This Act sets out rights and obligations for the Promoter (Derwent Valley Paper Company) to take water, hold pipeline easements, lease foreshore strips, construct drains and discharge effluent, and to keep operational records available to the Forestry corporation. It requires approvals from land authorities for works, makes the Promoter liable for damage or compensation (s.17(12), s.19(2),(5)), and applies arbitration rules (s.26A). The Act affects the Promoter, landholders whose land hosts pipelines or works, and regulatory agencies responsible for approvals and inspections.
Mechanically, the Florentine Valley Paper Industry Act 1935 (the Act) does three things. First, it vests a package of industry-specific rights and obligations in a single corporate Promoter, defined as Derwent Valley Paper Company Proprietary Limited and its assigns (interpretation, s 3). Second, it creates statutory permissions for water infrastructure and related land access for that Promoter, including an entitlement to a water licence under the Water Management Act 1999 and easements to enter, remain on and maintain an existing pipeline and associated infrastructure on third‑party land (s 17). Third, it provides ancillary powers and controls for the Promoter to occupy foreshore strips (leases under the Crown Lands Act 1976, s 18) and to construct drains, pipelines and discharge effluent subject to executive approvals and geographic constraints (s 19), while imposing record‑keeping and reporting duties in favour of the Forestry corporation (s 13).
Operationally relevant provisions in the current text are sparse because many original timber‑rights provisions and schedules have been repealed by later amendment. The present operative core centres on: definitions and the Promoter identity (s 3); assignment mechanics (s 4); records and return obligations with modest fines (s 13); pipeline and water‑licence easement rights and limits (s 17); foreshore lease power (s 18); powers and approvals for drains and effluent outlets (s 19); the application of the Mineral Resources Development Act 1995 to certain works (s 20); the limited duration of the Act (80 years from the appointed day, s 25); summary court jurisdiction (s 26) and the application of the Commercial Arbitration Act 2011 to arbitrations under this Act (s 26A). The Governor retains regulation‑making power for fire protection and general purposes (s 27).
The Act does not itself set detailed procedural regimes for water licences, Crown lands leases, mining‑style approvals, or foreshore rent and conditions. Instead it operates by conferring or declaring entitlement while channeling procedure and detailed regulation to other statutes: the Water Management Act 1999 (s 17), the Crown Lands Act 1976 (s 18), and the Mineral Resources Development Act 1995 (s 20). The Promoter is the primary payer and duty‑bearer under the Act for records, approvals, construction work and compensation for damage caused by exercise of easement powers (s 13; s 17(12)).
Current sections
Direct links to the current provisions in Florentine Valley Paper Industry Act 1935.
The Florentine Valley Wood-pulp and Paper Industry Act 1932 is hereby repealed.
3
Interpretation
3 Interpretation
[Section 3 amended by No. 71 of 1950, s. 9 ]**[Section 3 Amended by No. 36 of 1958, s. 5 ]
(1) *[Section 3 Subsection (1) amended by No. 18 of 1966, s. 2 ][Section 3 Subsection (1) amended by No. 75 of 1973, s. 2 and Sched. 2 ][Section 3 Subsection (1) amended by No. 49 of 1985, s. 3 and Sched. 1 ][Section 3 Subsection (1) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 3 Subsection (1) amended by No. 68 of 1994, s. 3 and Sched. 1 ]*In this Act, unless the contrary intention appears –
Forest Practices Code means the Code issued pursuant to section 30 of theForest Practices Act 1985 and in force under that Act and includes any amendments to that Code;
forest products means growing or dead trees, shrubs, or other vegetable growth and the products thereof;
industry means the manufacture by the Promoter in this State of paper pulp and pulp products, and the investigation in connection with such manufacture and the supply and preparation of materials therefor, and the carrying on of processes and businesses incidental to such manufacture, and the carrying on in this State by the Promoter of any manufacture cognate or incidental or subsidiary to such manufacture, including the milling and marketing of timber;
logging road means any road prepared or constructed by the Promoter for the haulage or transport of forest products and maintainable by him in accordance with section 21B ;
road means any road, street, or high road, or any reservation therefor;
the Promoter means Derwent Valley Paper Company Proprietary Limited and its assigns;
the said lands means the lands specified in Schedule 1 , other than such of those lands as have, under this Act, been declared to have ceased to be subject to the provisions of this Act;
timber includes trees of any description, whether alive or dead and whether standing or fallen;
working plan means a detailed statement in writing, setting out in respect of a specified area, called the working plan area –
(a) the facts on which the proposals therein contained are based;
(b) the intended operations to be carried out;
(c) the manner in which the same are to be carried out;
(d) the requirements to be observed in relation to all fellings and all operations for the regeneration, improvement, and protection of the forest or the establishment, maintenance, and protection of plantations; and
(e) the requirements for the proper record and control of the work –
in the working of that area during the period specified in such plan.
(2) *[Section 3 Subsection (2) added by No. 18 of 1966, s. 2 ]*References in this Act to a working plan that has been revised shall be construed as references to that plan as so revised.
4
Effect of assignment by Promoter
4 Effect of assignment by Promoter
Upon any assignment by the Promoter of his rights and concessions under this Act, the person in whom such rights and concessions shall be vested by virtue of such assignment shall be subject to all the obligations and conditions imposed upon the Promoter by this Act, to the exclusion of the person making such assignment.
[Section 6B Inserted by No. 18 of 1966, s. 5 ][Section 6B Subsection (3) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 6B Subsection (4) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 6B Subsection (6) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 6B Subsection (7) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 6B Subsection (9) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 6B Subsection (10) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 6B Subsection (12) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 6B Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
[Section 7 amended by No. 17 of 1945, s. 2 ][Section 7 amended by No. 71 of 1950, s. 10 ][Section 7 Repealed by No. 18 of 1966, s. 6 ]
8.
8.
[Section 8 Subsection (2) omitted by No. 18 of 1966, s. 7 ][Section 8 Subsection (3) amended by No. 18 of 1966, s. 7 ][Section 8 Subsection (3A) inserted by No. 18 of 1966, s. 7 ][Section 8 Subsection (3B) inserted by No. 18 of 1966, s. 7 ][Section 8 Subsection (3B) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 8 Subsection (3C) inserted by No. 18 of 1966, s. 7 ][Section 8 Subsection (3B) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 8 Subsection (3D) inserted by No. 18 of 1966, s. 7 ][Section 8 Subsection (4) amended by No. 18 of 1966, s. 7 ][Section 8 Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
9.
9.
[Section 9 Amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 9 Subsection (4) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 9 Subsection (1) amended by No. 18 of 1966, s. 8 ][Section 9 Subsection (2) substituted by No. 18 of 1966, s. 8 ][Section 9 Subsection (3) substituted by No. 18 of 1966, s. 8 ][Section 9 Subsection (3A) inserted by No. 18 of 1966, s. 8 ][Section 9 Subsection (3B) inserted by No. 18 of 1966, s. 8 ][Section 9 Subsection (3C) inserted by No. 18 of 1966, s. 8 ][Section 9 Subsection (3D) inserted by No. 18 of 1966, s. 8 ][Section 9 Subsection (3E) inserted by No. 49 of 1985, s. 3 and Sched. 1 ][Section 9 Subsection (4) amended by No. 18 of 1966, s. 8 ][Section 9 Subsection (5) substituted by No. 18 of 1966, s. 8 ][Section 9 Subsection (6) added by No. 18 of 1966, s. 8 ][Section 9 Subsection (7) added by No. 49 of 1985, s. 3 and Sched. 1 ][Section 9 Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
10.
10.
[Section 10 Amended by No. 75 of 1973, s. 2 and Sched. 1 ][Section 10 Subsection (1) amended by No. 18 of 1966, s. 9 ][Section 10 Subsection (1) amended by No. 25 of 1994, s. 45 and Sched. 1 ][Section 10 Subsection (2) substituted by No. 18 of 1966, s. 9 ][Section 10 Subsection (2A) inserted by No. 18 of 1966, s. 9 ][Section 10 Subsection (4) omitted by No. 18 of 1966, s. 9 ][Section 10 Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
11.
11.
