This instrument replaces earlier guidance and sets a technical regime for managing interference to receivers in the 1800 MHz band. It prescribes minimum receiver performance levels, a compatibility requirement for transmitters, additional out‑of‑band emission limits and rules about when a registered receiver will be protected. It affects 1800 MHz spectrum licensees, apparatus and class licensees, and operators who register receivers. Licensees pay to reduce emissions or fit filters and must coordinate; the ACMA decides protection and registration outcomes and expects parties to negotiate where the rules don’t automatically apply.
This instrument, the Radiocommunications Advisory Guidelines (Managing Interference to Spectrum Licensed Receivers - 1800 MHz Band) 2023, sets out non‑binding but operationally significant guidance for how interference to receivers operating under 1800 MHz spectrum licences should be managed (see s1 Name, s3 Authority). It replaces two 2012 guidelines (see s4 Repeal of other guidelines). It commences the day after registration on the Federal Register of Legislation (s2 Commencement). The instrument operates as an advisory guideline made under s262 of the Radiocommunications Act 1992 (s3 Authority), and it cross‑references a separate section 145 determination that addresses unacceptable levels of interference and registration procedures (see s5 definitions, section 145 determination note).
Mechanically, the instrument does the following things:
Defines the 1800 MHz band in lower (1710-1785 MHz) and upper (1805-1880 MHz) parts and sets definitions for key terms such as 1800 MHz receiver, spectrum licence, adjacent channel, in‑band, out‑of‑band and related performance parameters (s5 Definitions).
Establishes a notional receiver performance level (Schedule 1), specifying minimum receiver parameters that the ACMA will assume when deciding whether to afford protection to a receiver (see s12 Notional receiver performance level; Schedule 1 items 1-6).
Sets a compatibility requirement (Schedule 2) that fixed transmitters must meet for protection to be given to certain fixed receivers, expressed as a maximum unwanted signal level at the receiver antenna connector port (s13(1); Schedule 2 item 1).
Provides an additional out‑of‑band emission limit expressed as a required radiofrequency filtering characteristic between transmitter antenna and antenna connector (Schedule 3 item 1), and gives the method to calculate FreqOffset used in that limit (Schedule 3 item 2).
Current sections
Direct links to the current provisions in Radiocommunications Advisory Guidelines (Managing Interference to Spectrum Licensed Receivers – 1800 MHz Band) 2023.
13
1
Name
1 Name
These are the Radiocommunications Advisory Guidelines (Managing Interference to Spectrum Licensed Receivers – 1800 MHz Band) 2023.
2
Commencement
2 Commencement
This instrument commences at the start of the day after the day it is registered on the Federal Register of Legislation.
Note: The Federal Register of Legislation may be accessed free of charge at www.legislation.gov.au.
3
Authority
3 Authority
This instrument is made under section 262 of the Act.
4
Repeal of other guidelines
4 Repeal of other guidelines
(1) The Radiocommunications Advisory Guidelines (Managing Interference to Spectrum Licensed Receivers – 1800 MHz Band) 2012 [F2012L02047] are repealed.
(2) The Radiocommunications Advisory Guidelines (Additional Device Boundary Criteria – 1800 MHz Lower Band) 2012 [F2012L02046] are repealed.
5
Definitions
5 Definitions
(1) In this instrument:
1800 MHz band means the 1800 MHz lower band and the 1800 MHz upper band.
1800 MHz lower band means the frequency band 1710 MHz to 1785 MHz.
1800 MHz receiver means a radiocommunications receiver operated under an 1800 MHz spectrum licence.
1800 MHz spectrum licence means a spectrum licence that authorises the operation of radiocommunications devices in the 1800 MHz band.
1800 MHz upper band means the frequency band 1805 MHz to 1880 MHz.
Act means the Radiocommunications Act 1992.
adjacent channel, in relation to another channel (the occupied channel), means a channel with a centre frequency offset on either side of the assigned channel frequency of the occupied channel by a specific frequency relation.
adjacent channel selectivity: see item 2 of Schedule 1.
centre frequency, in relation to a radiocommunications transmitter, means the frequency midway between the lower and upper frequency limits of the transmitter’s occupied bandwidth.
compatibility requirement: see Part 5 and Schedule 2.
emission buffer zone, in relation to a spectrum licence, means a zone along the frequency or geographic boundary specified in a spectrum licence where emission levels of radiocommunications transmitters are reduced to ensure that significant levels of emissions stay within the geographic areas and frequencies of the licence.
fixed receiver means a radiocommunications receiver:
(a) located at a fixed point on land or sea; and
(b) not designed or intended for use while in motion.
fixed transmitter means a radiocommunications transmitter:
(a) located at a fixed point on land or sea; and
(b) not designed or intended for use while in motion.
frequency adjacent spectrum licence, in relation to a spectrum licence (the first licence), means a spectrum licence that authorises the operation of radiocommunications devices in a part of the spectrum that is adjacent to the parts of the spectrum specified in a core condition of the first licence.
geographic area, for a spectrum licence, means the area within which operation of a radiocommunications device is authorised under the licence.
in-band means:
(a) for a radiocommunications device operated under a spectrum licence – the part of the spectrum within which the operation of radiocommunications devices is authorised under the licence; or
(b) for a radiocommunications device operated under an apparatus licence that specifies a frequency band – the frequencies within the lower frequency limit and the upper frequency limit specified in the licence;
(c) for a radiocommunications device operated under an apparatus licence that specifies a specific frequency and bandwidth – the frequencies within that bandwidth, when centred on the specific frequency.
intermodulation response rejection: see item 3 of Schedule 1.
mobile device means a radiocommunications device that is used:
(a) while it is in motion on land, on water or in the air; or
(b) in a stationary position at unspecified points on land, on water or in the air.
notional receiver performance level: see subsection 12(2).
out-of-band, for a radiocommunications device, means a frequency other than an in-band frequency.
receiver blocking, in relation to a radiocommunications receiver, means the measure of the ability of the receiver to receive a wanted signal in the presence of a high level unwanted interferer on frequencies other than those of an adjacent channel.
section 145 determination means the Radiocommunications (Unacceptable Levels of Interference – 1800 MHz Band) Determination 2023.
Note: The section 145 determination is available, free of charge, from the Federal Register of Legislation at www.legislation.gov.au.
spectrum space means the three dimensional space consisting of a frequency band and a geographic area.
spurious response immunity: see item 5 of Schedule 1.
unwanted signal means a radio emission from a radiocommunications transmitter that is not a wanted signal.
wanted signal means a radio emission from a radiocommunications transmitter that is intended for reception by a radiocommunications receiver protected by this instrument.
Note: A number of other expressions used in this instrument are defined in the Act, including the following:
(2) In this instrument, unless the contrary intention appears, each term listed in subsection (3) has the meaning given by:
(a) the section 145 determination; or
(b) if another instrument replaces that determination – the other instrument.
(3) For the purposes of subsection (2), the terms are:
(a) additional device boundary criterion;
(b) areas of high mobile use;
(c) device boundary;
(d) device boundary criterion;
(e) effective antenna height;
(f) high sited;
(g) low sited.
(4) In this instrument, unless otherwise specified, a reference to a part of the spectrum or a frequency band includes all frequencies that are greater than but not including the lower frequency, up to and including the higher frequency.
Note: This subsection means the lower number in a part of the spectrum or a frequency band is not included in the part of the spectrum or the frequency band.
6
References to other instruments
6 References to other instruments
In this instrument, unless the contrary intention appears:
(a) a reference to any other legislative instrument is a reference to that other legislative instrument as in force from time to time; and
(b) a reference to any other kind of instrument or writing is a reference to that other instrument or writing as in force or existence from time to time.
Note 1: For references to Commonwealth Acts, see section 10 of the Acts Interpretation Act 1901; and see also subsection 13(1) of the Legislation Act 2003 for the application of the Acts Interpretation Act 1901 to legislative instruments.
