Gas and Electricity (Consumer Safety) Regulation 2018
38HSecretary may require submission of revised plan
Start here
Get a plain-English read of 38H
Turn the raw legal text into a practical explanation grounded in Gas and Electricity (Consumer Safety) Regulation 2018.
38H Secretary may require submission of revised plan
38H Secretary may require submission of revised plan
(1) The Secretary may, by written notice to a retailer or metering provider, require the retailer or metering provider to submit a revised plan if—
(a) in relation to a retailer—the safety management and customer procedures guidelines are amended or replaced while the retailer’s plan is in force, or
(b) in relation to a metering provider—the safety management and technical procedures guidelines are amended or replaced while the metering provider’s plan is in force.
(2) A retailer or metering provider’s plan is terminated if the retailer or metering provider does not submit a revised plan within 10 business days after notice of the requirement to provide a revised plan is given or within a longer period specified by the Secretary in the notice.
(3) Clause 38E(3)–(6) applies to a revised plan submitted under subclause (1) as if it were a proposed plan.
(4) However, if the Secretary confirms receipt of the revised plan, the revised plan—
(a) replaces the plan of the retailer or metering provider that was in force immediately before the revised plan was submitted, and
(b) remains in force until the plan it replaced would have expired.
pt 9A (cll 38A–38I): Ins 2020 (574), Sch 1[1].