Energy Pipelines Act 1981
21CApplication to vary licence area
Start here
Get a plain-English read of 21C
Turn the raw legal text into a practical explanation grounded in Energy Pipelines Act 1981.
21C Application to vary licence area (1) An application under section 21A for the Minister to vary the licence area made after construction of the pipeline had been completed shall be accompanied by: (a) details of the proposed variation describing the area it is proposed should remain subject to the licence; and (b) the fee prescribed by regulation. (2) The Minister shall not vary a licence as a result of an application referred to in subsection (1) except to accurately reflect the route of the pipeline on completion of construction and to reduce the licence area but so that, except where the Minister is satisfied that the exigencies of the case so require, the licence area is not in any place narrower than 25 m having as its centreline an imaginary line connecting markers erected in accordance with section 39(a) or directions given under section 40.