Note 2: All Commonwealth Acts and legislative instruments are registered on the Federal Register of Legislation.
Note 3: See section 314A of the Act.
7
Background
7 Background
(1) A spectrum licence authorises the operation of radiocommunications devices within a part of the spectrum and in a geographic area. Interference occurring between adjacent spectrum licences consists of in-band interference across the geographic boundaries, and out-of-band interference across the frequency boundaries.
(2) This interference is managed by creating emission buffer zones along the geographic and frequency boundaries of a spectrum licence, using a number of powers under the Act. Emission buffer zones may be created by, or as a result of, the following:
(a) specifying out-of-area and out-of-band emission limits in the core conditions of the licence, which must be included in all spectrum licences (see section 66 of the Act);
(b) a determination under section 145 of the Act, relating to unacceptable levels of interference and the registration of radiocommunications devices, and related licence conditions (see section 69 of the Act);
(c) advisory guidelines under section 262 of the Act, about managing interference in specific circumstances.
(3) This instrument:
(a) provides protection to 1800 MHz receivers from interference caused by radiocommunications transmitters operated under an apparatus licence, class licence, or spectrum licence;
(b) assists in the management of in-band and out-of-band interference by providing compatibility requirements for registered fixed receivers operated under 1800 MHz spectrum licences; and
(c) sets out minimum receiver performance requirements that the ACMA will assume are met by a radiocommunications receiver, when considering whether to provide protection to the receiver in accordance with this instrument, so that the onus of managing interference is not solely placed upon the operators of radiocommunications transmitters.
(4) This instrument is intended to provide guidance on the management and settlement of interference to 1800 MHz receivers, caused by radiocommunications transmitters operated under another class, apparatus or spectrum licence issued under the Act.
(5) This instrument should be used by spectrum licensees, apparatus licensees, and authorised third parties in the planning of services and in the resolution of interference.
(6) This instrument does not prevent a person negotiating and implementing other protection requirements with other persons.
8
In-band interference
8 In-band interference
(1) In-band interference to an 1800 MHz receiver, caused by a radiocommunications transmitter operated under an adjacent spectrum licence, is managed by the core conditions imposed on spectrum licences under section 66 of the Act, the device boundary criterion, and the additional device boundary criterion.
(2) In-band interference to an 1800 MHz receiver, caused by a radiocommunications transmitter operated under an apparatus licence that was first issued under section 100 of the Act on or after 18 June 2013, is managed as if the transmitter were operated under a spectrum licence. The device boundary criterion is to be applied to such radiocommunications transmitters, affording 1800 MHz receivers the same level of in-band protection from apparatus licensed radiocommunications transmitters as they are afforded from radiocommunications transmitters operated under adjacent area spectrum licences.
(3) The ACMA does not intend to afford protection from in-band interference to an 1800 MHz receiver caused by a radiocommunications transmitter operated under an apparatus licence that was first issued under section 100 of the Act before 18 June 2013.
(4) The ACMA does not intend to act in relation to in-band interference to an 1800 MHz receiver caused by a radiocommunications transmitter operated under a class licence where the operation complies with all relevant conditions of the class licence.
9
Out-of-band interference
9 Out-of-band interference
(1) Out-of-band interference is difficult to predict, because the levels and frequencies of unwanted emissions depend on both the nearness and the operating frequencies of radiocommunications transmitters and radiocommunications receivers that are spectrally or geographically close. In addition, out-of-band interference:
(a) can extend for many MHz either side of the frequency boundary of a spectrum licence; and
(b) is dependent on the quality of the radiocommunications receiver as well as the levels of the radiocommunications transmitter’s emissions; and
(c) is difficult to model accurately.
(2) Emission limits are also used to manage out-of-band interference, but these do not provide protection along the frequency boundaries of a spectrum licence throughout the entire geographic area. Because of the nature of out-of-band interference, emission limits cannot be used to provide protection from out-of-band interference for radiocommunications devices that are located near each other.
Note: Example: Radiocommunications devices that are located near each other include devices located at multi-operator sites.
(3) Emission limits are not the sole mechanism used to manage out-of-band interference for devices in close proximity, because the interference modelling inaccuracy would require large probability margins to be added to those limits. Large probability margins would place severe constraints on the use of the spectrum because the upper and lower frequency limits of a spectrum licence extend throughout the geographic area. Emission limits to manage out-of-band interference throughout the geographic area cannot be used, because they would lead to a severe loss of utility of the spectrum on both sides of the frequency limits.
(4) To avoid large probability margins, out-of-band interference is managed through interference management procedures based on a compatibility requirement for radiocommunications receivers. A minimum level of receiver performance is specified in Part 4 in conjunction with the compatibility requirement because the performance level of receivers:
(a) affects the level of interference; and
(b) can vary for receivers operating under spectrum licences.
Note: The minimum level of receiver performance is specified in Part 4. The compatibility requirement is set out in Part 5.
10
Recording radiocommunications receiver details in the Register
10 Recording radiocommunications receiver details in the Register
(1) In this instrument, for an 1800 MHz receiver to be afforded protection from interference caused by an apparatus licensed radiocommunications transmitter, the details of the receiver must have been included in the Register before the relevant apparatus licence was first issued under section 100 of the Act.
(2) In this instrument, for an 1800 MHz receiver to be afforded protection from interference caused by a spectrum licensed radiocommunications transmitter, the details of the receiver must have been included in the Register before the details of the relevant transmitter were included in the Register.
Note: See also Part 5.
11
Mobile devices
11 Mobile devices
The compatibility requirement specified in Part 5 does not apply to radiocommunications receivers operated under an 1800 MHz band spectrum licence that are mobile devices, because the transient nature of these devices prevents the use of this requirement as an interference management procedure.
12
Notional receiver performance level
12 Notional receiver performance level
(1) The level of interference caused by unwanted emissions depends on the interference susceptibility of a radiocommunications receiver and the level of the unwanted signal. Emission levels from radiocommunications transmitters should not have to be reduced below a point where the performance of the radiocommunications receiver is the main cause of the problem.
(2) A notional receiver performance level is set out in Schedule 1 and is to be used when setting a compatibility requirement for a radiocommunications receiver. A receiver should meet the notional receiver performance level to gain protection from interference from a radiocommunications transmitter specified in this instrument.
13
Compatibility
13 Compatibility
(1) In relation to a fixed receiver specified in subsection (2), the licensee of a fixed transmitter operated under an apparatus licence or a spectrum licence must ensure that the transmitter meets the compatibility requirement in Schedule 2.
(2) For the purposes of subsection (1), a fixed receiver is specified if the receiver:
(a) is operated under a spectrum licence; and
(b) has at least the notional receiver performance level; and
(c) was included in the Register before:
(i) if the fixed transmitter mentioned in subsection (1) is operated under a spectrum licence – the fixed transmitter was included in the Register; or
(ii) if the fixed transmitter mentioned in subsection (1) is operated under an apparatus licence – the apparatus licence was issued; and
(d) one of the following applies
(i) the receiver is operated in the 1800 MHz lower band; or
(ii) the receiver is operated in the 1800 MHz upper band, and has an effective antenna height for each increment 1, start formula h subscript e 1 open bracket phi subscript n close bracket end formulathat is less than or equal to 10 metres; or
(iii) the receiver is operated in the 1800 MHz upper band, and has an effective antenna height for each increment 1, start formula h subscript e 1 open bracket phi subscript n close bracket end formulathat is greater than 10 metres, and does not operate within 10 MHz (measured from the lower or upper limit of the occupied bandwidth of the received signal) of a frequency adjacent spectrum licence (in relation to the licence mentioned in paragraph (a)) authorising the operation of radiocommunication devices in the same area, and is not in an area of high mobile use.
Note: Radiocommunications receivers operated in the 1800 MHz upper band are generally not afforded protection from radiocommunications devices exempt from registration. It is the responsibility of the operator of the receiver to manage any interference from such devices through negotiation and mechanisms such as implementing guard bands and appropriate site selection.
