This Local Environmental Plan sets the zoning, permitted/prohibited uses and development‑consent rules for land in the Gilgandra local government area. It also establishes exempt and complying development categories and overlay controls for biodiversity, watercourses, wetlands, groundwater, heritage, flood risk and special requirements such as protecting Siding Spring Observatory (cl 5.14). Council is the consent authority (cl 1.6).
The Plan affects landowners, developers, farmers and infrastructure providers by changing where uses are allowed, what approvals and technical standards are required (for example minimum lot sizes cl 4.1; biodiversity cl 7.1; watercourse protections cl 7.2).
This instrument is the Gilgandra Local Environmental Plan 2011 (the Plan). Mechanically it replaces earlier local planning instruments that applied only to the Gilgandra local government area (see cl 1.8(1) and note), commences on publication to the NSW legislation website (cl 1.1AA), and establishes the statutory zoning, mapped controls and local provisions that govern what land uses require development consent, what may be carried out without consent, and what is prohibited on the land identified on the Land Application Map (cl 1.3; cl 2.2; cl 2.3(1)).
Key mechanical components set out in the Plan are:
the consent authority: the Council is the consent authority (subject to the Act) for the Plan area (cl 1.6);
the zones that apply and the Land Use Table which ties permissible, permitted-with-consent and prohibited uses to each zone (cl 2.1; cl 2.3; Land Use Table);
mapped controls: the Plan uses a Land Zoning Map, Lot Size Map, Land Application Map and a series of thematic maps referenced throughout (cl 1.7; cl 2.2; multiple clauses referring to maps);
development consent rules: many common activities require development consent (for example subdivision cl 2.6, demolition cl 2.7, erection of dwellings in particular zones cl 4.2A, and numerous local provisions in Parts 4-7);
exempt and complying development regimes: the Plan imports exempt and complying development concepts (Part 3, cl 3.1-3.3) and cross‑refers to the relevant State SEPP for wide‑ranging state‑wide specifications;
local environmental standards and qualifications: minimum lot sizes and various development standards (Part 4, notably cl 4.1 and related clauses), plus local constraints such as heritage, biodiversity, flooding, riparian protection, aquaculture rules and the Siding Spring Observatory lighting regime (see cl 5.10; cl 7.1-7.4; cl 5.21; cl 5.19; cl 5.14).
Current sections
Direct links to the current provisions in Gilgandra Local Environmental Plan 2011.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agritourism; Air transport facilities; Airstrips; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Boat launching ramps; Boat sheds; Building identification signs; Business identification signs; Camping grounds; Caravan Parks; Cellar door premises; Cemeteries; Charter and tourism boating facilities; Community facilities; Correctional centres; Crematoria; Depots; Dual occupancies; Dwelling houses; Eco-tourist facilities; Environmental facilities; Extractive industries; Farm stay accommodation; Flood mitigation works; Forestry; Freight transport facilities; Heavy industrial storage establishments; Heavy industries; Helipads; Home businesses; Home industries; Industrial retail outlets; Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Intensive plant agriculture; Jetties; Landscaping material supplies; Mooring pens; Moorings; Open cut mining; Plant nurseries; Recreation areas; Recreation facilities (outdoor); Roadside stalls; Rural industries; Rural workers’ dwellings; Veterinary hospitals; Water recreation structures; Water supply systems
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Note.
When this Plan was made, no land in the zones listed in the Table to subclause (2) was included on the Land Reservation Acquisition Map.
Part 6
Urban release areas
Part 6 Urban release areas
Part 6 Urban release areas
6
Arrangements for designated State public infrastructure
6 Arrangements for designated State public infrastructure
6.1 Arrangements for designated State public infrastructure
(1) The objective of this clause is to require satisfactory arrangements to be made for the provision of designated State public infrastructure before the subdivision of land in an urban release area to satisfy needs that arise from development on the land, but only if the land is developed intensively for urban purposes.
(2) Development consent must not be granted for the subdivision of land in an urban release area if the subdivision would create a lot smaller than the minimum lot size permitted on the land immediately before the land became, or became part of, an urban release area, unless the Director-General has certified in writing to the consent authority that satisfactory arrangements have been made to contribute to the provision of designated State public infrastructure in relation to that lot.
(3) Subclause (2) does not apply to—
(a) any lot identified in the certificate as a residue lot, or
(b) any lot to be created by a subdivision on land that was the subject of a previous development consent granted in accordance with this clause, or
(c) any lot that is proposed in the development application to be reserved or dedicated for public open space, public roads, public utility undertakings, educational facilities or any other public purpose, or
(d) a subdivision for the purpose only of rectifying an encroachment on any existing lot.
(4) This clause does not apply to land in an urban release area if all or any part of the land is in a region within the meaning of the Act, Division 7.1, Subdivision 4.
(3) Before determining a development application for development on land to which this clause applies, the consent authority must consider any adverse impact of the proposed development on the following—
(a) native ecological communities,
(b) the habitat of any threatened species, populations or ecological community,
(c) regionally significant species of fauna and flora or habitat,
(d) habitat elements providing connectivity.
