Environment Protection and Biodiversity Conservation (Recovery Plan for the Spiny Rice-flower (Pimelea spinescens subsp. spinescens)) Instrument 2024 | Zoe
Environment Protection and Biodiversity Conservation (Recovery Plan for the Spiny Rice-flower (Pimelea spinescens subsp. spinescens)) Instrument 2024
In ForceCTH
Jurisdiction
Commonwealth
Collection
legislative instrument
Plain English Summary
7/10 complexity
This instrument makes a 10‑year national Recovery Plan for the critically endangered Spiny Rice‑flower under subsection 269A(3) of the EPBC Act. It sets conservation objectives, measurable performance criteria and a schedule of actions — mapping, habitat protection, threat abatement, research, translocation and community engagement — to be delivered by Commonwealth and Victorian agencies, the Recovery Team, local governments, landholders and partners (see 7; Tables 2–4).
Costs and five‑year funding estimates are identified and the Plan must inform Commonwealth assessment of referred actions under s.139 of the EPBC Act (see 7.4, Table 5; 5 Guidance).
This instrument formally adopts a national Recovery Plan for Pimelea spinescens subsp. spinescens (Spiny Rice-flower) as a recovery plan under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act). The instrument is made under subsection 269A(3) of the EPBC Act (see 2.1C Authority) and gives effect to the substantive Recovery Plan document that sets objectives, performance criteria, strategies and detailed actions for a ten‑year period (the Plan’s life, reviewed at five years) to stop decline and support recovery of the Critically Endangered taxon. The instrument records administrative details: name (2.1A), commencement (2.1B - it commences the day after registration), and the making Ministers (signatures dated in the body of the instrument). The Recovery Plan itself replaces the earlier national recovery instrument from 2006 and incorporates the outcomes of reviews (see 2 General information, and 6 Implementation of the first Recovery Plan).
Mechanically, the Plan prescribes:
A long‑term vision and time‑bounded objectives to 2032 (7 Recovery Plan; 1.4 Objective). Those objectives include maintaining or increasing area of occupancy and the number of viable populations, identifying and managing all populations, and increasing community and Traditional Owner participation (1.4 Objective; 7.1 Performance criteria).
Eight specific performance criteria (7.1) that form the Plan’s success metrics, including mapping and surveying milestones (criterion 3: all known records surveyed and mapped in 2028 and every five years thereafter) and a target to increase formally protected populations by at least 10% (criterion 6).
Three strategic streams of action (7.2): Strategy 1 (protect and manage populations and habitats), Strategy 2 (research and knowledge gaps), and Strategy 3 (community/Traditional Owner engagement). Each strategy is elaborated with numbered actions in Tables 2-4 and prioritised with indicative timeframes and five‑year costings in Table 5 (7.4).
Current sections
Direct links to the current provisions in Environment Protection and Biodiversity Conservation (Recovery Plan for the Spiny Rice-flower (Pimelea spinescens subsp. spinescens)) Instrument 2024.
1
Source text: opening excerpt
Sourced from the Federal Register of Legislation (legislation.gov.au), CC BY 4.0.
meta-content-style-type: text/css
meta-content-type: application/xhtml+xml; charset=utf-8
title: Attachment A - National Recovery Plan - Spiny Rice-flower (Pimelea spinescens ssp spinescens)
Environment Protection and Biodiversity Conservation (Recovery Plan for the Spiny Rice-flower (Pimelea spinescens subsp. spinescens)) Instrument 2024
We jointly make this recovery plan under subsection 269A(3) of the Environment Protection and Biodiversity Conservation Act 1999.
Dated 03/03/2024
Tanya Plibersek
Minister for the Environment and Water (Commonwealth)
Dated 22/01/2024
Steve Dimopoulos
Minister for Environment (Victoria)
Minister for Tourism, Sport and Major Events Minister for Outdoor Recreation
2.1A Name
This instrument is the Environment Protection and Biodiversity Conservation (Recovery Plan for the Spiny Rice-flower (Pimelea spinescens subsp. spinescens)) Instrument 2023.
2.1B Commencement
This instrument commences the day after it is registered.
2.1C Authority
This instrument is made under subsection 269A(3) of the Environment Protection and Biodiversity Conservation Act 1999.
Unless otherwise noted, copyright (and any other intellectual property rights) in this publication is owned by the Commonwealth of Australia (referred to as the Commonwealth).
Operational prescriptions and guidance for decision makers on when a development or action may have a “significant impact” requiring referral or approval under the EPBC Act (Section 5 Guidance for decision makers). The Plan cross‑references Commonwealth Significant Impact Guidelines specific to the Spiny Rice‑flower (DEWHA 2009) and highlights specific impact thresholds (for example, loss of more than five individuals, or removal of 40-60% of male plants).
The Plan is an instrument for Commonwealth decision‑making under the EPBC Act and a practical workplan for partner agencies and community groups: it sets obligations for monitoring, mapping, tenure review, management agreements such as Public Authority Management Agreements (PAMAs), covenants and voluntary acquisitions, and prescribes research priorities and community coordination (Tables 2-4; 7.2-7.4). It does not itself create new criminal offences or new statutory property rights; it functions through the EPBC decision framework, existing State mechanisms (e.g. covenants, PAMAs), and funded implementation by named partners (7.5; Table 5).
Main concepts
The Recovery Plan organises the conservation response around a small set of technical concepts and operational priorities derived from the species’ biology and threat profile.
Recovery Plan as EPBC instrument: The document is made under s269A(3) EPBC Act (2.1C). The Plan is therefore an authoritative Commonwealth recovery plan that the Minister must consider in decisions under the EPBC Act (the instrument explicitly notes the effect of s139 in Table 2 Action 1.10). The Plan is to be reviewed within five years and has a ten‑year operational horizon (7.3 Implementation and evaluation; 7.4 Priorities, timeframes and funding).
