Gas Pipelines (Pipeline Corridor) Ulverstone Order 2014
4Planning corridor
Start here
Get a plain-English read of 4
Turn the raw legal text into a practical explanation grounded in Gas Pipelines (Pipeline Corridor) Ulverstone Order 2014.
4 Planning corridor
(1) In this clause –
pipeline means the pipeline that –
(a) is referred to in the pipeline licence granted under section 10 of the Act to Tas Gas Networks Pty Ltd on 28 May 2012, as amended; and
(b) extends from –
(i) the Ulverstone Offtake Facility and terminates at the point situated at 429,562.4E and 5,441,913.0N; and
(ii) the point situated at 429,562.4E and 5,441,913.0N and terminates at the Simplot Plant in Mason Street, Ulverstone; and
(c) is shown bounded by a heavy, black, broken line on Plan 9756 in the Central Plan Register, a reduced copy of which is set out, by way of illustration only, in Schedule 1 to this order.
(2) A planning corridor is declared in respect of the pipeline.
(3) The planning corridor declared in respect of the pipeline –
(a) extends along the length of the pipeline and is –
(i) for so much of the pipeline as is referred to in paragraph (b)(i) of the definition of pipeline in subclause (1) of this clause – 150 metres wide on each side of the pipeline; and
(ii) for so much of the pipeline as is referred to in paragraph (b)(ii) of the definition of pipeline in subclause (1) of this clause – 38 metres wide on each side of the pipeline; and
(b) extends –
(i) away from the end of the pipeline situated at the Ulverstone Offtake Facility in a semicircle with a radius of 150 metres from the centre-line at that end of the pipeline; and
(ii) away from the end of the pipeline situated at the Simplot Plant in Mason Street, Ulverstone in a semicircle with a radius of 38 metres from the centre-line at that end of the pipeline.