This Plan sets the land‑use rules for the Great Lakes area (cl 1.3): it zones land, lists permitted, consent and prohibited uses, and fixes standards such as minimum lot sizes, building heights and floor space ratios while layering environmental and heritage controls. Who pays and decides: landowners and developers bear consent, infrastructure and compliance costs; the Council is the consent authority (cl 1.6), with some development requiring agency concurrence (eg cl 6.8, 6.9). The Plan changes what landowners may subdivide, build, use temporarily, or must protect.
This instrument is a local environmental plan (LEP) that establishes statutory land use rules for the part of the Mid‑Coast local government area labelled “Great Lakes”. The Plan does three mechanical things.
First, it defines the territorial scope and basic legal operation. It commences on publication on the NSW legislation website (cl 1.1AA). The land to which it applies is the land identified on the Land Application Map (cl 1.3). It names the consent authority as the Council for the area, subject to the Act (cl 1.6). It also adopts and prescribes the maps that give effect to zoning, lot sizes, height, floor space ratio and numerous overlays (cl 1.7; cl 2.2; maps referenced throughout).
Second, it replaces earlier local instruments that applied to the same land. All local environmental plans and deemed environmental planning instruments applying only to the land are repealed (cl 1.8). The Plan expressly preserves the position of development applications made before the Plan’s commencement by requiring those applications to be determined as if the Plan had not commenced (savings provision cl 1.8A), subject to operation of Division 3.5 of the Environmental Planning and Assessment Act (noted in cl 1.8A).
Third, it sets the operational land‑use controls. The Plan:
establishes the zoning framework (Part 2; cl 2.1), with a Land Use Table that specifies, for each zone, the objectives, development permitted without consent, development permitted only with consent, and prohibited development (cl 2.3);
prescribes that subdivision and demolition generally require development consent (cl 2.6; cl 2.7);
creates a regime for exempt and complying development (Part 3; cl 3.1-3.3; Schedules 2-3) but excludes environmentally sensitive areas from those pathways (cl 3.3);
Current sections
Direct links to the current provisions in Great Lakes Local Environmental Plan 2014.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agriculture; Airports; Airstrips; Animal boarding or training establishments; Aquaculture; Backpackers’ accommodation; Bed and breakfast accommodation; Boat launching ramps; Boat sheds; Camping grounds; Caravan parks; Cellar door premises; Cemeteries; Centre-based child care facilities; Charter and tourism boating facilities; Community facilities; Crematoria; Depots; Dual occupancies; Dwelling houses; Eco-tourist facilities; Educational establishments; Environmental facilities; Environmental protection works; Exhibition homes; Extractive industries; Farm buildings; Farm stay accommodation; Flood mitigation works; Forestry; Hazardous storage establishments; Helipads; Heliports; Home-based child care; Home businesses; Hotel or motel accommodation; Industrial training facilities; Industries; Information and education facilities; Jetties; Kiosks; Landscaping material supplies; Marinas; Mooring pens; Moorings; Neighbourhood shops; Offensive storage establishments; Open cut mining; Places of public worship; Plant nurseries; Public administration buildings; Recreation areas; Recreation facilities (indoor); Recreation facilities (major); Recreation facilities (outdoor); Registered clubs; Respite day care centres; Restaurants or cafes; Roads; Roadside stalls; Rural industries; Rural supplies; Secondary dwellings; Sewerage systems; Signage; Timber yards; Transport depots; Truck depots; Veterinary hospitals; Water recreation structures; Water supply systems; Wharf or boating facilities
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone SP2 Infrastructure and marked “Drainage” | Council |
| Zone SP2 Infrastructure and marked “Local road” | Council |
| Zone SP2 Infrastructure and marked “Local road and drainage” | Council |
| Zone SP2 Infrastructure and marked “Sewerage systems” | MidCoast Water |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Note.
If land, other than land specified in the Table to subclause (2), is required to be acquired under the owner-initiated acquisition provisions, the Minister for Planning and Infrastructure is required to take action to enable the designation of the acquiring authority under this clause. Pending the designation of the acquiring authority for the land, the acquiring authority is to be the authority determined by order of the Minister for Planning and Infrastructure (see section 21 of the Land Acquisition (Just Terms Compensation) Act 1991).
cl 5.1: Am 2016 (110), cl 5.
Part 6
Urban release areas
Part 6 Urban release areas
Part 6 Urban release areas
Division 1
General
Division 1 General
Division 1 General
pt 6, div 1, hdg: Ins 2023 (81), Sch 1[4].
6
Arrangements for designated State public infrastructure
6 Arrangements for designated State public infrastructure
6.1 Arrangements for designated State public infrastructure
(1) The objective of this clause is to require satisfactory arrangements to be made for the provision of designated State public infrastructure before the subdivision of land in an urban release area to satisfy needs that arise from development on the land, but only if the land is developed intensively for urban purposes.
(2) Development consent must not be granted for the subdivision of land in an urban release area if the subdivision would create a lot smaller than the minimum lot size permitted on the land immediately before the land became, or became part of, an urban release area, unless the Director-General has certified in writing to the consent authority that satisfactory arrangements have been made to contribute to the provision of designated State public infrastructure in relation to that lot.
(3) Subclause (2) does not apply to—
(a) any lot identified in the certificate as a residue lot, or
(b) any lot to be created by a subdivision of land that was the subject of a previous development consent granted in accordance with this clause, or
(c) any lot that is proposed in the development application to be reserved or dedicated for public open space, public roads, public utility undertakings, educational facilities or any other public purpose, or
(d) a subdivision for the purpose only of rectifying an encroachment on any existing lot.
(4) This clause does not apply to land in an urban release area if all or any part of the land is in a region within the meaning of the Act, Division 7.1, Subdivision 4.
(1) The objective of this clause is to ensure that development does not disturb, expose or drain acid sulfate soils and cause environmental damage.
