This local environmental plan sets the planning rules that apply to Glen Innes Severn: it defines zones, what uses are allowed or prohibited, when development consent is needed, minimum lot sizes, and special controls for heritage, flood, riparian land and aquaculture. It replaces earlier local LEPs and applies to the land shown on its maps (cl 1.3; cl 1.8).
It affects landowners and developers (who pay for compliance with consent, subdivision and environmental conditions — cl 2.6; cl 4.1; cl 7.3) and gives the Council the role of consent authority (cl 1.6) with discretion under exception and assessment clauses (eg cl 4.6; cl 5.10).
This instrument is a local environmental plan (LEP) that prescribes land use rules and local planning controls for the Glen Innes Severn local government area. Mechanically it:
Declares the Plan’s name and commencement (it is the Glen Innes Severn Local Environmental Plan 2012 and commences on publication on the NSW legislation website, cl 1.1AA and cl 1.1).
Specifies the land to which it applies by reference to named maps including the Land Application Map and Land Zoning Map (cl 1.3; cl 2.2; cl 1.7). The maps, and other map products (Lot Size Map, Dwelling Opportunity Map, Heritage Map, Riparian Lands and Watercourses Map, Drinking Water Catchment Map, Land Reservation Acquisition Map, Obstacle Limitation Surface Map and Noise Exposure Forecast maps referenced in the Plan), determine which clauses apply to particular parcels of land. The Plan requires the maps to be made available to the public in electronic or paper form (cl 1.7).
Establishes the zoning framework to apply within the local government area and attaches a Land Use Table for each zone indicating permitted without consent, permitted with consent, and prohibited development (cl 2.1; cl 2.3; Land Use Table).
Repeals prior local environmental instruments insofar as they apply to the land the Plan covers (cl 1.8).
Sets out an exceptions regime for covenants and similar instruments to facilitate development that complies with the Plan (subject to expressly excluded instruments) (cl 1.9A).
Lays down key development controls including subdivision rules and minimum lot sizes (cl 4.1 and related clauses), consenting rules for demolition (cl 2.7), temporary uses (cl 2.8), prohibition on canal estate development (cl 2.9), and a range of more detailed local provisions (schedules and Part 7 clauses).
Current sections
Direct links to the current provisions in Glen Innes Severn Local Environmental Plan 2012.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Aquaculture; Backpackers’ accommodation; Bed and breakfast accommodation; Building identification signs; Business identification signs; Cellar door premises; Dual occupancies; Dwelling houses; Extractive industries; Farm buildings; Farm stay accommodation; Funeral homes; Group homes; Home industries; Intensive livestock agriculture; Intensive plant agriculture; Kiosks; Landscaping material supplies; Open cut mining; Plant nurseries; Restaurants or cafes; Rural supplies; Rural workers’ dwellings; Timber yards; Turf farming; Any other development not specified in item 2 or 4
4
Prohibited
4 Prohibited
4 Prohibited
Amusement centres; Boat building and repair facilities; Car parks; Centre-based child care facilities; Commercial premises; Depots; Entertainment facilities; Exhibition homes; Exhibition villages; Function centres; Health services facilities; Heavy industrial storage establishments; Highway service centres; Industrial retail outlets; Industries; Local distribution premises; Marinas; Mooring pens; Moorings; Passenger transport facilities; Places of public worship; Public administration buildings; Registered clubs; Residential accommodation; Respite day care centres; Restricted premises; Service stations; Sex services premises; Signage; Storage premises; Tourist and visitor accommodation; Vehicle body repair workshops; Vehicle repair stations; Warehouse or distribution centres; Wholesale supplies
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Part 6
Urban release areas
Part 6 Urban release areas
Part 6 Urban release areas
6
Arrangements for designated State public infrastructure
6 Arrangements for designated State public infrastructure
6.1 Arrangements for designated State public infrastructure
(1) The objective of this clause is to require satisfactory arrangements to be made for the provision of designated State public infrastructure before the subdivision of land in an urban release area to satisfy needs that arise from development on the land, but only if the land is developed intensively for urban purposes.
(2) Development consent must not be granted for the subdivision of land in an urban release area if the subdivision would create a lot smaller than the minimum lot size permitted on the land immediately before the land became, or became part of, an urban release area, unless the Director-General has certified in writing to the consent authority that satisfactory arrangements have been made to contribute to the provision of designated State public infrastructure in relation to that lot.
(3) Subclause (2) does not apply to—
(a) any lot identified in the certificate as a residue lot, or
(b) any lot to be created by a subdivision of land that was the subject of a previous development consent granted in accordance with this clause, or
(c) any lot that is proposed in the development application to be reserved or dedicated for public open space, public roads, public utility undertakings, educational facilities or any other public purpose, or
(d) a subdivision for the purpose only of rectifying an encroachment on any existing lot.
(4) This clause does not apply to land in an urban release area if all or any part of the land is in a region within the meaning of the Act, Division 7.1, Subdivision 4.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Glen Innes Severn Local Environmental Plan 2012.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Glen Innes Severn in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to encourage the proper management, development and conservation of natural and human resources in Glen Innes Severn by protecting, enhancing and conserving the following—
(i) land of significance to agricultural production,
(ii) timber, minerals, soil, water and other natural resources,
(iii) areas of significance for nature conservation,
(iv) areas of high scenic or recreational value,
(v) landscapes, places and buildings of archaeological or heritage significance, including aboriginal relics and places,
(vi) communities and settlements,
(b) to facilitate growth and development that—
(i) minimises the cost to the community of fragmented and isolated development of rural land, and
(ii) facilitates the efficient and effective delivery of amenities and services, and
(iii) facilitates stimulation of demand for a range of residential, enterprise and employment opportunities and promotes agricultural diversity, and
Identifies exempt and complying development classes and links them to the Building Code and BASIX/other requirements (Part 3; cl 3.1-3.3).
