Geothermal Energy Regulation 2022
sec.34Giving part of core sample— Act , s 194
Start here
Get a plain-English read of sec.34
Turn the raw legal text into a practical explanation grounded in Geothermal Energy Regulation 2022.
sec.34 Giving part of core sample— Act , s 194
The part of a core sample kept under section 33 that must be given to the chief executive under section 194 of the Act must— be at least 50% of the core recovered; and have as complete a vertical face as is practicable; and be given in a container suitable for its long-term storage and handling that is labelled with the following information— the identifying name of the geothermal well from which the core was recovered; the depth in metres of the top and bottom of the interval from which the core was recovered; if more than 1 core is recovered from the well—the number of the core; the length in metres of the core recovered.
- (a) be at least 50% of the core recovered; and
- (b) have as complete a vertical face as is practicable; and
- (c) be given in a container suitable for its long-term storage and handling that is labelled with the following information— (i) the identifying name of the geothermal well from which the core was recovered; (ii) the depth in metres of the top and bottom of the interval from which the core was recovered; (iii) if more than 1 core is recovered from the well—the number of the core; (iv) the length in metres of the core recovered.
- (i) the identifying name of the geothermal well from which the core was recovered;
- (ii) the depth in metres of the top and bottom of the interval from which the core was recovered;
- (iii) if more than 1 core is recovered from the well—the number of the core;
- (iv) the length in metres of the core recovered.
- (i) the identifying name of the geothermal well from which the core was recovered;
- (ii) the depth in metres of the top and bottom of the interval from which the core was recovered;
- (iii) if more than 1 core is recovered from the well—the number of the core;
- (iv) the length in metres of the core recovered.