Performance‑driven objectives and criteria: The Plan sets a ten‑year vision and eight measurable performance criteria (7.1). These criteria include quantitative targets (for example, maintain or increase known viable populations and increase the number of populations with formal protection by at least 10%) and process targets (periodic mapping and incorporation of new ecological knowledge into adaptive management).
Spatial and demographic units: The Plan treats “populations” and “habitat areas” as the fundamental management units. It defines “viable” (within the Plan) as dioecious populations with a minimum of 20 individuals and balanced sex ratio (1.2 Species information), and identifies all known populations (Appendix 1, Map 1) as important. The Plan asserts that “all known habitat for wild and translocated populations is critical to the survival” of the taxon (3.3 Habitat), although it records that no Critical Habitat has been declared under s207A of the EPBC Act (3.3 Habitat Critical).
Threat prioritisation and disturbance ecology: The Plan is organised around an explicit threat matrix (4.3 Table 1). Major threats identified include habitat loss and fragmentation, altered fire regimes (both low fire frequency and fire‑competition interactions), weeds, grazing and climate change effects on recruitment and pollination. The Plan links these threats to management levers: tenure security, targeted burning and biomass reduction, weed and herbivore control, and ex situ seed conservation for translocations (4 Threats; 7.2 Actions).
Hierarchy of mitigation: Avoidance is prioritised as the primary response to impacts, followed by mitigation and, where necessary, offsets consistent with Commonwealth Offsets Policy and the Translocation Policy (Section 5 Guidance for decision makers; 7.5 Interactions with other plans). Translocation is explicitly a last‑resort tool and comes with guidance and a protocol (7.3 and references to Pimelea spinescens Recovery Team translocation protocol 2013).
Implementation partnerships and funding: The Plan allocates roles and potential partners (Recovery Team, DEECA, Trust for Nature, Parks Victoria, CMAs, local governments, Traditional Owners, community groups and research institutions) and provides indicative five‑year costs for priority actions in Table 5 (7.4 and Tables 2-4). It anticipates funding from Commonwealth, State, local government and philanthropic sources (7.4).
Knowledge generation and adaptive management: Strategy 2 and associated actions (Table 3) prioritise filling specific knowledge gaps (seed ecology, fire‑recruitment dynamics, pollinator and dispersal ecology, genetic sampling and PVA integration) and establishing standardised monitoring and a state‑wide database (Actions 2.1-2.3, 1.1 and 1.6).
These concepts structure the Plan’s mechanisms: secure and manage tenure; schedule, test and apply biomass‑reduction regimes (including burning) appropriate to local productivity; obtain and curate demographic, genetic and habitat data; coordinate community and Traditional Owner engagement; and prioritise sites for resource allocation using a conservation prioritisation framework (Action 1.1 and Table 5).
Who it affects
The Recovery Plan lists the direct and indirect stakeholders whose activity or decisions interact with Spiny Rice‑flower populations and habitat. The Plan’s provisions and implementation tasks affect these parties in distinct ways.
Commonwealth decision‑makers: The Minister for the Environment and Water (Commonwealth) is a signatory and will use the Plan in EPBC Act decision‑making. The Plan notes that under section 139 of the EPBC Act, the Minister must not act inconsistently with a recovery plan when deciding on approvals, so Commonwealth referrals and controlled actions in the modelled distribution must be assessed against the Plan (Section 5 Guidance for decision makers; Table 2 Action 1.10).
State government agencies: The Victorian Department of Energy, Environment and Climate Action (DEECA) features as a recovery team member and potential implementer of actions (2.7 Recovery Team; Tables 2-4). State agencies that own or manage land (Parks Victoria, Melbourne Water, Department of Transport and Planning/VicTrack, cemetery trusts) are named partners for management agreements, PAMAs, site controls and prescribed burning (Tables 2, 7.5).
Local government and public authorities: A long list of local councils is identified (2.8 Affected Stakeholders and Appendix 1). Local governments will be asked to implement management plans, participate in PAMAs and manage roadsides and reserves that host many populations. Public authorities responsible for rail corridors and roads (e.g. Australian Rail Track Corporation, Metro Trains Melbourne, VicTrack) are explicitly identified (2.8).
Private landholders and developers: Approximately 20% of individuals occur on private land; large private‑land populations exist where tenure is unsecured (4.2 Habitat loss associated with land tenure; Appendix 1). The Plan’s actions include strategic covenanting (Action 1.3), voluntary acquisition (Action 1.4), and engagement to secure protection, all of which impose transaction and opportunity costs on landholders and public purchasing bodies (7.4 Priorities, timeframes and funding). Developers and landowners proposing works in the modelled distribution are affected by the Plan’s referral guidance and significant‑impact thresholds (Section 5).
Transport, utility and cemetery authorities: Road and rail corridors host many of the species’ remnants; the Plan prioritises PAMAs and operational changes to mowing, slashing and grading regimes (1.5, 1.8, Table 2). Cemeteries are specifically referenced (Truganina Cemetery PAMA example at 3.3 and Appendix 1).
Community groups, NGOs and recovery partners: The Pimelea spinescens Recovery Team (membership listed in 2.7), Pimelea Conservation Trust, Trust for Nature, CMAs, Landcare and local environmental networks are principal implementers of on‑ground actions, monitoring and community engagement (3.7, 6.7, Tables 2-4). The Plan anticipates a coordinator role (Action 3.1) funded and supported by partners (Table 5).