(4) Development consent must not be granted to development on land to which this clause applies unless the consent authority is satisfied that—
(a) the development is designed, sited and will be managed to avoid any adverse environmental impact, or
(b) if that impact cannot be avoided—the development is designed, sited and will be managed to minimise that impact, or
(c) if that impact cannot be minimised—the development will be managed to mitigate that impact.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
(Clause 5.2)
Schedule 5
Environmental heritage
Schedule 5 Environmental heritage
Schedule 5 Environmental heritage
(Clause 5.10)
Schedule 6
Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
(Clause 5.19)
Division 1
Site location requirements
Division 1 Site location requirements
Division 1 Site location requirements
Division 2
Operational requirements
Division 2 Operational requirements
Division 2 Operational requirements
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Gilgandra Local Environmental Plan 2011.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Gilgandra in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to promote development that is ecologically sustainable,
(b) to promote the orderly and economic use and development of land within the Gilgandra local government area,
(c) to encourage the proper management of the natural and human-made resources of the Gilgandra local government area,
(d) to ensure quality of design of buildings and public spaces to achieve a locality that is safe and accessible and has a vibrant social, cultural and community focus,
(e) to minimise land use conflicts and adverse environmental impacts,
(f) to increase employment opportunities within the Gilgandra local government area through the efficient use of resources,
(g) to provide for future tourist and visitor accommodation in a sustainable manner that is compatible with, and will not compromise, the natural resource and heritage values of the surrounding area,
(h) to protect and promote the use of rural resources for agricultural and primary production and related processing, service and value adding industries,
The Plan operates within the framework of the Environmental Planning and Assessment Act and relevant State environmental planning policies. It is explicitly subject to SEPPs that prevail under the Act (cl 1.9(1)) and cross‑references numerous state Acts and policies in setting out local constraints (for example Heritage Act 1977, Rural Fires Act 1997, Fisheries Management Act 1994, Biodiversity Conservation Act 2016, Local Government Act 1993). The Plan also contains a provision that, for the purpose of enabling development in accordance with the Plan, temporarily suspends private covenants and similar instruments to the extent necessary but lists a series of exceptions (cl 1.9A). Part 6 contains provisions that prevail over the remainder of the Plan for urban release areas (cl 6.4).
Beyond the local zoning matrix, the Plan is a rulebook of discrete local permissions, restrictions, and process triggers: e.g. temporary use limits (52 days in 12 months, cl 2.8), specific floor‑area caps for certain retail/industrial uses (cl 5.4(4),(10)), heritage consent requirements and notification duties (cl 5.10), a tightly defined Siding Spring Observatory lighting regime with consultation and lumens thresholds (cl 5.14), and aquaculture site and operational requirements (cl 5.19 and Schedule 6). It also identifies particular parcels where special additional permitted uses applied for a limited duration (Schedule 1).
Mechanically, the Plan is the primary statutory instrument that sets entitlement, consent triggers, consultative steps and mapped constraints for development in the Gilgandra LGA. It does not itself set out the Act’s administrative penalties or prosecution processes; instead it operates through the consent/development framework and cross‑references to the Act and State policies (see cl 1.6, cl 1.9 and multiple notes).
Main concepts
The Plan organises local planning controls into a small set of recurring legal concepts that govern decision‑making and behavioural incentives. The principal concepts to track are zoning and the Land Use Table; development consent versus exempt/complying categories; mapped overlay constraints; prescribed processes for consultation and notification; and certain discrete policy objectives with operational thresholds.
Zoning and Land Use Table. The Plan defines zones (cl 2.1) , a standard list (RU1, RU3, RU5; R1, R5; E1, E3, E4; SP2; RE1, RE2; C1, C3; W1) , and links them to a Land Use Table that specifies for each zone objectives, development that may be carried out without consent, that which requires consent, and what is prohibited (cl 2.3). The Land Use Table is the primary permissions matrix for every parcel shown on the Land Zoning Map (cl 2.2).
Development consent and exceptions. The Plan distinguishes three legal categories of activity: exempt development (Schedule 2, cl 3.1), complying development (Schedule 3, cl 3.2), and development requiring consent. The Plan imports state‑wide exempt/complying definitions by reference and supplies local additions and conditions. Where a use is permitted without consent in the Land Use Table it remains subject to Part 5 Act environmental assessment and approvals as applicable (note to cl 2.3), and the Plan preserves the broader hierarchy where SEPPs prevail (cl 1.9(1)).
Mapped overlays and local maps. The Plan’s operation is map‑driven: the Land Application Map, Land Zoning Map, Lot Size Map and multiple sensitivity maps (Biodiversity Sensitivity, Watercourse, Wetlands, Heritage, Groundwater Vulnerability etc.) determine which clauses apply to particular land. Many local clauses are expressly tied to these maps (for example cl 7.1 applies to land identified as “Biodiversity Sensitivity” on the Sensitivity Biodiversity Map).
Minimum lot size, subdivision controls and anti‑fragmentation measures. Clause 4.1 sets a development standard that lots cannot be smaller than the Lot Size Map unless otherwise allowed. The Plan contains several anti‑fragmentation mechanisms: exceptions to standards are tightly circumscribed (cl 4.6(6) prohibits consent where subdivision would create 2 or more lots less than the minimum area or a lot of less than 90% of the minimum), strata and community‑title limits (cl 4.1A and cl 4.1AA), and rural subdivision flexibility but with constraints on dwellings (cl 4.2; cl 4.2A) to avoid creating additional dwelling entitlements on smaller rural lots.
Environmental and heritage protections with procedural hooks. The Plan has multiple specialised protection clauses that condition consent on demonstrated investigation and mitigation: biodiversity (cl 7.1), riparian protection (cl 7.2), wetlands (cl 7.3), groundwater (cl 7.4), flood planning (cl 5.21), and heritage (cl 5.10). Many of these require the consent authority to be satisfied that impacts will be avoided, minimised or mitigated; some require notification to and consideration of responses from other bodies (Heritage Council, local Aboriginal communities) before consent is granted (cl 5.10(7)-(9)).
Local policy blockouts and special provisions. The Plan contains specific prohibitions and special purpose controls that alter the default market incentives: canal estate development is prohibited (cl 2.9), Siding Spring Observatory lighting regime imposes lumens thresholds and consultation obligations within defined radii (cl 5.14), intensive livestock agriculture and aquaculture have bespoke capacity thresholds and locational constraints (cl 5.18; cl 5.19 and Schedule 6). The Plan also prohibits certain uses in particular zones to protect the role of local centres or environmental values (see Land Use Table zone-by-zone prohibited lists).
Process and information obligations. The Plan requires the consent authority to have regard to zone objectives when deciding applications (cl 2.3(2)), mandates that certain applications be accompanied by particular documents under the EPA Regulation (cl 4.6(3) note), obliges record‑keeping of exercise of discretion (cl 4.6(4)), and creates mandatory consultation steps (for example cl 5.14(4) and (12) for the observatory; cl 5.10(7)-(9) for heritage; cl 5.10(8) for Aboriginal community notification).
