Extractive Industries Local Law 2018
Part 3FENCING GENERALLY
Start here
Get a plain-English read of Part 3
Turn the raw legal text into a practical explanation grounded in Extractive Industries Local Law 2018.
PART 3—FENCING GENERALLY 3.1 Fences within front and secondary setback areas (1) A person shall not, without the written consent of an authorised person, construct a free-standing fence greater than 1200mm in height, within the front setback area of a residential lot or townsite lot. (2) An authorised person may approve the construction of a fence of a height greater than 1200mm in the front setback area of a residential lot or townsite lot, if provision is made for lines of vision for a motorist using the driveway to access a thoroughfare where the fence on each side of the driveway into the lot across the front boundary is angled— (a) into the lot for a distance of not less than 1500mm along the frontage, and (b) to a distance of not less than 1500mm from the frontage. (3) The provision of subclause (2) shall not apply to a fence of open construction that does not obscure the lines of vision of a motorist using the driveway for access to a thoroughfare. (4) The provision of subclause (2) shall apply to a secondary setback area where a driveway in the secondary setback area is used as the primary driveway access. 3.2 Alteration of ground levels (1) A person shall not alter the natural ground level of land on or within 1000mm of the boundary of a lot, whether by removing soil or bringing onto the land any fill of any kind, by more than 500mm without the approval of an authorised person. (2) A fence constructed of corrugated fibre-reinforced pressed cement shall not have more than 150mm difference in the ground levels on each side of the fence. (3) Where land has been filled or retained to a height of more than 500mm above natural ground level at or within 1000mm of a boundary of a lot, a person shall only construct a dividing fence that is a sufficient fence on the said filled land or retaining wall if the person produces to an authorised person the written agreement of the owners of the adjoining lot. 3.3 Obstruction of watercourse No person shall construct a fence of impervious material in any place, position or location where it will, or is likely to, act as a barrier to or restrict the flow of a natural watercourse. 3.4 Gates or doors in fences A person shall not construct a gate or door in a fence which encroaches into or over any other property. 3.5 Retaining walls A person must not commence to construct a retaining wall which is on the boundary line unless— (a) an application has been lodged with the local government including— (i) two copies of a plan and specifications of the proposed retaining wall; and (ii) in the case of a retaining wall exceeding 500mm in height and when required by an authorised person, engineering calculations in respect of the proposed retaining wall; and (b) an authorised person has approved the application. 3.6 Estate fencing (1) A person shall not construct an estate entry statement or estate boundary fence without the approval of an authorised person. (2) Where an estate entry statement or estate boundary fence is constructed and contains an estate name, the entry statement or estate boundary fence shall also depict the locality name in at least equal prominence. (3) An owner or occupier of a lot adjacent to an estate boundary fence shall, where that fence is damaged, dilapidated or in need of repair, cause it to be repaired or replaced with the same or similar materials with which it was first constructed, so as far as practicable the repaired or replaced section shall be the same as the original fence.