Traditional Owners and Registered Aboriginal Parties: The Plan lists multiple Traditional Language Groups and Registered Aboriginal Parties across the species’ range (2.4). It records an intention to involve Traditional Owners in adaptive management planning and to respect cultural practices (2.6 Consultation; 3.4 Important populations; 7.2 Strategy 3 actions).
Researchers and universities: The Plan requires research partners (Royal Botanic Gardens Victoria, Arthur Rylah Institute, Victoria University) to deliver genetic analyses, PVAs, germination and recruitment studies and monitoring protocols (6.5; 7.2 Strategy 2; Table 3).
Users of public land and local communities: Where reserve management, fencing, signage or access changes are implemented to protect populations there may be changes to recreation, fuel‑management and burial plot availability (7.7 Social and economic impacts).
The Plan affects who pays and who decides. It identifies likely funders (Commonwealth, State, local government, philanthropic trusts) and specifies potential partners for each action (Tables 2-4 and Table 5). It sets out decision points: Commonwealth referral and approval processes (Section 5), state and local land tenure changes and PAMAs (Action 1.5), and voluntary mechanisms such as covenants and acquisitions (Actions 1.3-1.4). The Plan makes clear that much of the on‑ground work is voluntary or subject to negotiation (e.g. covenanting, acquisition), and that the state‑wide database remains incomplete, which affects prioritisation and who will be asked to act first (6.1, 6.2, Action 1.1).
Key duties and rights
This Recovery Plan is not a regulatory code of offences; it functions primarily as a planning instrument under the EPBC Act and prescribes duties, expectations and decision‑making constraints for Commonwealth processes while identifying actions for partners.
Ministerial constraint in EPBC decisions: The Plan records that, under section 139 of the EPBC Act, the Minister must not act inconsistently with an approved recovery plan when deciding whether to approve an action (Table 2 Action 1.10; Section 5 Guidance for decision makers). This creates a legal constraint on Commonwealth approvals: decision‑makers must consider the Plan and avoid decisions that would be inconsistent with its objectives and performance criteria.
Referral duty for proponents: The Plan instructs that development proposals within current and modelled distribution that “will, or are likely, to result in a decline in the national population should be referred to the Commonwealth government for assessment under the EPBC Act” (Section 5 Guidance for decision makers). It lists specific significant impact thresholds to guide referral decisions (for example, any loss of individuals on the edge of known distribution; loss of more than five individuals; removal of 40-60% of male plants). These thresholds are drawn from the Commonwealth’s Significant Impact Guidelines for the species (DEWHA 2009) and are cited in the Plan (Section 5).
Expectation of best‑practice management: The Plan sets out expected management actions for land managers and partners in Strategy 1 (Table 2): surveying, mapping, conservation prioritisation, tenure review, covenanting, acquisition, PAMAs for public land, establishment of site‑specific management plans, implementation of disturbance regimes (including burning), translocations and monitoring. These are framed as actions to be implemented by named partners (local, state and Commonwealth agencies, Recovery Team, TfN, CMAs, Traditional Owners).
Research and monitoring duties: The Plan requires the establishment of standard population monitoring protocols, a state‑wide database, a Monitoring and Research Sub‑committee (Action 2.1), and periodic surveys and mapping (Performance criterion 3: mapping in 2028 and every five years thereafter). Implementation implies obligations on partners to collect, curate and report data.
Rights and use of offsets and translocation: The Plan specifies that where avoidance and mitigation leave residual impacts, proponents must prepare offset proposals consistent with the EPBC Offsets Policy, and translocations used as offsets must be consistent with the EPBC Translocation Policy (Section 5). That creates a procedural pathway (but not an automatic entitlement) for proponents to propose offsets or translocations subject to policy and approval.
No new criminal sanctions in the Plan: The instrument and Plan text do not create new criminal offences nor do they purport to alter state property rights. Where statutory enforcement applies (e.g. criminal offences for taking a listed threatened species under the EPBC Act), the Plan does not change those statutory provisions; it operates within the existing EPBC decision framework (the instrument does not draft new offence provisions).
In short, the Plan creates binding expectations for Commonwealth decision‑makers (via s139), operational duties for recovery partners to implement monitoring, tenure and management actions, and procedural obligations on proponents to refer actions that may have significant impacts and to use avoidance, mitigation and offsets in that order. Parties’ rights to propose development, to negotiate covenants, to seek acquisition or to propose offsets are preserved but are subject to the Plan’s criteria and the applicable EPBC policies (Section 5; 7.5).
Penalties and enforcement
The Recovery Plan itself does not introduce new statutory penalties. Its enforcement and sanctioning effects operate indirectly through the EPBC Act decision framework and existing laws and policies referenced in the Plan.
Ministerial decision constraint (s139): The Plan records that the Minister must not act inconsistently with a recovery plan when making approval decisions under the EPBC Act (Section 5 and Table 2 Action 1.10). That is an enforceable constraint on Commonwealth decision‑makers: failure to give effect to the recovery plan in a decision could expose the decision to administrative review or judicial scrutiny in accordance with the EPBC Act and general administrative law, although the Plan text itself does not detail legal remedies.
Referral and controlled action process: The Plan reiterates the statutory threshold whereby an action is a “controlled action” if it has, will have, or is likely to have a significant impact on matters of national environmental significance (Section 5). For proponents, failing to refer an action that should have been referred, or proceeding in breach of conditions attached to a Commonwealth approval, can engage existing EPBC Act offences and penalty regimes. The Plan does not duplicate or change those offences, but it informs the Commonwealth’s assessment criteria.
Use of PAMAs, covenants and acquisition: The Plan promotes the use of Public Authority Management Agreements (PAMAs), Trust for Nature covenants and voluntary acquisition for tenure security (Actions 1.3-1.5). PAMAs and statutory covenants (where used) create enforceable land management obligations under state law; the Plan supports these mechanisms but does not itself create new statutory enforcement mechanisms.