(3) Licensees of radiocommunications transmitters operated under a spectrum licence are expected to reduce their out-of-band emissions to the levels set out in Schedule 3, if it would facilitate compatibility with registered radiocommunications receivers operated under a frequency adjacent spectrum licence. This expectation applies irrespective of which radiocommunications device was registered first. Licensees are responsible for bearing the costs of changes to their own system. If reducing out-of-band emissions would not facilitate compatibility between services, generally the radiocommunications device first registered will be given priority.
Note: This requirement reflects the fact that the strict out-of-band emission limits in a spectrum licence core condition have not been imposed. This was done to avoid any unnecessary costs and burden on licensees to implement arrangements that are only required to enable compatibility in specific situations. Consequently, it is only expected that licensees of 1800 MHz spectrum licences reduce out-of-band emissions when required to facilitate compatibility with other services.
Note: The 10 metre effective antenna height limit for the 1800 MHz upper band was chosen to be consistent with common deployment practice at the time this instrument was made.
(5) A radiocommunications transmitter operated under a class licence must comply with the conditions of the class licence.
Source text: opening excerpt
Sourced from the Federal Register of Legislation (legislation.gov.au), CC BY 4.0.
1 Name
1 Name
These are the Radiocommunications Advisory Guidelines (Managing Interference to Spectrum Licensed Receivers – 1800 MHz Band) 2023.
2 Commencement
2 Commencement
This instrument commences at the start of the day after the day it is registered on the Federal Register of Legislation.
Note: The Federal Register of Legislation may be accessed free of charge at www.legislation.gov.au.
3 Authority
3 Authority
This instrument is made under section 262 of the Act.
4 Repeal of other guidelines
4 Repeal of other guidelines
(1) The Radiocommunications Advisory Guidelines (Managing Interference to Spectrum Licensed Receivers – 1800 MHz Band) 2012 [F2012L02047] are repealed.
(2) The Radiocommunications Advisory Guidelines (Additional Device Boundary Criteria – 1800 MHz Lower Band) 2012 [F2012L02046] are repealed.
5 Definitions
5 Definitions
(1) In this instrument:
1800 MHz band means the 1800 MHz lower band and the 1800 MHz upper band.
1800 MHz lower band means the frequency band 1710 MHz to 1785 MHz.
1800 MHz receiver means a radiocommunications receiver operated under an 1800 MHz spectrum licence.
1800 MHz spectrum licence means a spectrum licence that authorises the operation of radiocommunications devices in the 1800 MHz band.
1800 MHz upper band means the frequency band 1805 MHz to 1880 MHz.
Act means the Radiocommunications Act 1992.
adjacent channel, in relation to another channel (the occupied channel), means a channel with a centre frequency offset on either side of the assigned channel frequency of the occupied channel by a specific frequency relation.
adjacent channel selectivity: see item 2 of Schedule 1.
centre frequency, in relation to a radiocommunications transmitter, means the frequency midway between the lower and upper frequency limits of the transmitter’s occupied bandwidth.
Specifies conditions for which receivers are eligible for protection, including registration timing, receiver type (fixed v mobile), receiver performance level, band and effective antenna height constraints for upper band receivers (s10 Recording; s11 Mobile devices; s13(2)).
The instrument explicitly frames why these provisions are needed: to manage both in‑band and out‑of‑band interference between adjacent spectrum licences by using emission buffer zones and compatibility requirements, and to avoid placing the whole burden of interference management on transmitter operators (s7 Background; s9 Out‑of‑band interference). It says emission limits alone are insufficient for close proximity situations and sets out minimum receiver performance parameters and coordination mechanisms to manage those situations (s9(2)-(4); s12(2)).
Who decides how the rules are applied and who is granted protection is the Australian Communications and Media Authority, operating under the Act and informed by the section 145 determination and the Register. The instrument establishes expectations and technical baselines that will be used by the ACMA when it determines whether a receiver merits protection and what transmitters must do to facilitate compatibility (see s7(3)(c), s10(1)-(2), s13(3)). The instrument does not itself set out enforcement penalties; enforcement relies on powers in the Act and related instruments (see s3 Authority; s6 References to other instruments).
This instrument therefore functions as an operational guidance layer: it prescribes technical minimums for receivers, a measurable compatibility requirement, and an additional emission‑filtering profile, while leaving enforcement, registration processes and some policy choices to be exercised under the Act and the section 145 determination.
Main concepts
The instrument organises interference management around a few recurring technical and administrative concepts, each with a concrete role in assigning responsibility and shaping behaviour.
Spectrum segmentation and emission buffer zones. The instrument treats a spectrum licence as a part of spectrum coupled with a geographic area (s5 Definitions, geographic area). Interference between adjacent licences is managed by emission buffer zones which are created via core conditions of licences, section 145 determinations, and advisory guidelines under s262 of the Act (s7(1)-(2)). The guideline makes explicit that emission limits in licence core conditions are a principal tool (s7(2)(a)), but that they alone are inadequate for close‑proximity out‑of‑band problems (s9(2)-(3)).
Notional receiver performance level. The ACMA sets a notional receiver performance level as the baseline performance a fixed receiver should meet to expect ACMA protection (s12(2)). Schedule 1 lists the four key receiver performance parameters that define this notional level: adjacent channel selectivity, intermodulation response rejection, receiver blocking and spurious response immunity, and specifies how they are to be assessed (at the antenna connector port) and numerically (Schedule 1 items 1-6).
Compatibility requirement. For registered fixed receivers meeting the notional level, the instrument requires that fixed transmitters must meet a compatibility requirement: a maximum unwanted signal level at the receiver antenna connector port (s13(1)). Schedule 2 sets that as a maximum of −123.5 dBm for no more than 1% of the time in any one hour measured in a 30 kHz rectangular bandwidth, with logarithmic scaling for other bandwidths (Schedule 2 item 1).
Registration timing and priority. The guideline makes registration timing central to who gets protection: to be eligible for protection against an apparatus‑licensed transmitter, the receiver must have been recorded in the Register before that apparatus licence was first issued; similarly, to be protected against a spectrum licensed transmitter, the receiver must be in the Register before the transmitter is recorded (s10(1)-(2)). The instrument states a general principle that if changes to reduce out‑of‑band emissions do not facilitate compatibility, the device first registered is generally given priority (s13(3) note).
Categorisation by device mobility and siting. The compatibility requirement explicitly applies to fixed receivers only; mobile receivers are excluded because their transient nature prevents use of this requirement as an interference management procedure (s11). For upper band receivers, effective antenna height and proximity to frequency adjacent spectrum licences matter: fixed receivers in the upper band with effective antenna height ≤10 m are included (s13(2)(d)(ii)); if >10 m, additional proximity constraints apply (s13(2)(d)(iii)).
Out‑of‑band emission control by additional filtering. The guideline sets an additional out‑of‑band emission limit through required radiofrequency filtering between the antenna and antenna connector of a transmitter (Schedule 3 item 1). That limit is piecewise: for FreqOffset ≤ 20.5 MHz it is defined by a formula combining a 2 dB baseline and a 60 log10 term; for offsets >20.5 MHz, the required attenuation is 70 dB (Schedule 3 items 1(a)-(b)). FreqOffset is the smallest frequency difference between the receiver licence band edge and the given external frequency (Schedule 3 item 2).
Default antenna gain and feeder loss for coordination. Schedule 1 specifies defaults to use when a receiver record lacks antenna gain or feeder loss, being 18 dBi gain and 2 dB feeder loss respectively (Schedule 1 item 6). The notional receiver performance parameters are assessed at the antenna connector port (Schedule 1 item 2), which ties back to the compatibility requirement measurement location.
Together these concepts partition responsibilities: receivers must meet a notional performance level and be registered to secure protection; transmitters must ensure unwanted levels at the registered fixed receiver antenna connector do not exceed the compatibility requirement and are expected to implement out‑of‑band filtering where needed, bearing the cost of their own system changes (s12(2); s13(1), (3) note). The ACMA, via the Register and the section 145 determination referred to in definitions, is the decision centre for protection determinations and registration.