[Section 11 Amended by No. 55 of 1965, s. 3 and Sched. 1 ][Section 11 Amended by No. 75 of 1973, s. 2 and Sched. 1 ][Section 11 Subsection (1) substituted by No. 18 of 1966, s. 10 ][Section 11 Subsection (2) omitted by No. 18 of 1966, s. 10 ][Section 11 Subsection (3) omitted by No. 18 of 1966, s. 10 ][Section 11 Subsection (4) amended by No. 18 of 1966, s. 10 ][Section 11 Subsection (4) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 11 Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
Records to be kept by, and returns to be made by, Promoter
13 Records to be kept by, and returns to be made by, Promoter
[Section 13 Subsection (1) amended by No. 67 of 1994, s. 3 and Sched. 1 ]**[Section 13 Subsection (2) amended by No. 67 of 1994, s. 3 and Sched. 1 ]
(1) *[Section 13 Subsection (1) amended by No. 18 of 1966, s. 12 ][Section 13 Subsection (1) amended by No. 55 of 1965, s. 5 ][Section 13 Subsection (1) amended by No. 25 of 1994, s. 45 and Sched. 1 ]*Books, maps, and plans recording the operations of the Promoter in connection with the industry shall be kept by the Promoter, and shall be available for inspection at all reasonable times by the Forestry corporation, or any officer of the Forestry corporation appointed by it for that purpose, and shall show in respect of each year particulars of –
(a) the operations in the forest, including fellings, sylvicultural operations, fire protection, and other works required by the relevant working plan;
(b) the quantity of wood and other forest products used in the manufacture of paper pulp or pulp products;
(c) the quantity of timber used for other milling purposes;
(d) the quantity of timber sold in the log;
(e) the quantity of pulp products produced;
(f) the quantity of paper pulp produced and sold as such;
(g) the quantity of timber obtained from private lands for conversion into paper pulp or pulp products;
(h) the respective amounts expended on fire protection, forest development and improvement, and reafforestation;
(i) such other particulars of a similar nature as may be prescribed.
Penalty: Fine not exceeding 2 penalty units.
(2) *[Section 13 Subsection (2) amended by No. 18 of 1966, s. 12 ][Section 13 Subsection (2) amended by No. 55 of 1965, s. 5 ][Section 13 Subsection (2) amended by No. 25 of 1994, s. 45 and Sched. 3 ]*The Promoter shall also furnish the Forestry corporation with returns in respect of all or any of the matters or things mentioned or referred to in subsection (1) , in such form and at such times as shall be prescribed.
Penalty: Fine not exceeding 2 penalty units.
14.
14.
[Section 14 Substituted by No. 18 of 1966, s. 13 ][Section 14 Repealed by No. 61 of 1996, s. 6 ]
15.
15.
[Section 15 Subsection (1) amended by No. 75 of 1973, s. 2 and Sched. 1 ][Section 15 Subsection (1) amended by No. 18 of 1966, s. 14 ][Section 15 Subsection (1) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 15 Subsection (2) amended by No. 71 of 1950, s. 11 ][Section 15 Subsection (2) amended by No. 18 of 1966, s. 14 ][Section 15 Subsection (2) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 15 Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
(a) the pipeline that, on 30 June 2001, existed on, above or under land in respect of which the Promoter held a water licence renewed (with the renewal No. 12W/58) on 21 August 1980 under the Mining Act 1929 , being the pipeline as repaired, modified and upgraded from time to time; and
(b) any pipeline that has replaced the pipeline referred to in paragraph (a) , or subsequent replacement pipeline, as repaired, modified and upgraded from time to time;
pipeline means –
(a) pipeline to carry water to the Promoter for the purposes of carrying on the industry; and
(b) pumping plant, buildings, trestles, bridges and other structures relating to that pipeline;
pipeline corridor means a strip of land 10 metres wide defined by measuring 5 metres in a horizontal plane to each side of the centreline of the existing pipeline at right angles to the centreline;
subject land means land that the Promoter does not own but needs, or is likely to need, to be able to enter and remain on for one or more of the following purposes:
(a) to examine, operate, maintain, repair, modify, upgrade, remove or replace any or all of the existing pipeline;
(b) to fence or place protective structures around any or all of the existing pipeline or to examine, operate, maintain, repair, modify, upgrade, remove or replace any such fences or protective structures;
(c) to clear the pipeline corridor of vegetation, structures and objects that could interfere with the proper operation of the existing pipeline.
(2) The Promoter is entitled to a licence under the Water Management Act 1999 for the purposes of carrying on the industry.
(3) An easement over subject land is vested in the Promoter.
(4) The easement under subsection (3) is a water pipeline easement and entitles the Promoter to –
(a) maintain the existing pipeline on, above or under the subject land; and
(b) enter and remain on the subject land, at any reasonable time and with any necessary vehicles and equipment, for any one or more of the following purposes:
(i) examining, operating, maintaining, repairing, modifying, upgrading, removing or replacing any or all of the existing pipeline;
(ii) fencing or placing protective structures around any or all of the existing pipeline or examining, operating, maintaining, repairing, modifying, upgrading, removing or replacing any such fences or protective structures;
(iii) clearing the pipeline corridor of vegetation, structures and objects that could interfere with the proper operation of the existing pipeline.
(5) Where it is necessary for the purpose of gaining access to subject land for the Promoter to enter and pass over adjoining or other land, an easement over that adjoining or other land is vested in the Promoter.
(6) The easement under subsection (5) is a right of carriageway and entitles the Promoter to enter and pass over the adjoining or other land, with vehicles and equipment, for the purpose of gaining access to subject land.
(7) The powers conferred by an easement under this section may be exercised by agents, contractors and employees authorised by the Promoter to act on the Promoter's behalf.
(8) The powers conferred by an easement under this section must be exercised, so far as is reasonably practicable, in a manner that minimises interference with the enjoyment of the land subject to the easement by persons lawfully occupying it.
(9) The exercise of the powers conferred by an easement under this section may be limited by the licence held by the Promoter under the Water Management Act 1999 for the purposes of carrying on the industry.
(10) Without limiting the limitations that may be imposed under subsection (9) by a licence on the exercise of the powers conferred by an easement under this section, those limitations may include a requirement that the Promoter can only undertake work for the purpose of maintaining, repairing, modifying, upgrading, removing or replacing any part of the existing pipeline that is on, above or under a road, railway line or bridge, or other area to which the public have access, if the approval of the person specified in the licence has first been obtained.
(11) Before a person enters land to exercise powers conferred by an easement under this section, the Promoter must, if practicable, give reasonable notice of the proposed exercise of powers to the persons lawfully occupying the land.
(12) The Promoter is liable to –
(a) make good any damage caused by the exercise of powers under an easement under this section as soon as practicable; or
(2) Every such lease shall be renewed on the application of the Promoter so long as he carries on the industry and such lease is required for the purposes thereof.
19
Power to construct drains and other works
19 Power to construct drains and other works
(1) The Promoter may construct pipe-lines, tunnels, or drains between any of his works, or from his works into the sea, or into the tidal waters of the River Derwent, or from that river or any of its tributaries to any of the said works upon, over, or under –
(a) the lands comprised in any such lease as aforesaid;
(4) The outlet of every such drain, tunnel, or pipe-line for the discharge of effluent or waste water shall be below low-water mark, and the Promoter shall discharge all effluent or waste water through the same into the sea or into the tidal waters of the River Derwent.
(5) The outlet for all effluent which is of such a nature as to be likely to create a nuisance shall be at a point to be approved by the Minister, and such outlet shall be placed at such a distance from the shore as the Minister may require, but the Promoter shall not be required to carry the same further south than the mouth of the River Jordan.
20
Application of Mineral Resources Development Act 1995
20 Application of Mineral Resources Development Act 1995
(1) Parts 4 and 8 of theMineral Resources Development Act 1995 apply to the exercise by the Promoter of the powers conferred by section 19(1) in relation to private land as if the Promoter were engaged in mining operations and as if the powers exercisable under that subsection were exercisable under Part 4 of that Act.
(2) Part 4 of theMineral Resources Development Act 1995 applies to the said lands, any private land and any other land used or occupied by the Promoter in connection with the industry as if that land were used or occupied for mining purposes.
[Section 21A Inserted by No. 71 of 1950, s. 12 ][Section 21A Subsection (1) amended by No. 18 of 1966, s. 16 ][Section 21A Subsection (2) amended by No. 24 of 1993, s. 3 and Sched. 1 ][Section 21A Subsection (4) inserted by No. 24 of 1993, s. 3 and Sched. 1 ][Section 21A Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
21B.
21B.
