Energy (Infrastructure Facilitation) Regulation 2024
sec.25AER must accept and include Powerlink’s second period adjustment for third period if s 24 applies
Start here
Get a plain-English read of sec.25
Turn the raw legal text into a practical explanation grounded in Energy (Infrastructure Facilitation) Regulation 2024.
sec.25 AER must accept and include Powerlink’s second period adjustment for third period if s 24 applies
This section applies if— Powerlink’s application made in compliance with a primary PTI allowance direction mentioned in section 18 includes the forecast capital expenditure for the third period as mentioned in section 24 (2) ; and a second period adjustment is included in Powerlink’s revenue proposal for the third period under section 24 . The AER must— accept the second period adjustment in its final decision for Powerlink’s transmission determination for the third period; and include the expenditure in the capital expenditure in the revenue determination for Powerlink for the third period. s 25 ins 2024 SL No. 105 s 6 (sec.25-ssec.1) This section applies if— Powerlink’s application made in compliance with a primary PTI allowance direction mentioned in section 18 includes the forecast capital expenditure for the third period as mentioned in section 24 (2) ; and a second period adjustment is included in Powerlink’s revenue proposal for the third period under section 24 . (sec.25-ssec.2) The AER must— accept the second period adjustment in its final decision for Powerlink’s transmission determination for the third period; and include the expenditure in the capital expenditure in the revenue determination for Powerlink for the third period.
- (a) Powerlink’s application made in compliance with a primary PTI allowance direction mentioned in section 18 includes the forecast capital expenditure for the third period as mentioned in section 24 (2) ; and
- (b) a second period adjustment is included in Powerlink’s revenue proposal for the third period under section 24 .
- (a) accept the second period adjustment in its final decision for Powerlink’s transmission determination for the third period; and
- (b) include the expenditure in the capital expenditure in the revenue determination for Powerlink for the third period.