This order may be cited as the Gas (Pipeline Corridor) Quoiba Order 2014 .
© 2026 Zoe. All rights reserved.
Zoe is a legal information platform. Always consult the Federal Register of Legislation for authoritative text.
Tasmania regulation
Declares a mapped planning corridor for a specific Tas Gas Networks pipeline from the Devonport Offtake Facility to the Horsehead Creek District Regulator Station, measured 38 metres each side of the pipeline centre-line with semicircular ends (cl.4, Schedule 1). It affects land within that mapped strip by requiring that planning and development decisions take the corridor into account. The Department of State Growth administers the order; costs and approval requirements fall on landowners, developers and planning authorities who deal with land in the corridor (cl.4).
Want the full deep dive?
Zoe can write the in-depth analysis on top of the summary above: how it works, who it affects and what each part actually does.
Direct links to the current provisions in Gas (Pipeline Corridor) Quoiba Order 2014.
This order may be cited as the Gas (Pipeline Corridor) Quoiba Order 2014 .
This order takes effect on the day on which its making is notified in the Gazette.
In this order –
Act means the Gas Act 2000 .
(1) In this clause –
pipeline means the pipeline that –
(a) is referred to in the licence granted under section 24 of the Act to Tas Gas Networks Pty Ltd on 14 July 2003, as amended; and
(b) extends from the Devonport Offtake Facility to the Horsehead Creek District Regulator Station; and
(c) is shown bounded by a heavy, black, broken line on Plan 9755 in the Central Plan Register, a reduced copy of which is set out, by way of illustration only, in Schedule 1 to this order.
(2) A planning corridor is declared in respect of the pipeline.
(3) The planning corridor declared in respect of the pipeline –
(a) extends along the length of the pipeline and is 38 metres wide on each side of the pipeline; and
(b) extends away from each end of the pipeline in a semicircle with a radius of 38 metres from the centre-line at that end of the pipeline.
(4) For the purposes of subclause (3)(a) of this clause, the width of each side of the planning corridor in respect of the pipeline is measured –
(a) from the centre-line of the pipeline; and
(b) at a right angle from the centre-line of the pipeline.
Displayed and numbered in accordance with the Rules Publication Act 1953.
Notified in the Gazette on 22 October 2014
This order is administered in the Department of State Growth.
Sourced from Tasmanian Legislation Online (legislation.tas.gov.au), CC BY 4.0.
This order may be cited as the Gas (Pipeline Corridor) Quoiba Order 2014 .
This order takes effect on the day on which its making is notified in the Gazette.
In this order –
Act means the Gas Act 2000 .
(1) In this clause –
pipeline means the pipeline that –
(a) is referred to in the licence granted under section 24 of the Act to Tas Gas Networks Pty Ltd on 14 July 2003, as amended; and
(b) extends from the Devonport Offtake Facility to the Horsehead Creek District Regulator Station; and
(c) is shown bounded by a heavy, black, broken line on Plan 9755 in the Central Plan Register, a reduced copy of which is set out, by way of illustration only, in Schedule 1 to this order.
(2) A planning corridor is declared in respect of the pipeline.
(3) The planning corridor declared in respect of the pipeline –
(a) extends along the length of the pipeline and is 38 metres wide on each side of the pipeline; and
(b) extends away from each end of the pipeline in a semicircle with a radius of 38 metres from the centre-line at that end of the pipeline.
(4) For the purposes of subclause (3)(a) of this clause, the width of each side of the planning corridor in respect of the pipeline is measured –
(a) from the centre-line of the pipeline; and
(b) at a right angle from the centre-line of the pipeline.
Clause 4
Displayed and numbered in accordance with the Rules Publication Act 1953.
Notified in the Gazette on 22 October 2014
This order is administered in the Department of State Growth.