[Section 21B Inserted by No. 71 of 1950, s. 12 ][Section 21B Amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 21B Subsection (1) amended by No. 18 of 1966, s. 17 ][Section 21B Subsection (1) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 21B Subsection (2) amended by No. 18 of 1966, s. 17 ][Section 21B Subsection (2) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 21B Subsection (3) amended by No. 18 of 1966, s. 17 ][Section 21B Subsection (3) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 21B Subsection (4) amended by No. 49 of 1985, s. 3 and Sched. 1 ][Section 21B Subsection (5) amended by No. 18 of 1966, s. 17 ][Section 21B Subsection (5) amended by No. 49 of 1985, s. 3 and Sched. 1 ][Section 21B Subsection (5) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 21B Subsection (6) inserted by No. 18 of 1966, s. 17 ][Section 21B Subsection (6) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 21B Subsection (7) added by No. 18 of 1966, s. 17 ][Section 21B Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
22.
22.
[Section 22 Subsection (2) amended by No. 18 of 1966, s. 18 ][Section 22 Subsection (2) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 22 Subsection (4) amended by No. 18 of 1966, s. 18 ][Section 22 Subsection (5) amended by No. 18 of 1966, s. 18 ][Section 22 Subsection (6) amended by No. 55 of 1965, s. 3 and Sched. 1 ][Section 22 Subsection (7) amended by No. 18 of 1966, s. 18 ][Section 22 Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
22A.
22A.
[Section 22A Amended by No. 71 of 1950, s. 13 ][Section 22A Subsection (3) amended by No. 18 of 1966, s. 19 ][Section 22A Subsection (3) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 22A Subsection (4) amended by No. 61 of 1996, s. 6 ][Section 22A Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
22B.
22B.
[Section 22B Inserted by No. 71 of 1950, s. 13 ][Section 22B Subsection (9) amended by No. 67 of 1994, s. 3 and Sched. 1 ][Section 22B Subsection (4) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 22B Subsection (5) amended by No. 18 of 1966, s. 20 ][Section 22B Subsection (5) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 22B Subsection (9) amended by No. 55 of 1965, s. 5 ][Section 22B Subsection (10) amended by No. 68 of 1994, s. 3 and Sched. 1 ][Section 22B Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
[Schedule 8 Clause 3 amended by No. 71 of 1950, s. 14 ][Schedule 8 Clause 3 amended by No. 25 of 1994, s. 45 and Sched. 3 ][Schedule 8 Clause 5 amended by No. 99 of 1982, s. 3 and Sched. 2 ][Schedule 8 Clause 5 amended by No. 25 of 1994, s. 45 and Sched. 3 ][Schedule 8 Clause 6 amended by No. 99 of 1982, s. 3 and Sched. 2 ][Schedule 8 Clause 6 amended by No. 25 of 1994, s. 45 and Sched. 3 ][Schedule 8 Clause 8 amended by No. 75 of 1973, s. 2 and Sched. 1 ][Schedule 8 Clause 8 amended by No. 25 of 1994, s. 45 and Sched. 3 ][Schedule 8 Clause 9 amended by No. 25 of 1994, s. 45 and Sched. 3 ][Schedule 8 Clause 10 amended by No. 25 of 1994, s. 45 and Sched. 3 ][Schedule 8 Clause 12 amended by No. 25 of 1994, s. 45 and Sched. 3 ][Schedule 8 Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
Source text: opening excerpt
Sourced from Tasmanian Legislation Online (legislation.tas.gov.au), CC BY 4.0.
Part I Preliminary
Part I Preliminary
1 Short title
1 Short title
This Act may be cited as the Florentine Valley Paper Industry Act 1935 .
2 Repeal
2 Repeal
The Florentine Valley Wood-pulp and Paper Industry Act 1932 is hereby repealed.
3 Interpretation
3 Interpretation
[Section 3 amended by No. 71 of 1950, s. 9 ]**[Section 3 Amended by No. 36 of 1958, s. 5 ]
(1) *[Section 3 Subsection (1) amended by No. 18 of 1966, s. 2 ][Section 3 Subsection (1) amended by No. 75 of 1973, s. 2 and Sched. 2 ][Section 3 Subsection (1) amended by No. 49 of 1985, s. 3 and Sched. 1 ][Section 3 Subsection (1) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 3 Subsection (1) amended by No. 68 of 1994, s. 3 and Sched. 1 ]*In this Act, unless the contrary intention appears –
appointed day means the date of the commencement of the Florentine Valley Paper Industry Act 1966 ;
[Section 3 Subsection (1) amended by No. 9 of 2011, Sched. 1, Applied:01 Oct 2012]arbitration means arbitration in accordance with the provisions of the Commercial Arbitration Act 2011 ;
court means the Supreme Court;
Forest Practices Code means the Code issued pursuant to section 30 of theForest Practices Act 1985 and in force under that Act and includes any amendments to that Code;
forest products means growing or dead trees, shrubs, or other vegetable growth and the products thereof;
[Section 3 Subsection (1) amended by No. 50 of 2013, Sched. 1, Applied:11 Dec 2013]Forestry corporation means the Forestry corporation continued by ;
The Act was enacted to replace an earlier Act (s 2 repeals the 1932 Act) and contains numerous historical amendments and repeals. The statutory text, as annotated, shows many parts repealed or substantially altered over time; the currently operative rights are ones expressly retained or substituted by later amending instruments (see amendment annotations throughout the Act).
Main concepts
The Act organises a small number of legal concepts around a single industrial promoter. The core definitional architecture is in s 3. Key defined terms and concepts are:
The Promoter: the statutory beneficiary of rights and obligations, defined as Derwent Valley Paper Company Proprietary Limited and its assigns (s 3). This definition makes the Act entity‑specific rather than generally available to any paper manufacturer.
Industry: a wide functional definition. "Industry" means manufacture by the Promoter in the State of paper pulp and pulp products and related investigation, supply and preparation of materials, and cognate or incidental manufacturing activities including milling and marketing of timber (s 3). The definition therefore links statutory powers to a business activity rather than to a parcel of land per se.
The said lands: the lands specified in Schedule 1 (s 3). The Act uses this phrase in other provisions to identify the spatial scope of some powers, though Schedule 1 was later the subject of amendment and repeal annotations (see Amendment history).
Working plan: a technical forestry document that sets out facts, intended operations, silvicultural requirements, regeneration and record‑keeping for a specified working plan area (s 3). The Act ties obligations to working plans where forest operations are carried out.
Easements and pipelines: s 17 defines "existing pipeline", "pipeline", "pipeline corridor" (a 10‑metre strip), and "subject land" (land the Promoter does not own but needs access to). It then vests a water pipeline easement in the Promoter and authorises rights to enter and remain on subject land and to obtain carriageway rights over adjoining land where necessary (s 17(2)-(6)).
Interplay with other statutes: the Act expressly incorporates other statutory frameworks rather than reproducing their operational content. Examples: the Water Management Act 1999 governs the licence to which easement powers are tied (s 17); the Crown Lands Act 1976 governs foreshore leases issued by the Director‑General of Lands (s 18); and the Mineral Resources Development Act 1995 is applied to certain construction powers so that Part 4 and Part 8 of that Act apply where s 19 works are on private land (s 20).
Enforcement and dispute resolution: the Act gives the Supreme Court summary jurisdiction to exercise any court jurisdiction conferred by the Act (s 26), and it makes arbitrations under the Act subject to the Commercial Arbitration Act 2011 as if there were a written arbitration agreement (s 26A).
Temporal limit: the Act contains an express expiry mechanism: it expires 80 years from the appointed day subject to orders under s 25(2) (s 25(1)). That creates a fixed time horizon for statutory rights conferred by the Act.
Conceptually the Act is a sector‑specific statute that privileges a named corporate actor with statutory forms of access and infrastructure rights while delegating regulatory detail to broader statutory regimes. It therefore functions as a legal wrapper: rights are declaratory or enabling, though materially exercised under other licensing, Crown lands or mining laws. The Promoter obtains both affirmative rights (licence entitlement, easement, capacity to construct) and affirmative duties (records, returns, approvals and compensation obligations).
Who it affects
Primary actors
The Promoter. The Act names Derwent Valley Paper Company Proprietary Limited and its assigns as the Promoter and ties most operative powers and duties to that identity (s 3; s 4). The Promoter bears record‑keeping duties (s 13), the obligation to obtain approvals prior to construction works (s 19(2)), the obligation to discharge effluent at defined points (s 19(4)-(5)), and liability to repair or compensate for damage resulting from exercise of easement powers (s 17(12)).
