprised of the following members:
(a) each of the mayors of the Greater Hobart area councils;
(b) the Minister with primary responsibility for economic development;
(c) the Minister with primary responsibility for infrastructure;
(d) the Minister with primary responsibility for housing;
(e) the Minister with primary responsibility for community development.
(3) A Minister who is responsible for more than one of the areas referred to in subsection (2) has as many votes at a meeting of the Committee as he or she has such areas of responsibility.
(4) The person who is a member of the Committee under subsection (2)(b) is to be the chairperson of the Committee.
(5) The meetings and procedure of the Committee are, subject to this Act and the regulations, to be as determined by the Committee.
7 Greater Hobart Advisory Group
7 Greater Hobart Advisory Group
(1) There is established by this subsection the Greater Hobart Advisory Group (the Advisory Group).
(2) The Advisory Group is comprised of the following members:
(a) each person who is a general manager, within the meaning of the Local Government Act 1993 , for a Greater Hobart area council;
(b) the Secretary of a department that is nominated by the Minister for the purposes of this paragraph;
(c) the Secretary of the department responsible to the Planning Minister in relation to the administration of the Land Use Planning and Approvals Act 1993 ;
(d) [Section 7 Subsection (2) amended by No. 26 of 2022, s. 16, Applied:01 Dec 2022] a person nominated by Homes Tasmania;
(e) the Secretary of the department, the primary purpose of which is to assist the Minister who has primary responsibility for community development;
(f) the Secretary of the department, the primary purpose of which is to assist the Minister who has primary responsibility for economic development;
(g) the Chief Executive Officer of Infrastructure Tasmania or, if that unit of administration ceases to exist, another unit of administration nominated by the Minister.
(3) The person who is a member of the Advisory Group under subsection (2)(f) is to be the chairperson of the Advisory Group.
(4) The meetings and procedure of the Advisory Group are, subject to this Act and the regulations, to be as determined by the Advisory Group.
Part 3 Work Program
Part 3 Work Program
Division 1 Contents of work program
Division 1 Contents of work program
8 Contents of work program
8 Contents of work program
(1) A work program is to set out the specific actions, including actions in relation to the corridors and activity centres that are identified in the map included in the work program under subsection (3) , that are to be carried out by, or on behalf of, the following:
(a) any one or more of the Greater Hobart area councils;
(b) an adjunct council;
(c) the State Government –
so as to further the Greater Hobart Objectives.
(2) Without limiting the generality of subsection (1) , a work program may include actions to enable the better coordination between Greater Hobart area councils, or between Greater Hobart area councils and the State, of decisions about infrastructure, strategic planning decisions, and decisions about land use.
(3) A work program is to include a map that identifies existing key transport corridors, and activity centres, within the Greater Hobart area.
(4) A work program –
(a) may contain any prescribed matter; and
(b) must contain any matter that must, in accordance with the regulations, be included in such programs.
(5) A work program may include proposed actions that, if carried out, would –
(a) expand the corridors and activity centres that have been identified in the map included in the work program under subsection (3) ; or
(b) establish, within the Greater Hobart area, new transport corridors or activity centres.
(6) A work program is to identify which persons, or bodies, are to be jointly or separately responsible for ensuring that specific actions, set out in the work program, are carried out.
(7) The Advisory Group, in preparing a draft work program, must –
(a) seek to further the objectives of the resource management and planning system, as set out in Part 1 of Schedule 1 to theLand Use Planning and Approvals Act 1993 ; and
(b) consider the Southern Tasmania Regional Land Use Strategy; and
(c) be consistent with any applicable State Policy within the meaning of the State Policies and Projects Act 1993 .
Division 2 Preparation and approval of draft work programs, &c.
Division 2 Preparation and approval of draft work programs, &c.
9 Advisory Group to prepare draft work program
9 Advisory Group to prepare draft work program
(1) The Advisory Group is to –
(a) prepare a draft work program as soon as practicable after the day on which this Act commences; and
(b) prepare a draft work program as soon as practicable after the day on which a work program is revoked in accordance with section 12(4) .
(2) As soon as practicable after a draft work program is prepared under subsection (1) , the Advisory Group is to submit the draft to the Committee.
10 Committee may approve draft work program
10 Committee may approve draft work program
(1) The Committee, as soon as practicable after a draft work program is submitted to it under section 9(2) , must –
(a) approve the draft work program; or
(b) after consulting with the Advisory Group, approve the draft work program, amended as the Committee thinks fit; or
(c) refuse to approve the draft work program.
(2) A draft work program is only to be taken to be approved under subsection (1)(a) or (b) if the majority of the members of the Committee, including no fewer than 3 of the members who are mayors of Greater Hobart area councils, have approved the draft work program under subsection (1)(a) or (b) respectively.
(3) A draft work program comes into effect as a work program on the day on which the draft work program is approved under subsection (1)(a) or (b) .
(4) The Committee must provide a copy of a work program to the Greater Hobart area councils as soon as practicable after the work program comes into effect under subsection (3) .
Division 3 Review, amendment, revocation and implementation of work programs
Division 3 Review, amendment, revocation and implementation of work programs
11 Review of work programs
11 Review of work programs
(1) The Advisory Group, within 3 months after a work program has been in effect for 3 years, is to begin a review of the work program.
(2) The Advisory Group is to review a work program by –
(a) reviewing the extent to which, and the manner in which, the specific actions set out in the work program were carried out; and
(b) considering whether other actions should be set out in the work program.
(3) The Advisory Group, within 6 months after beginning a review under subsection (1) or a longer period allowed by the chairperson of the Committee, must provide to the Committee a report in relation to the review of the work program.
(4) The chairperson of the Committee must, as soon as practicable after allowing a longer period under subsection (3) , notify the members of the Committee of that longer period.
12 Amendment or revocation of work program
12 Amendment or revocation of work program
(1) The Advisory Group may prepare a draft amendment of a work program or a draft revocation of a work program.
(2) Division 2 applies in relation to a draft amendment of a work program, or a draft revocation of a work program, that is prepared under subsection (1) , as if the draft amendment or draft revocation were a draft work program.
(3) If, in accordance with [Div