Export Control (Plants and Plant Products) Rules 2021
3‑1 Other requirements for accreditation3‑1 Other requirements for accreditation
Start here
Get a plain-English read of 3‑1 Other requirements for accreditation
Turn the raw legal text into a practical explanation grounded in Export Control (Plants and Plant Products) Rules 2021.
3‑1 Other requirements for accreditation
(1) For the purposes of paragraph 79(2)(b) of the Act, this section prescribes other requirements that must be met for a property to be accredited for a kind of export operations in relation to a kind of prescribed plants or plant products.
Note: The requirements in this section also apply in relation to an application to renew the accreditation of the property (see paragraph 84(2)(a) of the Act).
Importing country requirements must be able to be met (2) All importing country requirements relating to the export operations to be carried out at the property in relation to prescribed plants or plant products and the plants or plant products must be able to be met. System of controls must be in place (3) For a property to be accredited for operations to prepare prescribed plants or plant products for export, there must be a system of controls in place at the property in relation to those operations, and the plants or plant products for which the property is to be accredited, to ensure that the conditions prescribed by sections 3‑3A and 3‑3B will be complied with in relation to those operations and the plants or plant products.