(2) Development consent is required for the carrying out of works described in the Table to this subclause on land shown on the Acid Sulfate Soils Map as being of the class specified for those works.
| Class of land | Works |
| 1 | Any works. |
| 2 | Works below the natural ground surface.Works by which the watertable is likely to be lowered. |
| 3 | Works more than 1 metre below the natural ground surface.Works by which the watertable is likely to be lowered more than 1 metre below the natural ground surface. |
| 4 | Works more than 2 metres below the natural ground surface.Works by which the watertable is likely to be lowered more than 2 metres below the natural ground surface. |
| 5 | Works within 500 metres of adjacent Class 1, 2, 3 or 4 land that is below 5 metres Australian Height Datum and by which the watertable is likely to be lowered below 1 metre Australian Height Datum on adjacent Class 1, 2, 3 or 4 land. |
(3) Development consent must not be granted under this clause for the carrying out of works unless an acid sulfate soils management plan has been prepared for the proposed works in accordance with the Acid Sulfate Soils Manual and has been provided to the consent authority.
(4) Despite subclause (2), development consent is not required under this clause for the carrying out of works if—
(a) a preliminary assessment of the proposed works prepared in accordance with the Acid Sulfate Soils Manual indicates that an acid sulfate soils management plan is not required for the works, and
(b) the preliminary assessment has been provided to the consent authority and the consent authority has confirmed the assessment by notice in writing to the person proposing to carry out the works.
(5) Despite subclause (2), development consent is not required under this clause for the carrying out of any of the following works by a public authority (including ancillary work such as excavation, construction of access ways or the supply of power)—
(a) emergency work, being the repair or replacement of the works of the public authority, required to be carried out urgently because the works have been damaged, have ceased to function or pose a risk to the environment or to public health and safety,
(b) routine maintenance work, being the periodic inspection, cleaning, repair or replacement of the works of the public authority (other than work that involves the disturbance of more than 1 tonne of soil),
(c) minor work, being work that costs less than $20,000 (other than drainage work).
(6) Despite subclause (2), development consent is not required under this clause to carry out any works if—
(a) the works involve the disturbance of less than 1 tonne of soil, and
(b) the works are not likely to lower the watertable.
(2) Development for the purposes of multi dwelling housing is permitted with development consent.
9
Use of certain land at 9844 Pacific Highway, Bulahdelah
9 Use of certain land at 9844 Pacific Highway, Bulahdelah
9 Use of certain land at 9844 Pacific Highway, Bulahdelah
(1) This clause applies to part of Lot 100, DP 1139447, 9844 Pacific Highway, Bulahdelah, identified as “9” on the Additional Permitted Uses Map.
(2) Subdivision of the land and development for the purposes of a highway service centre is permitted with development consent.
(3) Development consent may only be granted under this clause if a single development application is submitted for the proposed subdivision and proposed land use.
10
Use of certain land in North Tuncurry Urban Release Area
10 Use of certain land in North Tuncurry Urban Release Area
10 Use of certain land in North Tuncurry Urban Release Area
(1) This clause applies to land in the North Tuncurry Urban Release Area that is in Zone RE2 Private Recreation.
(2) Development for the purposes of tourist and visitor accommodation is permitted with development consent if the site area of the development is no more than 3,000m2.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
(Clause 5.2)
Schedule 5
Environmental heritage
Schedule 5 Environmental heritage
Schedule 5 Environmental heritage
(Clause 5.10)
sch 5: Am 2017 (721), Sch 1 [1]–[4].
Schedule 6
Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
(Clause 5.19)
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Great Lakes Local Environmental Plan 2014.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in that part of the Mid-Coast local government area to which this Plan applies (in this Plan referred to as Great Lakes) in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to facilitate the orderly and sustainable economic development of land,
(b) to promote the health and well being of the population,
(c) to protect and enhance environmental, scenic and landscape assets,
(d) to facilitate cultural activities that will benefit the community,
(e) to promote the equitable provision of services and facilities for the community,
(f) to ensure that development does not create unreasonable or uneconomic demands for the provision or extension of public amenities or services,
(g) to promote public transport patronage and encourage walking and cycling,
(h) to ensure that development has regard to the capability of the land so that the risk of degradation is minimised,
(i) to minimise land use conflict,
(j) to ensure that development meets any local water quality objectives adopted by Council in relation to groundwater, rivers, estuaries, wetlands and other waterbodies,
sets primary development standards (Part 4), including minimum lot sizes (cl 4.1 and related exceptions 4.1AA-4.1D), height of buildings (cl 4.3), floor space ratio and calculation rules (cl 4.4-4.5), and an exceptions mechanism for development standards (cl 4.6) with specific limits on what may never be varied under that clause (cl 4.6(8));
contains a long list of local and technical provisions (Part 5 and Part 7) on matters such as heritage (cl 5.10), aquaculture (cl 5.19 and Schedule 6), flood and coastal risk (cl 5.21; cl 7.4), stormwater (cl 7.5), riparian land (cl 7.7), wetlands (cl 7.8), acid sulfate soils (cl 7.1), events on public reserves (cl 7.20), and specific precinct rules including an urban release area regime and North Tuncurry Urban Release Area rules (Part 6; cl 6.1-6.10);
authorises limited suspensions of private covenants and similar instruments to the extent necessary to permit development that complies with the Plan, subject to express exceptions (cl 1.9A).
The Plan is map‑driven. Many clauses operate only when land carries a map identifier or overlay (for example Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Wetlands Map, Heritage Map, Coastal Risk Planning Map). Where the Plan refers to other instruments and guidelines, it does so expressly; it remains subject to any State environmental planning policy that prevails in accordance with s 3.28 of the Act (cl 1.9(1)).
The instrument also attaches conditions to specific precincts and sites by Schedule (Schedule 1 additional permitted uses, Schedule 6 aquaculture controls, Schedule 5 heritage items and conservation areas). It contains savings, exceptions and detailed calculation rules (for example floor space ratio calculations and anti “double dipping” covenants in cl 4.5). Many operative obligations are framed as pre‑conditions for the grant of development consent, specifying matters the consent authority must be satisfied about before it may lawfully grant consent (see numerous clauses such as 2.8(3), 5.13(3), 5.19(2), 5.21(2), 7.5(2)-(3)).
The Plan does not itself set monetary penalties within its text. It prescribes permitted uses, consent triggers and procedural pre‑conditions, and relies on the Environmental Planning and Assessment Act and other statutes for enforcement, public notification and appeal mechanisms (see cl 1.6 note, cl 1.8A note and multiple cross references to other Acts).