Who it affects
The instrument identifies and alters the obligations and expectations of a set of market participants and regulators. The text makes these categories explicit.
Spectrum licensees. Licensees operating radiocommunications transmitters under 1800 MHz spectrum licences are repeatedly referenced. They must expect that fixed receivers registered under adjacent spectrum licences may be afforded protection based on the notional receiver performance level and compatibility requirement (s7(3)(a)-(b); s13(1), (3)). Spectrum licensees are expected to reduce out‑of‑band emissions to the levels in Schedule 3 where doing so would facilitate compatibility (s13(3) and note). They are expected to bear the costs of changes to their own systems (s13(3) note).
Apparatus licensees. The guideline treats certain apparatus‑licensed transmitters like spectrum licences where apparatus licences were first issued on or after 18 June 2013, applying the device boundary criterion to them and affording the same in‑band protection (s8(2)). Apparatus licences first issued before 18 June 2013 are explicitly excluded from ACMA intent to afford protection from in‑band interference (s8(3)). Apparatus licensees must comply with the compatibility requirement for fixed receivers that satisfy the eligibility criteria when the transmitter is subject to the compatibility requirement (s13(1)).
Class licensees. The guideline states the ACMA does not intend to act in relation to in‑band interference where the class licensed operation complies with its conditions (s8(4)). Class licence holders are still bound by their class licence conditions (s13(5)), and the instrument notes that upper band receivers are generally not afforded protection from devices exempt from registration, which includes many class licensed devices (s13(2) note).
Spectrum licensee receivers (fixed and mobile). Owners or operators of 1800 MHz receivers under spectrum licences are affected in two ways: to obtain ACMA protection from other devices their receiver must meet the notional receiver performance level and be recorded in the Register subject to timing requirements (s10(1)-(2); s12(2); Schedule 1). Mobile receivers, however, are not covered by the compatibility requirement because their transient operational patterns make that approach impractical (s11).
Site operators and multi‑operator sites. The instrument recognises that close proximity devices, such as those at multi‑operator sites, are especially susceptible to out‑of‑band interference and cannot rely on emission limits alone (s9(2)-(3)). Operators at such sites will be caught by the expectation that transmitters reduce out‑of‑band emissions or implement additional filtering when coordination with registered receivers is required (s13(3)).
Manufacturers and equipment suppliers. Equipment used in transmitters and receivers will need to meet or enable meeting the specified technical parameters. The notional receiver performance levels and the required transmitter out‑of‑band filtering impose technical specifications that can affect product selection, site design and capital expenditure, particularly where a licensee is expected to implement additional filtering in hardware between antenna and antenna connector (Schedule 3 item 1(b)).
ACMA and authorised third parties. The ACMA is the decision maker for registration and protection determinations (see s5 definitions referencing the section 145 determination and s7 Background). The instrument also expressly says it should be used by authorised third parties in planning and resolving interference (s7(5)). The section 145 determination is a related instrument governing unacceptable interference and registration; the guideline defers to it for other defined terms and for additional procedural detail (s5(2)-(3)).
Who pays and who bears operational risk? The instrument assigns cost responsibility primarily to licensees of transmitters where they are expected to reduce out‑of‑band emissions and to bear the costs of changes to their own systems (s13(3) note). Receiver operators retain responsibility where receivers are not eligible for protection, for example mobile devices (s11) and upper band receivers affected by exempt devices (s13(2) note). ACMA retains decision rights over protection but the instrument does not itself create a direct penalty regime; enforcement is by the Act and related instruments (s3 Authority; s6 References to other instruments).
Key duties and rights
The instrument creates a set of concrete duties, expectations and rights that shape planning, deployment and dispute resolution among spectrum, apparatus and class licence holders, and receiver operators.
Duties and expectations placed on transmitter operators
Ensure compliance with the compatibility requirement for fixed receivers that meet the eligibility conditions: s13(1) establishes the duty that the licensee of a fixed transmitter operated under an apparatus licence or a spectrum licence must ensure the transmitter meets the Schedule 2 compatibility requirement in relation to the fixed receiver specified in s13(2).
Reduce out‑of‑band emissions where doing so would facilitate compatibility: s13(3) makes it clear that spectrum licence holders are expected to reduce out‑of‑band emissions to Schedule 3 levels if that facilitates compatibility with registered receivers under a frequency adjacent licence. That expectation is irrespective of registration order, although a first‑registered device tends to be given priority if emission reduction would not facilitate compatibility (s13(3) and its note).
Bear costs of their own system changes: the instrument explicitly places the costs of any required transmitter-side changes on the licensee making the change (s13(3) note).
Duties and expectations placed on receiver operators
Registration timing: s10(1)-(2) makes registration timing decisive. A receiver is afforded protection from an apparatus‑licensed transmitter only if recorded in the Register before the apparatus licence was first issued. For protection against a spectrum licensed transmitter, the receiver must be in the Register before the transmitter details were included.
Meet the notional receiver performance level to receive protection: s12(2) and Schedule 1 require receivers to meet the listed parameters; the ACMA will assume receivers meet these minimums when deciding protection (s7(3)(c)).
Manage interference from exempt devices: s13(2) note places responsibility on receiver operators to handle interference from devices exempt from registration, particularly for upper band receivers, via negotiation, guard bands or site selection.
Rights and decision nodes held by ACMA
Registration and protection decisions: ACMA determines what receivers are afforded protection and uses the notional receiver performance level as the baseline for those decisions (s12(2); s7(3)(c)). The instrument points to the section 145 determination for the procedure around unacceptable interference and registration (s5 definition and note).
Discretion around in‑band protection: ACMA states it does not intend to afford in‑band protection to receivers where interference comes from apparatus licences first issued before 18 June 2013 (s8(3)), and it does not intend to act where class licence operations comply with relevant conditions (s8(4)). Those are policy statements of enforcement intent by ACMA.
Rights and expectations for planning and negotiation
The instrument expressly allows private negotiation and alternative protection arrangements: s7(6) states the instrument does not prevent persons negotiating and implementing other protection requirements. This preserves contractual freedom to agree to protections beyond the guideline baseline.
Measurement and technical duties
Performance is assessed at the antenna connector port: Schedule 1 item 2 and Schedule 2 item 1 specify the measurement point for receiver performance and the compatibility requirement respectively.
Use of default antenna gain and feeder loss: Schedule 1 item 6 prescribes default values if records lack those specifics; that creates a predictable coordination baseline.
Implement additional filtering where needed: Schedule 3 item 1 requires additional radiofrequency filtering between antenna and antenna connector expressed by formula and threshold attenuation, which is a practical duty on a transmitting licensee when coordination requires it.
Procedural dependencies and limits
The instrument is advisory and makes many declarations as ACMA intent or expectation rather than mandatory statutory penalties: see s7(3)(c) where ACMA will assume receivers meet minima, and s13(3) where licensees are expected to reduce emissions. Concrete enforcement mechanisms are in the Act and in the section 145 determination (s3; s5 definitions).
Collectively these duties allocate who must act and who has to bear costs in typical coordination disputes: transmitter licensees will generally be required to take the technical steps necessary to meet the compatibility requirement and to implement out‑of‑band filtering when coordination with registered receivers is required, and will pay for system changes. Receiver operators gain a right to protection only if they meet defined technical minima and meet registration timing thresholds.
Penalties and enforcement
The instrument itself is an advisory guideline made under s262 of the Act and does not set out a standalone civil or criminal penalty regime within its text. It instead establishes technical expectations and defines the criteria the ACMA will use when considering protection and coordination. Enforcement and penalties therefore derive from the Radiocommunications Act 1992 and related instruments rather than this guideline itself (see s3 Authority and s6 References to other instruments).