Provides detailed local controls for matters such as intensive livestock agriculture (cl 5.18), pond-based/tank-based and oyster aquaculture (cl 5.19 and Schedule 6), heritage controls (cl 5.10 and Schedule 5), flood planning (cl 5.21), drinking water catchments (cl 7.2), airport-related controls (airspace and aircraft noise, cl 7.4-7.5), and protections for music at licensed premises (cl 5.20).
Sets processes and preconditions for urban release areas (Part 6, cl 6.1-6.3), including requirements for infrastructure arrangements and development control plans.
The Plan expressly states its policy aim: to provide local environmental planning provisions for Glen Innes Severn in accordance with the relevant standard environmental planning instrument, with specific objectives such as protecting agricultural and natural resources, promoting arts and culture, and facilitating efficient use of infrastructure (cl 1.2). Those policy aims are stated in the Plan; the Plan’s mechanics translate them into parcel-level zoning, permission categories, design/operational standards and procedural requirements (for example, minimum lot sizes, heritage assessment obligations, aquaculture siting rules and flood-safety tests).
Key implementation features to note are: the reliance on maps to allocate rules to land (cl 1.7, cl 2.2), delegation of consenting decision‑making to the Council (cl 1.6) subject to the Act, and the interaction with State environmental planning policies (SEPPs) which prevail where they conflict (cl 1.9(1)). The Plan also creates affirmative obligations for applicants and consent authorities (for example, the consent authority must have regard to zone objectives when determining development applications, cl 2.3(2)) and imposes conditions on exempt and complying development (Part 3). Where the Plan is silent (for example, building height and floor space ratio are “not adopted”, cl 4.3-4.5), applicants must rely on other instruments or the Act/regulations.
This description identifies the instrument’s mechanical changes; the Plan itself states purposes (cl 1.2) and embeds procedural and substantive controls (zoning, consent requirements, development standards and local mapping) that shape private choices about land subdivision, development form, site selection for particular industries (aquaculture, intensive livestock), and the treatment of heritage and environmental risk.
Main concepts
The Plan operates around a set of recurring legal and planning concepts that determine how land may be used and developed.
Zones and Land Use Table. The Plan establishes a suite of zones (rural, residential, employment, mixed use, special purpose, recreation, conservation) listed in clause 2.1 and then assigns permitted, consent and prohibited uses via the Land Use Table (cl 2.3). The consent authority must have regard to zone objectives when deciding applications (cl 2.3(2)). The Land Zoning Map determines the zone applicable to each parcel (cl 2.2).
Maps as operative instruments. The Plan repeatedly ties controls to maps: Land Application Map (cl 1.3), Lot Size Map (cl 4.1), Dwelling Opportunity Map (cl 4.2A(3)(e)), Heritage Map (cl 5.10), Riparian Lands and Watercourses Map (cl 7.7), Drinking Water Catchment Map (cl 7.2) and Land Reservation Acquisition Map (cl 5.1). Clause 1.7 treats named maps as approved documents and permits them to be amended and kept in electronic form.
Development consent regimes. The Plan distinguishes development that is permitted without consent, development that is permitted only with consent and development that is prohibited (cl 2.3 and the Land Use Table). The Plan also sets out what counts as exempt development (Schedule 2) and complying development (Schedule 3 and cl 3.1-3.2), with cross-reference to the Building Code of Australia and relevant State policies (cl 3.1-3.2).
Minimum lot sizes and subdivision controls. Article 4 sets out minimum lot sizes, including tailored rules for community title schemes, strata plan schemes and split-zone lots (cl 4.1, 4.1AA, 4.1A, 4.1B), and special rural subdivision rules (cl 4.2). Subdivision requires development consent (cl 2.6).
Exceptions and flexibility. Clause 4.6 creates a formal exceptions mechanism allowing the consent authority to grant approval that contravenes a development standard, provided the applicant demonstrates that compliance is unnecessary or unreasonable and there are environmental planning grounds. The consent authority must record its assessment (cl 4.6(3)-(4)). The clause also lists standards that cannot be modified under it (cl 4.6(8)), including BASIX commitments and certain other clauses.
Heritage and environmental overlays. The Plan contains heritage listings and conservation area designations (Schedule 5; cl 5.10) and identifies environmentally sensitive areas that exclude exempt and complying development (cl 3.3). It sets out procedural steps for heritage and Aboriginal place assessment and consultation (cl 5.10(4)-(9)).
Localised operational rules. The Plan contains a variety of use-specific controls: bed and breakfasts and farm stay bedroom caps (cl 5.4(1),(5)); limits on floor area for home businesses and industrial retail outlets (cl 5.4(2),(4)); intensive livestock thresholds and locational buffer rules (cl 5.18); aquaculture siting, operational and discharge rules (cl 5.19 and Schedule 6).
Interaction with other authorities and law. The Plan makes the Council the consent authority (cl 1.6), identifies State authorities for the acquisition of reserved land (cl 5.1), requires consultation with Commonwealth aviation authorities if development penetrates the airport limitation or operations surface (cl 7.4), and recognises that SEPPs can prevail over the Plan (cl 1.9). It also suspends private covenants to the extent necessary to permit development consistent with the Plan, but carves out several instruments from that suspension (cl 1.9A).
Urban release and infrastructure sequencing. Part 6 requires arrangements for designated State public infrastructure before subdivision in urban release areas (cl 6.1), adequate public utility infrastructure for proposed development (cl 6.2), and a development control plan for staged, cost-effective urban release (cl 6.3).
Together these concepts create a layered regulatory structure: zoning plus maps provide spatial scope; the Land Use Table plus schedules and local clauses specify permitted activities and local standards; the consenting, exempt and complying regimes set the procedural pathways; and specialized clauses constrain or enable particular industries and site types. Decision-making is concentrated at the Council level subject to statutory interaction rules with State and Commonwealth instruments and agencies.
