Gas Safety Regulations 2021
54Statement of compliance for gas-fitting work
Start here
Get a plain-English read of 54
Turn the raw legal text into a practical explanation grounded in Gas Safety Regulations 2021.
54 Statement of compliance for gas-fitting work
(1) A statement of compliance for gas-fitting work on a complex gas installation, standard gas installation of a prescribed class or a prescribed gas storage system –
(a) must be in a form approved by the Director; and
(b) must be signed by the gas-fitter who carried out the gas-fitting work.
(2) A gas-fitter undertaking the gas-fitting work on a complex gas installation, standard gas installation of a prescribed class or a prescribed gas storage system must –
(a) ensure that the work has been carried out in accordance with any relevant standards or any condition specified under section 54(8) of the Act; and
(b) submit to the Director, within 48 hours of the gas installation or gas storage system being commissioned, a statement of compliance for gas-fitting work in respect of that installation or system.
Penalty: In the case of –
(a) a body corporate, a fine not exceeding 50 penalty units; or
(b) a natural person, a fine not exceeding 20 penalty units.
(3) The gas-fitter must, within 48 hours after the gas installation or gas storage system is commissioned, provide a copy of the completed statement of compliance for gas-fitting work –
(a) to the person on whose behalf the work was carried out or the owner of the gas installation or gas storage system; and
(b) to the gas supplier who is to supply gas to the installation or gas storage system.
Penalty: In the case of –
(a) a body corporate, a fine not exceeding 50 penalty units; or
(b) a natural person, a fine not exceeding 20 penalty units.
(4) The gas-fitter must keep a copy of the completed statement of compliance for gas-fitting work for at least 10 years after the completion of the work.
Penalty: In the case of –