Offsets and conditions: For approvals that proceed with offsets or conditions, compliance is enforced through Commonwealth approval instruments and the EPBC Act’s compliance and enforcement provisions. The Plan requires offsets to be consistent with EPBC Offsets Policy when deployed to counterbalance residual impacts (Section 5).
On‑ground compliance risk: The Plan highlights implementation risks relevant to enforcement: a substantial proportion of plants occur on unreserved public land, roadsides and rail reserves (about 52% of populations), and on private land with unsecured tenure (4.2). Those land tenures create practical enforcement challenges because management of activities (mowing, slashing, herbicide application, grading) is dispersed among many managers and often driven by non‑conservation objectives. The Plan therefore relies heavily on negotiated instruments (PAMAs, covenants), local management plans, and community engagement to achieve compliance at many sites (Action 1.5, 1.8).
Monitoring and reporting as compliance mechanisms: The Plan embeds monitoring, a state‑wide database and periodic reviews (Actions 1.1, 2.1, 7.3) as tools to identify non‑compliance and to inform remedial action. These are implementation mechanisms rather than statutory penalties.
In short, penalties and enforcement remain those provided under the EPBC Act and applicable state laws; the Recovery Plan operates as an authoritative source for the Commonwealth’s assessment and approval decisions and as a blueprint for negotiated statutory instruments (PAMAs, covenants) and operational compliance by partners. The Plan recognises enforcement limitations posed by land tenure and seeks to manage those by prioritising tenure security and formal agreements (Table 2, Actions 1.2-1.5).
How it interacts with other laws
The Recovery Plan cross‑references, complements and operates within a matrix of Commonwealth policies, EPBC Act processes and Victorian state instruments. It is expressly designed to inform Commonwealth decision‑making under the EPBC Act and to interact with state management frameworks.
EPBC Act processes and policy instruments: The Plan is an EPBC recovery plan made under s269A(3) (2.1C). It explicitly cites the EPBC Offsets Policy and the EPBC Translocation Policy as required frameworks where offsets or translocations are proposed to counterbalance residual impacts (Section 5; 7.5). It also relies on the Commonwealth’s Significant Impact Guidelines for the Spiny Rice‑flower (DEWHA 2009) and the general Significant Impact Guidelines 1.1 (DEWHA 2013) as the operational test for referral and controlled action assessment (Section 5).
Strategic assessments and Melbourne Strategic Assessment (MSA): The Plan identifies the Melbourne Strategic Assessment as the mechanism assessing actions within the MSA boundary (Section 5). It states that actions within MSA must comply with MSA requirements and therefore may not be subject to separate Commonwealth assessment. This interaction means the Plan’s referral guidance is applied differently inside the MSA area, where a landscape‑scale strategic assessment overlays project‑by‑project EPBC referral (Section 5).
State legislation and management mechanisms (Victoria): The Plan parallels and complements Victorian statutory instruments. It cites the Victorian Flora and Fauna Guarantee Act 1988 (FFG Act) listing and action statements (2.2 Conservation status; 7.5). It promotes use of Public Authority Management Agreements (PAMAs) under the FFG Act for public land not amenable to reservation (Action 1.5). It also expects state agencies (DEECA, Parks Victoria, local governments) to implement management plans, covenants and acquisitions,matters primarily controlled by state law and funding.
Planning and development instruments: The Plan anticipates interactions with planning approvals and local government management of roadsides, cemeteries and rail reserves. It requires that referred actions within the modelled distribution are assessed against Recovery Plan content (Table 2 Action 1.10). Where state clearing regulations apply, the Plan notes that exemptions can still lead to loss of populations and calls for strategic covenanting and acquisition to manage tenure risk (4.2 Habitat loss associated with land tenure).
Threat abatement and pest management instruments: The Plan references Commonwealth threat‑abatement instruments, for example the Threat Abatement Plan for competition and land degradation by rabbits (7.5). On‑ground pest controls and rabbit proof fencing projects described in implementation (6.3-6.4) sit alongside these statutory abatement plans.
Protocols and best practice guidelines: The Plan integrates sectoral protocols and guidelines (listed in 7.5). These include the Pimelea spinescens translocation protocol (2013), monitoring protocols, burning recommendations, and national guidelines for plant translocation and germplasm conservation. These documents are not statutory instruments but are treated as operational policy the Plan expects implementers to follow.
International obligations: The Plan notes the Ramsar Convention sites where Spiny Rice‑flower occurs (2.5) and references Australia’s obligations under the Convention on Biological Diversity (CBD). These international commitments are invoked as policy context rather than direct statutory constraints.
The Plan therefore operates as a nexus document: it constrains Commonwealth approval decisions under the EPBC Act, it expects alignment with Commonwealth policies (Offsets, Translocation, Significant Impact Guidelines), and it relies on state law instruments (PAMAs, covenants, reserve designation, planning controls) and implementation by state/local actors. The Plan highlights points of friction: MSA strategic assessment may preclude project‑level Commonwealth assessment in parts of Melbourne (Section 5), and state clearing controls with exemptions mean that some losses may still occur without Commonwealth involvement (4.2), creating an implementation gap the Plan seeks to address through voluntary agreements and prioritised acquisition.
Amendment history
The Recovery Plan replaces the earlier National Recovery Plan for Spiny Rice‑flower (Carter & Walsh 2006) and reflects successive reviews and updates recorded in the Plan text.
Earlier instruments: The first Recovery Plan was in effect under the EPBC Act from 16 December 2006. That plan was reviewed in 2012 and again in 2020/21 by the Commonwealth Department (DCCEEW previously DAWE). The present document states it replaces the 2006 Recovery Plan (2 General information; 2.1 Historical context).
