Gas Standards (Gas Supply and System Safety) Regulations 2000
Part 5Gas plant safety
Start here
Get a plain-English read of Part 5
Turn the raw legal text into a practical explanation grounded in Gas Standards (Gas Supply and System Safety) Regulations 2000.
Part 5 — Gas plant safety
-
Application of Part 52
-
Safety case, plant operator to submit to Director and content of 52
-
Exemption from r. 49(1) 52
-
Guidelines to preparation of safety case, Director may issue 52
-
Nominated auditor, nominating etc. 52
-
Certification of safety case by nominated auditor 53
-
Assessment and acceptance or rejection of safety case by Director 54
-
Rejected safety case to be modified 55
-
Assessment and acceptance or rejection of modified safety case 55
-
Director may determine safety case for gas plant in some cases 55
-
When accepted safety case has effect 56
-
Gas plant not to be operated without accepted safety case 56
-
Accepted safety case, effect of 57
-
Accepted safety case, periodical audit of 57
-
Accepted safety case, amending 58
-
Director may require accepted safety case to be amended 59
-
Records about accepted safety case, plant operator’s duties as to 59