Environmental Management and Pollution Control (Underground Petroleum Storage Systems) Regulations 2020
29Environmental site assessments
Start here
Get a plain-English read of 29
Turn the raw legal text into a practical explanation grounded in Environmental Management and Pollution Control (Underground Petroleum Storage Systems) Regulations 2020.
29 Environmental site assessments
(1) In this regulation –
petroleum-related pollutant includes petroleum, a pollutant originating from petroleum and a pollutant produced when petroleum undergoes degradation.
(2) For the purposes of these regulations, an environmental site assessment is an assessment of a parcel of land that is, or is likely to be, contaminated by a petroleum-related pollutant to determine –
(a) the type or types of petroleum-related pollutant concerned; and
(b) the source of the petroleum-related pollutant; and
(c) the spatial extent and magnitude of the petroleum-related pollutant, including whether the petroleum-related pollutant may have escaped from the parcel of land and whether the petroleum-related pollutant is affecting other land, a watercourse or body of water (including groundwater); and
(d) the level of risk to human health, and to the environment, associated with the petroleum-related pollutant; and
(e) whether further actions are required to limit the extent of the pollutant and the period within which these actions should be performed; and
(f) whether part or all of the parcel of land, or land in the vicinity of the parcel of land, is a contaminated site.
(3) An infrastructure owner of a storage system who is required under these regulations to commence an environmental site assessment must ensure that –
(a) the person who carries out the assessment gives to an infrastructure owner of the storage system, within 4 months after the environmental site assessment is commenced, a report (an environmental site assessment report) in relation to all the matters specified in subregulation (2) ; and
(b) the environmental site assessment is managed, and the environmental site assessment report is prepared, by a suitably qualified person; and
(c) the environmental site assessment is carried out and the environmental site assessment report is prepared –