Review process and evidence base: The Plan incorporates lessons from the implementation and review of the first Recovery Plan. The 2019 Recovery Team review (Appendix 2) assessed performance against seven objectives and assigned scores to prior actions. The Plan draws on monitoring, genetic studies (James & Jordan 2014), a PVA developed by Arthur Rylah Institute (Regan et al. 2021), and research such as Reynolds (2013) to inform updated objectives and actions (Sections 6 and 7).
Instrument metadata anomaly: The instrument contains a drafting inconsistency worth flagging: clause 2.1A names the instrument as the Environment Protection and Biodiversity Conservation (Recovery Plan for the Spiny Rice-flower (Pimelea spinescens subsp. spinescens)) Instrument 2023, while the cover and publication metadata (title pages and acknowledgements) and the heading refer to 2024 (see the top pages and the signature dates). The policy text records Ministerial signatures dated 03/03/2024 and 22/01/2024. Clause 2.1B records commencement “the day after it is registered,” so the effective commencement date depends on registration (2.1B). This discrepancy between the instrument name date and the signatory dates is present in the source text and could be a drafting or administrative oversight.
Planned reviews and adaptive amendment: The Plan mandates a five‑year review to assess progress against the performance criteria. The review will determine whether the Plan continues unchanged, is varied, or whether a recovery plan is no longer necessary (7.3 Implementation and evaluation). Table 5 indicates that the priorities and costs will be reassessed at the five‑year review.
Relationship to other policy changes: The Plan explicitly situates itself with existing Commonwealth and Victorian strategies and policies (7.5). Future amendments to those policies, strategic assessments (e.g. expansions to MSA), or EPBC Act reform could alter the Plan’s practical effect, but the present instrument does not itself prescribe mechanisms for amendment beyond the review process described at 7.3.
Record of setbacks and implementation events: The Plan records particular implementation events that have operational consequences and may prompt amendments: for example the private sale and loss of access to a seed orchard established for the species (6.5, Appendix 2), and ongoing incompleteness of the state‑wide database (6.1). These events are documented as implementation risks that the five‑year review may address.
In sum, the Plan is the latest formal recovery plan in a sequence (2006 plan → reviews → 2023/2024 instrument). It contains a stated five‑year review mechanism and is expected to be adapted in light of monitoring, new research, and implementation outcomes. The naming/date mismatch and dependencies on registration date are concrete technical details to watch when determining the instrument’s operative date in practice (2.1A-2.1B).
Litigation history
The Recovery Plan text does not record any litigation or judicial determinations concerning the Plan itself, the species listing, or the Plan’s implementation. The source material includes performance reviews, audits and program evaluations but no references to legal proceedings.
Administrative reviews and audits: The Plan refers to the Victorian Auditor‑General’s Office audit into protecting critically endangered grasslands (VAGO 2020) and to programmatic reviews of the Melbourne Strategic Assessment (MSA). These are administrative oversight instruments rather than litigation (4.2 Habitat loss and fragmentation; 7.5 Interactions).
No cases cited: The source lists many technical reports, academic studies and policy documents (References), but it does not identify any judicial decisions, merits review proceedings or litigation involving the Recovery Plan or specific Commonwealth approvals tied to Spiny Rice‑flower that have produced binding case law. The document does not cite any legal challenges to EPBC decisions referencing the species, nor does Appendix 2 or the implementation review record court actions.
Implications for practitioners: Because the Plan is silent on litigation history, practitioners should assume there is no established litigation precedent set out in the Plan text. The Plan does, however, set out explicit decision‑making constraints for Commonwealth ministers (section 139 referral) and operational thresholds that are likely to inform administrative decisions and could be invoked in merit or judicial review proceedings in future. If a party is considering litigation or facing enforcement, the Plan will be an authoritative policy document relevant to judicial review of administrative decisions under the EPBC Act, although the document itself does not describe any litigation outcomes.
Where to look next: The Plan’s references (7.5) and the EPBC Act records on the Department’s website and the Register of Environmental Management Instruments would be the primary places to check for any related litigation or review history outside the Plan text, but the instrument as provided contains no litigation history.
Gotchas
The Plan contains a number of implementation, legal and drafting features that create risks, constraints or decision‑points for lawyers, planners, and implementers. These are concrete items drawn from the source text.
Instrument naming and date inconsistency: Clause 2.1A names the instrument “Instrument 2023” while the document cover and signatory dates refer to 2024 (signatures dated 22/01/2024 and 03/03/2024). Commencement is “the day after it is registered” (2.1B). Practitioners should verify the registration date to determine the effective commencement, and be aware that the instrument name and dating differ in the published text.
No Critical Habitat declaration: The Plan states that “No Critical Habitat as defined under section 207A of the EPBC Act has been identified or included in the Register of Critical Habitat” (3.3 Habitat critical). The Plan nonetheless treats all known habitat as “critical to survival” for planning and management. This means that the stronger statutory instrument of a declared Critical Habitat (s207A) is not used; protection therefore relies on EPBC decision processes, PAMAs, covenants and acquisitions rather than a Critical Habitat register entry.
Reliance on voluntary and negotiated instruments: A large number of the Plan’s protective measures depend on voluntary covenants, strategic acquisitions, PAMAs or local management agreements (Actions 1.3-1.5). Those mechanisms depend on willing participants and funding. Table 5 provides indicative five‑year costs (e.g. $800,000 for covenanting program, $1,000,000 for voluntary acquisition), but the Plan acknowledges funding is not guaranteed and implementation is contingent on partners (7.4). The plan therefore relies on soft law and negotiated outcomes for tenure security.