What the instrument does specify about enforcement and scope
ACMA decision framework: The guideline instructs that ACMA will use the notional receiver performance level when deciding whether to afford protection to receivers (s12(2); s7(3)(c)). That creates an evidentiary baseline ACMA can apply when exercising powers under the Act and the section 145 determination.
Discretionary statements of intent: The ACMA records specific enforcement intentions, such as not intending to afford in‑band protection from apparatus licences first issued before 18 June 2013 (s8(3)), and not intending to act in relation to in‑band interference from compliant class licensed devices (s8(4)). Those are statements of likely enforcement approach rather than statutory prohibitions in the guideline text.
Expectation v mandatory duty: For transmitters, s13(1) sets a duty to ensure fixed transmitters meet the compatibility requirement in relation to eligible fixed receivers. The instrument also states licensees are expected to reduce out‑of‑band emissions where that would facilitate compatibility (s13(3)). The instrument’s language mixes mandatory phrasing (must ensure in s13(1)) with expectation language (s13(3)), leaving some enforcement detail to the Act or administrative processes.
Where penalties and enforcement mechanisms will be found
The instrument cross‑references the Radiocommunications Act 1992. The Act contains the ACMA’s statutory powers, including remedies for interference and mechanisms for registration, licensing, enforcement, and penalties. The instrument specifically references section 145 determinations dealing with unacceptable interference and registration; those determinations and the Act will set out the processes and any sanctions that can follow from breaching licence conditions or causing unacceptable interference (s5 definitions, section 145 determination note).
The instrument also points to spectrum licence core conditions (s66 of the Act) and the role of those core conditions in setting out emission limits (s7(2)(a)). Enforcement of licence conditions, including core conditions, will be through the Act’s administrative and regulatory mechanisms.
Practical enforcement implications for participants
Licensees that fail to meet the compatibility requirement for an eligible fixed receiver may face ACMA action under the Act, depending on the registration timing, the receiver’s compliance with the notional performance level, and the ACMA’s assessment under the section 145 determination. The guideline does not specify fines or suspension but establishes objective technical criteria that ACMA can use in administrative determinations.
The ACMA’s stated intentions to not afford protection in specific scenarios (s8(3)-(4)) matter for likely enforcement outcomes. For example, apparatus licences pre‑dating 18 June 2013 are unlikely to attract ACMA action for in‑band interference complaints against a receiver relying on the guideline.
Because the guideline expects licensees to bear costs of their own changes (s13(3) note), commercial disputes over cost allocation may arise and will typically be resolved by negotiation, contractual arrangements or, where applicable, ACMA administrative processes under the Act.
Limitation and uncertainty
The guideline does not enumerate penalties, fines, or the detailed procedural steps ACMA will take to enforce technical requirements. That detail is in the Act and the section 145 determination which is cross‑referenced in the instrument (s5 definitions). Participants should therefore treat this guideline as the technical and procedural baseline rather than the source of enforcement rules.
In short, enforcement and penalties are not created de novo by this guideline. The document produces measurable technical thresholds and an administrative framework ACMA will use, and enforcement follows via the powers and processes in the Radiocommunications Act and related determinations.
How it interacts with other laws
This guideline is explicitly cross‑referential to the Radiocommunications Act 1992 and to other legislative instruments. Interaction is designed to sit within the existing statutory and regulatory architecture rather than supplant it.
Authority and legislative placement
The instrument is made under s262 of the Radiocommunications Act 1992 (s3 Authority). That section provides the ACMA with power to issue advisory guidelines. As an advisory guideline, it is subordinate to the Act and to regulations or determinations made under the Act.
The instrument also assumes the existence and primacy of licence core conditions under s66 of the Act and the section 145 determination under s145 (s7 Background; s5 Definitions note). It does not replace licence core conditions but complements them by setting technical baselines and coordination expectations in scenarios where core conditions and emission limits are not sufficient.
Cross‑references and defined terms
Many terms used in this instrument are defined either within the instrument or in the Act. Section 5 notes that other expressions are defined in the Act, including ACMA, apparatus licence, class licence, core condition, interference and spectrum licence (s5 note). Subsections 5(2)-(3) say certain terms derive their meaning from the section 145 determination or any replacement instrument, thereby creating dependency on that determination for some technical definitions.
Section 6 requires that references to any other legislative instrument should be read as to the instrument as in force from time to time (s6). This means that changes to the Act, the section 145 determination, or other relevant instruments will affect how this guideline applies, and it embeds an ongoing interaction with the broader regulatory framework.
Relationship with the section 145 determination and registration processes
The guideline explicitly references the Radiocommunications (Unacceptable Levels of Interference - 1800 MHz Band) Determination 2023 (the section 145 determination) for definitions and for registration procedures (s5). The section 145 determination is the instrument that sets out unacceptable levels of interference and how registration interacts with those thresholds; the guideline relies on that determination for procedural and definitional detail.
Registration timing rules in s10 tie protection directly to how the Register is populated, which itself is governed by the Act and the section 145 determination. The guideline therefore interacts with statutory registration regimes.
Interaction with licence core conditions and emission limits
The guideline recognises that licence core conditions under s66 can include out‑of‑area and out‑of‑band emission limits (s7(2)(a)), and it explains why emission limits are inadequate for certain close‑proximity out‑of‑band interference (s9(2)-(4)). Thus it functions as an adjunct to licence conditions: it supplies a receiver‑performance based coordination mechanism when emission limits would be too constraining or inaccurate operationally.
The note to s13(3) explains that strict out‑of‑band emission limits were not imposed in spectrum licence core conditions to avoid unnecessary costs and burdens on licensees. The guideline therefore introduces additional filtering expectations via Schedule 3 as a situational remedy rather than a universal core condition.
Relationship to commercial law and private arrangements
The instrument expressly permits private negotiation and contractual arrangements to implement protection requirements outside the guideline (s7(6)). It therefore does not preclude parties from agreeing different technical or cost allocation outcomes, creating an interface with contract law practices and commercial negotiation.
Where parties reach private agreements, the guideline operates as a fallback baseline for ACMA’s administrative decisions and technical expectations if a dispute is escalated.
Statutory interpretation aids
Section 6 notes that the Acts Interpretation Act 1901 and Legislation Act 2003 apply in interpreting references to Commonwealth Acts and instruments. The instrument therefore must be read with those interpretation rules in mind (s6 and notes).
Practical net effect on legal relationships
The guideline allocates practical responsibilities and expectations within the statutory framework: ACMA retains statutory powers and decision rights under the Radiocommunications Act and the section 145 determination, licensees have technical duties and cost responsibilities consistent with licence conditions, and parties may contractually alter obligations. The guideline modifies how the technical details of interference disputes will be assessed within the existing legal architecture rather than creating new legal categories outside that framework.
Amendment history
The instrument contains a small, specific amendment history recorded within its own text. That history is limited to the repeal of earlier guidelines and the commencement mechanics.
Replacements and repeals
The instrument expressly repeals two earlier Radiocommunications Advisory Guidelines made in 2012: the Radiocommunications Advisory Guidelines (Managing Interference to Spectrum Licensed Receivers - 1800 MHz Band) 2012 [F2012L02047], and the Radiocommunications Advisory Guidelines (Additional Device Boundary Criteria - 1800 MHz Lower Band) 2012 [F2012L02046] (s4 Repeal of other guidelines). The 2023 instrument therefore displaces those specific advisory guidelines.
Commencement
The instrument commences at the start of the day after the day it is registered on the Federal Register of Legislation (s2 Commencement). There are no transitional provisions included in the instrument text about grandfathering or phased implementation; however, the instrument includes timing rules for registration to determine eligibility for protection (s10), which operate as operational transitions in practice.
Authority and potential future changes
The instrument is made under s262 of the Radiocommunications Act 1992 (s3 Authority) and section 6 provides that references to other legislative instruments are to be read as those instruments stand from time to time (s6). This flags that future amendments to the Act, the section 145 determination, or other instruments could change how the guideline operates without the guideline itself needing to be amended in every respect.