Main concepts
This Plan organises land use through a small number of recurring legal and planning devices. The machinery is standard for an LEP but contains a number of local calibrations.
Zoning and Land Use Table
The Plan creates the statutory zoning matrix: a list of zones (cl 2.1) and a Land Use Table that links permitted uses and objectives to those zones (cl 2.3). The consent authority must have regard to zone objectives when determining applications (cl 2.3(2)).
Maps and overlays
Maps are integral and are legally adopted as part of the Plan (cl 1.7). Controls such as minimum lot size (Lot Size Map), maximum building height (Height of Buildings Map), floor space ratio (Floor Space Ratio Map), wetlands (Wetlands Map), watercourses (Watercourse Map), heritage (Heritage Map), coastal risk planning areas (Coastal Risk Planning Map), and active street frontages are implemented by reference to those maps (various clauses).
Consent pathways and delegated alternatives
Development is split into categories: exempt development and complying development (Part 3; cl 3.1-3.2; Schedules 2-3); development that may be carried out without development consent (as specified in Land Use Table for a zone); development that requires development consent; and prohibited development (Land Use Table, cl 2.3). Exempt and complying development pathways are constrained by overlay exclusions (cl 3.3) and by Building Code and BASIX related constraints (cl 3.1(3) and cl 4.6(8)(b)).
Principal development standards and flex
Standards for subdivision (minimum lot sizes cl 4.1 and variants 4.1AA-4.1D), building height (cl 4.3) and floor space ratio (cl 4.4) are central. The Plan provides tailored exceptions to minimum lot sizes (eg ecological protection cl 4.1B, boundary adjustments cl 4.1C, split‑zone lots cl 4.1D), and a clause allowing the consent authority to approve contraventions of a development standard where the applicant demonstrates that compliance is unreasonable or unnecessary and there are sufficient planning grounds (cl 4.6). The Plan also limits the operation of that exceptions mechanism for certain categories of standards (cl 4.6(8)).
Environmental and technical overlays and local tests
The Plan requires specific technical information and imposes pre‑conditions for consent in many contexts: acid sulfate soils management plans (cl 7.1(3)); heritage management documents and conservation management plans (cl 5.10(5)-(6)); aquaculture site and operational requirements and species constraints (cl 5.19 and Schedule 6); stormwater and water sensitive urban design requirements (cl 7.5); flood planning tests (cl 5.21). Exempt and complying development is excluded from environmentally sensitive areas listed in cl 3.3.
Precinct‑specific instruments and urban release controls
Part 6 creates an urban release area regime that requires staged development control plans (DCPs), satisfactory arrangements for designated State public infrastructure (cl 6.1) and availability of public utility infrastructure (cl 6.2-6.3). The North Tuncurry Urban Release Area is given additional controls (cl 6.6-6.10) including minimum lot sizes, affordable housing requirements (at least 10% and management by registered community housing provider, cl 6.7), and requirements for concurrence from the Planning Secretary and Transport for NSW in specified circumstances (cl 6.8-6.9).
Heritage and Aboriginal cultural heritage
Heritage items and conservation areas are listed in Schedule 5 and shown on the Heritage Map (cl 5.10). Consent is required for demolition, alteration, excavation and other works affecting heritage items or Aboriginal heritage places, with specified consultation and notification duties to the Heritage Council and local Aboriginal communities (cl 5.10(2), (7), (8), (9)).
Private instruments and public interest overrides
Clause 1.9A permits suspension, to the extent necessary, of private covenants, agreements and similar instruments that would restrict development permitted by the Plan. That suspension is limited: it does not apply to covenants required by Council, certain Crown land instruments, conservation agreements, property vegetation plans, biobanking agreements, or planning agreements (cl 1.9A(2)). It also preserves public authority interests under registered instruments (cl 1.9A(3)) and required Governor approval pre‑making (cl 1.9A(4) note).
Event facilitation and cultural activity protections
The Plan allows temporary uses (maximum 52 days in any 12 months) subject to local amenity and land restoration tests (cl 2.8). Events on public reserves and roads may be carried out without development consent for temporary events up to 52 days (cl 7.20), although other statutory approvals may still be required. The Plan also includes a provision preventing the refusal of consent for licensed premises on the basis of music‑related characteristics where noise can be managed to an acceptable level (cl 5.20).
Map and schedule reliance
Numerous controls apply only where the maps identify land as carrying a particular overlay. Practitioners should treat the maps and schedules as the operational source of many rights and duties (cl 1.7; cl 2.2; cross references throughout).
Who it affects
Stakeholders fall into clear groups defined by the Plan’s mechanics, and each group faces concrete legal impacts.
Landowners and potential developers in the Great Lakes area
Owners of land shown on the Land Application Map, and their agents, are first affected. Whether a particular use is permitted, requires consent, or is prohibited depends on the zone shown on the Land Zoning Map and associated schedules and maps (cl 2.2; cl 2.3). Subdivision, building, demolition and change of use proposals must comply with minimum lot sizes (cl 4.1 and exceptions 4.1AA-4.1D), height and FSR limits (cl 4.3-4.4), and a host of environmental overlay rules (eg cl 7.1 acid sulfate soils; cl 7.4 coastal risk; cl 7.7 riparian land).
The Council (consent authority)
The Plan names the Council as the consent authority for the Plan area, subject to the Act (cl 1.6). The Council must apply the Plan’s tests when determining applications, including mandatory satisfaction tests set out in many clauses (for example cl 2.8(3) for temporary uses; cl 5.13(3) for eco‑tourist facilities; cl 5.19(2) for pond/tank aquaculture; cl 5.21 for flood planning). The Council is also empowered to classify or reclassify public land under cl 5.2, to register covenants as a condition of consent (cl 4.5(9)) and to require management plans (cl 5.10(5)-(6)).
