Electricity Supply (Corrosion Protection) Regulation 2020
5Operation of corrosion protection systems requires approval
Start here
Get a plain-English read of 5
Turn the raw legal text into a practical explanation grounded in Electricity Supply (Corrosion Protection) Regulation 2020.
5 Operation of corrosion protection systems requires approval
5 Operation of corrosion protection systems requires approval
(1) A person must not operate a corrosion protection system unless the system is the subject of an approval and is operated in accordance with the approval.
Maximum penalty—
(a) for a corporation—200 penalty units, or
(b) for an individual—50 penalty units.
(2) This clause does not apply to a person operating a corrosion protection system—
(a) for the purpose of testing it, but only for not more than a total of 24 hours after completion of—
(i) the installation or extension of the system, or
(ii) maintenance or repairs carried out on the system, or
(b) with the written consent of the Secretary.