Absence of amendment log
Apart from the repeal of the two 2012 instruments and the commencement clause, the instrument does not contain a formal amendment log, saving clause or staged timing schedule for particular provisions. There are no listed historical amendments within the text provided beyond the repeal of the 2012 guidelines.
Practical consequences for stakeholders
The repeal moves the operational baseline for managing interference in the 1800 MHz band from the 2012 documents to the 2023 guideline. Parties that relied on the 2012 texts should treat the 2023 instrument as the operative advisory guideline and check for differences in definitions, technical baselines and expectations (compare the definitions in s5 and the notional receiver performance and compatibility requirement in Schedules 1 and 2).
Because the instrument references the section 145 determination and other instruments as in force from time to time (s5(2)-(3); s6), any subsequent amendments to those instruments will have immediate cross‑effect on definitions and operational detail used by this guideline.
If legal practitioners need a traceable legislative history beyond what is contained in this instrument, the Federal Register of Legislation and the ACMA Register are the authoritative sources for prior instruments and any subsequent amendments or repeal notices referenced in the instrument’s notes (s2 note; s5 note).
Litigation history
The instrument itself does not contain or cite any litigation history, judicial decisions, or precedent cases. The text contains no references to court decisions, appeals, or administrative appeals arising from earlier guidelines (for example, the repealed 2012 instruments) or from the 2023 instrument. The instrument is framed as an advisory guideline and explicitly cross‑references the Radiocommunications Act and the section 145 determination rather than litigation outcomes (s3 Authority; s5 definitions and note).
Implications
Because this document does not record any litigation history, the guideline should be treated as a technical and administrative standard rather than a judicially interpreted legal rule. Any enforcement or dispute decisions will be made using the Act, the section 145 determination and ACMA’s administrative processes; if disputes escalate to merits review or judicial review, that litigation history will be recorded in courts or tribunals rather than in this guideline.
Action points for practitioners seeking litigation history
To determine whether there has been litigation relevant to these concepts (for example, disputes over registration timing, protection for receivers, compatibility requirement enforcement, or the interpretation of the section 145 determination), consult:
ACMA published decisions, determinations and investigation reports that address interference disputes under the Radiocommunications Act;
the Federal Court of Australia, Federal Circuit and Family Court records, the Administrative Appeals Tribunal, and other appropriate tribunals for judicial review or merits review decisions involving spectrum interference or ACMA regulatory action;
the Federal Register of Legislation and the ACMA website for any published guidance, determinations or enforcement actions connected to the 1800 MHz band.
Caveat
The absence of litigation references in this instrument does not imply the absence of disputes in practice. The document sets objective technical markers that can be litigated or reviewed, so interested parties should perform current searches of the ACMA decision register and judicial databases for any post‑2023 litigation or administrative review that interprets these guidelines or the section 145 determination.
Gotchas
This instrument contains a number of practical traps and timing or technical particulars that can materially affect whether a receiver gets ACMA protection and what costs fall on whom. The following points are drawn directly from the instrument and its Schedules.
Registration timing is decisive (s10)
A receiver must be included in the Register before the relevant apparatus licence was first issued to be afforded protection from that apparatus‑licensed transmitter, and before the transmitter details were included in the Register to be protected from a spectrum licensed transmitter (s10(1)-(2)). This creates a first‑mover effect: late registration can forfeit administrative protection even if the receiver would otherwise meet the notional receiver performance level.
Mobile receivers excluded from compatibility requirement (s11)
The compatibility requirement in Part 5 and Schedule 2 does not apply to receivers that are mobile devices, because their transience prevents use of the requirement as an interference management procedure (s11). Operators of mobile services cannot rely on the fixed‑receiver compatibility framework and must manage interference by other means, such as design choices, roaming arrangements or contractual protections.
ACMA intent not to afford protection in specific historical and licence contexts (s8)
ACMA states it does not intend to afford protection from in‑band interference caused by apparatus licences first issued before 18 June 2013 (s8(3)). If you operate or rely upon an older apparatus licence, this statement of intent matters: it signals likely administrative outcomes where complaint is made.
Similarly, the ACMA does not intend to act with respect to in‑band interference from class licensed devices that comply with class conditions (s8(4)). Class‑licensed device operators therefore have a defensive position if they follow their licence conditions.
Upper band effective antenna height constraint and proximity rules (s13(2)(d))
For receivers in the 1800 MHz upper band, only those with effective antenna height at or below 10 metres are straightforwardly included; receivers with effective antenna height greater than 10 metres may still be included only if they are not within 10 MHz of a frequency adjacent spectrum licence and are not in an area of high mobile use (s13(2)(d)(ii)-(iii)). Mismeasuring effective antenna height or misunderstanding FreqOffset could render protection inapplicable.
Notional receiver performance assessed at antenna connector port (Schedule 1 item 2)
All notional receiver performance parameters are assessed at the antenna connector port. If a registered receiver’s record does not specify antenna gain or feeder loss, default values apply (18 dBi gain and 2 dB feeder loss in Schedule 1 item 6). Using defaults can disadvantage a receiver whose real antenna characteristics would give it better resilience; conversely, not specifying realistic feeder loss can create coordination surprises.
Compatibility requirement is strict and measured in a narrow bandwidth (Schedule 2 item 1)
The maximum unwanted signal level is −123.5 dBm for no more than 1% of the time in any hour, measured in a 30 kHz rectangular bandwidth (Schedule 2 item 1). Alternative bandwidths require logarithmic scaling, which can be misunderstood without careful conversion. Practitioners should ensure measurement methodology is agreed.
Additional out‑of‑band emission limit requires physical filtering between antenna and antenna connector (Schedule 3 item 1(b))
The additional emission limit is derived from existing licence non‑spurious emission limits plus additional radiofrequency filtering between the antenna and the antenna connector of the transmitter, given by a formula for FreqOffset ≤20.5 MHz and a 70 dB requirement above that offset (Schedule 3 item 1). That implies hardware changes at the transmitter site to meet coordination requests. Licensees are expected to bear these costs (s13(3) note).
Expectation versus mandatory duty language (s13(1), s13(3))
The instrument uses both mandatory language and expectation language. Section 13(1) states an obligation: the licensee must ensure a fixed transmitter meets the compatibility requirement in relation to specified fixed receivers. Section 13(3) uses expectation language that spectrum licensees are expected to reduce out‑of‑band emissions to Schedule 3 levels when that would facilitate compatibility. This mix introduces ambiguity about enforceability in some coordination contexts and may require reliance on the Act for decisive enforcement.
Out‑of‑band interference is hard to model and can extend for many MHz (s9)
The instrument explicitly warns that out‑of‑band interference can extend for many megahertz and is difficult to model accurately, especially for nearby devices such as at multi‑operator sites (s9(1)-(3)). Licence holders who rely solely on propagation modelling without on‑site measurement risk incorrect conclusions.
Priority and burden allocation when compatibility cannot be facilitated (s13(3) note)
If reducing out‑of‑band emissions would not facilitate compatibility between services, generally the radiocommunications device first registered will be given priority (s13(3) note). That creates a strategic incentive to register promptly and to document receiver performance and site details.
No direct penalties listed in the guideline
The instrument does not list fines or specific penalties. Enforcement mechanisms are in the Act and the section 145 determination (s3; s5). Parties should not assume the guideline provides a standalone sanctions framework.
Allowance for private negotiation (s7(6))
The guideline explicitly permits parties to negotiate other protection requirements. This is a feature rather than a gotcha, but it does mean that formal protection under the ACMA regime is not the only available route and that careful negotiation can reallocate costs and protections.
Taken together, these points mean that timing, measurement methodology, registration details, and accurate technical records are critical. Failure to capture correct antenna gain, feeder loss, effective antenna height or to register in time can materially change whether a receiver receives protection and who bears retrofit costs.