Who it affects
The Plan affects a broad set of actors; the text identifies or implies specific categories and the legal mechanisms that apply to them.
Landowners and prospective purchasers. The Plan determines what development is permitted on each parcel through the Land Zoning Map and Lot Size Map (cl 2.2; cl 4.1). Owners proposing subdivision, dwellings, or particular uses (intensive livestock, aquaculture, rural workers’ dwellings, secondary dwellings) face bespoke consent requirements and locational constraints (cl 4.1; cl 4.2; cl 4.2A; cl 5.18; cl 5.19).
Developers and builders. Developers must follow the Plan’s Land Use Table, comply with exempt/complying development criteria (Part 3), meet Building Code and BASIX requirements where applicable (cl 3.1-3.2), and address site-specific overlays (heritage, flood, drinking water catchment, riparian land) before constructing (cl 5.10; cl 5.21; cl 7.2; cl 7.7). For urban release areas, developers must work to staged DCPs and show infrastructure arrangements (Part 6, cl 6.1-6.3).
Council (consent authority). The Plan names the Council as consent authority (cl 1.6) and gives it duties: apply zone objectives (cl 2.3(2)), assess heritage impacts (cl 5.10(4)), require heritage management documents and conservation plans (cl 5.10(5)-(6)), and consult with other agencies (cl 7.4). The Council also classifies and reclassifies public land under Schedule 4 (cl 5.2).
State agencies and ministers. The Plan designates the State authority for owner-initiated acquisitions (cl 5.1(2)), requires Director-General certification for subdivision in urban release areas where lot sizes decrease (cl 6.1(2)), and defers to relevant SEPPs where they prevail (cl 1.9(1)). The Minister approves map-keeping arrangements (cl 1.7(3)) and the Governor previously approved the covenant-suspension clause before its insertion (cl 1.9A(4)).
Crown land managers. The Plan’s suspension of covenants expressly excludes certain relevant Crown instruments and biobanking/trust/conservation agreements (cl 1.9A(2)(b)-(f)), and the Plan does not restrict State-owned infrastructure development permitted under the State SEPP (cl 5.12).
Heritage interests and Aboriginal communities. Owners of heritage items and land within heritage conservation areas are subject to specific consent rules for demolition, alteration, archaeological excavation and subdivision (cl 5.10(2)-(3)). For Aboriginal places, the consent authority must notify and consider local Aboriginal communities (cl 5.10(8)).
Farmers, primary producers and rural workers. The Plan contains multiple rural-specific controls: primary production zones (RU1) with permitted uses and prohibitions (Land Use Table); rural worker dwelling tests (cl 4.2B); rural subdivision flexibility and constraints on creating lots where dwellings would be sited (cl 4.2 and cl 4.2A); and intensive livestock rules including exempt thresholds and buffer distances (cl 5.18).
Aquaculture and fishery operators. Pond-based, tank-based and oyster aquaculture have bespoke site and operational requirements, discharge rules and priority area exceptions (cl 5.19; Schedule 6).
Licensed premises and hospitality operators. The Plan limits grounds on which consent may be refused for licensed premises for reasons related to music and dancing, and bars certain noise refusal grounds if noise can be managed to an acceptable level (cl 5.20).
Airport operators and aviation regulators. Where works would penetrate the Limitation or Operations Surface for Glen Innes Airport, the consent authority must consult with the relevant Commonwealth body and may only grant consent if that body raises no objection (cl 7.4). Development in ANEF contours must satisfy AS 2021,2000 requirements (cl 7.5).
Neighbouring landowners and the public. The Plan contains many rules that require consent authorities to consider impacts on adjoining land, amenity, watercourses and drinking water catchments (cl 2.4; cl 3.3; cl 7.2; cl 7.7). The savings provision (cl 1.8A) preserves the expectations of persons with development applications lodged before Plan commencement.
In practical terms, the day‑to‑day impact falls mostly on landowners, developers and the Council. Developers and owners pay compliance costs (application preparation, heritage assessments, environmental impact statements where required, infrastructure contributions for urban release areas). Council carries decision-making costs and public land classification functions (cl 5.2; Schedule 4). State and Commonwealth agencies have an oversight or consultation role for particular technical matters (SEPPs, airport operations, State infrastructure certification).
Key duties and rights
The Plan assigns duties to applicants, consent authorities and other actors, and grants particular rights or exceptions in constrained circumstances. All references below are to numbered clauses in the Plan.
Duties and procedural obligations
Consent authority duties. The consent authority must apply the zone objectives when determining applications (cl 2.3(2)). It must consider specified matters when assessing particular development types: heritage impacts (cl 5.10(4)-(9)), flood risk (cl 5.21(2)-(3)), drinking water catchments (cl 7.2(3)), riparian land impacts (cl 7.7(3)-(4)), and aircraft noise/ANEF criteria (cl 7.5(3)). For airport penetration, the consent authority must consult the relevant Commonwealth body and may not grant consent if that body objected (cl 7.4(2)-(4)).
Applicant obligations. Exempt development must meet Building Code of Australia presumed-to-satisfy provisions or be structurally adequate and must not be designated development or located on State‑listed heritage items (cl 3.1(2)-(4)). Complying development must be permissible in the zone and meet the Building Code and certain regulatory approvals (cl 3.2(2)-(3)). Development that proposes a standards contravention must be accompanied by the document required by the Environmental Planning and Assessment Regulation 2021 (cl 4.6(3) note).
Heritage and consultation duties. For archaeological sites not on the State Heritage Register, the consent authority must notify the Heritage Council before granting consent for development on such sites and consider any response within 28 days (cl 5.10(7)). For Aboriginal places, the consent authority must notify local Aboriginal communities and consider responses within 28 days (cl 5.10(8)). For demolition of nominated State heritage items, notice to the Heritage Council and consideration of responses is required (cl 5.10(9)).