Incomplete state‑wide database: The Plan repeatedly records the state‑wide database is incomplete and of variable accuracy (6.1, Appendix 2). That gap impairs prioritisation, formal protection decisions, assessment of “critical habitat” and accurate referral thresholds. Practitioners must treat site lists and counts as provisional and confirm current records before relying on them in assessments or approvals.
Management burden on many land managers: Approximately 52% of individuals are on unreserved public land (roadsides and rail reserves) and 20% on private land (4.2). Management responsibility is therefore distributed across many public authorities and private landholders, increasing transaction costs and raising enforcement and coordination risk.
MSA strategic assessment carve‑out: Actions within the Melbourne Strategic Assessment area are to be assessed under MSA arrangements and may not be referred as individual controlled actions to the Commonwealth (Section 5). This creates two regulatory streams within the species’ range and can complicate consistency of management across the range.
Clear significant impact thresholds: The Plan reproduces numeric thresholds from the Significant Impact Guidelines that proponents and assessors should treat as likely to represent significant impacts: e.g. loss of more than five individuals or removal of between 40-60% of male plants (Section 5). These specific thresholds are concrete referral triggers but are scientifically framed rather than statutory rigidities; nevertheless they will meaningfully shape Commonwealth assessments.
Fire regime trade‑offs and timing sensitivities: The Plan highlights that fire is both a tool and a risk: appropriate periodic biomass reduction (burning) can stimulate germination, create inter‑tussock space and aid recruitment, but the timing, intensity and frequency are critical (3.1 Fire ecology; Regan et al. 2021). Too frequent or inappropriately timed burning can reduce reproduction or facilitate weed invasion. Managers must operationalise fire prescriptions carefully and align them with local productivity (Action 1.6, Pimelea spinescens Recovery Team burning guidelines).
Translocation as last resort, with technical risk: The Plan treats translocation as last resort and records variable past success (Biosis 2014 review found average survival 33%; translocation performance sensitive to root damage and method) (6.3). Where translocations are proposed as offsets they must comply with EPBC Translocation Policy and best practice protocols (Section 5 and 7.5).
Seed orchard and ex‑situ sample vulnerability: The Plan documents a seed orchard created for propagation that later became inaccessible after private sale and a payment demand (Appendix 2). This is a concrete risk to ex situ capacity and suggests that ex situ actions reliant on private land or unsecured holdings have a vulnerability to access loss.
Funding and prioritisation assumptions: Table 5 itemises indicative five‑year costs and prioritisation ratings, but the Plan notes these will be reassessed at five years and assumes partners absorb core costs (7.4). Funding gaps are an implementation risk; cost figures are estimates and not funding commitments.
Cross‑jurisdictional complexity: Implementation requires alignment between Commonwealth policy, Victorian statutory instruments (e.g. PAMAs, FFG Act obligations) and local practice. Overlapping jurisdictions create coordination risk, particularly where land managers have non‑conservation mandates (road safety, rail maintenance, cemetery needs).
These “gotchas” are operational and legal realities documented in the Plan. They identify where the Plan’s stated objectives will encounter real‑world constraints and where additional legal, administrative or funding steps will be required to translate the Plan into on‑ground protection.
How to comply
This section sets out practical, source‑grounded steps for proponents, land managers, local authorities and lawyers who must comply with the Recovery Plan’s expectations and with the EPBC Act decision framework as described in the Plan.
Confirm distribution and database records before action
Check the state‑wide database and local records identified in the Plan and Appendix 1. The Plan notes the database is incomplete and many populations require updated surveys (6.1; Action 1.1). Before acting, proponents and assessors should commission flowering‑season surveys using the Recovery Team’s monitoring protocol (Action 2.2; 6.5) to verify presence, population size and sex structure.
Apply the EPBC referral test using the Plan’s thresholds
Use the specific “significant impact” guidance cited in the Plan (Section 5). Refer to the Commonwealth Significant Impact Guidelines for the species (DEWHA 2009) when deciding whether to refer. The Plan identifies concrete thresholds likely to be significant: any loss of individuals at an edge population, the loss of more than five individuals, removal of 40-60% of male plants, or any fragmentation that isolates patches (Section 5 Guidance for decision makers). If a proposed action meets or likely meets those thresholds, refer under the EPBC Act.
Prioritise avoidance, then mitigation, then offsets consistent with policy
The Plan states avoidance should be primary, followed by mitigation and then offsets consistent with the EPBC Offsets Policy (Section 5). If offsets are proposed, any translocations used as offsets must align with the EPBC Translocation Policy (Section 5). Prepare offset proposals in advance of approval applications.
Use the Plan’s management prescriptions and protocols
For management activities, adopt site‑specific management plans endorsed by the Recovery Team where available (Action 1.8, Table 2). Follow the Pimelea spinescens translocation protocol (2013), the monitoring protocol (2014), the seed collection protocol (2018), and the burning recommendations (Pimelea spinescens Recovery Team documents referenced in 7.5).
Secure tenure or formal management agreements where possible
For populations on private land or unreserved public land, pursue covenants, PAMAs or voluntary acquisition (Actions 1.2-1.5). The Plan offers potential partners (TfN, Parks Victoria, local councils) and provides indicative costs and priorities in Table 5. Where land cannot be reserved, establish PAMAs to lock in management obligations (Action 1.5).
Coordinate with the Recovery Team and Traditional Owners
Engage the Pimelea spinescens Recovery Team and Pimelea Conservation Trust early (2.7, 6.7). The Plan anticipates a coordinator role (Action 3.1) and expects Traditional Owner involvement in planning and implementation (3.2-3.3). Use the Monitoring and Research Sub‑committee and Recovery Team to align protocols and obtain technical guidance (Action 2.1).