Assigns of the Promoter. On assignment, the assignee "shall be subject to all the obligations and conditions imposed upon the Promoter by this Act, to the exclusion of the person making such assignment" (s 4). That clause shifts ongoing compliance and liability to the assignee, removing the assignor’s statutory obligations post‑assignment.
Public authorities and regulators
The Forestry corporation. The Act gives the Forestry corporation statutory inspection rights over the Promoter’s books, maps and plans and an entitlement to prescribed returns (s 13(1)-(2)). The Forestry corporation is therefore positioned as the oversight agency for forest operations, silviculture and related record‑keeping.
The Director‑General of Lands. The Director‑General must approve plans and specifications for drains, tunnels and pipelines (s 19(2)); the same official issues foreshore leases under the Crown Lands Act, as modified by the Act (s 18(1)).
The Minister. The Minister must approve the outlet location for effluent that is likely to create a nuisance, and may require a specified distance from shore subject to a defined southern limit (s 19(5)).
Water licensing authority. The Promoter is "entitled to a licence under the Water Management Act 1999" for purposes of carrying on the industry (s 17(2)), and that licence may limit the exercise of easement powers (s 17(9)). So the operational scope of the Promoter’s pipeline easement is constrained by the water licence system.
Private landholders and occupiers
Persons lawfully occupying subject land. The easement vests in the Promoter over subject land (s 17(3)-(4)) and includes the right to enter and remain on that land. The Act places an obligation on the Promoter to exercise easement powers so far as reasonably practicable in a manner that minimises interference with the enjoyment of the land by those lawfully occupying it (s 17(8)), and to provide reasonable notice where practicable before entry (s 17(11)). The Promoter is also liable to repair damage or pay reasonable compensation for damage caused by exercise of the easement (s 17(12)).
Contractors and agents
Agents, contractors and employees authorised by the Promoter may exercise easement powers on the Promoter’s behalf (s 17(7)). That creates delegation risk for compliance and indemnity and implicates procurement and contractor oversight.
Other affected interests
Road and rail authorities, local government and the public. Section 17(10) contemplates limits on exercise of powers where an existing pipeline is on a road, railway line, bridge or other area to which the public have access, and imposes a requirement for specified approvals under the water licence in such circumstances.
Parties affected by effluent discharge into tidal waters or the sea. The Promoter must locate outlets below low‑water mark and, for nuisance effluent, obtain Ministerial approval on outlet location and distance from shore (s 19(4)-(5)). That creates an environmental interface with coastal and river users.
Who pays and who decides
Costs largely fall on the Promoter: record keeping, compliance with approvals, construction, remediation of damage, compensation and the application and compliance costs of external licences and leases. The Director‑General of Lands, the Minister and the relevant water licensing authority have decision‑making power over approvals and licences, while the Forestry corporation exercises inspection and reporting oversight. Courts (Supreme Court) and arbitrators will resolve disputes (s 26; s 26A).
Substitution effects and capture risks to note
The Act concentrates statutory advantage in a single corporate promoter and routes much of the procedural and enforcement detail to other bodies and statutes. That structure creates administrative dependence on other statutory regimes (Crown Lands, Water Management, Mineral Resources) and concentrates compliance costs on the Promoter, with compensatory exposures vis‑à‑vis private occupiers and public agencies.
Key duties and rights
This section summarises the operative obligations and entitlements the Act creates for the Promoter and other parties, citing the controlling provisions.
Principal rights conferred on the Promoter
Entitlement to a water licence: the Promoter is entitled to a licence under the Water Management Act 1999 for purposes of carrying on the industry (s 17(2)). That is an express statutory right to seek the licence.
Easement over subject land: the Promoter automatically has a water pipeline easement vested in it for the existing pipeline, entitling it to maintain the pipeline and to enter and remain on subject land (s 17(3)-(4)). The easement includes rights to bring vehicles and equipment onto the land and to undertake maintenance, repair, replacement, fencing and clearing within the pipeline corridor.
Right of carriageway: where necessary for access to subject land, an easement over adjoining or other land for the purpose of gaining access (a right of carriageway) is vested in the Promoter (s 17(5)-(6)).
Foreshore leases: on application, the Director‑General of Lands may issue foreshore leases to the Promoter under and subject to the Crown Lands Act 1976 as modified by this Act (s 18(1)). Such leases must be renewed on application so long as the Promoter carries on the industry and the lease is required for its purposes (s 18(2)).
Construction powers: the Promoter may construct pipelines, tunnels or drains between works or to tidal waters, across Crown land, private land, roads, tramways or railways (s 19(1)).
Application of mining regimes: s 20 applies Parts 4 and 8 of the Mineral Resources Development Act 1995 to the Promoter’s exercise of s 19(1) powers in relation to private land, as if the Promoter were engaged in mining operations (s 20(1)-(2)). That imports mining‑style procedural requirements for certain works on private land.
Principal duties and constraints on the Promoter
Records and returns: the Promoter must keep books, maps and plans recording operations and provide returns to the Forestry corporation in prescribed form and times. The records must show forest operations, quantities of wood used and produced, timber from private lands, pulp production, and expenditures on fire protection and reafforestation among other items (s 13(1)-(2)). Failure carries a penalty of a fine not exceeding two penalty units (s 13).
Approval for construction works: before building pipelines, tunnels or drains under s 19(1), the Promoter must submit plans and specifications to the Director‑General of Lands and obtain approval (s 19(2)). Works must be completed within 12 months of approval unless extended by the Director‑General (s 19(3)).
Effluent discharge location: outlets for effluent or waste water must be below low‑water mark and discharge into the sea or tidal waters of the River Derwent (s 19(4)). For effluent likely to cause a nuisance, the outlet point and distance from shore require Ministerial approval; the Minister may not require the Promoter to place the outlet further south than the mouth of the River Jordan (s 19(5)).
Exercise of easements consistent with licence: easement powers may be limited by the water licence held by the Promoter under the Water Management Act 1999 (s 17(9)). The licence may require approvals before undertaking work in areas of public access (s 17(10)). The Promoter must give reasonable notice to occupiers where practicable before entering land (s 17(11)).
Minimising interference and remediation/compensation: the Promoter must, so far as reasonably practicable, exercise easement powers in a way that minimises interference with lawful occupiers, and is liable to make good any damage caused by exercise of those powers or to pay reasonable compensation (s 17(8), (12)).
Assignment mechanics
When the Promoter assigns rights and concessions under the Act, the assignee becomes subject to all obligations and conditions imposed by the Act, excluding the assignor (s 4). That clause transfers statutory obligations with the rights to the assignee.
Dispute resolution
Summary court jurisdiction: the Supreme Court’s jurisdiction under the Act may be exercised in a summary way (s 26).
Arbitration: the Commercial Arbitration Act 2011 applies to every arbitration pursuant to this Act as if there were a written arbitration agreement (s 26A). That makes arbitrations under the Act proceed under modern commercial arbitration procedures.
Delegation and agents
The Promoter’s agents, contractors and employees may exercise easement powers on the Promoter’s behalf (s 17(7)). The Promoter remains liable for damage and must use reasonable steps to minimise interference when agents exercise powers.
Overall the rights-duties balance is one of a strong, entity‑specific entitlement to infrastructure and land access, combined with statutory obligations for records, approvals and compensation and with substantive procedure located in other regulatory schemes.
Penalties and enforcement
The Act contains a limited number of expressly stated penalties and otherwise relies on external statutory regimes and executive decision‑makers to shape practical enforcement.
Express penalty provisions
Records and returns: the Act prescribes a financial penalty for failure to keep required books, maps and plans or to furnish returns to the Forestry corporation. The specified sanction is a fine not exceeding two penalty units for each contravention (s 13(1)-(2)). The Act does not amplify that penalty into a graduated enforcement scheme; it leaves operational enforcement to the Forestry corporation’s inspection rights.
Compensatory and remediation obligations
Damage arising from exercise of easement powers: the Promoter is liable to either make good any damage caused by the exercise of powers under easements or to pay reasonable compensation for the damage as soon as practicable (s 17(12)). That provision establishes a private law liability and an implied remedial route for affected landowners or occupiers.
Administrative and licensing enforcement
Licensing limits on easement exercise: the Promoter’s exercise of easement powers may be constrained by the conditions of the water licence under the Water Management Act 1999 (s 17(9)-(10)). That means enforcement of operational limits will often be handled through licence conditions and administrative sanctions available under the Water Management Act rather than by criminal sanction under this Act.