Record‑keeping and assessment duties. When granting consent to contravene a development standard under cl 4.6, the consent authority must keep a record of its assessment (cl 4.6(4)). The Plan also requires consent authorities to be satisfied of specific matters before granting consent in numerous contexts (e.g. 4.2B rural workers’ dwellings; 4.2C dual occupancies in RU1).
Rights, exceptions and enabling provisions
Suspension of private instruments. Clause 1.9A suspends, to the extent necessary, agreements, covenants or other similar instruments that would otherwise restrict development that is permitted by the Plan or a consent granted under the Act, subject to a list of excluded instruments (cl 1.9A(1)-(2)). This creates a right for a developer/landowner to rely on the Plan to override certain private encumbrances, but does not affect public authority rights under registered instruments (cl 1.9A(3)).
Conservation incentives. The consent authority may grant consent to otherwise prohibited development on heritage items or Aboriginal places if satisfied that conservation is facilitated and conservation works will be undertaken in accordance with an approved heritage management document (cl 5.10(10)). This grants a conditional right to depart from ordinary use restrictions to secure conservation outcomes.
Exceptions to development standards. Clause 4.6 allows consent authorities to permit development that contravenes a development standard (subject to limitations) where the applicant satisfies the “unreasonable or unnecessary” and “sufficient environmental planning grounds” tests, and the authority keeps a record of its assessment (cl 4.6(2)-(4)). The clause explicitly excludes several standards from its operation (cl 4.6(8)).
Savings for pending applications. If a development application was made before the Plan commenced and not finally determined, it must be determined as if the Plan had not commenced (cl 1.8A). This preserves applicants’ procedural expectations.
Access to exempt and complying pathways. Where a development matches Schedule 2 or Schedule 3 criteria and is not on an environmentally sensitive area or heritage item, it may qualify as exempt or complying development and proceed without development consent (cl 3.1-3.3; cl 3.3 prohibits exempt/compliant dev in environmentally sensitive areas).
Rights and duties in relation to public land and acquisition
Classification of public land. The Council is enabled to classify or reclassify specified public land as operational or community land in accordance with the Local Government Act 1993 (cl 5.2; Schedule 4). The Plan sets out which parcels are to be classified or reclassified (Schedule 4).
Owner‑initiated acquisition and nominated State authorities. Clause 5.1 identifies which State authorities are the “relevant acquisition authority” for land shown on the Land Reservation Acquisition Map if owner-initiated acquisition proceeds under the Land Acquisition (Just Terms Compensation) Act 1991. The relevant authority depends on the type of reservation (cl 5.1(2) and table).
Limits and constraints on rights
Excluded instruments for covenant suspension. Clause 1.9A lists several instruments that are unaffected by the suspension provision (for example, covenants imposed by Council, relevant Crown instruments, conservation agreements, biobanking agreements and planning agreements). The Plan therefore does not confer a right to override those instruments.
Standards that cannot be varied. Clause 4.6(8) identifies standards that cannot be contravened under the exceptions process (compliance standards for complying development, BASIX commitments, clauses 5.4/5.5 and certain Part 6 clauses), limiting the scope for flexibility.
Environmentally sensitive areas. Exempt or complying development is excluded from identified environmentally sensitive areas (cl 3.3(1)-(2)), reducing the scope of self‑authorised development in specified locations.
In sum, the Plan creates a network of duties (for consent authorities to consider specified matters and keep records, for applicants to meet Building Code/BASIX standards and to provide environmental information) and conditional rights (to use exempt/complying pathways, to obtain exceptions to standards in certain circumstances, to access conservation incentives and to rely on the Plan to suspend some private restrictions). Decision-making discretion is concentrated in the Council, but is scaffolded by statutory records, consultation obligations and prescribed mapping that determines applicability.
Penalties and enforcement
The Plan itself contains procedural and substantive controls but does not set out express penalty amounts or a dedicated enforcement schedule within the text provided. The instrument instead establishes requirements whose enforcement is exercised through the environmental planning and assessment framework administered under the Act and its regulations. From the Plan’s provisions we can identify the enforcement levers and recording obligations that will be applied by the consent authority or other statutory bodies:
Consent requirement as enforcement trigger. Multiple provisions make development conditional on development consent (for example, subdivision under cl 2.6; demolition under cl 2.7; erection of dwellings in specified zones under cl 4.2A; heritage works under cl 5.10(2); conversion of fire alarms only with consent under cl 5.8(2)). The absence of consent where required typically exposes a proponent to compliance action under the Act , although the Plan does not itself list penalty amounts.
Exempt and complying development conditions. The Plan requires exempt and complying development to meet Building Code of Australia provisions, structural adequacy and to avoid designated development and State heritage items (cl 3.1-3.2). Non‑compliance with the conditions attached to a complying development certificate or exempt development pathways can be enforced by Council under the Act and associated regulations.
Record‑keeping and transparency obligations. Clause 4.6(4) requires the consent authority to keep a record of its assessment when exercising the exceptions power. That record is an enforcement and accountability tool: it provides a basis for scrutiny, review or appeal in administrative or judicial review forums to the extent the Act and regulations allow.
Consultation and notification procedures tied to decision-making. For certain heritage and archaeological matters the consent authority must notify external bodies (Heritage Council or local Aboriginal communities) and consider responses before granting consent (cl 5.10(7)-(9)). Failure to follow these procedural steps may be challengeable, again under the Act and administrative law principles.
Statutory interaction and precedence. The Plan recognises that SEPPs prevail where they conflict (cl 1.9(1)) and that the Act provides for owner-initiated acquisition processes where land is reserved for public purposes (cl 5.1). Enforcement of State policy or acquisition obligations will occur through the relevant State mechanisms.
Infrastructure and certification preconditions. In urban release areas, subdivision creating smaller lots than previously permitted requires a Director‑General certificate that satisfactory arrangements for designated State public infrastructure are in place (cl 6.1(2)). Refusing or granting subdivision without this certification would be reviewable.