Design and implement appropriate disturbance regimes
For sites requiring biomass reduction to promote recruitment, adopt the Plan’s recommended burning intervals and seasons as a starting point (Pimelea spinescens Recovery Team burning guidance referenced; 3.1 Fire ecology). The Plan suggests at least one biomass reduction within three years in many contexts, but frequency should be matched to site productivity and local conditions (Action 1.6; 3.1 Fire ecology). Ensure native vegetation surveys by qualified botanists are done before fire control line preparation (see 3.1 Fire ecology).
For translocations and ex‑situ work, follow genetic and sourcing guidance
When using seed or plants for translocation or augmentation, follow the genetic sourcing guidance: source from multiple plants, mix material within but not between northern and southern clines, and treat Victorian Riverina populations separately (3.1 Genetics). Consult James & Jordan (2014) findings cited in the Plan and the Plan’s recommendations for within‑60 km sourcing where appropriate (3.1 Genetics).
Establish monitoring and reporting obligations
Implement standard monitoring protocols and populate the state‑wide database (Actions 1.1, 2.2). Ensure censuses are conducted during flowering season and sex structure is recorded as required by the Plan (Action 2.2). Prepare to contribute data for the five‑year review and for incorporation into the PVA (6.6, 7.3).
Consider social, economic and planning trade‑offs early
Be prepared to demonstrate how proposed activities avoid impacts on high‑priority populations and how mitigation (including PAMAs, covenants, offsets) will be implemented and funded (7.7 Social and economic impacts; Table 5 indicative costs). Where projects fall within the Melbourne Strategic Assessment area, confirm compliance with MSA requirements and whether separate Commonwealth referral is excluded (Section 5).
Document decisions and adaptive management
Keep records of avoidance measures tried, mitigation implemented, monitoring outcomes and adaptive adjustments. The Plan anticipates adaptive management and contains explicit performance criteria (7.1). Those records will be essential for Commonwealth decision‑makers applying s139 and for future reviews of the Plan.
Budget for ongoing management
The Plan provides indicative five‑year costs (Table 5) for core actions. Recognise that many actions require continuing expenditure (e.g. weed control, burning, monitoring, covenant administration). Funding must be identified early and responsibilities assigned among partners.
In practice, compliance is a coordinated mix of procedural steps (referral decisions, habitat surveys, mapping), negotiated instruments (covenants, PAMAs, acquisitions), technical implementation (fire prescriptions, weed and rabbit control, translocation protocols), and data capture (monitoring and the state‑wide database). The Plan provides the substantive guidance and lists partners; compliance requires translating those actions into funded, time‑bounded, and monitored projects that align with Commonwealth policies cited in the Plan (Section 5; 7.5).
Inquiries about the licence and any use of this document should be emailed to copyright@dcceew.gov.au.
Cataloguing data
This publication (and any material sourced from it) should be attributed as: DCCEEW 2024, National Recovery Plan for the Spiny Rice-flower Pimelea spinescens subspecies spinescens, Department of Climate Change, Energy, the Environment and Water, Canberra, October. CC BY 4.0.
Department of Climate Change, Energy, the Environment and Water
GPO Box 3090 Canberra ACT 2601
Telephone 1800 803 772
Web DCCEEW.gov.au
Disclaimer
The Australian Government acting through the Department of Climate Change, Energy, the Environment and Water has exercised due care and skill in preparing and compiling the information and data in this publication. Notwithstanding, the Department of Climate Change, Energy, the Environment and Water, its employees and advisers disclaim all liability, including liability for negligence and for any loss, damage, injury, expense or cost incurred by any person as a result of accessing, using or relying on any of the information or data in this publication to the maximum extent permitted by law.
Acknowledgements
This Recovery Plan benefited from the input of many individuals and agencies, especially the following: Debbie Reynolds – Pimelea Conservation Officer, Trust for Nature; Vanessa Craigie – DEECA; Doug Robinson – Trust for Nature; Steve Mueck – Biosis Pty Ltd; Liz James – Royal Botanic Gardens Melbourne; Neville Walsh – Royal Botanic Gardens Melbourne; Megan O’Shea – Victoria University; Paul Foreman – Blue Devil Consulting; Chris Lindorff – Trust for Nature; Deanna Marshall – Trust for Nature; Libby Woodward – Trust for Nature; Ben Thomas – DEECA; Simon Cropper – Botanicus Australia Pty Ltd; and the Pimelea spinescens Recovery Team.
The preparation of this plan was funded by the Commonwealth Government.
Acknowledgement of Country
We acknowledge the Traditional Custodians of Australia and their continuing connection to land and sea, waters, environment and community. We pay our respects to the Traditional Custodians of the lands we live and work on, their culture, and their Elders past and present.
