NSWIn ForceRegulation
Environmental Planning and Assessment (Development Certification and Fire Safety) Regulation 2021
25Interpretation
Start here
Get a plain-English read of 25
Turn the raw legal text into a practical explanation grounded in Environmental Planning and Assessment (Development Certification and Fire Safety) Regulation 2021.
#### 25 Interpretation
25 Interpretation
> > (1) In this Division—
> >
> > document receipt date—see section 27(2)(a).
> >
> > initial fire safety report means a written report specifying whether, on the basis of the documents referred to in section 27(1), the Fire Commissioner is satisfied that—
> >
> > > (a) the performance solution will meet the performance requirements it is intended to meet, and
> >
> > > (b) the fire hydrants in the proposed fire hydrant system will be accessible for use by Fire and Rescue NSW, and
> >
> > > (c) the couplings in the fire hydrant system will be compatible with the fire appliances and equipment used by Fire and Rescue NSW.
> >
> > relevant building work means building work that involves a performance solution for a fire safety requirement in a building other than—
> >
> > > (a) a class 1a, 1b or 10 building, or
> >
> > > (b) a temporary structure.
>
> > (2) A certifier or the Fire Commissioner must use the NSW planning portal to provide a document, information or notice required under this Division.
>
> > (3) An application for a construction certificate to which this Division applies made but not finally determined before 11 December 2020 must be dealt with under the [Environmental Planning and Assessment Regulation 2000](/view/html/repealed/current/sl-2000-0557) as in force immediately before that date.
>
> **s 25:** Am 2022 (788), Sch 1\[4\].