State agencies and other public authorities
The Plan allocates roles to State agencies. For owner‑initiated acquisition matters, it nominates relevant State authorities for particular types of land on the Land Reservation Acquisition Map (cl 5.1(2) table). For urban release subdivisions the Plan requires Director‑General certification for satisfactory arrangements for designated State public infrastructure for smaller lots (cl 6.1(2)). For North Tuncurry, the Planning Secretary’s concurrence is required for certain subdivisions below 5.5m AHD and the Planning Secretary must seek advice from the Biodiversity Conservation Division on flood management issues (cl 6.8). Transport for NSW concurrence is required for certain subdivisions that might affect the State road network (cl 6.9). MidCoast Water, the Minister administering the National Parks and Wildlife Act, and other agencies are named in cl 5.1 table for acquiring or managing particular reserved lands.
Registered community housing providers and affordable housing applicants
For residential development in the North Tuncurry Urban Release Area the Plan requires that affordable housing dwellings be managed by a registered community housing provider and a restriction under section 88E of the Conveyancing Act be registered before issue of the occupation certificate; the development must deliver at least 10% of dwellings as affordable housing (cl 6.7). This imposes a contractual and title encumbrance requirement on developers in that precinct.
Operators in regulated industries
Aquaculture operators must comply with cl 5.19 and Schedule 6 (site location, operational requirements and species selection). Intensive livestock agriculture is subject to cl 5.18 with both threshold exemptions and strict locational constraints designed to avoid sensitive receptors. Licensed premises and music venues are protected to a degree by cl 5.20 which prevents refusal on specified music‑related grounds provided noise is manageable.
Owners of heritage items and Aboriginal cultural heritage custodians
Owners of items listed in Schedule 5 and land within the heritage conservation areas on the Heritage Map face additional consent triggers. The consent authority must consider heritage impact and, where applicable, seek Heritage Council advice or notify local Aboriginal communities before granting consent to development that affects those values (cl 5.10(4), (5), (7), (8), (9)).
Persons subject to private covenants and agreements
Clause 1.9A suspends the operation of agreements, covenants and similar instruments that restrict development to the extent necessary to enable development consistent with this Plan, with express carve outs for covenants imposed by Council and specified Crown, conservation and biobanking instruments (cl 1.9A(1)-(3)). Registered rights of public authorities remain unaffected (cl 1.9A(3)). That creates an operational effect on private encumbrances, but only within the statutory limits set in the clause.
Event organisers and cultural operators
The Plan allows temporary events on public reserves and public roads for up to 52 days in any 12 months without development consent (cl 7.20). It also has a separate temporary use clause for private land allowing up to 52 days per year (cl 2.8). Licensed premises promoters have additional protection under cl 5.20 against refusals based solely on music characteristics provided noise can be managed.
Councils and holders of public land titles
Schedule 4 and cl 5.2 classify or reclassify public land as operational or community land and set out consequences (cl 5.2(2)-(5)). The Plan gives the Council authority to carry out classification or reclassification in accordance with the Local Government Act (cl 5.2(1)) and, where public reserves are discharged, it notes Governor approval may be required (cl 5.2(5) note).
Practitioners should treat the Plan as a map‑driven, consent‑centric instrument that imposes detailed information and management obligations on applicants and imposes procedural duties on the Council and some State agencies.
Key duties and rights
This section maps the principal legal obligations the Plan creates and the discrete rights it confers, together with the procedural mechanics that give them effect.
Duties of the consent authority (Council)
Apply zone objectives: the consent authority must have regard to the objectives of the relevant zone when deciding an application (cl 2.3(2)).
Pre‑conditions for consent: many clauses make consent conditional on specified satisfaction criteria. Examples include the temporary use criteria (cl 2.8(3)(a)-(d)); eco‑tourist facilities (cl 5.13(3)(a)-(j)); aquaculture (cl 5.19(2)(a)-(b)); flood planning (cl 5.21(2)(a)-(e)). These are expressed as mandatory satisfactions to be reached before consent may be granted.
Record keeping and assessment: where a development standard is to be contravened under the Plan’s exceptions mechanism, the consent authority must keep a record of its assessment under cl 4.6(4).
Consultation and notifications: the consent authority must notify and consider responses from the Heritage Council for archaeological sites (cl 5.10(7)) and for demolition of nominated State heritage items (cl 5.10(9)); and must notify local Aboriginal communities and consider responses before granting consent affecting Aboriginal places of heritage significance (cl 5.10(8)).
Duties of applicants and developers
Compliance with definitions and codes: exempt and complying development must meet Building Code of Australia deemed‑to‑satisfy provisions and must not cause classification contraventions (cl 3.1(3)-(4)).
Provide targeted technical plans: the Plan requires applicants to provide, where applicable, acid sulfate soils management plans (cl 7.1(3)), heritage management documents or heritage conservation management plans (cl 5.10(5)-(6)), stormwater management strategies (cl 7.5), aquaculture site plans consistent with Schedule 6 (cl 5.19(2)(a)), flood risk assessments consistent with the Considering Flooding guideline (cl 5.21(3)-(4) and definitions).
Title and covenant obligations: certain approvals must be accompanied by title restrictions; for example affordable housing in North Tuncurry requires an s 88E Conveyancing Act restriction to ensure management by a registered community housing provider (cl 6.7(3)(b)). When a consent grants floor area on multi‑lot sites, the consent authority may require a covenant preventing “double dipping” (cl 4.5(9)).
Special compliance for particular land: intensive livestock agriculture below specified thresholds may be permitted without consent but only if sited outside sensitive areas and complying with exclusions (cl 5.18(4)-(5)); eco‑tourist developments require a management strategy and environmental protection measures (cl 5.13(3)(k)‑(v)).
Rights conferred on landholders and developers
Rights to carry out permitted development: the Land Use Table and Schedules grant rights to carry out certain development without consent in specified zones (cl 2.3 and Land Use Table; Schedule 1 additional permitted uses).
Exempt and complying development pathways: where an item is listed in Schedule 2 (exempt) or Part 1 of Schedule 3 (complying) and the criteria are met, proponents may proceed under those faster pathways subject to other statutory approvals (cl 3.1-3.2).
Suspension of private restraints: where a covenant or agreement would restrict carrying out development permitted by the Plan, cl 1.9A provides that such instruments do not apply to the extent necessary to allow the development, subject to listed exceptions and preservation of public authority rights.
