Future Made in Australia (Guarantee of Origin) Act 2024
28Production gate and delivery gate
Start here
Get a plain-English read of 28
Turn the raw legal text into a practical explanation grounded in Future Made in Australia (Guarantee of Origin) Act 2024.
28 Production gate and delivery gate
(1) The production gate for a product at a facility is:
(a) if an instrument in force under subsection (3) determines a location in relation to the facility—that location; or
(b) otherwise—the point at which:
(i) a production module has been completed in relation to the product at the facility; and
(ii) the product is ready to be delivered.
(2) Each of the following is a delivery gate for a product:
(a) a location where the product is placed on a ship with the intention that it be taken out of Australia;
(b) a location where the product is exported from Australia (otherwise than by being placed on a ship);
(c) a location where the product enters a pipeline, or other infrastructure, that is part of a shared network and conveys the product;
(d) a location where the product is delivered to a consumer in Australia;
(e) a location determined in relation to the product in an instrument in force under subsection (4).
(3) The Regulator may determine a location in relation to a facility for the purposes of paragraph (1)(a).
(4) The Regulator may determine a location in relation to a product for the purposes of paragraph (2)(e).
(5) A determination under subsection (3) or (4) must be in writing but is not a legislative instrument.
(6) In making a determination under subsection (3) or (4), the Regulator:
(i) guidelines (if any) prescribed by the rules for determining a location to be a production gate or delivery gate; and