What the Plan does not do, as far as this text shows
The Plan does not itself list monetary fines, time‑limited notices to comply, stop-work orders or specific penalty scales. Those enforcement mechanisms and penalties exist in the Environmental Planning and Assessment Act, the Local Government Act, or other relevant legislation and regulations; they are not contained in the Plan text provided.
The Plan does not set out an administrative appeal or merits review pathway specific to the Plan; the Act and its regulations set those paths.
Practical enforcement implications
Enforcement actions will depend on the broader statutory framework under the Act. The Plan creates the legal requirements that, if breached, expose a person to the Act’s enforcement machinery administered by Council or other authorities. For example, carrying out development for which consent is required would leave a developer exposed to compliance action.
Procedural shortcomings (failure to notify the Heritage Council or local Aboriginal communities where required) create exposure to legal challenge in administrative law terms, and can affect the validity of a decision if a required statutory step is omitted (cl 5.10).
The Plan’s recording requirement for exceptions to development standards (cl 4.6(4)) imposes an evidentiary duty on the consent authority that can support later scrutiny of the reasonableness of a standards contravention.
Readers should treat enforcement as a two-step process: the Plan sets the substantive and procedural rules; enforcement, penalties and remedies arise under the Act and subordinate legislation that implement breaches of those rules. The Plan therefore establishes the objects of enforcement rather than the enforcement instruments themselves.
How it interacts with other laws
The Plan intersects with multiple layers of State and Commonwealth law and policy. The instrument itself specifies many of these interactions and cross-references; the most material are summarised below with clause citations.
State environmental planning policies (SEPPs)
The Plan is subject to SEPPs that prevail over it under the Act (cl 1.9(1)). Those SEPPs may impose State-wide standards, exemptions or requirements that either supplement or displace the Plan. The Land Use Table and local provisions operate subject to SEPPs where there is an inconsistency.
Environmental Planning and Assessment Act and Regulations
The Plan is made under and to implement the relevant standard environmental planning instrument under s 3.20 of the Act, and many procedural requirements in the Plan implicitly rely on the Act and associated regulations (cl 1.2 note; cl 3.1 note referencing Part 5 and the Act). For example, the requirement for an applicant to include a document supporting a contravention of a development standard is prescribed by the Environmental Planning and Assessment Regulation 2021 (cl 4.6(3) note).
Building and sustainability regulation
Exempt and complying development must meet the deemed‑to‑satisfy provisions of the Building Code of Australia (cl 3.1(3); cl 3.2(2)). BASIX commitments and associated regulatory commitments are protected from variation under the exceptions clause (cl 4.6(8)(b)), meaning BASIX obligations rely on State-level instruments and are insulated from local exceptions.
Heritage statutes
The Plan cross-references the Heritage Act 1977 when excluding exempt development on State‑listed heritage items and noting demolition/conservation obligations (cl 3.1(3)-(4); cl 5.10(2)). For archaeological matters the consent authority must involve the Heritage Council (cl 5.10(7)-(9)).
Crown land and conservation regimes
Clause 1.9A excludes “relevant instruments” within the meaning of section 13.4 of the Crown Land Management Act 2016 from the covenant suspension power (cl 1.9A(2)(b)). It also excludes conservation agreements under the National Parks and Wildlife Act 1974, Trust agreements under the Nature Conservation Trust Act 2001, property vegetation plans and biobanking agreements (cl 1.9A(2)(c)-(f)). The Plan therefore recognises the continuing effect of certain Crown/ conservation instruments.
Land acquisition and local government law
Owner‑initiated acquisition provisions and the identity of acquisition authorities are dealt with by reference to the Land Acquisition (Just Terms Compensation) Act 1991 (cl 5.1), and classification/reclassification of public land is pursuant to the Local Government Act 1993 (cl 5.2). The Plan defers to those Acts on acquisition and classification mechanics.
Fisheries and aquaculture law
Aquaculture provisions reference the Fisheries Management Act 1994, the Fisheries Management (Aquaculture) Regulation 2017 and the NSW Oyster Industry Sustainable Aquaculture Strategy (cl 5.19). The Plan imports definitions and expects alignment with aquaculture industry development plans.
Rural fire and flood law
Bush fire hazard reduction work authorised by the Rural Fires Act 1997 may be carried out without development consent (cl 5.11). Flood planning must take account of the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual (cl 5.21(4)-(5)).
Commonwealth aviation and airport regulation
The Plan requires consent authorities to consult the “relevant Commonwealth body” before approving development that penetrates the Limitation or Operations Surface for Glen Innes Airport (cl 7.4(2)-(4)). The Plan also requires compliance with AS 2021,2000 for development in ANEF contours (cl 7.5(3)).
Interplay and priority rules
The Plan expressly records that SEPPs prevail as provided by s 3.28 of the Act (cl 1.9(1)). It also states that Part 6 (urban release area) provisions prevail over other parts of the Plan to the extent of any inconsistency (cl 6.4). Maps and the Plan’s zone rules provide local specificity but operate within this broader legislative hierarchy.
Practical consequence of interactions
Applicants must run multi‑act due diligence: check the Plan and maps, relevant SEPPs, the Building Code and BASIX requirements, and any sectoral statutes (heritage, fisheries, Crown land, aviation). The Plan both depends on and constrains these external instruments. For example, BASIX commitments cannot be altered via the Plan’s exceptions clause (cl 4.6(8)(b)), and certain Crown or conservation instruments remain effective despite the Plan’s suspension power (cl 1.9A(2)).
Amendment history
The Plan text records multiple amendments and insertions with schedule and year references. The amendments in the text reveal the Plan’s ongoing local calibration and give practitioners pointers to change over time. Not all historical instruments are reproduced here; the Plan provides amendment footnotes at many clauses. Key recorded amendments include:
2014-2017 package amendments reflected in the Land Use Table and other parts: the Land Use Table shows amendments across 2014 (2014 (243), Sch 1[1]-[3]), 2015 (2015 (208), Sch 1[1]), 2016 and 2017 (2016 (168), Sch 1[2]; 2017 (493), Sch 1.1[1]) as recorded in the Land Use Table note.