Precinct‑level assurances: certain precinct rights are afforded by Schedule 1 or Part 6 instruments, for example specific additional permitted uses in identified sites (Schedule 1) and the 10% affordable housing guarantee mechanism in North Tuncurry (cl 6.7).
Limits on rights and non‑derogable duties
Prohibitions: the Land Use Table sets out prohibited development per zone and the Plan contains area‑wide prohibitions such as the prohibition on canal estate development (cl 2.9).
Non‑varia ble development standards: cl 4.6(8) lists categories of standards that cannot be contravened under the exceptions clause including standards for complying development, BASIX commitments, and specified clauses such as cl 5.4 and clauses in Part 6.
Overlay exclusions for exempt/compliant pathways: cl 3.3 excludes exempt or complying development from environmentally sensitive areas as defined, which are expressly listed. That removes the ability to use those faster pathways in sensitive contexts (cl 3.3(1)-(2)).
Procedural duties and interaction with other Acts
The Plan repeatedly cross‑refers to other statutes and policies. For example, the consent authority must have regard to State environmental planning policies (cl 1.9(1)), follow notification and acquisition provisions under the Land Acquisition (Just Terms Compensation) Act as to nominated acquiring authorities (cl 5.1 and note), and apply Local Government Act rules when classifying public land (cl 5.2). The Plan therefore imposes duties that interact with other statutory regimes.
In short, the Plan creates a consent‑centric duty structure: applicants must demonstrate specified technical and environmental outcomes; the Council must be satisfied about those matters before granting consent; and particular map and schedule identifications give rise to bespoke additional information, restrictions and title encumbrances.
Penalties and enforcement
The Plan itself does not set out specific monetary penalties within its text. Instead, it creates the regulatory triggers and conditions that determine when development requires consent, what supporting material must be provided, and what development is expressly prohibited. Enforcement and penalties for non‑compliance therefore operate through the primary statutory regime under the Environmental Planning and Assessment Act and other applicable Acts named in the Plan. The Plan makes that relationship explicit in several places by referring to “development consent” and to the operation of the Act (for example cl 1.6 states the consent authority is the Council “subject to the Act”; cl 1.8A note refers to Division 3.5 of the Act).
Practical enforcement mechanisms implied by the Plan
Council enforcement: because the Council is the consent authority (cl 1.6), it is the body charged with determining applications and monitoring compliance with the conditions of consents. Conditions it imposes may include management plans, covenants (cl 4.5(9)), registration of s 88E restrictions (cl 6.7(3)(b)), and specific operational conditions (eg cl 5.13(3)(k) for eco‑tourist facilities). Non‑compliance with consent conditions typically engages enforcement powers under the Environmental Planning and Assessment Act.
Registered instruments and title encumbrances: the Plan contemplates title restrictions as compliance tools (eg cl 6.7(3)(b) affordable housing; cl 4.5(9) covenants to prevent floor space “double dipping”). Failure to register or observe those instruments will affect the enforceability of the consent’s constraints and will likely engage remedies available under the Conveyancing Act and the Act.
Interaction with other regulators: the Plan calls for specific approvals and notifications to other agencies that can trigger parallel enforcement powers. For example, heritage matters require notifying the Heritage Council for archaeological sites (cl 5.10(7)); Aboriginal places require consultation and may engage the National Parks and Wildlife Act and other heritage enforcement pathways if objects are disturbed (cl 5.10(8); note cross references).
Limits and practical points
The Plan prescribes many “must not be granted unless” tests (eg cl 5.21(2) flood planning) which function as pre‑conditions. If consent is granted in breach of those pre‑conditions, the validity of the consent may be open to administrative review or challenge under the Act. The Plan itself does not state remedy mechanisms; those are sourced in the Act and judicial review processes.
Exempt and complying development pathways carry their own compliance expectations: exempt development is still subject to approvals, licences and other statutory requirements under other Acts (Schedule 2, Note 2). Complying development certificates issued under Schedule 3 are subject to conditions set out in the relevant State SEPP (sch.3-sec General conditions).
For practitioners, the take‑away is that enforcement is exercised via the consent framework and the wider statutory architecture referenced by the Plan. Remedies, penalties and compliance prosecution will typically be pursued under the Environmental Planning and Assessment Act and other Acts cited in the Plan rather than by reference to standalone penalty clauses inside the LEP.
How it interacts with other laws
The Plan is embedded in a network of State and local law. It expressly cross‑references and defers to other legislative instruments and policies in multiple passages. The interaction patterns are express and localised.
State environmental planning policies and the Act
The Plan is “subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act” (cl 1.9(1)). That means SEPPs may override the Plan where the SEPP is expressed to prevail; the Plan and the Act operate as an integrated hierarchy. The Plan also refers to specific SEPPs as being relevant to development in this area (eg SEPP (Housing) 2021 referenced in the Land Use Table notes).
Heritage and Aboriginal heritage statutes
The Plan refers to and operates alongside the Heritage Act 1977 and the National Parks and Wildlife Act 1974 when it prescribes consent and notification duties in relation to heritage items and Aboriginal places (cl 5.10). For archaeological sites and nominated State heritage items the Plan requires the consent authority to notify the Heritage Council and take its response into consideration (cl 5.10(7), (9)). For Aboriginal places it requires consultation with local Aboriginal communities and consideration of their responses (cl 5.10(8)).
Land acquisition and public land laws
Clause 5.1 identifies the relevant State authority for owner‑initiated land acquisition under the Land Acquisition (Just Terms Compensation) Act 1991 and ties that regime to the Land Reservation Acquisition Map. Clause 5.2 enables classification and reclassification of public land in accordance with the Local Government Act 1993 and notes the Plan can discharge trusts where operational land is substituted, subject to Governor approval in some cases (cl 5.2(1), (5) note).
Environmental protection, biodiversity and fisheries legislation
The Plan interacts with the Biodiversity Conservation Act 2016 (areas of outstanding biodiversity value referenced in Schedule 6 and cl 3.3), the Fisheries Management Act 1994 (aquaculture industry development plans referenced in cl 5.19 and Schedule 6), and the Marine Estate Management Act 2014 (conservation exclusion zones for aquaculture in Schedule 6). Some protections are layered: exempt/compliant development is excluded in areas listed under cl 3.3 such as coastal wetlands, Ramsar wetlands, marine parks and declared critical habitats.