Priority interplay and local override. The Plan expressly recognises the hierarchy with State instruments (cl 1.9) and gives a particular Part precedence where necessary: Part 6 (urban release areas) prevails over other parts to the extent of any inconsistency (cl 6.4). Clause 1.9A provides a limited suspension of private covenants to enable development in accordance with the Plan, but specifies exceptions and preserves public authority registered instrument rights (cl 1.9A(1)-(3)).
Incentive structure. The Plan mixes prohibitions, process costs and permitted‑use gates. It enables certain productive uses (a wide list in RU1), facilitates small scale aquaculture or intensive aquaculture subject to thresholds (cl 5.19; Sch 6), creates permissive allowances in business zones but caps retail floor areas for industrial retailers (cl 5.4(4)), and protects cultural/observatory/heritage interests via procedural hurdles and substantive thresholds. Those who can meet consent conditions and mapped thresholds obtain entitlements; those who cannot are excluded by prohibition or by the requirement that consent be refused unless the authority is satisfied about avoidance/minimisation/mitigation.
Who it affects
The Plan allocates decision rights, costs and compliance obligations across several identifiable groups. The principal actors affected are landowners and prospective developers in the Gilgandra local government area; the Council as consent authority; neighbouring landholders; specific industry groups (agriculture, aquaculture, light industry, hospitality/licensed premises); heritage owners; Aboriginal communities; infrastructure and State agencies; and interest groups that rely on specific protections such as the Siding Spring Observatory.
Landowners and developers. Anyone proposing development must determine whether the proposal is exempt, complying or requires development consent. Subdivision is generally consented (cl 2.6) and subject to Lot Size Map minima (cl 4.1). Owners of land mapped for biodiversity sensitivity, groundwater vulnerability, riparian areas, wetlands or within the flood planning area must expect additional consent thresholds and information requirements (cl 7.1-7.4; cl 5.21). Operators of licensed premises are affected by the playing and performing music clause (cl 5.20), which restricts the consent authority’s ability to refuse consent on specified grounds relating to music and dancing.
Council (consent authority). The Council is the consent authority under this Plan (cl 1.6) and bears the decision‑making burden and compliance oversight. It must assess proposals against zone objectives (cl 2.3(2)), ensure statutory consultation obligations are met (for example cl 5.14(4),(12); cl 5.10(7)-(9)), keep records where clauses require (cl 4.6(4)), and apply the Plan’s procedural and substantive standards. Where State SEPPs prevail (cl 1.9(1)), Council decision‑making is constrained by higher‑order instruments.
Neighbouring landholders and community. The Plan’s neighbourhood protections (e.g. flood planning cl 5.21, riparian cl 7.2, earthworks cl 7.8, heritage cl 5.10) are intended to protect amenity and environmental quality. Neighbours have indirect rights because the consent authority must consider impacts on amenity and surrounding uses (cl 2.3(2); cl 5.21(2) and (3)) and may require notification to heritage bodies or local Aboriginal communities (cl 5.10(7)-(9)).
Agriculture and rural industries. The Plan strongly engages with primary production: Zone RU1 lists a broad set of permitted activities and objectives prioritising sustainable primary industry (cl 2.1; RU1 objectives). However, subdivision and dwelling erection in rural and conservation zones are limited (cl 4.1, cl 4.2A, cl 4.2B), and intensive livestock operations are controlled by capacity and proximity thresholds that exempt only small‑scale examples from consent (cl 5.18(4)-(5)). Farm gate and farm stay proposals must satisfy criteria intended to avoid adverse impacts (cl 5.24; cl 5.25).
Aquaculture and seafood industry. Clause 5.19 and Schedule 6 set rules for pond‑, tank‑ and oyster aquaculture, including mandatory site and operational requirements, exemptions for extensive aquaculture in specific zones, and references to aquaculture industry development plans and the NSW Oyster Industry Sustainable Aquaculture Strategy. Oyster operators in priority areas have a carve‑out for carrying out aquaculture without consent where the mapping and conditions are met (cl 5.19(6)).
Heritage interests and Aboriginal communities. Owners of heritage items or land within heritage conservation areas face development consent requirements for demolition, alteration or subdivision (cl 5.10(2)). Consent authorities may require heritage management documents or conservation plans (cl 5.10(5)-(6)). Where archaeological sites or Aboriginal places are involved the consent authority must notify and take responses into account (cl 5.10(7)-(9)).
Siding Spring Observatory and scientific community. The Plan creates specific procedural obligations and substantive lumens limits to protect the observatory’s dark sky. The consent authority must consider adverse effects on observing conditions and consult the observatory director within 18 kilometres for lit development and seek Planning Secretary concurrence for certain outcomes (cl 5.14(2)-(6),(9)-(12),(14) and (15)). This imposes time and consultation costs on any lit development within mapped radii and creates a de facto veto pathway for developments likely to exceed the lumens thresholds absent concurrence.
State agencies and infrastructure proponents. The Plan identifies the State authority that would be the relevant acquisition authority for owner‑initiated acquisition under the Land Acquisition (Just Terms Compensation) Act for specified parcels (cl 5.1(2) and table). It also preserves infrastructure delivery under the State SEPP (cl 5.12) and includes Part 6 urban release area provisions that require certification by the Director‑General for designated State infrastructure arrangements before certain subdivisions (cl 6.1).
Business owners and hospitality sector. Local centre and employment zones allow many business and commercial activities but impose area caps and prohibited lists to protect core functions of centres and to limit competition from inappropriate uses (see Land Use Table zone specifics and cl 5.4). The music/performance protections at cl 5.20 in particular reduce a planning pathway for refusals based on genre or live amplification, shifting the constraint instead to objective noise management measures.
In sum, the Plan affects all parties that transact, develop, or make decisions over land in the mapped Gilgandra area, and distributes decision rights to Council while imposing specialised consultation and standards for environmental, heritage, observatory and infrastructure interests.