2018 amendments: cl 5.4 was amended by 2018 (406), Sch 1.50[1][2] to add controls such as the neighbourhood supermarket (cl 5.4(7AA)).
2019 amendments: several clauses show 2019 amendment entries. Notably, cl 1.8A (the savings provision for development applications) was inserted by 2019 (621), Sch 5[1]; cl 1.9A (suspension of covenants) was inserted and amended in 2019 (621), Sch 5[2]-[4]. Part 6’s cl 6.1 was amended in 2019 (621), Sch 5[5]. Schedule 5 (heritage) and Schedule 4 (public land) show 2019 amendment notes (sch 5 Am 2019 (169) Sch 1[6]; sch 4 Am 2019 (169) Sch 1[5]).
2020 amendments: various renumberings and insertions , e.g. cl 3.2 notes and Schedule 3 updates (2020 (158), Sch 1). Clause 4.1C was inserted in 2015 and later renumberings occurred in 2020 (2020 No 30, Sch 2.19[1]) for cl 4.2C.
2021-2023 amendments: cl 7.1 was repealed in 2021 (2021 (225), Sch 1). In 2022 there were several amendments (eg cl 2.1 Am 2022 (830), Sch 1.13[1]; cl 4.1AA and 4.1A inserted/amended 2022 (830), Sch 1.13[3]; cl 4.6 Am 2022 (830), Sch 1.13[6]; cl 5.9 substituted and amended 2022 (391), Sch 1[7]; cl 5.3 and others amended 2022 (830) Sch 1.13). Clause 6.1 was more recently amended in 2023 (2023 (554), Sch 1) to reflect updated certification processes for infrastructure arrangements.
2026 amendment: Schedule 4 carries an amendment note "Am 2026 (153), Sch 1" indicating a further update to classification/reclassification of public land was made in 2026.
Repeals and inserted clauses
The Plan repealed predecessor local environmental plans applying solely to Glen Innes Severn (cl 1.8(1) and the note identifying the Glen Innes LEP 1991). Several clauses have been inserted or repealed over time; the text annotates those changes (for example cl 1.9A inserted/amended 2019; cl 7.1 repealed 2021).
Notices of “Not adopted” and repeals
Several sections are marked as “Not adopted” (cl 4.3 Height of buildings; cl 4.4 Floor space ratio; cl 4.5 Calculation of FSR and site area) indicating the Plan contains placeholders for controls that were not established at the time. Other clauses are shown as repealed or renumbered, and the text provides amendment citations to trace the legislative history.
Practical use of the amendment history
Practitioners should consult the consolidated Plan on the NSW legislation website and the instrument’s amendment history because the Plan records many incremental changes across 2014-2026. The amendment footnotes in the Plan provide a line to the amending instruments, which is useful to trace when a material change (e.g., insertion of cl 1.9A or the introduction of development control plan requirements for urban release areas) occurred and to locate the relevant amending instrument if needed for transitional or savings issues (see cl 1.8A for application to pending development applications).
Litigation history
The Plan text does not identify any cases, determinations, or litigation related to its provisions. It does not cite judicial or tribunal decisions. Consequently, within the confines of this instrument, there is no recorded litigation history.
What this absence means for practitioners
Absence of case references in the Plan is not evidence that the Plan has not been the subject of litigation or review. It only means the Plan text does not list or summarise any cases. To identify decisions that interpret or apply the Plan’s clauses (for example, disputes about the exceptions to development standards in cl 4.6, heritage triggers in cl 5.10, or the application of basin/SEPP provisions that prevail under cl 1.9), practitioners need to search court and tribunal decisions, Development Consent Authority determinations, and merits review records external to the Plan.
Given the Plan’s repeated cross-references to the Act, SEPPs and external guidance (for example, the Considering Flooding in Land Use Planning Guideline referenced in cl 5.21), litigation that touches on Plan implementation is likely to involve arguments about statutory interpretation, procedural compliance with notification and consultation requirements, and the adequacy of environmental information accompanying development applications.
For any individual project or dispute, a targeted case law search (Land and Environment Court, Administrative Appeals Tribunal where relevant, and tribunal decisions) is a necessary next step to identify precedents that interpret the Plan’s key clauses.
Gotchas
This Plan contains several traps for the unwary. Below are material pitfalls and practical surprises drawn from the text.
Maps determine applicability , check them early (cl 1.3; cl 2.2; cl 1.7)
Many controls are map-driven (Lot Size Map, Dwelling Opportunity Map, Heritage Map, Riparian Lands and Watercourses Map, Drinking Water Catchment Map, Land Reservation Acquisition Map, Obstacle Limitation Surface Map, Noise Exposure Forecast Contour Map). If a parcel sits within a mapped overlay, additional constraints or permissions apply. Practitioners must check the authoritative maps on the NSW Planning Portal and confirm whether electronic updates or amendments affect the parcel. The Plan permits maps to be amended and replaced and keeps them authoritative (cl 1.7).
Pending DAs preserved , check pre-commencement lodgements (cl 1.8A)
If an application was lodged before the Plan commenced and not finally determined, it must be determined as if the Plan had not commenced (cl 1.8A). This can preserve a prior regulatory regime favouring the applicant, but it also interacts with Division 3.5 of the Act where an applicant may seek consent to development requiring an amendment. Check lodgement dates and whether an application is “finally determined” before relying on new Plan provisions.