Building and sustainability requirements
Exempt and complying development must meet the Building Code of Australia (cl 3.1(3)(a)) and BASIX commitments cannot be varied under the exceptions clause (cl 4.6(8)(b)). The Plan therefore coordinates development standards with building codes and energy/sustainability commitments.
Flood, coastal and climate guidance materials
The Plan requires consent authorities to assess flood risk and climate impacts using specified sources: the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual are named in cl 5.21, and the Coastal Planning Guideline for sea level rise is cross‑referenced in cl 7.4. For North Tuncurry, the Planning Secretary must seek advice from the Biodiversity Conservation Division about technical flood planning matters (cl 6.8(5)).
Local Government and roads legislation
Events on public roads and reserves are permitted without development consent under cl 7.20(2) but the Plan explicitly notes other approvals under the Local Government Act 1993, Roads Act 1993 and Crown Land Management Act 2016 may still be required (cl 7.20 note). Classification of public land also interacts with Local Government Act machinery (cl 5.2).
Conveyancing and title encumbrance law
The Plan requires or contemplates registration of title restrictions and covenants as conditions of consent (eg cl 6.7(3)(b) requires s 88E Conveyancing Act restrictions for affordable housing, cl 4.5(9) contemplates covenants to prevent creation of floor area where the site overlaps multiple lots). Those conditions give the Plan practical effect on land titles and engage conveyancing and property law procedures.
In short, the Plan is not a stand‑alone code. It prescribes and conditions development subject to other State policies, technical guidelines and specialist statutes. Practitioners must coordinate the LEP requirements with statutory duties and approvals under heritage, environmental, water, building, roads, Crown land and conveyancing law. The Plan itself contains the pointers and specific references that show where that coordination must occur (see cl 1.9, cl 5.10, cl 5.19, cl 5.21, cl 7.20, cl 6.7 and others).
Amendment history
The instrument records numerous amendments and insertion notes in‑text. The Plan was originally made as Great Lakes Local Environmental Plan 2014 and the text contains inline amendment marks. The document itself provides the amendment citations. The following is an extracted chronology of amendments and insertions as shown in the instrument (this list reproduces the Plan’s own marginal notes and clause histories):
2014: Original instrument (Great Lakes Local Environmental Plan 2014).
2014 No 33: Amendment to cl 4.1B (see cl 4.1B note); also Sch 2.18 references.
2015 (343), Sch 1: Amendments across the Land Use Table and later additions (Land Use tbl note records 2015 (343), Sch 1 [1] [2]); clause 7.3 was amended (cl 7.3 Am 2015 (648), cl 5).
2016 (110), cl 5: Amendment to cl 5.1 (Relevant acquisition authority) (see cl 5.1 note).
2016 (480), Sch 1 [1]: Various amendments including insertion of cl 4.2B (Erection of dual occupancies and secondary dwellings in Zone RU2) and others (see cl 4.2B inscription).
2016 (579), Sch 1 [3]: Insertions including cl 4.1C and cl 4.1D (see cl 4.1C and cl 4.1D notes).
2017 (493), Sch 1.1 [1] [2]: Amendments to Land Use Table and other textual updates (Land Use tbl note).
2017 (621), Sch 1 [1]: Amendment to cl 1.2 (Aims of Plan) (cl 1.2 Am 2017 (621), Sch 1 [1]).
2021 (714), Sch 11.18 [1]-[2]: Amendments including to cl 4.2B and insertion of cl 5.5 (controls relating to secondary dwellings on land in a rural zone).
2022 (831), Sch 1.10 [multiple]: Extensive package of amendments across the Plan, including updates to zone lists (cl 2.1), insertion of cl 4.1AA, variations to height and FSR leeways (cl 4.3; cl 4.4) and other technical amendments (see multiple clause notes referencing 2022 (831), Sch 1.10).
2023 (81), Sch 1 [1]-[6]: Inserted Part 6 urban release area headings and provisions and multiple schedule changes (see pt 6, div 1 hdg and other notes).
2023 (82), Sch 1.5 [13] and Sch 1.5 [14]: Further minor amendments indicated in the Land Use tbl note and Sch 1 entries.
2023 (458), Sch 2.34 [1] [2]: Amendment to Land Use Table and substitution of cl 5.24 and 5.25 (farm stay accommodation and farm gate premises) (see cl 5.24 and cl 5.25 notes).
2023 (554), Sch 1: Amendment to cl 6.1 (arrangements for designated State public infrastructure).
2023 (664), Sch 3.6: Amendment to cl 7.12 (conversion of serviced apartments).
2024 (42), Sch 1.20 [1]-[2]: Recent amendments recorded against the Land Use tbl note and inserted into cl 4.1D (see cl 4.1D note).
This chronology is the Plan’s own record of amendments. Each in‑text “Am”, “Ins”, “Rep” or “Subst” note gives the Act/Regulation reference and the schedule or clause number where the amendment appears. Practitioners should consult the consolidated official instrument and the NSW Legislation website for the current operative text and to confirm the chronological context of any relevant amendment.
Litigation history
The Plan itself does not include any case law or litigation narrative. The instrument does not list or cite judicial decisions. The text contains no references to litigation outcomes or judicially determined interpretations. Where the Plan refers to legal processes or to actions under the Environmental Planning and Assessment Act and other statutes (for example cl 1.8A note referencing Division 3.5 of the Act), it does so to explain statutory procedure rather than to recite cases.
If there are challenges to decisions made under this Plan, those challenges would be conducted under the usual review and appeal mechanisms established by the Environmental Planning and Assessment Act and administrative law principles. The instrument does not itself record any concluded litigation or precedent. Practitioners should search cases and administrative review decisions externally for judicial interpretation of specific clauses such as cl 4.6 (exceptions to development standards), cl 1.9A (suspension of covenants) or heritage provisions (cl 5.10) to determine how courts or tribunals have treated those provisions in practice.
Gotchas
The Plan contains multiple specific provisions that create traps for the unwary. These are concrete mechanics that commonly produce planning and legal risks.
