Future Made in Australia (Guarantee of Origin) Act 2024
73Measurement standard
Start here
Get a plain-English read of 73
Turn the raw legal text into a practical explanation grounded in Future Made in Australia (Guarantee of Origin) Act 2024.
73 Measurement standard
(1) The Minister may, by legislative instrument, prescribe requirements that apply to a facility.
(2) The requirements may relate to:
(a) metering, or otherwise measuring, electricity that is generated, stored, consumed, lost or dispatched by the facility or a component of the facility; or
(b) measuring an energy source for the facility or a component of the facility; or
(c) measuring an input (other than an energy source) into the facility or a component of the facility.
(3) An instrument under subsection (1) is to be known as a measurement standard.
(4) Despite subsection 14(2) of the Legislation Act 2003, a measurement standard may make provision in relation to a matter by applying, adopting or incorporating, with or without modification, any matter contained in an instrument or other writing as in force or existing from time to time.
Division 3—Renewable electricity facilities
Subdivision A—Applications to register facilities