Geothermal Energy Regulation 2022
sec.6Proposed development plan— Act , s 89
Start here
Get a plain-English read of sec.6
Turn the raw legal text into a practical explanation grounded in Geothermal Energy Regulation 2022.
sec.6 Proposed development plan— Act , s 89
For section 89 (1) (e) of the Act , the following matters are prescribed— for each geothermal reservoir identified in the area of the proposed geothermal lease, the location of the boundaries of the classified geothermal resources in the reservoir; details, including the location, type and size, of the infrastructure intended to be located in the area of the proposed geothermal lease. communication systems, compressors, pipelines, powerlines, pumping stations, reservoirs, roads, substations temporary structures or structures of an industrial or technical nature, including mobile and temporary camps
- (a) for each geothermal reservoir identified in the area of the proposed geothermal lease, the location of the boundaries of the classified geothermal resources in the reservoir;
- (b) details, including the location, type and size, of the infrastructure intended to be located in the area of the proposed geothermal lease. Examples of infrastructure— • communication systems, compressors, pipelines, powerlines, pumping stations, reservoirs, roads, substations • temporary structures or structures of an industrial or technical nature, including mobile and temporary camps
- • communication systems, compressors, pipelines, powerlines, pumping stations, reservoirs, roads, substations
- • temporary structures or structures of an industrial or technical nature, including mobile and temporary camps
- • communication systems, compressors, pipelines, powerlines, pumping stations, reservoirs, roads, substations
- • temporary structures or structures of an industrial or technical nature, including mobile and temporary camps