Savings and timing effects
Development applications lodged before commencement must be determined as if the Plan had not commenced (cl 1.8A). A practitioner should therefore check the application lodgement date relative to the Plan’s commencement to determine which rules apply. The Note to cl 1.8A points to the interaction with Division 3.5 of the Act where an application can be made in parallel with draft LEP amendments; timing thus matters.
Suspension of private covenants (1.9A) is limited and conditional
Clause 1.9A permits the non‑application of private agreements or covenants to the extent necessary for development approved under the Plan, but it expressly excludes covenants imposed by the Council and a number of Crown and conservation instruments (cl 1.9A(2)). It also preserves registered public authority rights (cl 1.9A(3)) and required prior Governor approval under s 3.16 of the Act is recorded (cl 1.9A(4) note). In practice a developer who relies on the suspension must check whether the covenant falls within an exclusion and confirm the presence or absence of public authority rights on title.
Exempt and complying development exclusions
Exempt or complying development pathways cannot be used in designated environmentally sensitive areas (cl 3.3). The listed areas include coastal waters, coastal lakes, Ramsar wetlands, World Heritage areas, and land within 100 metres of such areas (cl 3.3(2)(a)-(f)). Practitioners must check overlays before relying on the faster pathways in Part 3.
Exceptions to standards are not unconditional
Clause 4.6 permits contraventions of development standards but requires applicants to demonstrate that compliance would be unreasonable or unnecessary and that sufficient environmental planning grounds justify the contravention (cl 4.6(3)). The consent authority must keep a record of the assessment (cl 4.6(4)). Importantly cl 4.6(8) lists standards that cannot be varied under this clause, including BASIX commitments and certain clauses. This means an applicant cannot rely on 4.6 to avoid BASIX commitments or other specified standards.
Floor space ratio calculation and anti double dipping covenants
Clause 4.5 includes detailed rules about calculating site area and gross floor area for FSR purposes and allows the consent authority to require a covenant to prevent duplication of permitted floor area where a site is composed of several lots (cl 4.5(9)). This can reduce the effective FSR available to a building if a covenant is required on an associated lot. Developers should examine the covenant risk and potential floor area reductions (cl 4.5(10)).
Map‑dependence and site‑specific exceptions
Many rights and obligations apply only where land is shown on a particular map or schedule. Items such as Additional Permitted Uses (Schedule 1), heritage listings (Schedule 5), wetlands (Wetlands Map) and the North Tuncurry overlays are site specific. A failure to check the maps (cl 1.7; cl 2.2) can lead to incorrect assumptions about permissibility.
Affordable housing and title restrictions in North Tuncurry
The North Tuncurry affordable housing clause requires at least 10% of dwellings to be affordable and to be managed by a registered community housing provider; it also requires a section 88E Conveyancing Act restriction to be registered prior to issue of the occupation certificate (cl 6.7(3)). Failure to register the restriction will prevent lawful compliance with that clause.
Heritage consent, notification and Aboriginal consultation
Demolition and works affecting heritage items and Aboriginal places trigger consent and notification duties. The consent authority must consider impacts and may require heritage management documents or conservation management plans; archaeological sites and nominated State heritage items require Heritage Council notification and consideration of responses (cl 5.10(4)-(9)). For Aboriginal places the consent authority must notify local Aboriginal communities and consider responses (cl 5.10(8)). In practice this can add time and cost and impose pre‑conditions on consent.
Temporary events versus other approvals
The Plan permits temporary events on public reserves and roads without development consent (cl 7.20(2)). The clause expressly notes that other approvals (Local Government Act, Roads Act, Crown Land Management Act) may still be required (cl 7.20 note). Practitioners and event organisers must therefore obtain any separate licences or approvals that the relevant operational Acts require.
Aquaculture and discharge restrictions
Pond and tank aquaculture have strict operational requirements in cl 5.19 and Schedule 6, including limits on discharge to natural waterbodies for intensive aquaculture (Schedule 6, Division 2, item 4). Enterprises must demonstrate compliance with aquaculture industry development plans and NSW Oyster Industry Strategy where applicable (cl 5.19(5)-(6)). Failure to respect conservation exclusion zones or to provide screened outlets may render a proposal unacceptable.
Flood and coastal risk tests
Flood planning (cl 5.21) requires the consent authority to be satisfied that development is compatible with flood function and will not adversely affect flood behaviour or evacuation safety, and to consider climate change projections and related guidelines. Coastal risk planning (cl 7.4) adds similar obligations for land in the Coastal Risk Planning area. These are substantive tests that may require detailed modelling and peer review; cl 6.8 for North Tuncurry requires the Planning Secretary to seek technical advice from Biodiversity Conservation Division.
Canal estate prohibition
The Plan bans canal estate development outright (cl 2.9). The definition is broad and includes constructed canals that are inundated by surface or groundwater or drain to a waterbody, in conjunction with residential development and fill or excavation. Proposals involving canals should be assessed against cl 2.9 before seeking consent.
In practice, the “gotchas” are almost always a failure to consult the maps and Schedules, an assumption that one may use the exemptions or exceptions clause without checking the non‑varying list, or a failure to account for cross‑agency concurrence or title‑based obligations (eg s 88E restrictions, covenants).
How to comply
Compliance requires a site‑specific, map‑driven, multi‑disciplinary approach. The following is a practical step‑by‑step checklist derived from the Plan’s operative tests and conditions.
Confirm the operative instrument and maps
Obtain the current consolidated Great Lakes LEP 2014, including all maps (Land Zoning Map, Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Heritage Map, Wetlands Map, Watercourse Map, Coastal Risk Planning Map, Protection of Wildlife Corridors Map, Active Street Frontages Map, Land Reservation Acquisition Map, Foreshore Building Line Map, Dwelling Density Map and any precinct maps). The Plan’s controls are map dependent (cl 1.7; cl 2.2).
Determine permissibility under the Land Use Table and Schedules
Identify the zone and locate the proposed use in the Land Use Table for that zone (cl 2.3). Confirm whether the use is permitted without consent, permitted with consent, or prohibited. Check Schedule 1 for site‑specific additional permitted uses (cl 2.5; Schedule 1).