How to comply
This section translates the instrument’s technical requirements and administrative expectations into practical steps for licensees, receiver operators, equipment suppliers and advisers. Each step is grounded in the instrument text and Schedules.
Establish whether the receiver is eligible for protection (s10, s11, s12, s13)
Verify that the receiver is a fixed receiver operated under an 1800 MHz spectrum licence (s13(2)(a)). Mobile devices are excluded from the compatibility framework (s11).
Ensure the receiver meets the notional receiver performance level in Schedule 1: adjacent channel selectivity 43.5 dB for offsets <5 MHz (Schedule 1 item 2), intermodulation response rejection −74 dBm per 30 kHz at offset ≥5 MHz (Schedule 1 item 3), receiver blocking −65 dBm per 30 kHz within 1690-1805 MHz or total mean power −15 dBm outside that band (Schedule 1 item 4), and spurious response immunity 65 dB (Schedule 1 item 5). All parameters are to be assessed at the antenna connector port (Schedule 1 item 2).
Record antenna gain and feeder loss in the Register. If these are not recorded, coordination should use default values (18 dBi gain, 2 dB feeder loss) per Schedule 1 item 6.
Register receivers and manage timing (s10)
To obtain protection from an apparatus‑licensed transmitter, include receiver details in the Register before the apparatus licence is first issued (s10(1)). To obtain protection from a spectrum licensed transmitter, register the receiver before the transmitter’s details are included in the Register (s10(2)). Because registration timing is decisive, ensure registration occurs as early as is feasible when deploying fixed infrastructure.
Assess effective antenna height and location constraints for upper band receivers (s13(2)(d))
If the receiver operates in the 1800 MHz upper band (1805-1880 MHz), calculate effective antenna height using the method in Schedule 3 to the section 145 determination (s13(4)). Receivers with effective antenna height ≤10 m are treated favourably (s13(2)(d)(ii)). If >10 m, verify the receiver is not within 10 MHz of an adjacent frequency licence and not in an area of high mobile use (s13(2)(d)(iii)).
For transmitter licensees, measure and ensure compliance with the compatibility requirement (s13(1); Schedule 2)
For coordination with an eligible fixed receiver, ensure that the maximum unwanted signal level at the receiver antenna connector port does not exceed −123.5 dBm for more than 1% of the time in any 1 hour period in a 30 kHz bandwidth, using logarithmic scaling for other bandwidths (Schedule 2 item 1). Agree measurement methods and locations with the receiver operator where practical to avoid disputes.
If the receiver is registered and compatibility cannot be achieved without reducing out‑of‑band emissions, be prepared to implement radiofrequency filtering between the transmitter antenna and the antenna connector as specified by Schedule 3 item 1. For FreqOffset ≤20.5 MHz, apply the specified formula to derive required attenuation; for offsets >20.5 MHz, apply a 70 dB attenuation requirement. Identify FreqOffset as the smallest frequency gap to the receiver’s licence band edge per Schedule 3 item 2.
Plan for the capital and operational cost of filters and related hardware changes. The instrument expects licensees to bear their own system change costs (s13(3) note).
Coordinate measurement methodology and use agreed defaults where records lack detail (Schedule 1 item 6)
Agree in advance whether measurements will be taken at the antenna connector port and whether the receiver’s registered antenna gain and feeder loss will be relied upon. If those values are absent from the Register, the default coordination values are 18 dBi and 2 dB (Schedule 1 item 6).
Use negotiation and contracts when ACMA protection is uncertain (s7(6))
The instrument explicitly permits parties to negotiate alternate protection arrangements (s7(6)). Where registration timing or technical eligibility is borderline, negotiate contractual solutions for coexistence, including guard bands, site sharing rules, or cost‑sharing for filtering or retuning.
Document technical baselines and keep records current
Maintain up‑to‑date entries in the Register, including antenna characteristics, precise frequencies, and effective antenna height calculations. The Register timing rules (s10) make this documentation operationally decisive. Where equipment is upgraded or antenna heights change, update registration records promptly.
Prepare for on‑site measurement and remediation at multi‑operator or dense sites (s9)
Because out‑of‑band interference is hard to model and can extend many MHz in close proximity, plan for on‑site testing and pragmatic remedies such as physical separation, antenna pattern adjustments, or local filtering. Emission limits alone may not be sufficient in such environments (s9(2)-(3)).
Seek ACMA guidance and apply section 145 determination definitions and procedures
The instrument defers to the section 145 determination for certain definitions and for unacceptable interference procedures (s5(2)-(3); s5 note). Consult the section 145 determination and ACMA guidance for procedural steps for lodging interference complaints and for registration details.
Anticipate ACMA enforcement policy statements when planning (s8)
Design plans should reflect ACMA’s stated enforcement intentions. For example, apparatus licences issued before 18 June 2013 are less likely to attract ACMA action for in‑band interference complaints (s8(3)). Similarly, class licensed devices compliant with class conditions are unlikely to attract ACMA action for in‑band interference (s8(4)). Do not rely on these as absolute protections, but incorporate them into risk assessments.
If in doubt, engage technical experts for measurement conversions and compliance testing
The compatibility requirement measurement uses narrowband 30 kHz metrics and requires logarithmic scaling for alternative bandwidths (Schedule 2 item 1). Convert and document these measurements using robust, standardised methods to avoid disputes.
Following these steps connects the instrument’s technical thresholds to operational planning. The key control points are registration timing, achieving the receiver’s notional performance parameters at the antenna connector, and transmitter-side emission control and filtering where required under Schedule 3. Commercial negotiation remains an available tool to reallocate costs or to implement bespoke coexistence arrangements (s7(6)).
compatibility requirement: see Part 5 and Schedule 2.
emission buffer zone, in relation to a spectrum licence, means a zone along the frequency or geographic boundary specified in a spectrum licence where emission levels of radiocommunications transmitters are reduced to ensure that significant levels of emissions stay within the geographic areas and frequencies of the licence.
fixed receiver means a radiocommunications receiver:
(a) located at a fixed point on land or sea; and
(b) not designed or intended for use while in motion.
fixed transmitter means a radiocommunications transmitter:
(a) located at a fixed point on land or sea; and
(b) not designed or intended for use while in motion.
frequency adjacent spectrum licence, in relation to a spectrum licence (the first licence), means a spectrum licence that authorises the operation of radiocommunications devices in a part of the spectrum that is adjacent to the parts of the spectrum specified in a core condition of the first licence.
geographic area, for a spectrum licence, means the area within which operation of a radiocommunications device is authorised under the licence.
in-band means:
(a) for a radiocommunications device operated under a spectrum licence – the part of the spectrum within which the operation of radiocommunications devices is authorised under the licence; or
(b) for a radiocommunications device operated under an apparatus licence that specifies a frequency band – the frequencies within the lower frequency limit and the upper frequency limit specified in the licence;
(c) for a radiocommunications device operated under an apparatus licence that specifies a specific frequency and bandwidth – the frequencies within that bandwidth, when centred on the specific frequency.
intermodulation response rejection: see item 3 of Schedule 1.
mobile device means a radiocommunications device that is used:
(a) while it is in motion on land, on water or in the air; or
(b) in a stationary position at unspecified points on land, on water or in the air.
notional receiver performance level: see subsection 12(2).
out-of-band, for a radiocommunications device, means a frequency other than an in-band frequency.
receiver blocking, in relation to a radiocommunications receiver, means the measure of the ability of the receiver to receive a wanted signal in the presence of a high level unwanted interferer on frequencies other than those of an adjacent channel.
section 145 determination means the Radiocommunications (Unacceptable Levels of Interference – 1800 MHz Band) Determination 2023.
Note: The section 145 determination is available, free of charge, from the Federal Register of Legislation at www.legislation.gov.au.
spectrum space means the three dimensional space consisting of a frequency band and a geographic area.
spurious response immunity: see item 5 of Schedule 1.
unwanted signal means a radio emission from a radiocommunications transmitter that is not a wanted signal.
wanted signal means a radio emission from a radiocommunications transmitter that is intended for reception by a radiocommunications receiver protected by this instrument.
