Gas Standards (Gas Supply and System Safety) Regulations 2000
Sch 3Requirements for gas plant safety case
Start here
Get a plain-English read of Sch 3
Turn the raw legal text into a practical explanation grounded in Gas Standards (Gas Supply and System Safety) Regulations 2000.
Schedule 3 — Requirements for gas plant safety case
-
Term used: gas incident 65
-
Performance standards, requirement as to 65
Part 2 — Content of safety case
-
Manager etc. of gas plant to be specified 65
-
Person responsible for safety case etc. to be specified 66
-
Plant description, requirements as to 66
-
Formal safety assessment, requirements as to 66
-
Safety management system to be specified 67
-
Gas incidents, procedure for reporting to be specified 67
-
Address where records kept to be specified 67
Part 3 — Content of safety management system
-
Safety policy, requirements as to 67
-
Organisational structure and responsibilities to be specified 67
-
Published technical codes etc. which will apply to be specified 68
-
Means of ensuring adequacy of design, construction etc. 68
-
Control systems which will be used to be specified 68
-
Critical equipment etc. to be specified 69
-
Response plan for emergencies to be specified 69
-
Emergency communications systems to be specified 69
-
Internal monitoring etc. processes etc. to be specified 70
-
Gas incidents, performance standards for recording etc. to be specified 70
-
Staff skills etc., systems to ensure to be specified 70