CTHRepealedLegislation
Financial Sector (Collection of Data) (reporting standard) determination No. 43 of 2021
Item 1: Portfolio to dateItem 1: Portfolio to date
Start here
Get a plain-English read of Item 1: Portfolio to date
Turn the raw legal text into a practical explanation grounded in Financial Sector (Collection of Data) (reporting standard) determination No. 43 of 2021.
Item 1: Portfolio to date
Report item 1 for all Flood scheme-backed loans from the commencement of the Scheme to date. Include loans that have been securitised. Exclude facilities that are entered into and subsequently cancelled, due to being raised in error.
| Column 1 | Report the number of Flood scheme-backed loan facilities. |
|---|---|
| Column 2 | Report the dollar value of Flood scheme-backed loan facilities. |
| Item 1.1 | Report loans approved for Flood scheme-backed loans. Include loans that have terminated or matured. Exclude loans refinanced. |
|---|---|
| Item 1.2 | Report loans approved for Flood scheme-backed loans with a director or personal guarantee. Include loans that have terminated or matured. Exclude loans refinanced. |
| Item 1.3 | Report loans refinanced. |
| Item 1.4 | Report all Flood scheme-backed loans that have been written off and deducted as a loss per relevant Australian Accounting Standards. |
| Item 1.5 | Report recoveries made for Flood scheme-backed loans (e.g. enforcement of security). |
| Item 1.6 | Report all guarantee claims. Include claims that have been made in prior periods. |
| Item 1.7 | Report amounts of guarantee claims that have been paid to the entity. Include claims that have been paid in prior periods. |