Suspension of covenants is limited and does not gulp all encumbrances (cl 1.9A)
Clause 1.9A suspends private agreements and covenants only “to the extent necessary” to permit development that complies with the Plan, but it expressly excludes numerous instruments: covenants imposed by Council, Crown Land Management Act instruments, conservation agreements under the National Parks and Wildlife Act, trust agreements under the Nature Conservation Trust Act, property vegetation plans, biobanking agreements and planning agreements (cl 1.9A(2)(a)-(g)). The clause also does not affect public authority rights under registered instruments (cl 1.9A(3)). Practitioners should not assume a simple Plan-compliant consent will override all encumbrances.
Exceptions to standards require documented justification and record-keeping (cl 4.6)
Clause 4.6 permits contravention of development standards only where the applicant demonstrates compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds, and the consent authority must keep a record of its assessment (cl 4.6(3)-(4)). The Environmental Planning and Assessment Regulation 2021 requires a supporting document for such applications. This creates evidentiary and procedural obligations; failing to supply the required material risks refusal or later challenge.
BASIX and certain standards cannot be varied (cl 4.6(8))
The exceptions clause cannot be used to contravene development standards for complying development or BASIX commitments, among other limits. Where sustainability commitments under State instruments apply, local exceptions are unavailable.
Exempt and complying development exclusions , environmentally sensitive areas (cl 3.3)
Exempt or complying development is barred in identified environmentally sensitive areas (cl 3.3(1)), including coastal waters, coastal wetlands, Ramsar or World Heritage areas, land identified as high Aboriginal cultural or biodiversity significance, land reserved under national parks legislation and similar. An otherwise straightforward exempt class can be unavailable depending on location.
Heritage procedural traps (cl 5.10)
Heritage works trigger multiple preconditions: demolition, disturbance of archaeological sites or Aboriginal places and development within heritage conservation areas require consent (cl 5.10(2)). For archaeological sites non-registered at State level, the consent authority must notify the Heritage Council and consider any response within 28 days (cl 5.10(7)). For Aboriginal places, local Aboriginal communities must be notified and considered (cl 5.10(8)). Failure to follow these steps can render decisions vulnerable to challenge.
Flood and climate-change-forward planning (cl 5.21)
Flood planning requires that development be compatible with flood functions on the land and account for projected climate change effects (cl 5.21(1)-(3)). Consent authorities must consider climate change impacts on flood behaviour and evacuation capacity (cl 5.21(3)(a),(c)). Practitioners should ensure flood modelling and climate change allowances are considered early.
Airport-related constraints (cl 7.4-7.5)
Development that penetrates limitation or operations surfaces for the Glen Innes Airport requires consultation with the relevant Commonwealth body and may not be approved if that body objects (cl 7.4(2)-(4)). Noise-sensitive development in ANEF contours must satisfy AS 2021,2000 indoor design sound levels (cl 7.5(3)). Applicants near the airport must budget time for Commonwealth consultation and acoustic compliance.
Aquaculture and livestock locational buffers and operational rules (cl 5.18; cl 5.19; Sch 6)
Intensive livestock operations have detailed threshold capacities that may be exempt from consent if siting and buffer conditions are met; but the thresholds and locational limits (e.g., 100m from a natural watercourse, 500m from another dwelling, 5km separation rules for poultry breeding farms) are prescriptive (cl 5.18(4)-(5)). Pond-based/tank-based aquaculture has site/location and discharge rules in cl 5.19 and Schedule 6 (no freshwater discharge to natural waterbodies except from open flow-through systems, screening outlets to avoid escapes, conservation exclusion zones). Mistakes in siting or discharge design can defeat an exempt pathway.
Urban release sequencing and infrastructure obligations (Part 6)
Subdivision in urban release areas that would create smaller lots than previously permitted requires Director‑General certification that arrangements for designated State public infrastructure are made (cl 6.1(2)). Development consent must not be granted without this certificate unless exceptions apply. For urban releases, a development control plan must be in place (cl 6.3). Developers planning staged urban intensification must resolve infrastructure funding and staging issues early.
Music protections for licensed premises (cl 5.20)
The Plan limits grounds for refusal of development related to music and dancing at licensed premises, and prohibits refusal on certain noise grounds if the consent authority is satisfied noise can be managed to acceptable levels (cl 5.20(1)-(2)). Applicants and objectors should be aware that the Plan restricts consent authorities from basing refusals on a range of music-related attributes.
“Not adopted” staples (height, FSR)
The Plan marks height and floor space ratio provisions as “Not adopted” (cl 4.3-4.5). This means local quantitative controls are absent and other instruments or the Act will supply the necessary metrics or criteria. For multi-storey or density projects, check whether other policies or DCPs apply.
Public land classification and interests (cl 5.2; Schedule 4)
Schedule 4 lists parcels to be classified as operational land or community land and records whether trusts or interests are discharged. Changes to classification may affect existing trusts and what the land can be used for; the Plan retains any specified interests for parcels in Part 1 (cl 5.2(4)-(5)). Confirm current Schedule 4 entries and any Governor approvals required.
How to comply
This section sets out a practical compliance checklist and workflows tied to specific Plan clauses and mapped requirements. Use this as a project-level guide.
Identify the parcel and applicable maps
Obtain the Land Application Map, Land Zoning Map, Lot Size Map, Dwelling Opportunity Map, Heritage Map, Riparian Lands and Watercourses Map, Drinking Water Catchment Map, Land Reservation Acquisition Map and any relevant maps on the NSW Planning Portal (cl 1.3; cl 1.7; cl 2.2). These maps determine applicable zones, minimum lot sizes, overlays (heritage, riparian, drinking water), and acquisition or reservation status.
Determine use permissibility
Consult the Land Use Table for the parcel’s zone to see whether the proposed use is permitted without consent, permitted with consent or prohibited (cl 2.3 and the Land Use Table). If the use is not listed, check the “Any other development not specified in item 2 or 4” entries in the relevant zone clause.