Approval and compliance with Director‑General of Lands and Minister: the Promoter must obtain approvals for certain works (s 19(2)) and Ministerial approval for nuisance effluent outlets (s 19(5)). Failure to obtain such approvals could expose the Promoter to administrative enforcement measures under the Crown Lands Act, Water Management Act, or the Mineral Resources Development Act (s 20), depending on which procedural regime applies.
Judicial and dispute resolution remedies
Summary jurisdiction of the Supreme Court: the Act expressly allows the court to exercise its jurisdiction in a summary way for matters arising under the Act (s 26). That permits expedited judicial remedies and injunctions to be sought in the Supreme Court where statutory rights or duties under the Act are implicated.
Arbitration: where parties submit disputes to arbitration under the Act, the Commissioned Arbitration Act 2011 applies (s 26A). Arbitration awards will be enforceable under general arbitration enforcement regimes.
Regulatory instruments and executive discretion
Regulations: the Governor may make regulations "for fire protection of the said lands and generally for the purposes of this Act" (s 27). Those regulations can add compliance obligations and enforcement instruments on matters within their scope.
Interaction with other statutes: the Act’s enforcement ecosystem is distributed across the Water Management Act 1999, Crown Lands Act 1976 and the Mineral Resources Development Act 1995 (s 17; s 18; s 20). These statutes contain their own compliance sanctions, licensing conditions, offences and administrative remedies, which can be relied on to sanction or restrain the Promoter’s activities.
Observations on enforcement architecture
The Act itself contains modest direct penalties (notably s 13) and relies substantively on administrative licensing, lease conditions and regulatory regimes under other Acts for operational enforcement. Where damage occurs, the Act imposes a compensatory obligation on the Promoter, creating a private‑law enforcement route for affected occupiers. Courts and arbitrators are the institutions for resolving disputes, while regulators and ministers exercise discretionary approvals that shape the Promoter’s permissible conduct.
How it interacts with other laws
The Act is structured to confer specific rights and then to import or defer to other established statutory regimes for the procedural, technical and enforcement detail. The principal cross‑statutory interactions in the text are as follows.
Water Management Act 1999 (s 17)
The Promoter’s pipeline easement and the entitlement to a water licence are expressly placed within the framework of the Water Management Act 1999. Section 17(2) grants an entitlement to a licence for purposes of carrying on the industry, and s 17(9)-(10) explicitly provides that the exercise of the easement powers may be limited by licence conditions. Therefore, the water licence regime will typically prescribe water extraction rates, environmental conditions, monitoring and enforcement mechanisms that bound the statutory easement rights.
Crown Lands Act 1976 (s 18)
Foreshore leases to be issued by the Director‑General of Lands are to be "under and subject to the provisions of the Crown Lands Act 1976 as herein modified" (s 18(1)). The Crown Lands Act will therefore supply rent, term, public‑interest and procedural conditions for foreshore occupation; this Act modifies that application by obliging renewal while the Promoter carries on the industry and requires the lease (s 18(2)).
Mineral Resources Development Act 1995 (s 20)
Section 20 declares that Parts 4 and 8 of the Mineral Resources Development Act 1995 apply to the Promoter’s exercise of powers under s 19(1) in relation to private land "as if the Promoter were engaged in mining operations" (s 20(1)), and that Part 4 applies to the said lands and other Promoter land in effect treating them as land used for mining purposes (s 20(2)). That statutory cross‑application means mining‑grade procedural requirements (including notices, safety, rehabilitation and possibly access and compensation frameworks) will be invoked for pipeline and drain construction on private land.
Forest Practices Act 1985 and Forest Management Act 2013 (s 3)
The Act defines "Forest Practices Code" as that issued pursuant to s 30 of the Forest Practices Act 1985, and "Forestry corporation" is linked to the Forestry corporation continued by s 6 of the Forest Management Act 2013 (s 3). The Forestry corporation is given inspection powers in respect of the Promoter’s records (s 13), so the forestry statutory framework and associated codes will shape acceptable forestry operations, regeneration standards and other silvicultural obligations.
Commercial Arbitration Act 2011 (s 26A)
Arbitrations under the Act are to be governed by the Commercial Arbitration Act 2011 as if there were a written agreement (s 26A). That imports the modern commercial arbitration regime (procedures, appointment of arbitrators, confidentiality, and enforcement) for disputes referred to arbitration.
Other procedural interfaces
Director‑General and Ministerial powers: the Promoter must submit plans to and obtain approval from the Director‑General of Lands prior to constructing drains or pipelines (s 19(2)), and the Minister has approval powers for nuisance effluent outlets (s 19(5)). These executive approvals will be administered under the rules and processes of the relevant agencies and impacted by the Crown Lands Act and other instruments.
Practical consequence of the cross‑references
The Act is enabling rather than self‑contained. The substantive operational limits, environmental conditions, procedural safeguards and enforcement mechanisms are mostly provided by other statutes. Practitioners must therefore treat the Act as a statutory device that triggers obligations and entitlements under a network of other laws. Compliance therefore requires:
securing and complying with a Water Management Act licence that may limit easement use (s 17(9));
obtaining Director‑General of Lands approval for construction plans and complying with Crown Lands Act lease terms (s 19(2); s 18);
complying with Parts 4 and 8 of the Mineral Resources Development Act 1995 when works affect private land (s 20);
meeting Forestry corporation reporting and inspection obligations under the forest statutory regime (s 13).
Where this Act conflicts with procedural detail in other statutes, practitioners should follow the operative text of those statutes (for procedural mechanics), noting that the Act itself sometimes modifies application (for example, by declaring entitlement to a licence or subjecting approvals "as herein modified"). The Act’s language indicates that it is to be read alongside, and operationalised through, these other legal instruments.
Amendment history
The Act’s annotated text shows a significant amendment and repeal history. The record in the text documents a sequence of changes that substantially narrowed and modernised the Act. The following summarises the principal amendments and their effect as reflected in the statute annotations.
Early changes and replacement of an earlier Act
Short title and repeal of predecessor: s 1 gives the short title Florentine Valley Paper Industry Act 1935; s 2 expressly repealed the Florentine Valley Wood‑pulp and Paper Industry Act 1932.
Mid‑20th century amendments
Definitions and procedural insertions in s 3 were amended multiple times over the mid‑20th century. The annotated text records amendments to s 3 by No. 71 of 1950 (s 9), No. 36 of 1958 (s 5), No. 18 of 1966 (s 2), No. 75 of 1973 (s 2 and Sch 2), No. 49 of 1985 (s 3 and Sch 1), No. 25 of 1994 (s 45 and Sch 3), and No. 68 of 1994 (s 3 and Sch 1). Later amendments added modern cross‑references such as to the Commercial Arbitration Act and the Forest Management Act.
Large‑scale repeals in 1991 and later modernisations
No. 42 of 1991 (Sch 6, applied 27 June 1997) repealed a large number of substantive sections and schedules. Many timber‑rights and operational provisions, together with Schedules 1-8 in various parts, were repealed or substituted in that instrument, substantially reducing the original statutory footprint.
No. 71 of 1950 inserted s 26A (arbitration) which was later amended (No. 68 of 1994) and given contemporary effect by No. 9 of 2011 (Sch 1, applied 1 Oct 2012) to align with the Commercial Arbitration Act 2011.
No. 18 of 1966 substituted or added provisions such as s 25 (expiration) and s 26 (summary jurisdiction) and rewrote several sections, many of which were later repealed.
No. 45 of 1999 (Sch 6, applied 1 Jan 2000) and No. 47 of 2001 (s 4, applied 1 Jul 2001) substantively substituted s 17, modernising the pipeline and water licence provisions and incorporating the Water Management Act 1999 framework. The 1999/2001 changes are the source of the current structure of s 17.
No. 9 of 2003 (Sch 1, applied 16 Apr 2003) substituted s 20 to apply the Mineral Resources Development Act 1995 Parts 4 and 8 to the Promoter’s exercise of certain powers, effectively importing mining‑style procedure for private land works.
Record‑keeping amendments: s 13 (records to be kept and returns) was amended by No. 67 of 1994 (s 3 and Sch 1) and earlier amendments, while some other detailed operational sections were repealed by No. 42 of 1991.
Schedules and repeals
The Act originally contained multiple schedules which were modified, substituted and largely repealed across the amendment history. The annotations show substitution of Schedule 1 by No. 18 of 1966 and mass repeals of schedules by No. 42 of 1991, applied 27 June 1997. Several other schedules (2-8) were repealed earlier.