Key duties and rights
The Plan establishes a framework of duties on the consent authority and rights or entitlements for landowners and applicants. These duties and rights are expressed mainly as conditions precedent to granting development consent, as permitted use categories, and as consultation obligations.
Duties of the consent authority (Council)
Apply zone objectives: The consent authority must have regard to the objectives for development in a zone when deciding a development application (cl 2.3(2)). This creates a duty to align decisions with stated zone aims (for example RU1 objectives emphasise primary production).
Consider prescribed matters: The Plan repeatedly requires the consent authority to consider specific impacts before granting consent, for example biodiversity impacts (cl 7.1(3)-(4)), riparian impacts (cl 7.2(3)-(4)), wetland impacts (cl 7.3(3)-(4)), groundwater effects (cl 7.4(3)-(4)), flood risk considerations (cl 5.21(2)-(3)), and heritage impacts (cl 5.10(4)-(6)).
Notification/consultation obligations: The consent authority must notify the Heritage Council and take its response into account before granting consent for development on archaeological sites (cl 5.10(7)); must notify and consider responses from local Aboriginal communities for Aboriginal places (cl 5.10(8)); must consult the observatory director before consenting to lit development within specified distances and consider comments (cl 5.14(4),(12)); and must in some cases obtain concurrence of the Planning Secretary (cl 5.14(5),(7)).
Record-keeping: Where a development standard is contravened under the Plan’s exceptions clause, the consent authority must keep a record of its assessment (cl 4.6(4)).
Precondition on subdivisions in urban release areas: For subdivisions that would create smaller lots than previously permitted, the consent authority must be satisfied that the Director‑General has certified satisfactory arrangements for designated State public infrastructure (cl 6.1(2)).
Rights and entitlements for applicants/landowners
Entitlement to apply for consent: Landowners have the right to apply for development consent for any use that is permitted with consent in the zone (Land Use Table; cl 2.3).
Exempt and complying development pathways: Where a proposal meets Schedule 2 exempt development criteria (cl 3.1) or Schedule 3 complying development criteria (cl 3.2), the landowner benefits from an alternative, less onerous approval pathway subject to the specified conditions and State SEPP provisions referenced in the Plan.
Limited protection against refusal on music grounds: Licensed premises applicants are protected against refusals based solely on the music genre, live/amplified nature, presence of dancing, orientation of stage, decorative or lighting choices or number of performers , the consent authority must not refuse on those grounds alone, and must not refuse on noise grounds if satisfied noise can be managed to acceptable levels (cl 5.20(1)-(2)).
Right to rely on additional permitted uses: Schedule 1 grants site‑specific permitted rights (for example temporary permission for dwellings on identified lots), albeit subject to time limits (Schedule 1 clauses 1 and 2 cease on the fifth anniversary of commencement).
Ability to seek flexibility with records: Clause 4.6 allows the consent authority to grant consent even if a development standard is contravened, provided applicants demonstrate compliance is unreasonable/unnecessary and there are sufficient planning grounds; this opens a pathway for negotiated departures, subject to the authority keeping an assessment record (cl 4.6(2)-(4)).
Specific duties with substantive thresholds
Siding Spring Observatory limits: The consent authority must refuse, without Planning Secretary concurrence, consent to lit development within 18 km of the observatory that would result in disallowed light fittings, or lumens above set thresholds, and must be satisfied designs will minimise light pollution (cl 5.14(3)-(6),(9),(11),(13)).
Heritage process duties: For demolition, alteration or subdivision affecting heritage items or conservation areas, the consent authority must consider heritage significance and may require a heritage management document or conservation plan before consent (cl 5.10(2),(4)-(6)).
Subdivision duties: For subdivision into lots smaller than map minima, the Plan supplies strict constraints and requires consent authority satisfaction; some exemptions exist for strata and community land subdivisions but are also controlled (cl 4.1; cl 4.1AA; cl 4.1A; cl 4.6(6)).
Limitations on powers and duties
The Plan is subject to State instruments and the Act: cl 1.9(1) states the Plan is subject to any SEPP that prevails under section 3.28 of the Act. Clause 5.12 preserves development permitted under State SEPP (Transport & Infrastructure) (cl 5.12(1)). Clause 6.4 confirms Part 6 prevails over conflicting Plan provisions for urban release areas.
Records and transparency
The Plan mandates maps be available to the public (cl 1.7(3)-(4) and note), and in several places requires notification or written advice to applicants (for example cl 5.10(3)(a) where an applicant may be excused formal consent if the council in writing advises the proposed development is of a minor nature). These provisions shape information flows between Council and applicants.
In short, the Plan creates a duty‑laden decision framework for Council and conditional rights for applicants to apply, proceed via exempt/compliant pathways when eligible, and in some cases to obtain consent even where a development standard is contravened (subject to evidential and record obligations).
Penalties and enforcement
The Plan itself sets substantive permissions, prohibitions and procedural duties, but it does not set out a schedule of penalties or enforcement mechanisms within the text provided. Enforcement of the Plan’s requirements and sanctions for non‑compliance are therefore effected through the broader statutory framework that the Plan operates within, namely the Environmental Planning and Assessment Act and its regulations and related State legislation which the Plan repeatedly cites and depends upon.
How enforcement will operate in practice under the Plan as drafted:
Prohibited acts and requirement for consent: The Plan specifies many categories of development that are prohibited in particular zones (Land Use Table) and many activities that require development consent (for example demolition cl 2.7; subdivision cl 2.6; erection of dwellings in certain zones cl 4.2A). Carrying out development contrary to those permissions triggers compliance action under the Environmental Planning and Assessment Act (the Act), as the Plan functions as an environmental planning instrument under that Act (see cl 1.6 which situates the consent authority “subject to the Act”).
Decision‑making obligations and consequences: Where the consent authority fails to comply with Plan duties (for example not considering a mandatory consultation response or failing to apply a compulsory provision like cl 5.14(15)), the legitimacy of a consent may be open to administrative challenge under the Act or judicial review; the Plan requires the consent authority to keep records where discretion is used (cl 4.6(4)), which is material evidence in regulatory or legal proceedings.