Note: A number of other expressions used in this instrument are defined in the Act, including the following:
(2) In this instrument, unless the contrary intention appears, each term listed in subsection (3) has the meaning given by:
(a) the section 145 determination; or
(b) if another instrument replaces that determination – the other instrument.
(3) For the purposes of subsection (2), the terms are:
(a) additional device boundary criterion;
(b) areas of high mobile use;
(c) device boundary;
(d) device boundary criterion;
(e) effective antenna height;
(f) high sited;
(g) low sited.
(4) In this instrument, unless otherwise specified, a reference to a part of the spectrum or a frequency band includes all frequencies that are greater than but not including the lower frequency, up to and including the higher frequency.
Note: This subsection means the lower number in a part of the spectrum or a frequency band is not included in the part of the spectrum or the frequency band.
6 References to other instruments
6 References to other instruments
In this instrument, unless the contrary intention appears:
(a) a reference to any other legislative instrument is a reference to that other legislative instrument as in force from time to time; and
(b) a reference to any other kind of instrument or writing is a reference to that other instrument or writing as in force or existence from time to time.
Note 1: For references to Commonwealth Acts, see section 10 of the Acts Interpretation Act 1901; and see also subsection 13(1) of the Legislation Act 2003 for the application of the Acts Interpretation Act 1901 to legislative instruments.
Note 2: All Commonwealth Acts and legislative instruments are registered on the Federal Register of Legislation.
Note 3: See section 314A of the Act.
7 Background
7 Background
(1) A spectrum licence authorises the operation of radiocommunications devices within a part of the spectrum and in a geographic area. Interference occurring between adjacent spectrum licences consists of in-band interference across the geographic boundaries, and out-of-band interference across the frequency boundaries.
(2) This interference is managed by creating emission buffer zones along the geographic and frequency boundaries of a spectrum licence, using a number of powers under the Act. Emission buffer zones may be created by, or as a result of, the following:
(a) specifying out-of-area and out-of-band emission limits in the core conditions of the licence, which must be included in all spectrum licences (see section 66 of the Act);
(b) a determination under section 145 of the Act, relating to unacceptable levels of interference and the registration of radiocommunications devices, and related licence conditions (see section 69 of the Act);
(c) advisory guidelines under section 262 of the Act, about managing interference in specific circumstances.
(3) This instrument:
(a) provides protection to 1800 MHz receivers from interference caused by radiocommunications transmitters operated under an apparatus licence, class licence, or spectrum licence;
(b) assists in the management of in-band and out-of-band interference by providing compatibility requirements for registered fixed receivers operated under 1800 MHz spectrum licences; and
(c) sets out minimum receiver performance requirements that the ACMA will assume are met by a radiocommunications receiver, when considering whether to provide protection to the receiver in accordance with this instrument, so that the onus of managing interference is not solely placed upon the operators of radiocommunications transmitters.
(4) This instrument is intended to provide guidance on the management and settlement of interference to 1800 MHz receivers, caused by radiocommunications transmitters operated under another class, apparatus or spectrum licence issued under the Act.
(5) This instrument should be used by spectrum licensees, apparatus licensees, and authorised third parties in the planning of services and in the resolution of interference.
(6) This instrument does not prevent a person negotiating and implementing other protection requirements with other persons.
8 In-band interference
8 In-band interference
(1) In-band interference to an 1800 MHz receiver, caused by a radiocommunications transmitter operated under an adjacent spectrum licence, is managed by the core conditions imposed on spectrum licences under section 66 of the Act, the device boundary criterion, and the additional device boundary criterion.
(2) In-band interference to an 1800 MHz receiver, caused by a radiocommunications transmitter operated under an apparatus licence that was first issued under section 100 of the Act on or after 18 June 2013, is managed as if the transmitter were operated under a spectrum licence. The device boundary criterion is to be applied to such radiocommunications transmitters, affording 1800 MHz receivers the same level of in-band protection from apparatus licensed radiocommunications transmitters as they are afforded from radiocommunications transmitters operated under adjacent area spectrum licences.
(3) The ACMA does not intend to afford protection from in-band interference to an 1800 MHz receiver caused by a radiocommunications transmitter operated under an apparatus licence that was first issued under section 100 of the Act before 18 June 2013.
(4) The ACMA does not intend to act in relation to in-band interference to an 1800 MHz receiver caused by a radiocommunications transmitter operated under a class licence where the operation complies with all relevant conditions of the class licence.
9 Out-of-band interference
9 Out-of-band interference
(1) Out-of-band interference is difficult to predict, because the levels and frequencies of unwanted emissions depend on both the nearness and the operating frequencies of radiocommunications transmitters and radiocommunications receivers that are spectrally or geographically close. In addition, out-of-band interference:
(a) can extend for many MHz either side of the frequency boundary of a spectrum licence; and
(b) is dependent on the quality of the radiocommunications receiver as well as the levels of the radiocommunications transmitter’s emissions; and
(c) is difficult to model accurately.
(2) Emission limits are also used to manage out-of-band interference, but these do not provide protection along the frequency boundaries of a spectrum licence throughout the entire geographic area. Because of the nature of out-of-band interference, emission limits cannot be used to provide protection from out-of-band interference for radiocommunications devices that are located near each other.
Note: Example: Radiocommunications devices that are located near each other include devices located at multi-operator sites.
(3) Emission limits are not the sole mechanism used to manage out-of-band interference for devices in close proximity, because the interference modelling inaccuracy would require large probability margins to be added to those limits. Large probability margins would place severe constraints on the use of the spectrum because the upper and lower frequency limits of a spectrum licence extend throughout the geographic area. Emission limits to manage out-of-band interference throughout the geographic area cannot be used, because they would lead to a severe loss of utility of the spectrum on both sides of the frequency limits.
(4) To avoid large probability margins, out-of-band interference is managed through interference management procedures based on a compatibility requirement for radiocommunications receivers. A minimum level of receiver performance is specified in Part 4 in conjunction with the compatibility requirement because the performance level of receivers:
(a) affects the level of interference; and
(b) can vary for receivers operating under spectrum licences.
Note: The minimum level of receiver performance is specified in Part 4. The compatibility requirement is set out in Part 5.
10 Recording radiocommunications receiver details in the Register
10 Recording radiocommunications receiver details in the Register
(1) In this instrument, for an 1800 MHz receiver to be afforded protection from interference caused by an apparatus licensed radiocommunications transmitter, the details of the receiver must have been included in the Register before the relevant apparatus licence was first issued under section 100 of the Act.
(2) In this instrument, for an 1800 MHz receiver to be afforded protection from interference caused by a spectrum licensed radiocommunications transmitter, the details of the receiver must have been included in the Register before the details of the relevant transmitter were included in the Register.
Note: See also Part 5.
11 Mobile devices
11 Mobile devices
The compatibility requirement specified in Part 5 does not apply to radiocommunications receivers operated under an 1800 MHz band spectrum licence that are mobile devices, because the transient nature of these devices prevents the use of this requirement as an interference management procedure.
12 Notional receiver performance level
12 Notional receiver performance level
(1) The level of interference caused by unwanted emissions depends on the interference susceptibility of a radiocommunications receiver and the level of the unwanted signal. Emission levels from radiocommunications transmitters should not have to be reduced below a point where the performance of the radiocommunications receiver is the main cause of the problem.
(2) A notional receiver performance level is set out in Schedule 1 and is to be used when setting a compatibility requirement for a radiocommunications receiver. A receiver should meet the notional receiver performance level to gain protection from interference from a radiocommunications transmitter specified in this instrument.
13 Compatibility
13 Compatibility
(1) In relation to a fixed receiver specified in subsection (2), the licensee of a fixed transmitter operated under an apparatus licence or a spectrum licence must ensure that the transmitter meets the compatibility requirement in Schedule 2.
(2) For the purposes of subsection (1), a fixed receiver is s