Net effect
The amendment history shows a contraction from a broader, older timber‑rights statute into a narrower modern statute that principally declares named entitlements for a single Promoter and delegates procedural and technical regulation to other, later statutes (Crown Lands Act, Water Management Act, Mineral Resources Development Act). Contemporary operational provisions were inserted or modernised mainly between 1999 and 2003, while many legacy provisions were removed in the 1991 repeals and earlier mid‑century amendments.
Practical instruction
Practitioners should consult the consolidated, current version of the Act and the amending instruments (annexed annotations in the official source) to trace which substantive provisions remain in force. The annotations in the text identify exact amending instruments and years; the most material modern changes for operational practice are the s 17 substitutions (1999/2001) and s 20 substitution (2003).
Litigation history
The statutory text itself does not record any cases or judicial decisions. There are no case names or reported judgments cited in the Act as printed in the provided text. The Act does, however, provide the institutional routes by which disputes under the Act are likely to be resolved, and those institutional routes indicate the likely litigation pathways.
Forum and dispute mechanisms in the Act
Supreme Court summary jurisdiction: the Act authorises the Supreme Court to exercise its jurisdiction under the Act in a summary way (s 26). That means contested matters may be litigated in the State’s Supreme Court by interlocutory or expedited procedures, with remedies such as injunctions, declarations and damages available through ordinary civil process.
Arbitration: s 26A provides that the Commercial Arbitration Act 2011 applies to arbitrations under this Act as if there were a written arbitration agreement. That establishes arbitrability for disputes within the scope of the Act and routes such disputes into the domestic commercial arbitration regime where the parties agree or where the Act contemplates arbitration.
Likely categories of disputes (based on statutory text)
Compensation and land damage claims. Section 17(12) creates an express obligation on the Promoter to make good damage or pay reasonable compensation for damage caused by exercise of easement powers. Disputes over the quantum of compensation, timing, or the extent of damage are naturally agrarian for litigation or arbitration.
Scope of easement and access rights. The Act vests an easement and carriageway rights but requires minimisation of interference and may be limited by licence conditions (s 17(4), (8), (9)). Disputes are likely about the scope of "entry and remain", what activities are permitted within the pipeline corridor, and what constitutes reasonable notice.
Licence and approval compliance. Where the Promoter proceeds without Director‑General approval for drains (s 19(2)), or outside water licence conditions (s 17(9)), regulatory decisions or enforcement actions may give rise to judicial review, appeals, or civil enforcement.
Environmental and nuisance claims. The Act controls effluent discharge points (s 19(4)-(5)). Disputes may arise regarding whether an outlet will create nuisance, whether Ministerial approvals were correctly granted or conditioned, or whether discharges comply with licence or environmental law.
Contractual and assignment disputes. s 4 assigns obligations to assignees "to the exclusion of the person making such assignment." Disputes may arise about warranties, residual liabilities, or the rights of assignors and assignees.
Absence of reported cases in the text
Because the Act text contains no case citations, practitioners must search case law databases for decisions construing s 17 entitlements, s 19 approvals, s 13 record obligations, and the interaction of s 20 with Mineral Resources Development Act procedures. The Act provides the procedural hooks (Supreme Court summary jurisdiction and arbitration) but does not itself provide an internal list of judicial treatments.
Practical implication
In the absence of reported decisions in the Act text, careful statutory reading and cross‑reference to the Water Management Act, the Crown Lands Act, the Mineral Resources Development Act and relevant environmental statutes will be necessary. Where questions of statutory interpretation, compensation quantum or administrative law arise, both summary proceedings and arbitration remain available dispute resolution paths (s 26; s 26A).
Gotchas
This Act contains several potential traps for practitioners, investors, landholders and compliance officers. The following are concrete points drawn from the statutory text that merit operational attention.
Entity‑specific entitlements
The Act gives rights to a named corporate Promoter, Derwent Valley Paper Company Proprietary Limited, and to its assigns (s 3). That means the statutory rights are not generic licences that any paper manufacturer can claim. If advising a purchaser, financier or counterparty, confirm whether the rights have been validly assigned and whether the assignor’s obligations have passed (s 4). The statute contains an express assignment rule that places all obligations on the assignee to the exclusion of the assignor (s 4); contractual allocation of residual liabilities beyond that statutory shift must be carefully documented.
Schedules and repeals
Several schedules and many original timber provisions have been repealed (see numerous repealed sections and schedule annotations). That history means some historic references in older instruments, titles or conveyances may appear to rely on provisions that are no longer in force. Practitioners should not assume Schedule 1 or other schedules exist substantively today simply because the Act uses the phrase "the said lands"; check the current consolidated Act and cadastral records for present operation of any Schedule.
Interplay of easement and licence
The Promoter’s easement is expressly subject to limits that may be imposed by a water licence (s 17(9)-(10)). That creates a two‑part compliance obligation: (i) secure and comply with a Water Management Act licence; and (ii) exercise the easement in accordance with the licence and any other approvals. Failure on either front risks administrative action under the Water Management Act or civil liability to occupiers.
Minimal express penalty but broader regulatory risk
The Act’s direct financial penalty for record‑keeping non‑compliance is modest (fine not exceeding two penalty units, s 13). That small penalty may understate the practical enforcement risk: non‑compliance with licence conditions or Director‑General approvals under other Acts (Crown Lands, Water Management, Mineral Resources) can attract far larger administrative sanctions and civil liabilities. Do not rely on the Act’s fine as the only compliance exposure.
Ministerial geographic limit for effluent outlets
The Act limits the Minister’s power to require the outlet of nuisance effluent to be placed further south than the mouth of the River Jordan (s 19(5)). That atypical geographic constraint is a statutory cap on the Minister’s discretion. Practitioners should check whether this locational cap interacts with broader environmental obligations under other statutes or with modern coastal management instruments.
Assignment de‑risking and warranties required
Because an assignee takes on statutory obligations to the exclusion of an assignor (s 4), transaction documents should address indemnities, environmental liabilities, outstanding approvals, and historic compliance with working plans and the Forestry corporation’s record requirements (s 13). Do not assume the statutory assignment clause resolves commercial indemnity needs.
Confined duration of rights
The Act expires 80 years from the appointed day (s 25(1)). Confirm the appointed day and any orders made under s 25(2) in the current consolidated enactment. The temporal limit affects the lifespan of statutory easements, lease renewals tied to the industry, and long‑term financing.
Delegation risks with contractors and agents
Agents, contractors and employees may exercise easement powers for the Promoter (s 17(7)). That creates practical risk for the Promoter’s supervision of contractors, and an indemnity or warranty structure should be in place to manage third‑party conduct and damage liabilities under s 17(12).
Cross‑statute procedural traps
The Act often relies on other statutes for procedural detail. For example, s 20 imports Part 4 and Part 8 of the Mineral Resources Development Act 1995 where applicable. That importation means additional procedures, notification obligations, and rehabilitation requirements may apply beyond the Act’s face. Practitioners must map the regulatory cascade for every project touching private land, foreshore or water.
Public‑access approvals
When pipelines or works are on roads, railway lines, bridges or other public access areas, the water licence may require approval from a named person before work may proceed (s 17(10)). Identify early which people or agencies must provide approvals and build approval timing into project scheduling.
Record‑keeping scope
The Act lists a fairly comprehensive set of records to be kept (s 13(1)(a)-(i)). The Promoter must show quantities used and produced, sources of timber including from private lands, and expenditures on reafforestation and fire protection. These records are inspectable by the Forestry corporation at "all reasonable times" (s 13(1)); ensure document retention and audit trails are robust and aligned with working plans.
In short, the Act grants useful infrastructure and land‑access rights but wraps those rights in assignment, licensing, approval and forestry reporting obligations. The practical pitfalls derive from cross‑statute dependencies, timing and approval sequencing, allocation of liability at assignment, and the need to integrate licence terms into the practical exercise of easements.
How to comply
This compliance checklist is targeted to lawyers, compliance officers, project managers and accountants advising the Promoter (or an assignee) and affected landholders. It follows the Act’s operational structure and cross‑references the controlling provisions.
Confirm Promoter identity and assignment status (s 3; s 4)
Verify the legal entity that holds Promoter status under the Act (Derwent Valley Paper Company Proprietary Limited) and whether that status has been validly assigned. If you are advising a purchaser or financier, obtain certified searches and the assignment instrument; ensure the assignee acknowledges statutory obligations because s 4 assigns obligations to the assignee "to the exclusion of the person making such assignment." Ensure contractual indemnities and disclosure of historical compliance.