Third‑party enforcement options: Although the Plan does not itself create new private enforcement rights, persons affected by non‑compliant development may have recourse under the Act (for example through an objection, appeal or enforcement action) and through common law remedies where the Plan’s mapped or consent requirements intersect with private rights; the Plan expressly notes that exempt development is not exempt from other Acts, licences or approvals, and that common law and adjoining owners’ rights still apply (Schedule 2 Note 2).
Administrative instruments and compliance tools: The Plan anticipates conditions of consent, heritage management plans, heritage conservation management plans, environmental impact statements and other regulatory documents which, once imposed, create compliance obligations enforceable by Council and State agencies under the Act and associated regulations (cl 5.10(5)-(6); cl 4.6(3) note).
Consultation and concurrence as gatekeepers: Some clauses require concurrence from the Planning Secretary (cl 5.14(5),(7)) or certification from the Director‑General before particular subdivisions may proceed (cl 6.1(2)). Failure to obtain required concurrence or certification will prevent lawful progress and invite enforcement or refusal.
Practical note on enforcement visibility in the Plan:
The Plan contains no schedule of monetary fines or explicit criminal sanctions within its text. Its enforcement is therefore procedural: non‑compliance eliminates the right to lawfully carry out works and enables the Act’s enforcement pathways to be used. The Plan references the Act in several places (for example cl 1.6, cl 1.9 and notes), which signals that enforcement and penalties sit at the Act/regulation level rather than in the local instrument.
For practitioners advising clients, the operational consequence is that compliance requires both satisfying the Plan’s mapped and clause‑based tests and navigating the Act’s compliance/enforcement regime. Where the Plan demands consultation or concurrence, failing to obtain those steps is a fatal compliance defect rather than an issue remediable by a Plan‑level fine.
How it interacts with other laws
This Plan is drafted and operates expressly within a hierarchy of State legislation, SEPPs and other statutory instruments. It cross‑references multiple State Acts, SEPPs and guidelines and contains specific interaction rules that determine precedence, exception and consultation duties.
Priority and SEPPs. Clause 1.9(1) states the Plan is subject to any State environmental planning policy (SEPP) that prevails over the Plan as provided by section 3.28 of the Act. The instrument therefore recognises higher order SEPPs can override local provisions. The Land Use Table notes several SEPPs likely to be relevant (for example SEPP (Housing) 2021 and several Chapter 2/3 SEPPs addressing transport, industry, primary production and resilience). Clause 5.12(1) specifically preserves development permitted under State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2, so the Plan does not restrict or enable the restriction of development intended to be carried out by or on behalf of a public authority under that SEPP.
Covenants and private agreements. Clause 1.9A provides a clear interaction: to enable Plan‑consistent development any agreement, covenant or similar instrument that restricts carrying out of that development “does not apply to the extent necessary” to enable the Plan‑consistent development (cl 1.9A(1)). The clause, however, lists several exceptions where the suspension does not apply: covenants imposed by the Council, relevant instruments under the Crown Land Management Act 2016, conservation agreements under the National Parks and Wildlife Act 1974, trust agreements under the Nature Conservation Trust Act 2001, property vegetation plans under Native Vegetation Act 2003, biobanking agreements, and planning agreements under the Act (cl 1.9A(2)(a)-(g)). Clause 1.9A(3) preserves public authorities’ rights under registered instruments. This is a significant local override mechanism but it is qualified by the listed statutory protections.
Heritage and Aboriginal law. The Plan interacts with the Heritage Act 1977 in multiple ways. Clause 5.10 requires development consent for altering or demolishing items listed in Schedule 5 or in heritage conservation areas and requires notification to the Heritage Council for certain archaeological site consents (cl 5.10(7) and (9)). It also requires notification to local Aboriginal communities and consideration of responses for development in Aboriginal places of heritage significance (cl 5.10(8)). Thus the Plan embeds statutory consultation duties and defers to heritage processes established under State law.
Environmental and biodiversity regimes. The Plan references and dovetails with the Biodiversity Conservation Act 2016, the Fisheries Management Act 1994 and related regulations (cl 1.9A exceptions, cl 5.19 referencing aquaculture industry development plans under Fisheries Management Act, and Schedule 6 site exclusions related to biodiversity areas). Clause 3.3 defines environmentally sensitive areas drawing on Coastal Management Act 2016, Marine Parks Act 1997, Ramsar listings, declared biodiversity areas and other statutory designations. The Plan therefore layers local assessment duties on top of State environmental protections.
Local Government Act interaction. Clause 5.2 gives the Plan effect in relation to classification/reclassification of public land under Part 2 of Chapter 6 of the Local Government Act 1993 and references section 30 (discharge of trusts) and related provisions. Clause 5.1 uses the Land Reservation Acquisition Map to identify the relevant State authority for owner‑initiated acquisition under the Land Acquisition (Just Terms Compensation) Act 1991. These provisions coordinate local planning outcomes with council governance and State acquisition powers.
Rural Fires and natural hazards. Clause 5.11 permits bush fire hazard reduction works authorised by the Rural Fires Act 1997 to be carried out without development consent, and cross‑references the Rural Fires Act’s provisions about development on bush fire prone land. Flood planning clauses (5.21 and references to the Considering Flooding guideline and Flood Risk Management Manual) direct the consent authority to integrate State flood guidance into local decision‑making.
BASIX and building controls. Clause 4.6(8) explicitly excludes certain categories of development standards from the Plan’s exceptions power, including development standards that arise in connection with BASIX commitments (cl 4.6(8)(b)), and clauses 3.1(3)(a)-(b) require compliance with the Building Code of Australia for exempt development. These references ensure that State building sustainability and safety standards bind local exemptions and departures.
Observatory protections. Clause 5.14 creates a novel local-State-academic agency interaction: the consent authority must consult the observatory director and in many cases obtain concurrence from the Planning Secretary. The observatory director is defined as the Director of the Research School of Astronomy and Astrophysics at the ANU (cl 5.14(14)). This clause creates a formal role for a research institution within the statutory planning process and allocates technical evidence and concurrence as decisive inputs.
