Geothermal Energy Regulation 2022
sch.2-sec.6Casing of prescribed well
Start here
Get a plain-English read of sch.2-sec.6
Turn the raw legal text into a practical explanation grounded in Geothermal Energy Regulation 2022.
sch.2-sec.6 Casing of prescribed well
Steel casing must be removed from all sections of a geothermal well that are within or immediately adjacent to geothermal fluid. However, subsection (1) need not be complied with if it is not technically or commercially feasible to remove the casing. production casing that has been cemented in place and can not feasibly be removed (sch.2-sec.6-ssec.1) Steel casing must be removed from all sections of a geothermal well that are within or immediately adjacent to geothermal fluid. (sch.2-sec.6-ssec.2) However, subsection (1) need not be complied with if it is not technically or commercially feasible to remove the casing. production casing that has been cemented in place and can not feasibly be removed