Check for exempt or complying pathways
If the proposal might qualify as exempt or complying development, confirm it meets Schedule 2 or Schedule 3 requirements and the Building Code of Australia deemed-to-satisfy provisions (cl 3.1-3.2). Ensure the parcel is not within an environmentally sensitive area as defined in cl 3.3; if it is, the exempt/compliant pathway is unavailable.
Verify overlay triggers
Heritage: If the site contains a heritage item or is within a heritage conservation area (Schedule 5 and Heritage Map), any demolition, exterior alteration, archaeological disturbance or subdivision will require development consent unless the Council advises the work is minor (cl 5.10(2)-(3)). Be prepared to prepare heritage management documents or conservation management plans if required (cl 5.10(5)-(6)).
Flooding: If the site is in a flood planning area, prepare flood impact and evacuation assessments that address climate change projections and evacuation routes in line with the Considering Flooding in Land Use Planning Guideline and Flood Risk Management Manual (cl 5.21).
Drinking water catchments and riparian land: Where these overlays apply, include assessments of water quality impacts, waste management, distance to waterways and mitigation measures (cl 7.2; cl 7.7).
Airport/ANEF: If within ANEF contour or under obstacle surfaces, consult with the relevant Commonwealth aviation body and provide acoustic and siting compliance evidence per AS 2021,2000 (cl 7.4; cl 7.5).
Subdivision and lot size compliance
For subdivisions, check the Lot Size Map and cl 4.1 et seq. Confirm whether community title, strata, split-zone, or boundary change rules apply (cl 4.1AA; cl 4.1A; cl 4.1B; cl 4.1C). If creating smaller lots in an urban release area, secure Director‑General certification for designated State public infrastructure before consent (cl 6.1(2)).
Prepare the development application documentation
Provide statements required by the Act and regulations: statement of environmental effects, environmental impact statement if designated development, BASIX certificate where applicable, and the exceptions supporting document if relying on cl 4.6 (cl 4.6(3) note). For intensive livestock or aquaculture, include the technical reports required by cl 5.18 and cl 5.19 and the relevant parts of Schedule 6.
If the proposal involves heritage places, prepare a heritage management document or conservation management plan where requested and be ready to notify/consult the Heritage Council or local Aboriginal communities (cl 5.10(5)-(9)).
Engage early with consent authority and other agencies
Meet with Council (the consent authority) at pre-lodgement to confirm documentation and understand local DCP requirements (cl 1.6; cl 6.3 for urban release areas). If development might penetrate airport limitation surfaces, contact the relevant Commonwealth body prior to lodgement (cl 7.4).
For matters involving Crown land instruments, biobanking, conservation agreements, or property vegetation plans, confirm whether those instruments apply and that cl 1.9A does not suspend them.
Consider staged infrastructure and DCP requirements in urban release areas
For urban release areas check that a development control plan (DCP) is prepared that addresses staging, transport hierarchy, landscaping, recreation areas, stormwater management and hazard amelioration (cl 6.3). If required by cl 6.1, obtain Director‑General certification for State infrastructure arrangements before subdividing.
For exempt/compliant pathways, comply with operational conditions
If relying on exempt or complying development, ensure compliance with Building Code of Australia provisions, any relevant council approvals for on-site effluent systems (cl 3.2(3)(b)), and avoid work in environmentally sensitive areas (cl 3.3). Remember that exempt development is not exempt from other necessary licences or approvals outside the Act (Schedule 2 Note 2).
Heritage and Aboriginal place obligations
If an archaeological site or Aboriginal place is involved, notify and consult as required, and allow at least 28 days for responses where the Plan requires (cl 5.10(7)-(9)). For conservation incentives, prepare a heritage management document demonstrating that conservation work will be carried out and how the proposal will not adversely affect heritage significance (cl 5.10(10)).
Manage noise and music issues for licensed premises
If proposing licensed premises, note the Plan’s constraints on refusal grounds for music, dance and entertainment features (cl 5.20). Include noise management plans showing how noise will be managed to an acceptable level.
Ensure environmental controls for aquaculture and intensive livestock
For pond-based and tank-based aquaculture, follow Schedule 6 site location and operational requirements (screen outlets, use freshwater where required, design ponds so they can be drained and dried for intensive aquaculture, and avoid conservation exclusion zones) (cl 5.19; Sch 6). For intensive livestock, confirm capacity thresholds and buffers to avoid losing an exempt pathway (cl 5.18(4)-(5)).
Record-keeping and exception strategy
If seeking a variation under cl 4.6, prepare the supporting document in accordance with the Regulation and frame environmental planning grounds carefully. Be aware the consent authority must keep an assessment record (cl 4.6(3)-(4)), and that certain standards (BASIX, complying development standards) are non-negotiable (cl 4.6(8)).
Post-approval compliance
Ensure imposed conditions, conservation works and monitoring obligations (for example, eco‑tourist management strategies under cl 5.13, or monitoring obligations in cl 5.19(3)) are implemented. For conversions of fire alarms where complying development applies, adhere to the hours-of-work condition (cl 5.8(4)).
Summary checklist (quick)
Step 1: Confirm maps/zone and permitted use (cl 2.2; cl 2.3).
Step 4: Prepare required documentation: SEARs/EIS/statement of environmental effects/BASIX/Building Code compliance and exception documents if needed (cl 3.1; cl 3.2; cl 4.6(3) note).
Step 5: Engage Council and other agencies early (cl 1.6; cl 7.4).
Step 6: For urban release and subdivision, ensure infrastructure arrangements and DCP compliance (Part 6).
Step 7: Satisfy heritage/Aboriginal consultation and record obligations (cl 5.10(5)-(9)).
Step 8: Implement conditions and monitoring post-approval.
Following this workflow and cross‑checking with the Plan clauses cited will reduce the risk of procedural failure, challenge and delays. Where the Plan is silent on a numeric control (for example, building height or FSR), check State instruments and any applicable development control plans.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Glen Innes Local Environmental Plan 1991
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new
This is an opening excerpt, not the complete document.