Urban release and State infrastructure certification. Part 6 overlays urban release areas with a requirement that satisfactory arrangements for designated State public infrastructure be certified by the Director‑General before the consent authority can grant certain subdivisions that reduce minimum lot sizes (cl 6.1(2)). This elevates State infrastructure delivery as a precondition for intensified subdivision in those mapped areas.
In sum, the Plan is constructed to sit within and interact with a web of State laws and instruments. It disapplies some private instruments to the extent necessary for Plan‑compliant development, requires statutory consultation and concurrence in specific technical domains, and preserves the primacy of SEPPs and State guidelines for particular matters, while using local maps to limit or permit uses that interact with those State regimes.
Amendment history
The Plan text as provided contains embedded amendment annotations that identify the dates and schedules of a number of amendments and insertions. The instrument has been edited since its original making; the text preserves amendment footnotes for particular clauses. The explicit amendment notes in the text are the authoritative record within the instrument and indicate the following changes (extracting the in‑text amendment annotations):
Clause 1.8A (Savings provision relating to development applications): annotated "Am 2019 (621), Sch 5[1]". This indicates a 2019 amendment added the savings provision that development applications made before the Plan’s commencement must be determined as if the Plan had not commenced (cl 1.8A).
Clause 1.9A (Suspension of covenants, agreements and instruments): annotated "Am 2019 (621), Sch 5[2]-[4]". The suspension-of-covenants clause and its stated exceptions were inserted or amended in 2019.
Clause 2.1 (Land use zones) and clause 4.1AA and 4.1A have annotations "Am 2022 (832), Sch 1.5[1]" and "Am 2022 (832), Sch 1.5[3]" respectively, indicating amendments in 2022 that altered zone lists and introduced community title/strata subdivision limitations (cl 2.1; cl 4.1AA; cl 4.1A).
Clause 4.2A and 4.2B were amended or inserted in 2022 as well (cl 4.2A annotation "Am 2022 (832), Sch 1.5[3] [4]" and cl 4.2B present in the text), indicating further rural dwelling and rural workers’ dwelling clarifications in that round.
Clause 4.6 (Exceptions to development standards) includes historical notes indicating repeals of subclauses and adoption changes; cl 4.6(6) remains an important constraint that appears to have been preserved.
The Land Use Table is shown as amended several times: "Am 2016 (168), Sch 1 [2]; 2017 (493), Sch 1.1 [1]; 2019 (137), Sch 6 [1]; 2022 (314), Sch 1; 2022 (832), Sch 1.5[2]; 2023 (458), Sch 2.32." These notes imply incremental changes across 2016, 2017, 2019, 2022 and 2023 to the Land Use Table content.
Clause 5.4 (Controls relating to miscellaneous permissible uses) annotated "Am 2018 (406), Sch 1.49 [1] [2]", indicating a 2018 amendment that updated floor area and scale caps (for example industrial retail outlets and artisan food rules).
Clause 5.14 (Siding Spring Observatory,maintaining dark sky) includes insertion annotation "Ins 2016 (310), Sch 3.3", indicating it was inserted in 2016 and is labelled as a compulsory provision for the Standard Instrument (cl 5.14(15)). The inclusion of this clause post‑original making evidences policy additions to protect observatory operations.
Clause 5.16 (Subdivision of, or dwellings on, land in certain rural, residential or conservation zones) and clause 7.7 show amendment annotations: cl 7.7 annotated "Am 2017 (493), Sch 1.2 [1]".
Schedule 1 entries (additional permitted uses) are time‑limited and thereby reflect temporary local permissions (Schedule 1 clauses 1 and 2 cease five years after commencement).
Clause 6.1 (Arrangements for designated State public infrastructure) contains later amendments "Am 2019 (621), Sch 5[5]; 2023 (554), Sch 1", indicating changes to the urban release and certification arrangements.
Clause 5.24 and 5.25 (Farm stay and farm gate premises) are annotated "Subst 2023 (458), Sch 1[4]", which indicates substantive replacement in 2023 of these clauses, reflecting recent state/local policy changes on agritourism and farm gate operations.
These annotations in the Plan text show that the instrument has been actively updated over time, with notable policy inserts around observatory protection (2016), amendments around SEPP harmonisation and covenant suspension (2019), ongoing Land Use Table updates (2016-2023), and recent (2022-2023) adjustments to subdivision and rural dwelling rules. The amendment notes identify the amending instrument references by year and schedule number, which practitioners should consult directly for the amending legislation to review the precise wording changes, commencement dates and transitional arrangements.
For due diligence and project advice: check the in‑text amendment footnotes relevant to the clause you rely upon, and obtain the amending instruments cited (for example “2019 (621), Sch 5”) from the NSW legislation website to confirm commencement dates, savings, and any transitional provisions that affect applications made before particular amendments.
Litigation history
The Plan text supplied contains no judicial decisions, appeals or case annotations. It does not name any cases nor summarise litigation. Clause 5.10 and other clauses require notification to statutory bodies (for example the Heritage Council) and the consent authority must take responses into account (cl 5.10(7)-(9)), but the instrument itself does not report or cite any litigation arising from its application.
Implications for practitioners:
There are no precedential cases included in the instrument text to guide interpretation of the Plan’s discretionary provisions. Practitioners should therefore rely on the Plan text, the Act, relevant SEPPs and administrative law principles when advising clients and on any applicable NSW case law addressing the Act or SEPPs more generally (but such cases are not within this Plan’s text and hence are not cited here).
Because the Plan creates a number of thresholds and consultation requirements (for example cl 5.14 observatory concurrence and cl 5.10 heritage notifications), disputes may arise in practice about sufficiency of information, the exercise of discretion under cl 4.6 (exceptions to development standards) and whether consent processes complied with mandatory consultative steps. None of those disputes are referenced in the text presented.
