Short title
1 Short title
This order may be cited as the Gas (Pipeline Corridor) Launceston Order 2014 .
© 2026 Zoe. All rights reserved.
Zoe is a legal information platform. Always consult the Federal Register of Legislation for authoritative text.
Tasmania regulation
This order declares a fixed “planning corridor” along specified sections of the Tas Gas Networks pipeline (the licence pipeline) and records the corridor on Plan 9750 (cl.4; Schedule 1). The corridor is 38 metres wide each side of the pipeline centre-line with semicircular ends and is defined by precise coordinates. It affects land within that mapped strip and is administered by the Department of State Growth. The order sets a spatial rule (the corridor and its measurement method) but does not itself set fees, approvals or enforcement mechanisms.
Want the full deep dive?
Zoe can write the in-depth analysis on top of the summary above: how it works, who it affects and what each part actually does.
Direct links to the current provisions in Gas (Pipeline Corridor) Launceston Order 2014.
This order may be cited as the Gas (Pipeline Corridor) Launceston Order 2014 .
This order takes effect on the day on which its making is notified in the Gazette.
In this order –
Act means the Gas Act 2000 .
(1) In this clause –
pipeline means the pipeline referred to in the licence granted under section 24 of the Act to Tas Gas Networks Pty Ltd on 14 July 2003, as amended;
pipeline sections means the sections of the pipeline that –
(a) are part of the pipeline referred to in the licence granted under section 24 of the Act to Tas Gas Networks Pty Ltd on 14 July 2003, as amended; and
(b) extend from –
(i) the Westbury Road District Regulator Station, situated at 510,629.5E and 5,407,012.7N, and terminate at –
(a) the point situated at 510,564.8E and 5,407,214.9N; and
(b) the point situated at 512,298.2E and 5,409,604.2N; and
(c) the point situated at 513,045.4E and 5,410,193.6N; and
(d) the point situated at 511,941.6E and 5,411,571.2N; and
(e) the point situated at 511,320.5E and 5,413,219.0N; and
(f) the point situated at 511,693.3E and 5,413,275.8N; and
(ii) the point situated at 511,598.1E and 5,413,440.0N, and terminate at the point situated at 512,022.6E and 5,414,902.8N; and
(iii) the point situated at 512,927.8E and 5,410,729.3N and terminate at the point situated at 513,716.1E and 5,411,396.6N; and
(c) are each shown bounded by a heavy, black, broken line on Plan 9750 in the Central Plan Register, a reduced copy of which is set out, by way of illustration only, in Schedule 1 to this order.
(2) A planning corridor is declared in respect of the pipeline sections.
(3) The planning corridor declared in respect of the pipeline sections –
(a) extends along the length of the pipeline sections and is 38 metres wide on each side of the pipeline sections; and
(b) extends away from each end of the pipeline sections in a semicircle with a radius of 38 metres from the centre-line at that end of the pipeline section.
(4) For the purposes of subclause (3)(a) of this clause, the width of each side of the planning corridor in respect of the pipeline sections is measured –
(a) from the centre-line of the pipeline sections; and
(b) at a right angle from the centre-line of the pipeline sections.
Displayed and numbered in accordance with the Rules Publication Act 1953.
Notified in the Gazette on 22 October 2014
This order is administered in the Department of State Growth.
Sourced from Tasmanian Legislation Online (legislation.tas.gov.au), CC BY 4.0.
This order may be cited as the Gas (Pipeline Corridor) Launceston Order 2014 .
This order takes effect on the day on which its making is notified in the Gazette.
In this order –
Act means the Gas Act 2000 .
(1) In this clause –
pipeline means the pipeline referred to in the licence granted under section 24 of the Act to Tas Gas Networks Pty Ltd on 14 July 2003, as amended;
pipeline sections means the sections of the pipeline that –
(a) are part of the pipeline referred to in the licence granted under section 24 of the Act to Tas Gas Networks Pty Ltd on 14 July 2003, as amended; and
(b) extend from –
(i) the Westbury Road District Regulator Station, situated at 510,629.5E and 5,407,012.7N, and terminate at –
(a) the point situated at 510,564.8E and 5,407,214.9N; and
(b) the point situated at 512,298.2E and 5,409,604.2N; and
(c) the point situated at 513,045.4E and 5,410,193.6N; and
(d) the point situated at 511,941.6E and 5,411,571.2N; and
(e) the point situated at 511,320.5E and 5,413,219.0N; and
(f) the point situated at 511,693.3E and 5,413,275.8N; and
(ii) the point situated at 511,598.1E and 5,413,440.0N, and terminate at the point situated at 512,022.6E and 5,414,902.8N; and
(iii) the point situated at 512,927.8E and 5,410,729.3N and terminate at the point situated at 513,716.1E and 5,411,396.6N; and
(c) are each shown bounded by a heavy, black, broken line on Plan 9750 in the Central Plan Register, a reduced copy of which is set out, by way of illustration only, in Schedule 1 to this order.
(2) A planning corridor is declared in respect of the pipeline sections.
(3) The planning corridor declared in respect of the pipeline sections –
(a) extends along the length of the pipeline sections and is 38 metres wide on each side of the pipeline sections; and
(b) extends away from each end of the pipeline sections in a semicircle with a radius of 38 metres from the centre-line at that end of the pipeline section.
(4) For the purposes of subclause (3)(a) of this clause, the width of each side of the planning corridor in respect of the pipeline sections is measured –
(a) from the centre-line of the pipeline sections; and
(b) at a right angle from the centre-line of the pipeline sections.
Clause 4
Displayed and numbered in accordance with the Rules Publication Act 1953.
Notified in the Gazette on 22 October 2014
This order is administered in the Department of State Growth.