Records and returns: set up compliance register (s 13)
Maintain the books, maps and plans required by s 13(1). The records must show: forest operations (fellings, sylviculture, fire protection), quantities of wood used in pulp manufacture and otherwise, quantities sold in log form, quantities of pulp products produced, quantities of timber from private land, and amounts expended on fire protection, forest development and reafforestation. Create a periodic returns schedule to supply returns in the prescribed form and times to the Forestry corporation (s 13(2)).
Implement document retention, data collection and audit controls; prepare for Forestry corporation inspections at "all reasonable times" (s 13(1)).
Secure and comply with Water Management Act licences and map licence conditions onto easement practice (s 17(2), (9)-(10))
Apply for the water licence expressly contemplated by s 17(2). When you obtain the licence, review all conditions and map them into operations, because the licence may limit the exercise of the easement and require specified approvals for works in public areas (s 17(9)-(10)).
If the pipeline is in or over public infrastructure (roads, railways, bridges), identify the "person specified in the licence" whose approval is required before conducting certain works (s 17(10)).
Establish and document pipeline easements and corridor management (s 17(3)-(6))
Define the existing pipeline and pipeline corridor spatially (s 17(1) definitions). Where access to subject land requires crossing other land, ensure carriageway easements are identified and documented (s 17(5)-(6)).
Prepare operational rules for entry that minimise interference with occupiers (s 17(8)), and protocols for giving reasonable notice before entry where practicable (s 17(11)). Maintain contractor appointment and authorisation documentation because agents, contractors and employees may exercise easement powers on the Promoter’s behalf (s 17(7)).
Damage remediation and compensation procedures (s 17(12))
Maintain an insurance program and a remediation fund to "make good any damage" or to pay reasonable compensation quickly, as required by s 17(12). Establish claims protocols, valuation procedures and dispute resolution escalation for compensation claims from occupiers.
Approvals for drains, pipelines and effluent discharge (s 19(1)-(5))
Before constructing any pipeline, tunnel or drain, submit plans and specifications and obtain the Director‑General of Lands' approval (s 19(2)). Build approval time into project schedules and ensure plans address environmental, navigational and public‑safety considerations.
Complete approved works within 12 months unless the Director‑General grants an extension (s 19(3)). If an extension is needed, apply in writing before the 12‑month expiry.
Locate all effluent outlets below low‑water mark and discharge into the sea or tidal waters of the River Derwent as required by s 19(4). For effluent likely to create a nuisance, obtain Ministerial approval for outlet position and distance from shore and plan to comply with any spatial constraints, noting the statutory outer limit in s 19(5).
Apply Mineral Resources Development Act procedures where required (s 20)
Where you propose works on private land under s 19(1), comply with Parts 4 and 8 of the Mineral Resources Development Act 1995 as applied by s 20(1). That includes procedural notices, safety, environmental rehabilitation and possibly fees or rehabilitation bonds. Map the Mineral Resources procedural steps into project workflows for landowner consultation, compensation and restoration.
Foreshore leases: coordinate with Director‑General of Lands and Crown Lands Act provisions (s 18)
Where foreshore strips are required, apply to the Director‑General of Lands for a lease "under and subject to the Crown Lands Act 1976 as herein modified" (s 18(1)). Ensure compliance with Crown Lands Act requirements and retain renewal applications because s 18(2) requires renewal on application so long as the Promoter carries on the industry and the lease is required for its purposes.
Coordinate with Forestry corporation on working plans and Forest Practices Code (s 3; s 13)
Prepare working plans that satisfy the definition in s 3 and conform to the Forest Practices Code issued under the Forest Practices Act 1985. Provide the Forestry corporation with returns and permit inspections; align forest operations (felling, regeneration, fire protection) to the working plan requirements.
Contracting and delegation controls
Ensure contracts with agents and contractors include indemnities, compliance warranties, specification of authorised activities under the easement, safety obligations and obligations to repair damage. Maintain supervision protocols to satisfy the Promoter’s liability under s 17(12).
Dispute resolution and litigation readiness (s 26; s 26A)
Include arbitration clauses that align with the Commercial Arbitration Act 2011 and understand that arbitrations under the Act are treated as if there were a written arbitration agreement (s 26A). Maintain litigation budgets and be ready to seek summary relief in the Supreme Court where urgent injunctive remedies are required (s 26).
Compliance monitoring and governance
Set up compliance monitoring that tracks: licence conditions, Director‑General approvals, working plan adherence, scheduled returns to the Forestry corporation, and maintenance of pipeline corridors. Ensure board‑level oversight of compliance given the Promoter’s statutory obligations and potential compensation liabilities.
Transactional due diligence
If acquiring rights or financing the Promoter, conduct targeted due diligence on: assignments and chain of title; compliance history with s 13 record obligations; existence and conditions of water licences; Director‑General approvals for existing works; foreshore leases and Crown Lands Act conditions; and any outstanding compensation claims.
Sunset and planning horizon (s 25)
The Act’s rights expire 80 years from the appointed day (s 25(1)). Confirm the appointed day and any orders made under s 25(2) in the current consolidated text and plan asset life and financing around the statutory timeline.
Regulatory watch
Monitor changes in the Water Management Act, Crown Lands Act, Mineral Resources Development Act and Forest Practices Code because the Act’s practical scope and constraints are largely determined by those regimes. Regulatory changes there can materially alter the Promoter’s operational obligations.
Following this checklist aligns operations with the statutory text and its cross‑references. The core compliance tasks are: secure and comply with the water licence; obtain and abide by Director‑General and Ministerial approvals; keep comprehensive forestry and production records and returns; manage easement operations so as to minimise interference and remediate damage promptly; and integrate Mineral Resources and Crown Lands procedural requirements into project workflows.
industry means the manufacture by the Promoter in this State of paper pulp and pulp products, and the investigation in connection with such manufacture and the supply and preparation of materials therefor, and the carrying on of processes and businesses incidental to such manufacture, and the carrying on in this State by the Promoter of any manufacture cognate or incidental or subsidiary to such manufacture, including the milling and marketing of timber;
logging road means any road prepared or constructed by the Promoter for the haulage or transport of forest products and maintainable by him in accordance with section 21B ;
[Section 3 Subsection (1) amended by No. 9 of 2003, Sched. 1, Applied:16 Apr 2003]private land means any land alienated, or contracted to be alienated, from the Crown in fee simple, or held under any lease or any occupation, residence, or business licence granted or issued under the Crown Lands Act 1976 , or under any lease, licence, or other authority granted or issued under the Mineral Resources Development Act 1995 or under any timber or forestry lease or permit granted by the Crown under any Act;
pulp products means paper and paper board;
road means any road, street, or high road, or any reservation therefor;
the Promoter means Derwent Valley Paper Company Proprietary Limited and its assigns;
the said lands means the lands specified in Schedule 1 , other than such of those lands as have, under this Act, been declared to have ceased to be subject to the provisions of this Act;
timber includes trees of any description, whether alive or dead and whether standing or fallen;
working plan means a detailed statement in writing, setting out in respect of a specified area, called the working plan area –
(a) the facts on which the proposals therein contained are based;
(b) the intended operations to be carried out;
(c) the manner in which the same are to be carried out;
(d) the requirements to be observed in relation to all fellings and all operations for the regeneration, improvement, and protection of the forest or the establishment, maintenance, and protection of plantations; and
(e) the requirements for the proper record and control of the work –
in the working of that area during the period specified in such plan.
(2) *[Section 3 Subsection (2) added by No. 18 of 1966, s. 2 ]*References in this Act to a working plan that has been revised shall be construed as references to that plan as so revised.
4 Effect of assignment by Promoter
4 Effect of assignment by Promoter
Upon any assignment by the Promoter of his rights and concessions under this Act, the person in whom such rights and concessions shall be vested by virtue of such assignment shall be subject to all the obligations and conditions imposed upon the Promoter by this Act, to the exclusion of the person making such assignment.
5.
[Section 5 Substituted by No. 79 of 1937, s. 2 ][Section 5 Substituted by No. 18 of 1966, s. 3 ][Section 5 Subsection (1) amended by No. 75 of 1973, s. 2 and Sched. 1 ][Section 5 Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
Part II Timber Rights
Part II Timber Rights
6.
