Environmental Management and Pollution Control (Underground Petroleum Storage Systems) Regulations 2020
36Permanent decommissioning of storage system
Start here
Get a plain-English read of 36
Turn the raw legal text into a practical explanation grounded in Environmental Management and Pollution Control (Underground Petroleum Storage Systems) Regulations 2020.
36 Permanent decommissioning of storage system
(1) An infrastructure owner of a storage system must, within 4 months after –
(a) the commencement of permanent decommissioning under regulation 34(b)(ii) ; or
(b) the expiry of the 12-month period referred to in regulation 35(4) –
complete permanent decommissioning of the storage system in accordance with subregulation (2) .
Penalty: Fine not exceeding 100 penalty units.
(2) For the purposes of these regulations, the permanent decommissioning of a storage system is complete –
(a) if –
(i) the storage system is –
(A) removed; and
(B) disposed of in accordance with AS 4976; or
(ii) where the storage system, or any part of the storage system, cannot be removed safely without serious risk to the safety of people or adjoining infrastructure – the storage system, or part of the storage system, is decommissioned in situ, in accordance with AS 4976, without being removed; and
(b) if an assessment is conducted as to whether –
(i) petroleum has contaminated the soil or groundwater within the vicinity of the storage system; and
(ii) any contamination detected is likely to pose an unacceptable risk of harm to human health or the environment; and
(iii) management or remediation measures, or both, are required to lower any risk of unacceptable harm to human health or the environment to an acceptable level; and
(iv) further investigation is required in order to determine the level of risk posed by any contamination detected; and
(v) a parcel of land is a contaminated site; and
(c) if a report in relation to the matters referred to in paragraph (b) (a ) has been obtained by the infrastructure owner; and