Check for overlay exclusions to exempt or complying development
If a project would rely on exempt or complying development (Part 3; Schedule 2/3), check cl 3.3: environmentally sensitive areas listed in cl 3.3 are excluded from exempt and complying pathways. If the site falls within any environmentally sensitive area, prepare to follow the development consent pathway.
Identify applicable development standards and constraints
Check minimum lot size (cl 4.1, and exceptions 4.1AA-4.1D), height limits (cl 4.3), FSR (cl 4.4), floor space calculation rules (cl 4.5), and any site‑specific controls in Part 7 (eg acid sulfate soils cl 7.1, coastal risk cl 7.4, stormwater cl 7.5, riparian cl 7.7, wetlands cl 7.8). Confirm whether the project requires a covenant to avoid “double dipping” for FSR (cl 4.5(9)).
Determine required technical documentation
Prepare and provide the specific plans and documents the Plan requires when relevant:
Acid sulfate soils management plan where required (cl 7.1(3)).
Heritage management assessment or heritage conservation management plan when development affects heritage items or conservation areas (cl 5.10(5)-(6)).
Aquaculture site and operational information consistent with Schedule 6 and any aquaculture industry development plans (cl 5.19; Schedule 6).
Flood risk assessment and compliance with the Considering Flooding in Land Use Planning Guideline for flood planning areas (cl 5.21).
Stormwater management and water sensitive urban design plans (cl 7.5).
Bush fire or evacuation measures where relevant (cl 5.21(3)(d); cl 7.4(3)(d)).
Check for mandatory notifications and concurrence
If development affects an archaeological site or nominated State heritage item, notify the Heritage Council and allow 28 days for response (cl 5.10(7), (9)). For Aboriginal places of heritage significance, notify and consult local Aboriginal communities and allow 28 days for response (cl 5.10(8)). For North Tuncurry subdivisions below 5.5m AHD, obtain Planning Secretary concurrence and ensure Biodiversity Division advice is sought (cl 6.8). For subdivisions in specified zones that may affect State roads, obtain Transport for NSW concurrence (cl 6.9).
Comply with prescribed numerical limits and thresholds
Respect the Plan’s stated numerical caps where applicable: temporary use maximum 52 days in any 12 months (cl 2.8(2)); bed and breakfast guest rooms not more than 3 (cl 5.4(1)); home business up to 50 m2 (cl 5.4(2)); kiosk size caps (cl 5.4(6)); neighbourhood shop retail floor area caps (cl 5.4(7)); secondary dwelling size caps (cl 5.4(9); cl 5.5 for rural zones); aquaculture and intensive livestock thresholds in cl 5.19 and cl 5.18.
Address title and covenant outcomes
If the consent will require a registered restriction, covenant or s 88E instrument, prepare those instruments early and ensure they are registrable prior to issue of occupation certificates where required (eg cl 6.7(3)(b) affordable housing). If multiple lots comprise a site, check whether the Council will require covenants to prevent the creation of floor space on a restricted lot to avoid FSR “double dipping” (cl 4.5(9)).
Consider use of development standard exceptions carefully
If seeking to contravene a development standard under cl 4.6, prepare the statutory demonstration document required by the Environmental Planning and Assessment Regulation showing that compliance is unreasonable or unnecessary and that sufficient environmental planning grounds exist (cl 4.6(3) and accompanying Note). Be aware of standards that cannot be varied under cl 4.6(8).
Coordinate other statutory approvals
Determine other approvals that may still be required despite the Plan: approvals under the Local Government Act, Roads Act, Crown Land Management Act, Fisheries Management Act, Biodiversity Conservation Act or the Heritage Act may be necessary depending on the nature and location of the development (multiple clauses and notes: cl 7.20 note; cl 5.19 cross‑refs; cl 5.10 cross‑refs). Exempt development is not a substitute for approvals under other Acts (Schedule 2 note).
For urban release areas and precincts
For land in an urban release area comply with Part 6 pre‑conditions: ensure a DCP is prepared that addresses the matters in cl 6.3(3); ensure any designated State public infrastructure arrangements are certified by the Director‑General where smaller lots are to be created (cl 6.1(2)); ensure essential public utility infrastructure is provided or arrangements made (cl 6.2).
For events and temporary uses
If the proposal is a temporary event on public reserves or roads check cl 7.20 and obtain any additional approvals required by the Local Government Act, Roads Act or Crown Land Management Act. For temporary private land uses check the 52 day limit and the restoration obligation in cl 2.8(3)(d).
Build compliance monitoring into the planning program
Budget for time and cost of heritage and Aboriginal consultations (cl 5.10(7)-(9)); flood and groundwater modelling where needed (cl 6.8(5)); and biodiversity advice where required. Check whether the planning authority may impose monitoring, funding or auditing mechanisms for ongoing management as is required in certain precincts (cl 7.15(2)(f) for Seven Mile Beach).
Record retention and administrative steps
Where cl 4.6 is used, expect the consent authority to keep a formal record of its assessment (cl 4.6(4)). Keep copies of all heritage, environmental and technical documentation lodged and any written confirmations by the consent authority (for example where the Council notifies a minor heritage matter will not adversely affect significance under cl 5.10(3)(a)).
Seek early liaison with the Council and relevant agencies
Early pre‑lodgement liaison with Council, and where relevant Transport for NSW, the Biodiversity Conservation Division or the Planning Secretary, will identify likely technical expectations and concurrence requirements (cl 6.8-6.9). For developments touching State environmental priorities or significant extractive resources, contact the agencies listed in cl 5.1 and cl 7.14.
Following these steps will align an application with the Plan’s map‑driven rules, the Plan’s pre‑conditions for consent and the cross‑agency, title and environmental obligations that the instrument creates. Where tests are subjective (for example whether noise “may be managed and minimised to an acceptable level” under cl 5.20(2)), provide objective evidence and proposed management measures for the consent authority to assess.
(k) to protect, enhance and provide for the long-term management of native biodiversity, including habitat linkages, threatened species populations and endangered ecological communities, and to identify and protect biodiversity links or corridors throughout the landscape.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Great Lakes Local Environmental Plan 1996
Manning Local Environmental Plan No 1
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and