For project risk assessment, absence of litigation mention in the Plan does not indicate absence of legal risk; rather it indicates this instrument does not itself record litigation outcomes. Practitioners should search case law and tribunal decisions under the Environmental Planning and Assessment Act and appeals to the Land and Environment Court to identify precedent on issues such as the exercise of the Plan’s discretions, mandatory consultation duties, heritage impact assessments and the observatory/concurrence pathway.
In short, the Plan contains no litigation history within its text; legal advisers must therefore consult external case law and administrative decisions when anticipating legal challenge risk or framing grounds for merits review or judicial review connected to particular consents or refusals under this Plan.
Gotchas
Several provisions in the Plan create traps for the unwary applicant or adviser. These are concrete, Clause‑based operational risks that change project viability, timing and cost.
Savings and transitional treatment of in‑flight applications (cl 1.8A)
Development applications made before the Plan’s commencement and not finally determined must be determined as if the Plan had not commenced (cl 1.8A). That means applicants with pre‑commencement applications may lose the benefit of newly permitted uses or revised minimum lot sizes. Practitioners should check application lodgement dates precisely and consider whether re‑submission under the new Plan is possible or desirable. The Note directs attention to Division 3.5 of the Act for situations where a draft EPi may be considered with public notice.
Suspension of covenants with exceptions (cl 1.9A)
The clause suspending private covenants only operates “to the extent necessary” to enable development in accordance with the Plan, but excludes many instruments (cl 1.9A(2)(a)-(g)). If a client relies on covenant suspension to override a private restriction, verify the restriction’s provenance: covenant imposed by Council, conservation agreements, biobanking agreements and property vegetation plans remain enforceable. Also cl 1.9A(3) preserves registered public authority rights, so registered easements or similar public instruments can still block development.
Minimum lot sizes are enforced via the Lot Size Map (cl 4.1(3)), strata and community title subdivision in certain zones is limited (cl 4.1A; cl 4.1AA). Clause 4.6(6) bars granting consent under the exceptions power for subdivisions that would result in multiple lots under the minimum area or create a lot less than 90% of the minimum, limiting the scope for negotiating departures. Applicants seeking small‑lot subdivisions in rural or environmental zones face significant constraints.
Heritage and archaeological notification timing (cl 5.10)
For archaeological sites and certain heritage actions the consent authority must notify the Heritage Council or local Aboriginal communities and allow time for a response (28 days in some cases, cl 5.10(7)-(9)). Failure to undertake these steps can be fatal to the lawfulness of consent. If heritage or archaeological risk exists, anticipate material timing and potential additional requirements (heritage management documents, conservation plans).
Siding Spring Observatory lumens thresholds and concurrence (cl 5.14)
Lit development within 18 km is subject to strict lumens limits, shielding requirements and mandatory consultation with the observatory director, and in many cases Planning Secretary concurrence is required before consent (cl 5.14(3)-(6),(10)). The clause includes specific numeric thresholds (e.g. 900 lumens within 12 km, 1,800 lumens up to 18 km, and 1,000,000 lumens beyond 18 km subject to concurrence). These specific figures create binary outcomes: exceeding a threshold typically requires concurrence and may be refused without it. Applicants must model cumulative lighting and dust effects (cl 5.14(2)(d)).
Exempt and complying development reliance (cl 3.1-3.3 and Schedules)
Schedule 2 (exempt development) and Schedule 3 (complying development) are largely empty in the Plan and rely on State SEPPs for substantive content. That means practitioners must consult the relevant State SEPPs, Building Code of Australia and external guidelines (not only the local Plan) to determine whether a proposal qualifies as exempt or complying. Exempt development is not exempt from other statutory approvals or common law constraints (Schedule 2 Note 2).
Temporary use limits and restoration obligations (cl 2.8)
Temporary uses are capped at 52 days in any 12 months unless they are sales offices, and the consent authority must be satisfied that land will be restored where practicable (cl 2.8(2)-(3)(d)). Applicants proposing recurrent short‑term uses must propose robust restoration measures and may need to justify any repeated temporary uses beyond the cap.
Music and licensed premises protections (cl 5.20)
The Plan stops the consent authority refusing licensed premises solely on a range of music‑related grounds (genre, live/amplified, number of musicians, presence of dance floors etc.), and prohibits refusal on noise grounds where noise can be managed and minimised to an acceptable level (cl 5.20(1)-(2)). This tilts disputes from arbitrary refusals to demonstrable noise management. Applicants should prepare objective noise management plans and be ready to demonstrate mitigation measures.
Aquaculture technical and locational conditions (cl 5.19 and Sch 6)
Aquaculture activity is regulated by both the Plan and industry development plans under the Fisheries Management Act; pond/tank designs, discharges and conservation exclusions are prescriptive (Sch 6 Divisions 1-2). Oyster aquaculture in priority areas may be permitted without consent where mapping and area size qualify (cl 5.19(6)). Practitioners must confirm the relevant maps and industry development plans and avoid locations declared as conservation exclusion zones (Sch 6 Div 1 and 2).
Essential services precondition (cl 7.6)
The consent authority must be satisfied essential services are available or arrangements exist to provide them when required before granting consent (cl 7.6). Proposals without confirmed service delivery (water, electricity, sewage, stormwater, road access) face refusal or conditions requiring staged servicing arrangements.
These “gotchas” are clause‑specific, statutory, and in most cases non‑waivable except through the Plan’s defined exceptions route (for certain development standards under cl 4.6), or via State SEPPs where they prevail. Practitioners should run a clause matrix against parcel maps and application lodgement history to identify which of these traps apply to a particular proposal.
How to comply
Complying with this Plan requires a mapped and clause‑based checklist approach. Below is a pragmatic procedural roadmap for advising clients and structuring applications; each step references the relevant Plan clauses and schedules.
Map and zoning audit
Check the Land Application Map, Land Zoning Map, Lot Size Map and all thematic maps (biodiversity sensitivity, heritage, wetlands, watercourse, groundwater vulnerability, Siding Spring Observatory distance mapping) to identify which clauses apply to the subject land (cl 1.3; cl 2.2; cl 7.1-7.4; cl 5.14; Schedule references).
