Gas Supply Regulation 2007
sec.35Release of draft report and draft proposed code
Start here
Get a plain-English read of sec.35
Turn the raw legal text into a practical explanation grounded in Gas Supply Regulation 2007.
sec.35 Release of draft report and draft proposed code
QCA must, after complying with section 34 , publish on its website— a draft report about the material issues for the proposed distribution network code and a draft of the proposed distribution network code. The draft of the proposed distribution network code may be a first draft or a revision of any draft of the proposed distribution network code that formed the issues document. s 35 amd 2014 SL No. 338 s 44 (2) (sec.35-ssec.1) QCA must, after complying with section 34 , publish on its website— a draft report about the material issues for the proposed distribution network code and a draft of the proposed distribution network code. (sec.35-ssec.2) The draft of the proposed distribution network code may be a first draft or a revision of any draft of the proposed distribution network code that formed the issues document.
- (a) a draft report about the material issues for the proposed distribution network code and
- (b) a draft of the proposed distribution network code.