Table 1 Threats impacting the Spiny Rice-flower......................................27
Table 2 Actions to ensure all Spiny Rice-flower populations and habitat are adequately protected and managed (Strategy 1).......41
Table 3 Actions to address knowledge gaps to better inform adaptive management plans for the Spiny Rice-flower (Strategy 2).......45
Table 4 Actions to support community-based collaboration for the recovery of Spiny Rice-flower (Strategy 3).......48
Table 5 Priorities, actions, timeframes, estimated costs for Spiny Rice-flower recovery within the 5-year reviewa.......51
Table 6 Threatened Ecological Communities (TECs) known and likely supporting the Spiny Rice-flower56
Figures
Figure 1 A contrasting phenotype of male (left) and female plant (right), both in flowering stage. Male plants bear more showy flowers than female (see Figure 2 for flower close-up).......9
Figure 2 Flowers of Spiny Rice-flower. Left–female inflorescence, Middle–male inflorescence, Right–hermaphroditic individual bearing seeds and male flowers.......10
Figure 3 Conceptual model of the timing of ecological processes including the effect of fire across seasons.......11
Figure 4 Spiny Rice-flower hosts various invertebrate species, including insects that are important as its pollination vector.......13
Figure 5 Left-Spiny Rice-flower root formation. Right-close up of tap root and underground stem formation of a mature Spiny Rice-flower ......14
Figure 6 Conceptual life-stage model for Spiny Rice-flower..............................16
Figure 7 Prescribed burning at Pioneer Park conducted with Brimbank Council and contractors in attendance.......34
Figure 8 Left–The Recovery Team and Mt Korong Eco-Watch Association conducted population monitoring. Right– Supplementary planting and population monitoring at Skipton Common supported by Glenelg Hopkins CMA, Ballarat Environment Network, Pimelea Conservation Trust, Skipton Primary school, Wadawurrung Traditional Owners Aboriginal Corporation, Field Naturalist’s Club Balarat and the Snake Valley CFA Brigade. Spiny Rice-flower recovery is part of the Glenelg Hopkins CMA’s Victorian Volcanic Plain Recovery Project.......35
Figure 9 Collecting seeds from multiple populations for supplemental planting. Using seeds from different populations help promote genetic diversity within the often isolated and small remnant populations.......36
Figure 10 Spiny Rice-flower translocation. Top–A tree spade mounted on a tractor is used to extract plant to minimise root damage. Bottom–When the recipient site and salvage site are in a close distant, individual plant is transplanted directly after extraction.......38
Figure 11 Spiny Rice-flower plant growing in its grasslands habitat.........................55
Maps
Map 1 Spiny Rice-flower Distribution Map..........................................21
1 Summary
1.1 Conservation status
Pimelea spinescens subsp. spinescens (Spiny Rice-flower) is listed as Critically Endangered under the Commonwealth Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) effective from 1 May 2003 (TSSC 2003).
Spiny Rice-flower is listed as Critically Endangered under the Victorian Flora and Fauna Guarantee Act 1988 (FFG Act) (DELWP 2021).
1.2 Species information
Spiny Rice-flower is a sub-shrub endemic to grasslands and grassy woodlands in western and northern Victoria. In 2022, it is known from more than 325 wild populations containing a total of 70,000 to 90,000 mature individuals. Most populations are restricted to small, isolated grassland habitat on roadsides and railway lines in highly fragmented landscapes (DELWP 2021). The term ‘viable’ is defined within the recovery plan to describe dioecious populations consisting of a minimum of 20 individuals with half of each sex.
1.3 Threats
Principal threats to Spiny Rice-flower include the loss and fragmentation of habitats through clearing for urban and agricultural development, as well as habitat degradation induced by competition from both native and exotic plants. Fire regimes that cause declines in biodiversity, and prolonged drought have also contributed to the species decline (TSSC 2003; DELWP 2021). Overgrazing by livestock, in some sites, is deemed as a large threat to the subspecies (TSSC 2003).
1.4 Recovery Plan objectives, performance criteria, and actions
Objective
The long-term vision for Spiny Rice-flower recovery is to ensure Spiny Rice-flower can survive, flourish and retain its potential for evolutionary development in the wild through the continuation of threat abatement that maintains and/or enhances viable in situ populations.
This Recovery Plan sets out actions that will ensure significant progress towards achieving this vision.
The objectives over the 10-year life of this Recovery Plan (by 2032) are to:
Maintain or increase positive trend in the area of occupancy.
Maintain or increase the number of viable populations (compared to 2021/22 baseline counts).
Identify, manage and protect all populations of the Spiny Rice-flower from key threats to ensure its persistence.
Maintain and enhance community and institutional support.
Performance criteria
This Recovery Plan will be deemed successful if, by 2033, all the following criteria have been achieved:
The number of known viable 2021/22 populations (both wild and translocated) has been maintained or increased from 2021/22 baseline counts.
The number of individuals in each population has been maintained or increased from 2021/22 baseline counts.
All known population records are surveyed and accurately and mapped in 2028 and every 5 years thereafter.
All known populations are identified, protected and managed to support recovery.
The area of occupancy of Spiny Rice-flower has increased through the establishment and protection of new viable populations.
The number of populations subject to formal protection measures has increased by at least 10%.
Knowledge of Spiny Rice-flower ecology, recruitment and seedling survivorship, genetic variation, and ecological requirements has increased, and this information has been incorporated into the adaptive management plans.
Participation in recovery planning and actions by key stakeholders and Traditional Owners has increased.
Recovery actions
The recovery actions are outlined in Table 2, Table 3, and Table 4 (see 7.3 Recovery Actions). The actions are categorised in 3 main strategies:
Strategy 1: Protecting and managing all populations and habitats.
Strategy 2: Increasing knowledge of reproductive ecology, population and habitat extent, and disturbance ecology and incorporate this knowledge into adaptive management plans.
Strategy 3: Increasing community awareness and involvement and support for land managers, community and Traditional Owners to include adaptive habitat management in their work supporting the recovery of Spiny Rice-flower.
2 General information
This document constitutes the National Recovery Plan for the Critically Endangered Spiny Rice-flower (Pimelea spinescens subsp. spinescens). The plan identifies the research and management actions necessary to stop the decline of, and support the recovery of, the species so that its chances of long-term survival in nature are maximised. This Recovery Plan replaces the previous National Recovery Plan for the Spiny Rice-flower (Carter & Walsh 2006).
2.1 Historical context
The first Recovery Plan, in effect under the EPBC Act from 16 December 2006, was reviewed in 2012 and in 2020/21 by the Commonwealth Department of Climate Change, Energy, Environment and Water (DCCEEW, previously the Department of Agriculture, Water and the Environment (DAWE)) with the support of the Pimelea spinescens Recovery Team. Considerable achievements have b
This is an opening excerpt, not the complete document.