Confirm whether any special Schedule 1 additional permitted use applies to the parcel (Schedule 1) and whether that permission remains in effect (note the five‑year expiry in Schedule 1 entries).
Classify the proposed development under the Land Use Table
Determine whether the proposal is “permitted without consent”, “permitted with consent”, or “prohibited” in the relevant zone (cl 2.3; Land Use Table). If prohibited, there is no pathway under the Plan unless a development standard exception might apply (cl 4.6), but cl 4.6 has explicit limits for subdivisions in certain zones (cl 4.6(6)).
Exempt/compliant pathway check
If the proposal could be exempt or complying development, confirm the relevant State SEPP provisions and local Schedule entries. For exempt development check Schedule 2 and cl 3.1; for complying development check Schedule 3 and cl 3.2. Ensure compliance with Building Code of Australia requirements and BASIX commitments where relevant (cl 3.1(3)(a); cl 4.6(8)(b)).
Pre‑lodgement technical investigations
For any development that may affect biodiversity, riparian land, wetlands, groundwater or heritage, commission appropriate technical reports (ecological impact assessment, heritage impact statement/heritage management document, Aboriginal cultural heritage assessment, groundwater risk assessment, flood risk assessment) referenced by the relevant clauses (cl 7.1(3); cl 7.2(3); cl 7.3(3); cl 7.4(3); cl 5.21(2); cl 5.10(5)-(6)).
For aquaculture proposals, ensure pond/tank design, discharge arrangements and species selection comply with Schedule 6 and cl 5.19 and are consistent with any aquaculture industry development plan and the NSW Oyster Industry Sustainable Aquaculture Strategy (cl 5.19(2)-(5); Sch 6).
Consultation and notification obligations
Identify mandatory consultations early. For heritage/archaeological sites and Aboriginal places notify and consider local Aboriginal communities and the Heritage Council as required (cl 5.10(7)-(9)). For any lit development within 18 km of Siding Spring Observatory notify the observatory director and be prepared to obtain Planning Secretary concurrence where thresholds are exceeded (cl 5.14(3)-(6),(10)-(12)). For urban release area subdivisions requiring State infrastructure arrangements, obtain Director‑General certification where required (cl 6.1(2)).
Services and feasibility checks
Demonstrate essential services availability or staged arrangements (cl 7.6). For subdivisions, ensure minimum lot sizes per the Lot Size Map (cl 4.1(3)) and be mindful of anti‑fragmentation clauses (cl 4.6(6)). For secondary dwellings, rural workers’ dwellings or farm stay accommodation, check the specialised controls (cl 4.2A; cl 4.2B; cl 5.24).
Address amenity and nuisance risk
For licensed premises and venues, prepare a robust acoustic/noise management plan since cl 5.20 prevents refusal based solely on music type but allows a consent authority to refuse where noise cannot be managed to an acceptable level (cl 5.20(2)). For intensive livestock or agricultural proposals near residential zones, ensure odour, effluent and distance thresholds are considered (cl 5.18).
Prepare documentation for any proposed departures
If a development standard would be contravened, prepare the justification required under cl 4.6(3) demonstrating that compliance is unreasonable or unnecessary and that there are sufficient environmental planning grounds. Keep in mind the consent authority must keep a record of its assessment (cl 4.6(4)); therefore submit a complete evidentiary package.
Heritage management and conservation incentives
Where heritage conservation incentives are sought, develop a heritage management document or a heritage conservation management plan per cl 5.10(5)-(6). If conservation incentives are relied upon to permit otherwise non‑standard development, ensure all necessary conservation work is identified and will be required by condition (cl 5.10(10)).
Use Council process and record timeframes
Allow time for required notifications and consultation windows: 21 days for observatory director responses (cl 5.14(12)); 28 days for Heritage Council responses (cl 5.10(7) and (9)). Incorporate these statutory windows into project timings and condition schedules.
Verify excluded exemptions and overlaps with other Acts
Exempt development under the Plan remains subject to other Acts and approvals (Schedule 2 Note 2). Make sure licences, water approvals, Crown land approvals or other statutory permits are obtained where relevant (cl 1.9A exceptions; Sch 6 notes).
Post‑consent compliance and conditions
Expect conditions enforcing management commitments (heritage conservation, environmental management strategies under cl 5.13 for eco‑tourist facilities, lighting limits for observatory protection). Ensure plans are prepared to meet ongoing conditions, monitoring and ISO 14000‑style management where requested (cl 5.13(3)(k)).
Practical legal and commercial checklist for lodgement
Pre‑lodgement meeting with Council to confirm mapping and required studies.
Obtainment of up‑to‑date map extracts (Lot Size Map, Heritage Map, Biodiversity Map, Watercourse/Wetlands Map, Siding Spring map).
Confirm whether the proposal fits exempt or complying pathways and prepare necessary certificates (Building Code, BASIX, Council effluent approvals where unsewered).
For contested thresholds (lumens, lot size, noise), prepare cumulative impact modelling and mitigation measures and plan for State concurrence where required.
Draft conditions for consent that reflect required mitigation and monitoring so anticipated compliance obligations are transparent to the client.
Following the mapped audit and clause‑by‑clause compliance checklist will materially reduce consent risk, timing and exposure to enforcement or refusal on procedural grounds.
(i) to provide opportunities for a range of new housing and housing choice in locations that have good access to public transport, community facilities and services, retail and commercial services and employment opportunities,
(j) to allow for the equitable provision of social services and facilities for the community,
(k) to protect places and buildings of archaeological or heritage significance, including Aboriginal relics and places.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Gilgandra Local Environmental Plan 2004
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU3 Forestry
RU5 Village
Residential Zones
R1 General Residential
R5 Large Lot Residential
Employment Zones
E1 Local Centre
E3 Productivity Support
E4 General Industrial
Special Purpose Zones
SP2 Infrastructure
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
C3 Environmental Management
Waterway Zones
W1 Natural Waterways
cl 2.1: Am 2022 (832), Sch 1.5[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the
This is an opening excerpt, not the complete document.