Short title
1 Short title
These regulations may be cited as the Gas Industry (Planning Permit Exemption) Regulations 2024 .
© 2026 Zoe. All rights reserved.
Zoe is a legal information platform. Always consult the Federal Register of Legislation for authoritative text.
Tasmania regulation
These regulations set out which gas works are exempt from requiring a local planning permit under section 60(2)(b) of the Gas Industry Act by naming prescribed kinds of work and measurable criteria. They mainly affect gas network operators, developers and local planning authorities. Key limits apply to pressure reduction facility works: they must occur in rural or industrial zones, mainly in daylight, meet specified noise limits, avoid substantial night-time lighting, and stay within height and footprint caps (reg 4); the 2014 exemption regulations are rescinded (reg 5, Sch 1).
Want the full deep dive?
Zoe can write the in-depth analysis on top of the summary above: how it works, who it affects and what each part actually does.
Direct links to the current provisions in Gas Industry (Planning Permit Exemption) Regulations 2024.
These regulations may be cited as the Gas Industry (Planning Permit Exemption) Regulations 2024 .
These regulations take effect on the day on which their making is notified in the Gazette.
In these regulations –
Act means the Gas Industry Act 2019 ;
pressure reduction facility means a facility that has the primary purpose of altering the pressure between a transmission pipeline and a distribution system.
(1) For the purposes of section 60(2)(b) of the Act, work is of a prescribed kind if the work is –
(a) gas connection work; or
(b) work undertaken on gas infrastructure; or
(c) work undertaken on a pressure reduction facility.
(2) For the purposes of section 60(2)(b) of the Act, the prescribed criteria for work prescribed under subregulation (1) are –
(a) in the case of work prescribed under subregulation (1)(a) , that the work is undertaken on a distribution system; and
(b) in the case of work prescribed under subregulation (1)(b) , that the work is not undertaken on a pressure reduction facility; and
(c) in the case of work prescribed under subregulation (1)(c) , that –
(i) the work is only undertaken within an area that is zoned, in a planning scheme under the Land Use Planning and Approvals Act 1993 , for rural or industrial purposes; and
(ii) the work is intended to be undertaken primarily during daylight hours; and
(iii) if the work is intended to take more than 4 weeks, and it is intended, at the time the work commences, that the work will not result in a time average A-weighted sound pressure level (as defined in Australian Standards AS 1055:2018 Acoustics – Description and measurement of environmental noise) that exceeds –
(A) if the work is to take not more than 26 weeks to be completed, 60dB(A) when evaluated over any 10-minute period beyond the boundary of the land parcel on which the pressure reduction facility is situated; and
(B) if the work is to take more than 26 weeks to be completed, 55dB(A) when evaluated over any 10-minute period beyond the boundary of the land parcel on which the pressure reduction facility is situated; and
(iv) at the time the work commences it is not intended that the site, where the work is being undertaken, will be required to be artificially illuminated for substantial periods between dusk and dawn, unless necessary during an emergency or emergency work; and
(v) at the time the work is completed, the pressure reduction facility is not intended to exceed –
(A) 7.5 metres in height at any point; and
(B) a ground area of more than 30 metres by 40 metres.
The legislation specified in Schedule 1 is rescinded.
| Gas Infrastructure (Planning Permit Exemption) Regulations 2014 (No. 61 of 2014) |
Displayed and numbered in accordance with the Rules Publication Act 1953.
Notified in the Gazette on 26 June 2024
These regulations are administered in the Department of State Growth.
Sourced from Tasmanian Legislation Online (legislation.tas.gov.au), CC BY 4.0.
These regulations may be cited as the Gas Industry (Planning Permit Exemption) Regulations 2024 .
These regulations take effect on the day on which their making is notified in the Gazette.
In these regulations –
Act means the Gas Industry Act 2019 ;
pressure reduction facility means a facility that has the primary purpose of altering the pressure between a transmission pipeline and a distribution system.
(1) For the purposes of section 60(2)(b) of the Act, work is of a prescribed kind if the work is –
(a) gas connection work; or
(b) work undertaken on gas infrastructure; or
(c) work undertaken on a pressure reduction facility.
(2) For the purposes of section 60(2)(b) of the Act, the prescribed criteria for work prescribed under subregulation (1) are –
(a) in the case of work prescribed under subregulation (1)(a) , that the work is undertaken on a distribution system; and
(b) in the case of work prescribed under subregulation (1)(b) , that the work is not undertaken on a pressure reduction facility; and
(c) in the case of work prescribed under subregulation (1)(c) , that –
(i) the work is only undertaken within an area that is zoned, in a planning scheme under the Land Use Planning and Approvals Act 1993 , for rural or industrial purposes; and
(ii) the work is intended to be undertaken primarily during daylight hours; and
(iii) if the work is intended to take more than 4 weeks, and it is intended, at the time the work commences, that the work will not result in a time average A-weighted sound pressure level (as defined in Australian Standards AS 1055:2018 Acoustics – Description and measurement of environmental noise) that exceeds –
(A) if the work is to take not more than 26 weeks to be completed, 60dB(A) when evaluated over any 10-minute period beyond the boundary of the land parcel on which the pressure reduction facility is situated; and
(B) if the work is to take more than 26 weeks to be completed, 55dB(A) when evaluated over any 10-minute period beyond the boundary of the land parcel on which the pressure reduction facility is situated; and
(iv) at the time the work commences it is not intended that the site, where the work is being undertaken, will be required to be artificially illuminated for substantial periods between dusk and dawn, unless necessary during an emergency or emergency work; and
(v) at the time the work is completed, the pressure reduction facility is not intended to exceed –
(A) 7.5 metres in height at any point; and
(B) a ground area of more than 30 metres by 40 metres.
The legislation specified in Schedule 1 is rescinded.
Regulation 5
| Gas Infrastructure (Planning Permit Exemption) Regulations 2014 (No. 61 of 2014) |
Displayed and numbered in accordance with the Rules Publication Act 1953.
Notified in the Gazette on 26 June 2024
These regulations are administered in the Department of State Growth.