[Section 6 Subsection (2) added by No. 18 of 1966, s. 4 ][Section 6 Subsection (3) added by No. 18 of 1966, s. 4 ][Section 6 Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
6A.
[Section 6A Inserted by No. 18 of 1966, s. 5 ][Section 6A Subsection (3) omitted by No. 25 of 1994, s. 45 and Sched. 3 ][Section 6A Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
6B.
[Section 6B Inserted by No. 18 of 1966, s. 5 ][Section 6B Subsection (3) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 6B Subsection (4) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 6B Subsection (6) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 6B Subsection (7) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 6B Subsection (9) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 6B Subsection (10) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 6B Subsection (12) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 6B Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
6C.
[Section 6C Inserted by No. 18 of 1966, s. 5 ][Section 6C Subsection (5) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 6C Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
7.
[Section 7 amended by No. 17 of 1945, s. 2 ][Section 7 amended by No. 71 of 1950, s. 10 ][Section 7 Repealed by No. 18 of 1966, s. 6 ]
8.
[Section 8 Subsection (2) omitted by No. 18 of 1966, s. 7 ][Section 8 Subsection (3) amended by No. 18 of 1966, s. 7 ][Section 8 Subsection (3A) inserted by No. 18 of 1966, s. 7 ][Section 8 Subsection (3B) inserted by No. 18 of 1966, s. 7 ][Section 8 Subsection (3B) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 8 Subsection (3C) inserted by No. 18 of 1966, s. 7 ][Section 8 Subsection (3B) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 8 Subsection (3D) inserted by No. 18 of 1966, s. 7 ][Section 8 Subsection (4) amended by No. 18 of 1966, s. 7 ][Section 8 Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
9.
[Section 9 Amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 9 Subsection (4) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 9 Subsection (1) amended by No. 18 of 1966, s. 8 ][Section 9 Subsection (2) substituted by No. 18 of 1966, s. 8 ][Section 9 Subsection (3) substituted by No. 18 of 1966, s. 8 ][Section 9 Subsection (3A) inserted by No. 18 of 1966, s. 8 ][Section 9 Subsection (3B) inserted by No. 18 of 1966, s. 8 ][Section 9 Subsection (3C) inserted by No. 18 of 1966, s. 8 ][Section 9 Subsection (3D) inserted by No. 18 of 1966, s. 8 ][Section 9 Subsection (3E) inserted by No. 49 of 1985, s. 3 and Sched. 1 ][Section 9 Subsection (4) amended by No. 18 of 1966, s. 8 ][Section 9 Subsection (5) substituted by No. 18 of 1966, s. 8 ][Section 9 Subsection (6) added by No. 18 of 1966, s. 8 ][Section 9 Subsection (7) added by No. 49 of 1985, s. 3 and Sched. 1 ][Section 9 Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
10.
[Section 10 Amended by No. 75 of 1973, s. 2 and Sched. 1 ][Section 10 Subsection (1) amended by No. 18 of 1966, s. 9 ][Section 10 Subsection (1) amended by No. 25 of 1994, s. 45 and Sched. 1 ][Section 10 Subsection (2) substituted by No. 18 of 1966, s. 9 ][Section 10 Subsection (2A) inserted by No. 18 of 1966, s. 9 ][Section 10 Subsection (4) omitted by No. 18 of 1966, s. 9 ][Section 10 Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
11.
[Section 11 Amended by No. 55 of 1965, s. 3 and Sched. 1 ][Section 11 Amended by No. 75 of 1973, s. 2 and Sched. 1 ][Section 11 Subsection (1) substituted by No. 18 of 1966, s. 10 ][Section 11 Subsection (2) omitted by No. 18 of 1966, s. 10 ][Section 11 Subsection (3) omitted by No. 18 of 1966, s. 10 ][Section 11 Subsection (4) amended by No. 18 of 1966, s. 10 ][Section 11 Subsection (4) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 11 Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
12.
[Section 12 Substituted by No. 18 of 1966, s. 11 ][Section 12 Subsection (1) amended by No. 25 of 1994, s. 45 and Sched. 1 ][Section 12 Subsection (2) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 12 Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
13 Records to be kept by, and returns to be made by, Promoter
13 Records to be kept by, and returns to be made by, Promoter
[Section 13 Subsection (1) amended by No. 67 of 1994, s. 3 and Sched. 1 ]**[Section 13 Subsection (2) amended by No. 67 of 1994, s. 3 and Sched. 1 ]
(1) *[Section 13 Subsection (1) amended by No. 18 of 1966, s. 12 ][Section 13 Subsection (1) amended by No. 55 of 1965, s. 5 ][Section 13 Subsection (1) amended by No. 25 of 1994, s. 45 and Sched. 1 ]*Books, maps, and plans recording the operations of the Promoter in connection with the industry shall be kept by the Promoter, and shall be available for inspection at all reasonable times by the Forestry corporation, or any officer of the Forestry corporation appointed by it for that purpose, and shall show in respect of each year particulars of –
(a) the operations in the forest, including fellings, sylvicultural operations, fire protection, and other works required by the relevant working plan;
(b) the quantity of wood and other forest products used in the manufacture of paper pulp or pulp products;
(c) the quantity of timber used for other milling purposes;
(d) the quantity of timber sold in the log;
(e) the quantity of pulp products produced;
(f) the quantity of paper pulp produced and sold as such;
(g) the quantity of timber obtained from private lands for conversion into paper pulp or pulp products;
(h) the respective amounts expended on fire protection, forest development and improvement, and reafforestation;
(i) such other particulars of a similar nature as may be prescribed.
Penalty: Fine not exceeding 2 penalty units.
(2) *[Section 13 Subsection (2) amended by No. 18 of 1966, s. 12 ][Section 13 Subsection (2) amended by No. 55 of 1965, s. 5 ][Section 13 Subsection (2) amended by No. 25 of 1994, s. 45 and Sched. 3 ]*The Promoter shall also furnish the Forestry corporation with returns in respect of all or any of the matters or things mentioned or referred to in subsection (1) , in such form and at such times as shall be prescribed.
Penalty: Fine not exceeding 2 penalty units.
14.
[Section 14 Substituted by No. 18 of 1966, s. 13 ][Section 14 Repealed by No. 61 of 1996, s. 6 ]
15.
[Section 15 Subsection (1) amended by No. 75 of 1973, s. 2 and Sched. 1 ][Section 15 Subsection (1) amended by No. 18 of 1966, s. 14 ][Section 15 Subsection (1) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 15 Subsection (2) amended by No. 71 of 1950, s. 11 ][Section 15 Subsection (2) amended by No. 18 of 1966, s. 14 ][Section 15 Subsection (2) amended by No. 25 of 1994, s. 45 and Sched. 3 ][Section 15 Repealed by No. 42 of 1991, Sched. 6, Applied:27 Jun 1997]
16.
[Section 16 Repealed by No. 18 of 1966, s. 15 ]
Part III Other Rights and Powers
Part III Other Rights and Powers
17 Licence under Water Management Act 1999
17 Licence under Water Management Act 1999
[Section 17 Subsection (1) amended by No. 61 of 1996, s. 15 ][Section 17 Subsection (1) amended by No. 5 of 1990, s. 3 and Sched. 1 ][Section 17 Subsection (2) amended by No. 5 of 1990, s. 3 and Sched. 1 ][Section 17 Substituted by No. 45 of 1999, Sched. 6, Applied:01 Jan 2000][Section 17 Substituted by No. 47 of 2001, s. 4, Applied:01 Jul 2001]
(1) In this section –
existing pipeline means –
(a) the pipeline that, on 30 June 2001, existed on, above or under land in respect of which the Promoter held a water licence renewed (with the renewal No. 12W/58) on 21 August 1980 under the Mining Act 1929 , being the pipeline as repaired, modified and upgraded from time to time; and
(b) any pipeline that has replaced the pipeline referred to in paragraph (a) , or subsequent replacement pipeline, as repaired, modified and upgraded from time to time;
pipeline means –
(a) pipeline to carry water to the Promoter for the purposes of carrying on the industry; and
(b) pumping plant, buildings, trestles, bridges and other structures relating to that pipeline;
pipeline corridor means a strip of land 10 metres wide defined by measuring 5 metres in a horizontal plane to each side of the centreline of the existing pipeline at right angles to the centreline;
subject land means land that the Promoter does not own but needs, or is likely to need, to be able
This is an opening excerpt, not the complete document.