Future Made in Australia (Guarantee of Origin) Act 2024
29Methodology determination
Start here
Get a plain-English read of 29
Turn the raw legal text into a practical explanation grounded in Future Made in Australia (Guarantee of Origin) Act 2024.
29 Methodology determination
(1) The Minister may, by legislative instrument, determine one or more production pathways for a product.
(2) A production pathway, for a product, is a set of production modules.
(3) A production module is a step in the production of a product and includes:
(a) the use of particular equipment; and
(b) a particular process.
(4) If the Minister determines a production pathway for a product, the determination:
(a) must provide that a specified unit is the functional unit of the product; and
(b) must provide that at least one specified production module is a minimum module for the production pathway; and
(c) may provide that a specified production module is:
(i) an optional module for the production pathway; or
(ii) a conditional module for the production pathway; and
(d) may specify:
(i) a formula or method for working out the amount of a product in a batch of the product that is produced in accordance with the production pathway; and
(ii) one or more sources of greenhouse gas emissions for the production pathway; and
(iii) for any source so specified—requirements for monitoring, measuring and reporting greenhouse gas emissions from the source; and
(e) may specify:
(i) a formula or method for working out the amount of a product that reaches a delivery gate for the product; and
(ii) one or more sources of greenhouse gas emissions for a delivery module for the product; and
(iii) for any source so specified—requirements for monitoring, measuring and reporting greenhouse gas emissions from the source.
(5) A delivery module, for a product, is:
(a) a method for storing the product; or
(b) a method for transporting the product; or
(c) a method for both storing and transporting the product.
(6) If the Minister determines a production pathway for a product, a source of greenhouse gas emissions that is specified in the determination for the production pathway is a production emissions source for the production pathway for the product.
(7) If the Minister specifies a source of greenhouse gas emissions relating to a delivery module for the product, a source of greenhouse gas emissions that is so specified in the determination is a post‑production emissions source for the delivery module.
(8) Despite subsection 14(2) of the Legislation Act 2003, a determination under this section may make provision in relation to a matter by applying, adopting or incorporating, with or without modification, any matter contained in an instrument or other writing as in force or existing from time to time.